Att 0009 - Material Cert - PE Interface Cover.doc
DOC document 27 KB Posted
- Solicitation number
- W52P1J-21-Q-PTS7
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 0010 - Material Cert MJU-75B Sliders.doc | DOC document | |
| Att 0011 - Material Cert - NYLON RESIN.doc | DOC document | |
| Att 0007 - INJECTION MOLDING PARAMETERS.xlsx | XLSX spreadsheet | |
| Att 0014 - Vendor Guide - beta.sam.gov.pptx | PPTX presentation | |
| Att 0013 - FAR 52.204-24 - Sec 889.docx | DOCX document | |
| Att 0008 - Material Cert - Igniter Top.pdf | ||
| Att 0001 - MJU75B Plastic Parts - Pricing Matrix.xls | XLS spreadsheet | |
| Att 0012 - Material Cert - Igniter Bottom.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERTIFIED MATERIAL TEST REPORT
For those material(s) identified below, a Certificate of Analysis test report shall be provided to the Government at time of delivery to CAAA (Crane Army Ammunition Activity). The test results contained on the Certificate of Analysis report(s) shall be adequate to determine compliance with all applicable requirements of the material specification(s) listed below. Availability of the Certificate of Analysis may be in addition to other Purchase requirements and does not reduce or prejudice the Government’s right to inspect supplies under other provisions of this contract. The test report(s) shall contain the following:
a.
Name and address of Manufacturer and Supplier when *applicable.
(*If Material is not manufactured by the Supplier.)
b.
Purchase order number.
c.
Identification of material by specification, revision, amendment and dates, together with type, grade, size etc. number.
d.
Quantity of material.
e.
Material testing results shall address specifications.
Product: Interface Cover Material: Polyethylene IAW ASTM D4976, PE210A29900 KB012 UA320. Use 100%
Virgin Material, No Reground Material Allowed Documentation to support the above information shall be provided to CAAA at the time of delivery. This information will aid in the receiving / acceptance process.
f.
Quantity tested, sample size, and specimen type as applicable.
g.
Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of test report Product
Mju-75 Interface Cover Requirements For MJU-75/B Program
File details come from the government source that posted it. Updated .