Att 01_Schedule of Items (250701).docx
DOCX document 16 KB Posted
- Attached to
- Lake Vesuvius Railing Federal contract opportunity
- Solicitation number
- 12445525Q0049
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for a construction contract to replace a damaged railing section at Lake Vesuvius boardwalk in Lawrence County, Ohio, managed by the USDA Forest Service. The project involves three primary line items: mobilization, fabrication of a 31-foot railing section according to specifications, and railing installation, with a performance period of 30 days after contract award.
Key contract details include a Firm Fixed Price (FFP) structure requiring contractors to be actively registered in sam.gov, compliance with Davis-Bacon construction wage reporting requirements, and no pre-quote site visit. Contractors are advised to contact Nicholas Mossbarger to inspect the site before quoting. The project requires a precise replacement of an existing handrail section, matching the original design, materials, finish, and structural integrity, with all materials and labor to be provided by the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12445525Q0049.pdf | ||
| Att 06_Wage Rates (250815).pdf | ||
| Att 04_Project Site Map (250617).docx | DOCX document | |
| Att 05_Photo Log (250617).pdf | ||
| Att 02_Statement of Work (250617).docx | DOCX document | |
| Att 03_Drawings and specifications (250617).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Vesuvius Railing Waine National Forest, Ironton Ranger District Lawrence County, OH Performance Period: 30 days after award
Schedule of Items:
| Number |
| Description |
| Qty |
| Pay |
Units Amount
| 0001 |
| Mobilization |
| 1 |
| Lump |
Sum
| 0002 |
| Fabricate 31-ft Section of railing according to specifications |
| 1 |
| Lump |
Sum
| 0003 |
| Install Railing |
| 1 |
| Lump |
Sum
Total
By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _____________________________________________________________________________
| Signature:______________________________________________ | Date:_____________ |
| Company:______________________________________________ | UEI:______________ |
Schedule Notes:
1) Contractor must have an active registration in sam.gov to be eligible for award. Note that a status of “ID Assigned” is not an active registration.
2) One Firm Fixed Price (FFP) contract is anticipated from this solicitation. Contractor must enter prices for all line items. Prices should be typed into the schedule provided, if possible, to promote readability.
3) This will be a construction contract. Compliance with construction wage reporting requirements [AKA “Davis-Bacon”] is required.
4) There will be no pre-quote site visit for this project. Interested contractors may contact Nicholas Mossbarger [nicholas.d.mossbarger@usda.gov] to arrange time to inspect the site before quoting.