Att 0008 - Material Cert - Igniter Top.pdf

PDF 111 KB Posted

Attached to
Plastic Parts for MJU-75B Countermeasure Flares - Sole Source
Solicitation number
W52P1J-21-Q-PTS7
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATE OF ANALYSIS

For those material(s) identified below, a Certificate of Analysis (C of A) report shall be provided to the government at time of delivery to CAAA (Crane Army Ammunition Activity).

The results contained on the Certificate of Analysis report(s) shall be adequate to determine compliance with all applicable requirements of the material specification(s) listed below. Availability of the Certificate of Analysis may be in addition to other Purchase requirements and does not reduce or prejudice the Government’s right to inspect supplies under other provisions of this contract.

The certificate of analysis shall contain the following:

a. Name and address of Manufacturer and Supplier when *applicable.

(*If not manufactured by the Supplier.)

b. Purchase order number.

c. Identification of material by product description, part number (drawing & revision) and date of manufacturer (lot number).

d. Quantity of material.

e. Certificate of Analysis shall address drawing specifications.

Item: Igniter Top Drawing: 201416434 Material Drawing: 20156941 Resin, Nylon

Part No: ZYTEL SUPER TOUGH NYLON 80G 43 HS 1L BK 104 See Note 3 - Only the item described on this drawing when procured from the Vender(s) listed hereon is approved by Hill AFB for use in the Applications(s) specified hereon. A substitute item shall not be used without prior approval by Hill AFB.

Note: Component (Igniter Top) shall be identified with a traceable lot number at time of delivery.

Note: Component (Igniter Top) shall be Identifiable / Traceable to Individual Cavities of Mold.

At time of delivery to CAAA, Item(s) cannot be accepted without documentation to support the above material was used to produce.

f. Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of the Certificate of Analysis.

Component: Igniter Top, Dwg. 201416434.

Requirements for: MJU-75/B Program

File details come from the government source that posted it. Updated .