Att_1_Specifications.pdf
PDF 46 KB Posted
- Attached to
- LAVO - INSTALL VIDEO SURVEILLANCE CAMERAS Federal contract opportunity
- Solicitation number
- 140P8424Q0119
About this file
This document is an Attachment 1 - Specifications & Statement of Work for RFQ No. 140P8424Q0119 issued by the National Park Service (NPS) at Lassen Volcanic National Park (LAVO) in California.
The requirement includes inspecting, testing, troubleshooting, repairing, and replacing the existing video surveillance systems in 9 buildings. The contractor must also supply and install two new high-resolution color dome cameras that are compatible with the existing monitoring software and systems. The new cameras must meet current federal IT security standards and be able to capture color images during the day and switch to infrared during low/no light conditions.
The contractor will provide an initial systems orientation/training for park staff. Evaluation for award will be made in accordance with simplified acquisition procedures under FAR Part 13. This is a small business set-aside with a NAICS code of 238210 and a $19 million size standard. Quotations are due by the date/time specified in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8424Q0119.pdf | ||
| Att_4_WD_15-5675.pdf | ||
| Att_5_-_Full_Text_Provisions.pdf | ||
| Att_3_WD_15-5627.pdf | ||
| Att_2_Surveillance_System_Inventory.xlsx | XLSX spreadsheet | |
| Att_6_Experience___Past_Performance_Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1, RFQ No. 140P8424Q0119
SPECIFICATIONS & STATEMENT OF WORK
VIDEO SURVEILLANCE SYSTEM SERVICE AND CAMERA INSTALLATION
LASSEN VOLCANIC NATIONAL PARK
1.0 INTRODUCTION:
The National Park Service (NPS) at Lassen Volcanic National Park (LAVO) has a requirement for the inspection and servicing of several video surveillance systems. Also required is the supply and installation of two new cameras that will be strategically placed for specific Federally regulated and required monitoring services within the park’s main Headquarters Building #1 location.
1.1 INSPECTION, TESTING, & REPAIR
The Contractor shall inspect, test, troubleshoot, repair, and/or replace (as necessary) the existing video surveillance systems. The Contractor shall also provide systems tuning and focusing of the systems identified in the attached inventory (attachment 2) to ensure accuracy and imagery are captured in full, low and no light conditions. For any deficiencies identified, the Contractor shall develop and submit an itemized quote to the Contracting Officer. No repairs or parts replacement shall be performed without the verbal or written approval of the Contracting Officer. A separate purchase order for repairs and/or parts will be issued.
1.2 INSTALL TWO NEW VIDEO SURVEILLANCE CAMERAS
Contractor-supplied cameras must be compatible with existing monitoring software and systems.
The interior cameras procured and installed must be of high resolution and must meet current Federal Standards for IT Security. To remain consistent with the current inventory, new cameras shall be automatic Color Dome Cameras assembled and tested as a manufactured unit, containing a dome assembly, color camera and receiver/driver. This requirement is necessary for structural monitoring systems where motorized pan, tilt, and zoom lens may be required. The new cameras must be able to capture digital color images during daylight hours and automatically switch over to infrared illumination during low and no-light hours to remain consistent with the park’s inventory.
The Contractor shall connect the cameras to the existing HQ DVR. See attachment 2 for description.
The cameras shall be Arecont Surveillance Cameras- AV05CID-200 / 5 Megapixel (MP) H.265/H.264 All-in-One 2.7–13.5mm F1.4 Motorized Lens True Day/Night Indoor Dome IP Camera with SNAPstream+™ (Smart Noise Adaptation and Processing), Enhanced WDR™ (Wide Dynamic Range), NightView™, Smart IR, and Video Analytics (or Equivalent).
Video samples for new installations for all lighting conditions must be provided to the Park’s assigned Contracting Officers Representative (COR) upon installation for final approval. The Contractor will provide an initial systems orientation / training to applicable park staff.
File details come from the government source that posted it. Updated .