Att 007 Module Quality and Safety Selection Criteria Questions.pdf

PDF 498 KB Posted

Attached to
Design and construction of onsite Photovoltaic (PV) systems - Hilo, HI
Solicitation number
12905B22R0004
Issued by

About this file

This document contains survey questions for evaluating photovoltaic module quality and safety criteria for a federal contract opportunity to design and construct onsite photovoltaic systems at a facility in Hilo, Hawaii. The solicitation requires testing module components and completed modules according to standards from the National Renewable Energy Laboratory to verify compliance with quality management systems and pass accelerated testing requirements. Modules must undergo testing for UV exposure of encapsulants and backsheets, matched component coupons, UV exposure of cables and connectors, UV exposure and thermal testing of junction boxes, and thermal cycling, dynamic mechanical load, system voltage, and hot spot testing of completed modules. Responses to survey questions for each proposed module must include results of accredited laboratory tests verifying passes or failures for each test criterion.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solar PV Module Quality and Safety Selection Criteria - Questions

The Solar Module Quality and Safety Selection Criteria is an adjectival evaluation factor. Modules and the associated module sub-components listed below to be reported on do not need to pass all tests in order to be viewed as acceptable.

The following module accelerated testing questions mirror the recommended testing steps detailed in the National Renewable Energy Laboratory (NREL) report “Photovoltaic Module Qualification Plus Testing” 2013 and is available online here:

http://www.nrel.gov/docs/fy14osti/60950.pdf

Each proposed module that is constructed of crystalline silicon cells laminated between a glass front sheet and polymeric backsheet and encapsulated in ethylene vinyl acetate (EVA) will be evaluated for quality and safety through the NREL Qualification Plus testing recommendations.

Contractors that propose module technologies other than that covered in the Qualification Plus Test recommendations are required to report the module manufacturer’s quality manufacturing programs in place as well as what accelerated tests have been conducted by

Answers to the following module quality questions must be based on tests done at an accredited laboratory, accredited by either an International Laboratory Accreditation Corporation (ILAC). When a manufacturer submits test data for the component testing, it must be accepted by the independent test lab according their data acceptance procedures. Both the certificate and test report shall indicate that submitted data were accepted by the test lab.

One survey form for each module proposed by contactor.

Tested Module Manufacturer___________________________________________________________

Tested Module Model Number _________________________________________________________

Date of test report ____/____/_______

Attachment 7

Table 1 - ISO 9001 Quality Management

Table 2 - Qualification Plus Componenet Tests

Qualification Plus Test Survey – Quality Management System at Manufacturer

Document

URL for Document

Management

Practices in Use?

Yes/No

Guide for Quality Management System for PV Module

Manufacturing: Supplemental Requirements to ISO 9001-2008 http://www.nrel.gov/docs/ fy13osti/58940.pdf

ISO 9001 Quality System Audit must be from an Certification Body approved by ANSI-ASQ National Accreditation Board (ANAB). A Certification body approved by a similar organization to ANSI such as International Accreditation Forum (IAF). An IAF accredited organization from either inside or outside the United States is acceptable.

Qualification Plus Test Survey – Components Component Test

Name Page & Section of Qualification Plus

Document

Pass/Fail Criteria for Test - Page &

Section

Results of Test:

Pass/Fail?

UV Exposure for Encapsulants

Page 24 Section 1 Page 24 Section 1.d

UV Exposure for Backsheets

Page 24 Section 2.a Page 24 Section 2.a.iv

Matched Component

Coupon Test with Visual Inspection and Physical Property

Measurement

Page 25 Section 2.b Page 24 Section 2.b.vi

UV Exposure for Cables and Connectors

Page 26 Section 3 Page 26 Section 3.d

UV Exposure for Junction Box

Page 26 Section 4 Page 26 Section 4.d

Bypass Diode and Junction Box Thermal Test

Page 27 Section 4 Page 27 Section 5.c

Table 3 - Qualification Plus Module Tests

Qualification Plus Test Survey – Modules Module Test Name Page & Section of

Qualification Plus Document

Pass/Fail Criteria for Test - Page &

Section

Results of Test:

Pass/Fail?

Thermal Cycling Page 27 Section 1 Section 10.11 of IEC 61215 with diodes still functioning

Dynamic (Cyclic) Mechanical Load

(DML)

Page 28 Section 2 Page 28 Section 2 – same paragraph

System Voltage (Potentially

Induced Degradation and

Polarization)

Page 28 Section 3 Page 28 Section 3.c

Hot Spot Test Page 28 Section 3 Page 28 Section 4 Sampling

Requirements Page 28 Page 28 Section 2