Att_1_Specifications.pdf
PDF 300 KB Posted
- Attached to
- REDW Felling Head Attachment Federal contract opportunity
- Solicitation number
- 140P8424Q0062
About this file
This document is an Attachment 1 - Specifications for a Directional Felling Head Saw required under Request for Quotation (RFQ) No. 140P8424Q0062 issued by the National Park Service (NPS) at Redwood National Park (REDW).
The Directional Felling Head Saw must meet the following specifications: be rated for a 30-ton excavator, have a minimum grapple opening of 40", minimum bar length of 42", minimum motor size of 45cc, minimum bar oil capacity of 8 gallons, maximum weight of 4,000 lbs, compatible with a DX225 Doosan pin grabber style quick coupler, and have 360 continuous rotation. The contractor must provide machine setup on a Doosan DX225 excavator, which REDW will deliver to the contractor's facility within 500 miles of Crescent City, California. This is a total small business set-aside procurement, and award will be made to the responsible quoter whose quote is most advantageous to the Government, price and other factors considered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_2_Full_Text_Provisions.pdf | ||
| Sol_140P8424Q0062.pdf | ||
| Att_3_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. 140P8424Q0062 A achment 1
SPECIFICATIONS
DIRECTIONAL FELLING HEAD SAW
Must be rated for a 30-ton excavator.
Minimum grapple opening of 40” Minimum bar length of 42” Minimum motor size of 45cc Minimum bar oil capacity 8 gal Maximum weight of 4,000 lbs.
Supply quick coupler hanger compa ble with DX225 Doosan pin grabber style.
Must have 360 con nuous rota on.
Provide machine setup on Doosan DX225 excavator. REDW will deliver the excavator to the Contractor’s facility for installa on within 500 miles of Crescent City, California.
Otherwise, the Contractor will need to deliver and install at REDW. No facili es are available at REDW for the installa on.
File details come from the government source that posted it. Updated .