This document is a Contract Line-Item (CLIN) Bid Schedule for the 2026 Chatfield 54-Inch Conduit Repair project. The schedule establishes pricing for three basic items required to complete the repair of a 54-inch reinforced concrete pipe conduit.
The three CLINs are: CLIN 0001 for site mobilization, tools, and demobilization (1 job); CLIN 0002 for inspection of the 54-inch pipe, including location of leaking joints using sounder/locater methods or government-approved alternatives (1 job); and CLIN 0003 for excavation, dewatering, repair of damaged pipe sections and/or joints, operational pressure testing, and backfill and soil compaction to restore full conduit functionality (1 job). Bidders must enter individual prices for each CLIN line item; total amounts submitted without itemized CLIN prices will be rejected. In cases of discrepancies between CLIN prices and total amounts, the individual CLIN prices will be considered correct. All work scopes include materials, labor, and equipment necessary to complete each respective task.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN SCHEDULE
2026 CHATFIELD 54-INCH CONDUIT REPAIR
CONTRACT LINE-ITEM BID SCHEDULE
ITEM
NO.
DESCRIPTION
QUANTITY
UNIT
AMOUNT
BASIC ITEMS
Site Mobilization, Tools, Demobilization.
Job
Inspection of the 54-inch Pipe
Repair of the 54-inch pipe
TOTAL BASIC AMOUNT $_____________________________
NOTES:
1. CLIN prices must be entered for all items of the schedule. Total amounts submitted without individual CLIN prices being entered will be rejected. Additions will be subject to verification by the Government. In case of variation between the CLIN prices and the total amounts, the CLIN prices will be considered the correct amounts.
2. CLIN 0001 – All aspects of work to include materials, labor, equipment, etc to mobilize and demobilize for the required work.
3. CLIN 0002 – All aspects of work to include materials, labor, equipment, etc to Perform Inspection of the Permit Required Confined Space of the 54-inch Reinforced Concrete Pipe. Locate the leaking joint using the sounder/locater method or any other method to be submitted for the government approval.
4. CLIN 0003 -- All aspects of work to include materials, labor, equipment, etc to Excavate and dewater, Repair the 54-inch pipe damaged sections and/or joints, perform operational pressure testing and backfill and compact the soil to return a fully repaired and functioning conduit.