Att_02_140P8623Q0083_SOW.pdf

PDF 596 KB Posted

Attached to
GOGA MUWO WATERLINE VALVE SERVICE
Solicitation number
140P8623Q0083
Issued by

About this file

This statement of work outlines inspection, servicing, and modification requirements for a pressure reducing valve that supplies water to Muir Woods National Monument. The scope of work includes a visual inspection, rebuild of the main valve rubber kit, installation of a stainless steel pilot, and installation of a properly sized bypass valve for low flows. A National Park Service utilities mechanic must observe all work, which must be performed by a certified technician and is expected to be completed within one day of the water shutdown. The location is provided as the upper valve system at Muir Woods National Monument on private Tourist Club property. The related federal contract opportunity is solicitation number 140P8623Q0083 for valve servicing work issued by the National Park Service Pacific West Region.

View the file

Other files

File Type Posted
Sol_140P8623Q0083_Amd_0001.pdf PDF
140P8623Q0083_0001.docx DOCX document
Att_03_140P8623Q0083_SCA_Wages.pdf PDF
Att_05_140P8623Q0083_Exp_and_PP_Form.pdf PDF
Att_04_140P8623Q0083_Reps_and_Certs.pdf PDF
Sol_140P8623Q0083.pdf PDF
Att_01_140P8623Q0083_Quote_Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Valve Servicing, Muir Woods Water Line

1.0 Background

In 2022, the park completed a new waterline to service Muir Woods National Monument. This statement of work is to for additional servicing and modification to the existing valve which includes installation of a bypass to reduce wear on the valve during low flows.

2.0 Scope

The work shall include inspection, servicing, and modification of the existing Cla-Val 90- 01 pressure reducing valve with KO trim.

3.0 Objectives

The objective of this contract is the installation of a bypass that will reduce wear on the valve during low flows. The valve system serves the waterline that supplies domestic water and firefighting water to Muir Woods National Monument.

4.0 Tasks

Inspection shall include a visual inspection of the exterior and interior of the valve system. Service shall include rebuild of main valve rubber kit and install of stainless-steel pilot. Modification includes this install of properly sized CRD-L bypass for low flows. All work must be performed by a technician certified by Cla-Val to perform service on Cla-Val equipment.

Upon completion, the work area shall be left clean of debris and trash associated with the work. The pressure reducing valve shall be set for proper pressures to adequately protect the downstream water line and valve system. The next pressure reducing valve is approximately 380 feet lower in elevation.

There shall be no additional charges for removal and/or disposal of materials.

5.0 Delivery

• See “Tasks” for work to be delivered.

• Work is expected to be completed within 1 days of work and should be completed as soon as possible following award. The water shutdown for servicing must be coordinated with the Contracting Officer’s Representative and Contracting Office.

6.0 Government-Furnished Property

N/A

7.0 Security

A National Park Service utilities mechanic must be on scene for the shutdown, to observe service and modification of the valve, and for placing the valve back in service.

8.0 Place of Performance

The project is on the upper valve system at Muir Woods National Monument. The valve system is located on private property (Tourist Club property). Coordinates are 37.89736, -122.57051. See attached map for the approximate location of the valve to be serviced.

Photos are included below in Appendix A.

9.0 Period of Performance

The work is expected to be completed within one day and as soon as can be scheduled after contract award.

Appendix A: Photos

Ridge Rd.

Pacific Ocean

North

STINSON BEACH

Mt. Home

Mt. Tamalpais State Park

Muir Woods Visitor Center

Middle Green Gulch (bicycles uphill only)

Muir Beach Overlook

Slide Ranch

Bootjack

To East Peak of Mt. Tam

MILL VALLEY

Camp Eastwood Trail

Dead End

Steep Ravine

Muir Beach

Muir Woods National

Monument

Pantoll Ranger Station

Tourist Club (private)

To Hwy 101

HOMESTEAD

VALLEY

Zen Center-Green Gulch Farm

Troop 80 Trail

Bootjack Trail

S ierra Trail

Panoramic Hig h way

T.C.C . Tr ai l

Ben Johnson Trail

Deer Park

Dipsea Trail

Fire Road

Dipsea Trail

Highway 1

Dipsea Tr ail

Steep R avin e Tr ai l

Lo ne Tre e Fire Road

Pa noramic Highway

Fern Creek

Sta p el veldt

O ld

M ine

Coastal View Trail

Plevi n Cu t

O cean

Vie w Trail

Lost Trail

Panoram ic

Trail

A lic e Ea st woo d

Ro ad

Railroad G rade

O ld

St ag e Fi re Ro ad

Panoram ic Highw ayR edw ood Trail

S un Trail

Dipsea Trail

Muir Woods Road

Middle Green Gulch

Dias Ridge Fi re Ro ad

Redwoo d

Cr ee k Trail

Heather Cutoff

Fra nk Valley Muir Woods

Road

Miwok

Tr ail

Hig hw ay

Highway 1

Gr ee n Gulch Trail

Coyote Ridge Trail

Coastal Trail

Dipsea Tra il

A lp in e

Tra il

O w l Trail

H illside

Trail

Muir Woods Trail Map Muir Woods National Monument Golden Gate National Recreation Area

National Park Service U.S. Department of the Interior

1 Mile

1 Kilometer

Horses Allowed

Hikers Only

Horses & Bikes Allowed

Public Parking

Picnic Area

Camping

Dogs Permitted on Leash

Paved Road

Trail Use Key

Accessible Paved Trail

SMcConnico Highlight

A04 Valve Service SOW updated 2023 8 14.pdf
Muir Woods Trail Map.pdf

File details come from the government source that posted it. Updated .