Att 03_FR321 x UNT Kinzua Creek Construction Plans_260624.pdf

PDF 3 MB Posted

Attached to
FR 321 Kinzua Creek AOP Replacement Federal contract opportunity
Solicitation number
12445526Q0084
Issued by
Department of Agriculture Forest Service

About this file

This is a Design Document for a culvert replacement project prepared by the United States Department of Agriculture Forest Service. The project involves replacing an existing 42" x 50" x 45' corrugated metal pipe arch (CMPA) culvert with a proposed 128" x 83" x 44' CMPA at Station 145+80 on Forest Road (FR) 321 where it crosses an unnamed tributary to Kinzua Creek, located on the Allegheny National Forest, Bradford Ranger District, in McKean County, Pennsylvania (R09 Eastern Region).

The design includes comprehensive construction specifications and details across five sheets: a cover sheet with project location maps, a plan view showing the culvert alignment, road and stream profiles, detailed cross-sections and inlet/outlet protection configurations, and a dewatering plan. Key construction elements include stream channel reconstruction using limestone 3A modified material and riprap, installation of multiple grade control structures (seven total) at specified stations to maintain stream stability, bank stabilization using R4 and R5 riprap, and creation of a defined low-flow thalweg with a bankfull width of 7.3 feet. The project requires dewatering of the work area using bypass pumps, sandbag cofferdams, filter bags, and compost filter socks. Estimated project materials include 128 tons of 3A modified streambed material, 70 tons of R4 riprap, 131 tons of R5 riprap, and native stone with a 21-ton scour pool backfill component. The design was prepared by C. Howard and checked by W. Printup, with approval noted from Robert Klasen (Forest Supervisor) on 4/13 (date year not specified).

View the file

Other files for this federal contract opportunity

Other files attached to FR 321 Kinzua Creek AOP Replacement, newest first.
File Type Posted
Q and A_12445526Q0084.docx DOCX document
FR321 Road Surface.jpg JPG image
FR321 Crossing Photos.pdf PDF
Att 01_Schedule of Items_260714.docx DOCX document
Amd_0001_12445526Q0084.pdf PDF
Q and A_12445526Q0084.docx DOCX document
SOL_12445526Q0084.pdf PDF
Att 01_Schedule of Items_260629.docx DOCX document
Att 04_Wage Rates_260518.pdf PDF
HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf PDF
Att 02_Statement of Work_260624.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

SHEET OF

United States Department of Agriculture Forest Service

01 05

FR 321 CULVERT REPLACEMENT

RECOMMENDED BY:

APPROVED:

DESIGN ENGINEER

DISTRICT RANGER DATE

DATE

FOREST ENGINEER DATE

FOREST SUPERVISOR DATE

RO FACILITIES PROGRAM MANAGER DATE

5/3 /23

:3

6 C

HO

W

AR

D C:

\U

SE

RS

\A

DA

MD

EL

AN

EY

\B

OX

\09

T

RA

VE

LM

AN

AG

EM

EN

T\

R0 9 A

NF

T

RA

VE

L

MG

MT

\77

DE

VE

LO

PM

EN

T\

_R

OA

DS

TR

UC

TU

RE

S\

CU

LV

ER

TS

\D

ES

IG

NS

\F

R3

_U

NT

K

IN

ZU

A

CR

EE

K\

FR

1 C

UL

VE

RT

R

EP

LA

CE

ME

NT

C

OV

ER

.D W

G;

PENNSYLVANIA

MCKEAN COUNTY

(R09) EASTERN REGION

ALLEGHENY NATIONAL FOREST

BRADFORD RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVER SHEET

2 PLAN VIEW FR 321 x UNT TO KINZUA CREEK

3 ROAD-STREAM PROFILES

4 DETAILS AND SECTIONS

5 DEWATERING PLAN

VICINITY MAP

CULVERT

LOCATION

STATION 145+80

G G G G G

-0+71

-0 +5

0+00

0+50

1+00

1+14

5+

5+

6+

6+

6+

GROUND

TRAFFIC SIDE

TYPICAL TYPE 3 OBJECT MARKER PLACEMENT-G6-1

SCALE: 1" = 2'-0"

NOTE:

STRIPES SLOPE DOWNWARD TOWARD THE

SIDE OF THE OBSTRUCTION ON WHICH

TRAFFIC IS TO PASS.

EDGE OF

TRAVELED WAY

ROADWAY

8'-0" OR LESS

4' -0

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 4/2

6 1 5:

A

DA

MD

EL

AN

EY

C

:\U

SE

RS

\A

DA

MD

EL

AN

EY

\B

OX

\09

T

RA

VE

LM

AN

AG

EM

EN

T\

R0 9 A

NF

T

RA

VE

L

MG

MT

\77

DE

VE

LO

PM

EN

T\

_R

OA

DS

TR

UC

TU

RE

S\

CU

LV

ER

TS

\D

ES

IG

NS

\F

R3

_U

NT

K

IN

ZU

A

CR

EE

K\

CO

NT

RA

CT

D

OC

UM

EN

TS

\F R

1 X

U

NT

A

OP

3.

.20

E

DI

TS

.D

W G;

(R09)

EASTERN REGION

FR 321 x UNT TO

KINZUA CREEK

CULVERT

REPLACEMENT

ALLEGHENY NATIONAL

FOREST

BRADFORD RANGER DISTRICT

FR 321 x KINZUA CREEK

CULVERT REPLACEMENT

PLAN

03/02/2026

C.HOWARD

C.HOWARD

W. PRINTUP

C-01 2 5

UNT TO

KINZUA CREEK

FL

O

W

FL

O

W

CONTROL POINT#1

EL. 99.38

CONTROL POINT #2

EL. 89.52

PROPOSED 128" x 83" x 44' CMPA

CAUTION: OGM MARKERS ON

BOTH SIDES OF STREAM.

CROSSING ELEVATION TO BE

VERIFIED WITH OWNER.

GENERAL NOTES:

1. CONTRACTOR TO COMPLETE PENNSYLVANIA ONE CALL PRIOR TO EXCAVATION (800) 242-1776

2. FOREST SERVICE TO OBTAIN GP-7 PERMIT FOR WORK IN STREAM.

3. CONTRACTOR TO NOTIFY FOREST SERVICE TWO WEEKS PRIOR TO START OF CONSTRUCTION TO

COORDINATE RELOCATION OF AQUATIC SPECIES PRIOR TO DE-WATERING SITE.

4. SITE SURVEY COMPLETED BY FOREST SERVICE. SUPPLEMENTAL LONGITUDINAL PROFILE SURVEY

COLLECTED BY FOREST SERVICE. SURVEY IS NOT TIED TO A KNOWN CORRIDOR SURVEY, DATUM IS

ASSUMED.

5. IN-STREAM GRADE CONTROLS AND BANK STABILIZATION STRUCTURES ARE APPROXIMATED AND SHOULD BE FIT IN THE FIELD UNDER THE GUIDANCE OF AN INSPECTOR EXPERIENCED WITH THEIR

CONSTRUCTION.

6. STREAM CHANNEL RECONSTRUCTION SHALL INCLUDE A DEFINE LOW-FLOW THALWEG AND

BANKFULL WIDTH OF 7.3 FT. SEE TYPICAL DETAILS.

CONSTRUCT "TYPE 1" GRADE CONTROL STA -0+24

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS BOTH SIDES

CONSTRUCT "TYPE 1" GRADE CONTROL STA 0+56

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS BOTH SIDES

CONSTRUCT GRADE CONTROL STA 0+80

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS BOTH SIDES

Feet 0 10 20

3'-0" MIN.

3'-0" MIN.

3'-0" MIN.

3'-0" MIN.

GC-1

GC-3

GC-4

GC-5

GC-7

LEGEND

GRADE CONTROL NUMBER

SURVEY CONTROL POINT

3A MODIFIED STREAMBED MATERIAL

EXISTING PIPE

PROPOSED CMPA

GC-#

ESTIMATED PROJECT MATERIALS AND QUANTITIES

GC-2

GC-6

CONSTRUCT "TYPE 1" GRADE CONTROL STA -0+12

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS BOTH SIDES

CONSTRUCT "TYPE 1" GRADE CONTROL STA 0+00

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS 3 FT MIN. BOTH SIDES

CONSTRUCT "TYPE 1" GRADE CONTROL STA 0+44

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS 3 FT MIN. BOTH SIDES

EXISTING 42" x 50" x 45'

CMPA TO BE REMOVED

FR 321

CONSTRUCT "TYPE 1" GRADE CONTROL STA 0+68

USING NATIVE STONE, R4, AND R5 RIPRAP.

KEY INTO BANKS BOTH SIDES

BACKFILL SCOUR POOL

WITH 21 TONS OF

3A MODIFIED, R4,

AND R5 RIPRAP

CONSTRUCT STREAM BANKS

WITH R4 AND R5 RIPRAP

CONSTRUCT STREAM BANKS

WITH R4 AND R5 RIPRAP

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

UNT TO KINZUA CREEK ALIGNMENT PROFILE

ST

A

-0

+2 3.

B

EG

IN

U N

T

TO

K

IN

ZU

A

C R

EE

K

AL

IG

N M

EN

T

EL

2.

8'

ST

A.

+8

0.

E N

D U

N T

TO

K

IN

ZU

A C

R

EE

K

AL

IG

N

M

EN

T

EL

.5

-7.00%

STA 0+20.00

ELEV 90.28

STA 0+20.00

ELEV 87.70

STA 0+56.00

ELEV 87.17

-0+75

.0

.6

-0+50

.9

.8

.7

.5

.4

.8

.7

0+00

.5

.0

.4

.3

.5

.6

.3

.9

.9

.2

0+50

.5

.5

.9

.8

.4

.1

.0

.4

.9

1+00

.4

.6

1+20

STA 0+43.86

ELEV 86.02

STA 0+00.00

ELEV 89.09

BACKFILL SCOUR POOL

WITH 21 TONS OF

3A MODIFIED, R4,

AND R5 RIPRAP

CONSTRUCT "TYPE 1" GRADE CONTROL

USING NATIVE STONE, R4, AND R5 RIPRAP

CONSTRUCT "TYPE 1" GRADE

CONTROL USING NATIVE STONE, R4,

AND R5 RIPRAP

CONSTRUCT "TYPE 1" GRADE CONTROL

USING NATIVE STONE, R4, AND R5 RIPRAP

STA 0+68.00

ELEV 86.33CONSTRUCT "TYPE 1" GRADE CONTROL

USING NATIVE STONE, R4, AND R5 RIPRAP

STA -0+12.00

ELEV 91.93

EL

EV

AT

IO

N (F

EE

T)

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

FR 321 ALIGNMENT PROFILE

-3.67% 1.57%

ST

A

5+

.8

BE

G

IN

F

R

A

LI

G

N M

EN

T

EL

.5

ST

A.

+5 2.

E

N D

F R

A

LI

G N

M

EN

T

EL

0.

0'

PVI STA: 145+87.87

PVI ELEV: 98.96

LVC: 100.00

VC

S

TA

: 1

+3

7.

VC

E

LE

V:

.7

VC

S

TA

: 1

+3

7.

VC

E

LE

V:

9.

LP STA: 146+07.95

LP ELEV: 99.51

145+10

1.

1.

1.

1.

0.

0.

145+50

0.

0.

0.

0.

.8

.8

.5

.7

.4

.5

146+00

.2

.5

.3

.5

.4

.5

.6

.6

.7

.7

146+50

.9

.9

146+60

FINISHED ROAD FILLLIMESTONE DSA

STA 145+80.00

ELEV 90.28STA 145+80.00

ELEV 87.70

STA 145+79.10

ELEV 95.05

STA 145+80.00

ELEV 99.72

STA 145+80.00

ELEV 100.22

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 4/2

6 1 5:

A

DA

MD

EL

AN

EY

C

:\U

SE

RS

\A

DA

MD

EL

AN

EY

\B

OX

\09

T

RA

VE

LM

AN

AG

EM

EN

T\

R0 9 A

NF

T

RA

VE

L

MG

MT

\77

DE

VE

LO

PM

EN

T\

_R

OA

DS

TR

UC

TU

RE

S\

CU

LV

ER

TS

\D

ES

IG

NS

\F

R3

_U

NT

K

IN

ZU

A

CR

EE

K\

CO

NT

RA

CT

D

OC

UM

EN

TS

\F R

1 X

U

NT

A

OP

3.

.20

E

DI

TS

.D

W G;

(R09)

EASTERN REGION

FR 321 x UNT TO

KINZUA CREEK

CULVERT

REPLACEMENT

ALLEGHENY NATIONAL

FOREST

BRADFORD RANGER DISTRICT

FR 321 x KINZUA CREEK

CULVERT REPLACEMENT

PROFILES

03/02/2026

C.HOWARD

C.HOWARD

W. PRINTUP

C-02 3 5

EXISTING 42" x 50" x 46' CMPA

PROPOSED 128" x 83" x 44' CMPA

EXISTING GROUND EL. PROPOSED STREAMBED EL.

NOTE: PROPOSED STREAMBED EL. SHOWN

BOTTOM OF PIPE EL. OFFSET 2.0 FT

REMOVE 0.33 CY

SEDIMENT WEDGE.

TO BE RE-USED ON SITE

EXISTING GROUND EL. PROPOSED ROAD BASE EL.

APPLY 6" LIMESTONE

DSA STA 142+80 - 148+80

PROPOSED ROADWAY BACKFILL

EXISTING ROADWAY

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

7'

4" 7'

4"

7'

4" 7'

4"

7'

4" 7'

4"

CONSTRUCT 15"-18" BANKS

USING R4 AND R5 RIPRAP

CHOKE VOIDS WITH 3A MODIFIED

CONSTRUCT 15"-18" BANKS

USING R4 AND R5 RIPRAP

CHOKE VOIDS WITH 3A MODIFIED

7'-0" - 7'-6"

3' -6

" M

IN

1' -6

" M

IN

2'

-0 " M

IN

INVERT

ELEVATION

2' -0

" M

IN

2'

-0 " M

IN

2' -0

" M

IN

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 4/2

6 1 5:

A

DA

MD

EL

AN

EY

C

:\U

SE

RS

\A

DA

MD

EL

AN

EY

\B

OX

\09

T

RA

VE

LM

AN

AG

EM

EN

T\

R0 9 A

NF

T

RA

VE

L

MG

MT

\77

DE

VE

LO

PM

EN

T\

_R

OA

DS

TR

UC

TU

RE

S\

CU

LV

ER

TS

\D

ES

IG

NS

\F

R3

_U

NT

K

IN

ZU

A

CR

EE

K\

CO

NT

RA

CT

D

OC

UM

EN

TS

\F R

1 X

U

NT

A

OP

3.

.20

E

DI

TS

.D

W G;

(R09)

EASTERN REGION

FR 321 x UNT TO

KINZUA CREEK

CULVERT

REPLACEMENT

ALLEGHENY NATIONAL

FOREST

BRADFORD RANGER DISTRICT

FR 321 x KINZUA CREEK

CULVERT REPLACEMENT

DETAILS AND SECTIONS

03/02/2026

C.HOWARD

C.HOWARD

W. PRINTUP

C-03 4 5

STA 0+00

STA 0+07.33

STA 0+14.66

STA 0+22.00

STA 0+29.33

STA 0+36.66

STA 0+44.00

CULVERT INLET

"TYPE 1"

GRADE CONTROL

"TYPE 2"

GRADE CONTROL

"TYPE 3"

GRADE CONTROL

CULVERT OUTLET

"TYPE 1"

GRADE CONTROL

"TYPE 2"

GRADE CONTROL

"TYPE 3"

GRADE CONTROL

"TYPE 2"

GRADE CONTROL

"TYPE 1" GRADE CONTROL

INLET AND OUTLET PROTECTION

"TYPE 2" GRADE CONTROL

"TYPE 3" GRADE CONTROL

SECTION A-A

STREAM SIMULATION PLAN

SECTION A-A

CONSTRUCT 15"-18" BANKS

USING R4 AND R5 RIPRAP

SIMULATE STREAMBED USING

LIMESTONE 3A MODIFIED. DEPTH = 2.0 FT TYP.

WITH RANDOMLY PLACED R4

CONSTRUCT GRADE CONTROL

RIBS USING R5 RIPRAP

USE 2 LAYERS FOR STABILITY

CONSTRUCT LOW-FLOW THALWEG

TIE GRADE CONTROL

RIBS INTO BANKS

CONSTRUCT GRADE CONTROL

RIBS USING R4 RIPRAP

USE TWO LAYERS FOR STABILITY.

CONSTRUCT LOW-FLOW THALWEG

TIE GRADE CONTROL

RIBS INTO BANKS

CONSTRUCT INLET AND OUTLET

PROTECTION USING R4 AND R5 RIPRAP

AND ON-SITE NATIVE STONE

RANDOMLY PLACE R4

RIPRAP BETWEEN RIBS

FLO

W

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

G G G G G

-0+71

-0 +5

0+00

0+50

1+00

1+14

5+

5+

6+

6+

6+

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 4/2

6 1 5:

A

DA

MD

EL

AN

EY

C

:\U

SE

RS

\A

DA

MD

EL

AN

EY

\B

OX

\09

T

RA

VE

LM

AN

AG

EM

EN

T\

R0 9 A

NF

T

RA

VE

L

MG

MT

\77

DE

VE

LO

PM

EN

T\

_R

OA

DS

TR

UC

TU

RE

S\

CU

LV

ER

TS

\D

ES

IG

NS

\F

R3

_U

NT

K

IN

ZU

A

CR

EE

K\

CO

NT

RA

CT

D

OC

UM

EN

TS

\F R

1 X

U

NT

A

OP

3.

.20

E

DI

TS

.D

W G;

(R09)

EASTERN REGION

FR 321 x UNT TO

KINZUA CREEK

CULVERT

REPLACEMENT

ALLEGHENY NATIONAL

FOREST

BRADFORD RANGER DISTRICT

FR 321 x KINZUA CREEK

CULVERT REPLACEMENT

DEWATERING PLAN

03/02/2026

C.HOWARD

C.HOWARD

W. PRINTUP

E-01 5 5

SANDBAG COFFERDAM

OR SIMILAR

BYPASS PUMP

FILTER BAG

12" COMPOST FILTER SOCK

STOCKPILE

AREA

DISTURBANCE AREA = 0.15 ACRES

Feet 0 10 20

CONSTRUCTION NOTES:

1. EROSION AND SEDIMENTATION CONTROLS (E&SC)

1.1 ALL REQUIRED E&S MEASURES MUST BE IMPLEMENTED AND FULLY FUNCTIONAL PRIOR TO ANY

CLEARING, GRUBBING, OR EARTHWORK ASSOCIATED WITH THIS PROJECT.

1.2 ALL ACTIVITIES ASSOCIATED WITH REMOVAL OF THE EXISTING CULVERT AND INSTALLATION OF THE

REPLACEMENT CULVERT STRUCTURE MUST BE DONE IN A

DE-WATERED CONDITION. CONTRACTOR WILL BE REQUIRED TO FOLLOW THE DE-WATERING PLAN

PROVIDED ON SHEET 5 OF 5.

1.3 CONTRACTOR WILL BE REQUIRED TO MEET ALL POST-CONSTRUCTION STABILIZATION MEASURES, INCLUDING SEEDING AND MULCHING REQUIREMENTS, PER PROJECT E&S PLAN

1.4 ONCE THE DE-WATERING MEASURES HAVE BEEN INSTALLED AND ARE OPERATIONAL, CONSTRUCTION

OF THE PROJECT MUST BE COMPLETED IN A CONTINUOUS AND EXPEDIENT MANNER, BOTH TO

REDUCE THE RISK OF EROSION AND SEDIMENTATION AND TO MINIMIZE IMPACT TO THE STREAM

RESOURCE.

2. EXCAVATION

2.1 EXCAVATION OF THE ROADWAY AND EMBANKMENT SHOULD BE MINIMIZED TO THE WIDTH

NECESSARY TO PLACE THE STRUCTURE AND MAINTAINING OSHA GUIDELINES FOR EXCAVATION

SAFETY.

2.2 OVER-EXCAVATE THE BOTTOM OF THE CUT A MINIMUM DEPTH OF 6" FOR PLACEMENT OF A

FOUNDATION BED OF PA 2A STONE UPON WHICH TO CONSTRUCT THE PLATE INVERT AT ELEVATIONS AND SLOPE PROVIDED IN THIS PLAN SET. IF WET OR SOFT SOILS ARE ENCOUNTERED, INCREASE

THICKNESS OF THE BED TO PROVIDE A SUITABLE FOUNDATION.

2.3 NATIVE MATERIALS SHOULD BE EVALUATED BY THE CONSTRUCTION SUPERVISOR TO DETERMINE SUITABILITY FOR RE-USE IN CONSTRUCTION OF THE STREAMBED. MATERIALS SUITABLE FOR THIS PURPOSE WILL BE STOCKPILED ONSITE. UNSUITABLE CUT MATERIALS WILL BE DISPOSED OF IN AN

APPROVED LOCATION PER THE PROJECT E&S PLAN.

3. CULVERT INSTALLATION

3.1 THE STRUCTURE WILL BE INSTALLED AT THE INLET (89.09') AND OUTLET (86.02') INVERT ELEVATIONS AND INSTALLATION SLOPE (7.0%). RECONSTRUCTED STREAMBED (STA -0+24 TO 0+80) WILL BE CONSTRUCTED AT THE PROFILES, ELEVATIONS AND CROSS-SECTIONS PROVIDED IN THIS PLAN.

3.2 CULVERT INSTALLATION MUST COMPLY WITH ALL SHOP DRAWINGS AND SPECIFICATIONS AS PROVIDED BY THE CULVERT MANUFACTURER / VENDOR, INCLUDING THOSE GOVERNING BACKFILL AROUND THE CULVERT WITH SUFFICIENT FINES TO ALLOW FOR COMPACTION. BACKFILL MUST BE PLACED IN LIFTS NO GREATER THAN 6” DEPTH AND COMPACTED PRIOR TO PLACEMENT OF THE NEXT

LIFT OVER TOP.

4. STREAM CHANNEL RECONSTRUCTION

4.1 MATERIAL FOR RECONSTRUCTION OF THE STREAMBED WILL BE COMPRISED OF LIMESTONE 3A

MODIFIED WITH RANDOMLY PLACED R4 STONE. AT THE DIRECTION OF THE CONSTRUCTION

SUPERVISOR, SUITABLE NATIVE MATERIAL OBTAINED DURING EXCAVATION OF THE CUT WILL BE ADDED TO THE AGGREGATE . THE AGGREGATE WILL BE WELL-MIXED OUTSIDE OF THE CUT BEFORE

BEING PLACED IN THE STREAMBED OR CULVERT.

4.2 THE CONTRACTOR WILL BE REQUIRED TO IDENTIFY A SUITABLE METHOD AND NECESSARY EQUIPMENT, LABOR ETC. FOR PLACING AND RECONSTRUCTING THE STREAMBED INSIDE THE STRUCTURE (MAX.

AVAILABLE RISE INSIDE OF THE CULVERT PRIOR TO PLACING FILL IS 6'-11").

4.3 PROPER INSTALLATION OF A CONSTRUCTED RIFFLES FOR GRADE CONTROL ARE CRITICAL TO THE LONG-TERM PERFORMANCE AND SUCCESS OF THIS PROJECT. INSTALL AT LOCATIONS AND ELEVATIONS INDICATED IN THIS PLAN, AND REFERENCE THE DETAIL DRAWINGS PROVIDED. INSTALLATION OF ALL

IN-STREAM STRUCTURES INCLUDING GRADE CONTROLS AND IN-STREAM HABITAT STRUCTURES

SHOULD OCCUR UNDER THE DIRECT GUIDANCE OF A CONSTRUCTION SUPERVISOR EXPERIENCED IN

THEIR INSTALLATION AND INTENDED PURPOSE. PROPER CONSTRUCTION OF IN-STREAM ROCK

STRUCTURES IS GREATLY AIDED BY USE OF AN EXCAVATOR LARGE ENOUGH TO EASILY HANDLE THE

SIZE OF ROCKS PRESCRIBED, WITH A HYDRAULIC THUMB ATTACHED SO THAT ROCKS CAN BE

INDIVIDUALLY PLACED.

4.4 RECONSTRUCTED PORTIONS OF THE STREAMBED MUST MAINTAIN THE BANKFULL CHANNEL WIDTH OF ~7.3 FT THROUGH ENTIRE LENGTH OF RECONSTRUCTED STREAM CHANNEL, INCLUDING INSIDE THE

CULVERT. THE FINISHED RECONSTRUCTED STREAMBED MUST PROVIDE A LOW-FLOW CHANNEL

(THALWEG) AS SHOWN ON THE CULVERT DETAIL IN THIS PLAN.

LEGEND

LIMIT OF DISTURBANCE

SURVEY CONTROL POINT

3A MODIFIED STREAMBED MATERIAL

EXISTING PIPE

PROPOSED CMPA

BYPASS

PUMP

TEMPORARY ROCK

ENERGY DISSIPATER

HOSES AND PLUMBING

HOSES AND PLUMBING

12" COMPOST FILTER SOCK

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
FR 321 Culvert Replacement Cover-COVERSHEET
OLE1
FR 321 x UNT AOP 3.19.2026 edits-Plan
OLE1
FR 321 x UNT AOP 3.19.2026 edits-Road-Steam Profiles
OLE1
FR 321 x UNT AOP 3.19.2026 edits-Details and Sections 1
OLE1
FR 321 x UNT AOP 3.19.2026 edits-Dewatering Plan
OLE1
FR 321 Culvert Replacement Cover-PLOT
OLE1
2026-04-13T16:28:21-0400
CHASE HOWARD
2026-04-14T14:32:28-0400
RICHARD HATFIELD
2026-04-14T14:48:04-0400
ROBERT HEIAR
2026-04-13T16:31:58-0400
ROBERT KLASEN
Date6_af_date: 4/13/26
Date7_af_date:
Date8_af_date:
Date9_af_date:
Date10_af_date:

File details come from the government source that posted it. Updated .