Att 02_140P8420Q0107_SOW.pdf
PDF 2 MB Posted
- Attached to
- Inverness Ridge Chipping Project, NPS-PORE Federal contract opportunity
- Solicitation number
- 140P8420Q0107
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8420Q0107_Amd_0001.pdf | ||
| Att 04_140P8420Q0107_Technical Info Form.pdf | ||
| Att 03_140P8420Q0107_SCA Wage Determination.pdf | ||
| Sol_140P8420Q0107.pdf | ||
| Att 01_140P8420Q0107_Quote Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(Attachment 02)
Inverness Ridge Chipping Project
Point Reyes National Seashore
RFQ No.: 140P8420Q0107
1.0 Background
The San Francisco Bay Area Fire Management Network is in need of procuring the services of a tracked wood chipper (with an operator) that can chip woody debris located adjacent to the
Inverness Ridge Trail in Point Reyes National Seashore (see map at end of this document). This debris consists of branches and trunks of trees that were cut as part of a larger multi‐year project to reduce hazardous forest fuels along the National Park Service boundary and adjacent to the community on Inverness Ridge. Reducing forest fuels can decrease the threat of catastrophic wildfire to communities situated in the wildland‐urban interface.
2.0 Scope
Point Reyes National Seashore requires approximately 105 piles of woody debris chipped onto the forest floor adjacent to the Inverness Ridge Trail. A tracked chipper will have to navigate and operate from either on the trail or on the forest floor.
3.0 Objectives
Desired outcome: Reduce the risk of catastrophic wildfire to both park resources and the community on Inverness Ridge.
Objective #1: Reduce forest fuel loads adjacent to the Inverness Ridge Trail.
Objective #2: Reduce fuel loading by chipping previously constructed piles of woody debris under the forest canopy.
4.0 Tasks
Contractor shall:
Provide a tracked chipper that can operate on the Inverness Ridge Trail and/or on the forest floor. The tracked chipper provided shall have the ability to:
o Navigate independently (ie. not moved around towed behind a truck);
o Operate on trails, slopes, and on the forest floor; and o Process woody material up to 12" dbh.
Inverness Ridge Chipping Project
Transport the tracked chipper to a pre‐determined location at either the end of
Drakesview or Sunnyside Drive in Inverness, California.
Provide a qualified operator each day for this piece of equipment.
Work safely in collaboration with the Marin County Fire Department Tam Fire Crew who will perform the work of hauling the woody material and loading the chipper.
Chip approximately 105 piles of woody debris onto the forest floor adjacent to the
Inverness Ridge Trail.
Distribute the chips evenly on forest floor, not exceeding 6” in depth whenever possible.
Provide for their own logistical needs including chipper maintenance, fuel, etc.
5.0 Delivery
Contractor must work in collaboration with the Marin County Fire Tam Crew to chip approximately 105 piles of woody debris.
Work shall be accomplished between August 24 and December 1, 2020 (period of performance).
Work will occur in the Point Reyes National Seashore, California adjacent to the
Inverness Ridge Trail.
A NPS Fire Management employee will inspect the work upon completion to determine if the contract was completed according the terms of the award.
6.0 Additional Requirements
A pre‐work site visit will be arranged as needed between the Contractor and the
Contracting Officer’s Representative (COR). The pre‐work site visit will be an opportunity to orient the Contractor to the project site prior to commencement of work.
Prior to work commencing on site, the Contractor shall submit a proposed schedule to the Contracting Officer. Work schedule must be approved by the Contracting Officer’s
Representative (COR) prior to project start.
Prior to work commencing on site, the Contractor shall prepare and submit a site‐ specific safety plan covering on‐site work to be performed by the Contractor and any subcontractors. The plan shall cover topics such as appropriate PPE (hardhat, eye protection, ear protection, etc.), and any other reasonable safety related topics commensurate with the size and nature of this particular work. The plan shall address planned adherence to any local government health orders in effect to reduce the rate of transmission of Novel Coronavirus Disease 2019 (“COVID‐19”).
7.0 Government‐Furnished Property
No government‐furnished property will be provided.
Inverness Ridge Chipping Project
8.0 Security
Contractor will be responsible for the security of the equipment if it is left on site for the duration of the project.
9.0 Place of Performance
Point Reyes National Seashore, Inverness, California.
10.0 Period of Performance
Work shall be accomplished promptly between August 24 and December 1, 2020.
SU
NN
YS
IDE D
RIV
E
Inv ern es s R idg e T rai l
Drakes View Trail
SUNNYSIDE DR
DRAKES VIEW DR
ELIZABETH PL
BUCK POINT RD
unlabeled or unnamed
DOVER RD
Behr Lane
Point Reyes National Seashore, California
Location of Inverness Ridge Burn Piles
Map produced by Fire Management, April 2020
National Park Service U.S. Department of the Interior
¯0 75 150 225 30037.5 Yards
Legend Zone where piles located
OWNERSHIP
NPS
PORE Wildnerness
File details come from the government source that posted it. Updated .