ATT 05_Volume II_HTRO Self-Scoring Worksheet.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California Federal contract opportunity
- Solicitation number
- FA4610-24-R-0012
About this file
This document is a Self-Scoring Worksheet related to a federal contract opportunity for a Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California. The worksheet provides instructions and a scoring system for offerors to self-evaluate their relevant experience, number of design-build projects, experience with complex projects, staffing, bonding capacity, and contractor license type.
The federal contract opportunity, solicitation number FA4610-24-R-0012, is for the Western-Range Operational Ordering Contract for Infrastructure Enhancement (WOOKIE) MACC. The MACC will provide a vehicle for maintenance, repair, and new construction of buildings, facilities, or base infrastructure at Vandenberg SFB and remote locations. The award is anticipated to be an 8(a) competitive set-aside limited to 8(a) firms in NAICS code 236220, with up to five IDIQ contracts for a 5-year base period plus options. The NAICS code is 236220 with a $45M size standard. The acquisition will be conducted under FAR Parts 15 and 36.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATT 02_Volume I_Executive Summary Sheet.docx | DOCX document | |
| Draft Solicitation - FA461024R0012.pdf | ||
| ATT 01_SOW_20241003.pdf | ||
| ATT 04_ Volume II_Project Category Definitions.pdf | ||
| ATT 03_Volume I_Price Proposal Template.xlsx | XLSX spreadsheet | |
| ATT 06_Volume II_Relevant Experience Project Template.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Scoring Worksheet
| SELF-SCORING WORKSHEET | Lists | Number Projects | Bonding | ||||||
| OFFEROR NAME: [FILL IN OFFEROR NAME HERE] | YES | 0 | $25M | ||||||
| Note: See Solicitation FA461024R0012 Sections L and M for Additional Information | NO | 1 | $25M - $50M | ||||||
| Note: Offerors only fill in the orange shaded blocks throughout. Offerors shall not alter any other rows, columns, or forumlas within the Self-Scoring Worksheet. | 2 | Over $50M | |||||||
| 3 | |||||||||
| Evaluation Criteria Section | Category | Point Value | Select the appropriate response for each question as applicable | Offeror's Self-Score | 4 | ||||
| Section L Paragraph L-2 Subparagraph 2.2.1.6 | I. Relevant Experience Projects (max 3 projects per category/30 projects maximum): | 5 | |||||||
| 1. Erosion Stabilization (e.g. landslide repair, sinkhole remediation, 24"+ culvert repair) | 6 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 7 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 8 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 9 | ||||||
| 2. Electrical Distribution and/or Transmission Lines (e.g. electrical lines from 12kV to 70kV) | 10 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 11 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 12 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 13 | ||||||
| 3. Asbestos Abatement, Hazardous Material, and/or Lead-Based Paint Abatement (In California) (incidental is acceptable) | 14 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 15 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 16 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 17 | ||||||
| 4. Blast resistant windows, Active Vehicle Barriers, Traffic Check Houses, and/or Entry Control Points (for Federal Facilities) | 18 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 19 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 20 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 21 | ||||||
| 5. General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades) | 22 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 23 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 24 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 25 | ||||||
| 6. Fire Suppresion, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation | 26 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 27 | ||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 28 | ||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | 29 | ||||||
| 7. Electrical System Repair, Replacement, Upgrade, or Installation including Electrical Generation and/or Switchgear | 30 | ||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| 8. Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units; Repair, Replacement, Upgrade, or Installation | |||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| 9. Secured Room Construction in accordance with ICD 705 Specifications | |||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| 10. Special Interest Project (Environmental, Cultural, etc) (California or Federal Standards) (Incidental is allowed) | |||||||||
| Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume] | 1000 | 0 | |||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.6 ONLY: | 30,000 | 0 | |||||||
| Section L Paragraph L-2 Subparagraph 2.2.1.8 | II. Number of Design-Build Projects as Prime Contractor: | ||||||||
| In California | 125 per project | 0 | |||||||
| In Santa Barbara County | 100 per project | 0 | |||||||
| With Santa Barbara County Air Pollution Control District | 100 per project | 0 | |||||||
| CONUS/HI/AK US Military Bases | 300 per project | 0 | |||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.8 ONLY: | 18,750 | 0 | |||||||
| Section L Paragraph L-2 Subparagraph 2.2.1.9 | III. Experience in Complex Projects: | ||||||||
| With 5 or more tasks | 200 | 0 | |||||||
| With 4 tasks | 100 | 0 | |||||||
| With 3 tasks | 300 | 0 | |||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.9 ONLY (Category will be capped at 15,000 points): | 15,000 | 0 | |||||||
| Section L Paragraph L-2 Subparagraph 2.2.1.10 | IV. Staffing: | ||||||||
| Number of incumbent qualified Project Managers | 250 per (750 max) | 0 | |||||||
| Number of incumbent qualified Superintendents | 250 per (1,500 max) | 0 | |||||||
| Number of incumbent qualified Quality Control Managers | 250 per (1,500 max) | 0 | |||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.10 ONLY: | 3,750 | 0 | |||||||
| Section L Paragraph L-2 Subparagraph | |||||||||
| 2.2.1.11 | V. Contractor has an Aggregate Bonding Capacity of: | ||||||||
| Equal to $60M but less than $90M | 1,250 | 0 | |||||||
| Equal to or Greater Than $90M but less than $120M | 2,500 | ||||||||
| Equal to or Greater Than $120M | 3,750 | ||||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.11 ONLY: | 3,750 | 0 | |||||||
| Section L Paragraph L-2 Subparagraph | |||||||||
| 2.2.1.12 | VI. Contractor has a California General Contractor's License: | ||||||||
| Type A | 1,875 | 0 | |||||||
| Type B | 1,875 | 0 | |||||||
| SUBTOTAL SCORE FOR SECTION L PARAGRAPH L-2 SUBPARAGRAPH 2.2.1.12 ONLY: | 3,750 | 0 | |||||||
| TOTAL POINTS SCORED: | 75,000 | 0 |
FA461024R0012
Attachment 05_Volume II_HTRO Self-Scoring Worksheet
File details come from the government source that posted it. Updated .