About this file
This is a Statement of Work for the FR18 ERFO Road Project, a construction contract to address drainage problems resulting from the May 2023 flood event on the Monongahela National Forest. The project scope includes removing existing culverts, installing one new culvert with a hardened stream crossing, constructing specification ditches, grading the road, constructing a hardened broad base dip to ensure positive drainage, and constructing headwalls as detailed in project plans. The contractor must provide all labor, supervision, tools, equipment, transportation, supplies (unless otherwise specified), permits, licenses, and incidentals necessary to complete the work.
The related solicitation (12445526Q0098) is issued by the Department of Agriculture Forest Service as a Request for Quotation under a Total Small Business Set-Aside. The applicable industry classification is 237310 (Highway, Street, and Bridge Construction) with a small business size standard of $45,000,000. This combined solicitation follows FAR Parts 12 and 36 for commercial construction and permits all responsible sources to submit quotations, though the award will be restricted to small business concerns.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att 01_Schedule of Items_260713.docx | DOCX document | |
| Att 04_Map_260629.png | PNG image | |
| HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf | ||
| Sol_12445526Q0098.pdf | ||
| Att 03_FR18 ERFO Road Drainage Project Plans_260603.pdf | ||
| Att 05_Wage Rates_260518.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FR18 ERFO ROAD PROJECT
The purpose of this contract is to fix drainage problem areas due to the2023 May flood event. The project shall consist of removing culverts, installing 1 new culvert and hardened stream crossing, construct spec ditches, grade road, and construct hardened broad base dip for positive drainage, and construct head walls as specified in plans.
The Contractor shall furnish all labor, supervision, tools, equipment, transportation, supplies (unless otherwise designated), permits, licenses and incidentals necessary to perform the required services on the Monongahela National Forest.