Att 02 (DRAFT dtd 01JUL2023) - Warehouse Photographs.pdf
PDF 3 MB Posted
- Attached to
- Consequence Management Support Center - DRAFT Solicitation for Industry Day and Synopsis
- Solicitation number
- W9133L24R3801
About this file
This document contains photographs of the Consequence Management Support Center Building 415 and related federal contract opportunity. The photographs depict the interior and exterior areas of the building including the main entrance, hallways, conference rooms, training rooms, break rooms, analytical labs, maintenance bays, warehouse storage areas, loading docks, and vehicle storage areas.
The related federal contract opportunity is a draft pre-solicitation notice from the Department of the Army National Guard Readiness Center seeking industry input for a potential requirement to provide unspecified support services at the Consequence Management Support Center. Responses are requested by August 15, 2023 to assist in requirements development for a future solicitation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Consequence Management Support Center
CoMSupCen
Building 415
As of 01 June 2023
DRAFT
CoMSupCen Main Entrance
Building Right Front
Right Side
Building Left Front
1A1 Bay (Front Doors & Left Side)
Lobby
Conference Rooms Layout (4)
Entry Hallway
Front Left Hallway
Rear Hallway
Training Rooms (2)
Breakroom (Right Side)
Breakroom (Left Side)
Warehouse Hallway
Analytical Lab # 1 (Left Room)
Analytical Lab # 2 (Left Room)
Analytical Lab (Right Room)
Maintenance Bay – Right Side
Maintenance Bay – Left Side
Open Training Area in Warehouse
Open Training Area in Warehouse
Maintenance Bay
HD/SE & Medical Storage Cages
Rear Aisle in Warehouse from Med Cage
General Storage Areas in Warehouse
Front Aisle in Warehouse
Central Work Area in Warehouse
Central Work Area in Warehouse
Front Aisle in Warehouse (Loading Dock Doors)
FAST Packages Area in Warehouse
1A1 Bay
New 1A1 Bay (Left Side)
New 1A1 Bay (Right Side)
Motor Pool & Vehicle Storage Areas
Loading Docks
Building Rear
1A1 Bay (Rear Doors)
1A1 Bay (Rear Doors & Left Side)
Loading Ramps & Training Area
Loading Ramps
| Slide 1 |
| Slide 2 |
| Slide 3 |
| Slide 4 |
| Slide 5 |
| Slide 6 |
| Slide 7 |
| Slide 8 |
| Slide 9 |
| Slide 10 |
| Slide 11 |
| Slide 12 |
| Slide 13 |
| Slide 14 |
| Slide 15 |
| Slide 16 |
| Slide 17 |
| Slide 18 |
| Slide 19 |
| Slide 20 |
| Slide 21 |
| Slide 22 |
| Slide 23 |
| Slide 24 |
| Slide 25 |
| Slide 26 |
| Slide 27 |
| Slide 28 |
| Slide 29 |
| Slide 30 |
| Slide 31 |
| Slide 32 |
| Slide 33 |
| Slide 34 |
| Slide 35 |
| Slide 36 |
| Slide 37 |
| Slide 38 |
| Slide 39 |
| Slide 40 |
| Slide 41 |
| Slide 42 |
| Slide 43 |
File details come from the government source that posted it. Updated .