ATM Performance Work Statement.pdf

PDF 312 KB Posted

Attached to
Army Training Models - Solicitation
Solicitation number
W91CRB-26-R-A004
Issued by

About this file

This is a Performance Work Statement (PWS) for the Army Training Models (ATM) contract dated 9 February 2026, issued by the Headquarters, Department of the Army, Deputy Chief of Staff Operations, Directorate for Training (G-3/7).

The contract requires the contractor to provide comprehensive software development, maintenance, and analytical support for a suite of training resource applications used by the Army to support Planning, Programming, Budgeting, and Execution (PPBE) processes. Key objectives include supporting the Regionally Aligned Readiness and Modernization Model (ReARMM), providing subject matter expertise in collective training and operational readiness, and ensuring timely and accurate forecasting of Army training requirements. The ATM suite consists of multiple primary models including the Training Resource Model Information System (TRMIS), the Training Resource Model (cTRM) with sub-applications like the Battalion Level Training Model (BLTM) and Man-Day Resource Model (cMRM), the Aviation Training Resource Model (cATRM), and the Institutional Training Resource Model (cITRM). Services also encompass software maintenance, software development, training delivery, custom analysis, and staff support across multiple Army locations including the Pentagon, T2COM, Centers of Excellence, and Army Commands.

The contract period runs from 15 May 2026 through 14 May 2027 (Base Year) plus four 12-month option periods and a 6-month extension option, extending through 14 November 2031. The Government anticipates a Firm Fixed Price contract type. Key personnel requirements include a Program Manager with 10 years of experience, multiple Task Leaders with 10 years of experience across various functional areas (Active Ground, Aviation, Institutional, ARNG/USAR, and Software Development), Senior Analysts with 10 years of experience, Systems Analysts with 5 years of experience, Programmer/Analysts with 5 years of experience, and a Knowledge Manager with 5 years of experience. All personnel require security clearances ranging from Secret to Top Secret with Sensitive Compartmented Information access. The contractor must maintain an estimated annual workforce of approximately 95,060 productive hours distributed across vendor locations and government sites. Deliverables include data compilation and reporting, installation visits and video teleconferences with performance standards requiring 95% accuracy and timeliness. The contractor must submit monthly status reports to the Contracting Officer Representative and comply with extensive security, privacy, data rights, and compliance requirements including Risk Management Framework (RMF) compliance, DoD 8570.01 information assurance certifications, and NIST SP 800-171 controls for Controlled Unclassified Information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

9 February 2026 Army Training Models

Part 1 Introduction

1.1. Description of Services/Introduction: The Headquarters, Department of the Army (HQDA) Deputy Chief of Staff Operations, Directorate for Training G-3/7, is the functional proponent for Army Training and for strategic resourcing within the framework of the Planning, Programming, Budgeting, and Execution (PPBE) process. The G-3/7 has sponsored the development of a suite of software applications to answer these questions. In this capacity, the G- 3/7 Training Directorate provides oversight and management for the training resource applications developed and supported outside HQDA. The Directorate for Training G-3/7 is the functional proponent for Regionally Aligned Readiness and Modernization Model (ReARMM), Munitions and Collective Training. In this capacity, the G-3/7 Training Directorate provides oversight and management for the training resource applications developed and supported outside HQDA.

1.2. Background: These applications are collectively referred to as the Army Training

Models (ATM). The ATM contract supports critical training programs to include collective training, operational readiness, and institutional training. These models provide analytical support to develop funding requirements for Army-wide collective and individual training and are used to support resource decision making within the PPBE at HQDA and in subordinate commands. The ATM contract provides critical support needed to develop and defend training and operational readiness resource requirements and funding strategies for Army training programs consistent with Army Policies and Priorities in The Army Plan and to meet the timelines of the PPBE process.

The Department of Defense’s shift to strategic competition against near-peer threats requires the Army to adopt a supply-based unit readiness model. The new model must accomplish two requirements. It must provide dedicated periods to modernize and build enduring warfighting advantages in the Army of 2030. Additionally, the model must support integrated deterrence by providing a consistent supply of ready units with regional understanding and competence to meet global campaigning and directed readiness requirements. To meet the requirements of the strategic context, the Army developed a new force generation model. The Regionally Aligned Readiness and Modernization Model (ReARMM) is flexible and predictable. It also creates an Army that is regionally aligned to Combatant Commanders (CCDR) regions and modernized to support the National Defense Strategy (NDS).

1.3 Objectives: The Contractor shall provide subject matter experts with a focus and emphasis to providing experience and continuity with specific emphases on the planning, programming, budgeting, and execution of the programs that support and resource a wide range of requirements for the Army. Additionally, the Contractor shall provide subject matter experts with a focus and emphasis on providing long-term continuity with specific emphases on the planning, programming, budgeting, and execution of the programs that support and resource modernization.

1.3.1 The Contractor shall provide technical and programmatic support for the Training Directorate. Support includes but is not limited to programmatic and analytical support for the Operational Tempo (OPTEMPO), Collective Training, Institutional Training, Mission, Intelligence programs, technical assistance, and subject matter expertise directly supporting the Regionally Aligned Readiness and Modernization Model (ReARMM), and Collective Training in support of the Chief of Staff, Army (CSA), as well as Operational Analysis for the G3-5/7 Training Directorate.

1.4 Scope: The Contractor shall provide services for various activities required to ensure that the ability and means needed to support Army Training requirements are adequately defined, resourced and managed. This effort incorporates requirements from the Director of Training, Army G-3/5/7 for programmatic and analytical support.

1.5 Period of Performance: The period of performance shall be for one (1) Base period of 12 months, plus four (4) 12-month option periods.

Base Year 15 May 2026 – 14 May 2027 Option Year 1- 15 May 2027 – 14 May 2028 Option Year 2- 15 May 2028 – 14 May 2029 Option Year 3- 15 May 2029 – 14 May 2030 Option Year 4- 15 May 2030 – 14 May 2031 6 month extension Option – 15 May 2031 – 14 November 2031

1.6 General Information

1.6.1 Quality Control: The contractor must submit their quality control procedures for contracting officer acceptance with their proposal and maintain a quality program to ensure services are performed in accordance with this contract and established commercial and regulatory standards.

The quality control plan must reflect the remedies offered by the contractor for non-performance.

Government personnel will monitor the success of the quality program. The contractor shall effectively retain personnel with the appropriate levels of education, experience and expertise to accomplish the range of tasks described in PART 5.

Specific Tasks

1.6.2 Quality Assurance: The government must rely on the contractor to provide quality service through maintaining an effective quality control program. However, the government representative will evaluate the contractor’s performance through various methods of surveillance. Government personnel will record all surveillance observations. When an observation indicates defective performance, the quality assurance personnel will require the contract manager on site to initial the observation. Government surveillance of tasks not listed in the PWS or by methods other than those listed in the PWS may occur during the performance period of this contract. Additionally, the government shall coordinate any necessary command clearances, approvals, and sponsorship for travel performed under this task order. The primary control mechanism for the work performed under this task order will be the Contracting Officer Representative (COR). The contractor shall provide the COR with a monthly status report that covers what was accomplished over the last 30 days and work planned for the next 90 days for each employee. The status report is due by the 15th of the month following the month being reported.

1.6.3 Recognized Holidays: Unless otherwise directed by the customer, the Contractor is not required to work on the following Federal holidays.

Christmas Day New Year’s Day Martin Luther King Jr Birthday Washington’s Birthday Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day

1.6.4 Hours of Operation/Place of Performance: Core hours of operation are from 0800 - 1700 Monday through Friday, except federal holidays and non-work hours due to closure or inclement weather. The COR must approve work in excess of eight hours per day or 40 hours per week prior to performance. Work in support of Software Development will be performed at the contractor’s facility. Work in support of Functional Analysis will be performed at the contractor’s facility and the government sites. However, much of the work that will be done on this contract will require considerable interaction (Face-to-Face, Video Teleconference (VTC), Teleconference, and email) with staffs: Army G-3/5/7 (Training Directorate), Army National Guard, the Office of the Chief of Army Reserves, Transition & Training Command (T2COM) (formerly Training and Doctrine Command (TRADOC)), Centers of Excellence and other locations as stated in the Technical Exhibit 3.

The Contractor must maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential. The government will provide workspace, office furniture, computer resources, telephones, offices supplies and tools necessary to perform duties at government locations. The vendor will provide workspace, office furniture, computer resources, telephones, offices supplies and tools necessary to perform duties at the vendor’s location. The contractor shall have access to government regulations and technical manuals. Government furnished items shall not be used for any project other than these tasks.

1.6.5 Type of Contract: The Government anticipates award of a Firm Fixed Price contract.

1.6.6 Privacy Requirements: Privacy Act: Contractor personnel performing work under this contract may have access to information, which may be subject to the Privacy Act of 1974. The

Contractor shall ensure that personnel agree to adhere to the Privacy Act of 1974, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations. All personnel shall hold and maintain a secret level clearance. See attached DD Form 254 (Department of Defense Contract Security Classification Specification).

1.6.7. Security Requirements

1.6.7.1 Personnel Clearance. In accordance with (IAW) DD Form 254 Classification Specification:

All personnel shall hold or be eligible to receive and maintain a SECRET level clearance. At a minimum at least one individual on this contract requires a TOP SECRET (TS) level clearance.

The user agency will identify classified information and provide specific direction and guidance concerning the safeguarding of such information. The contractor staff shall be required to read and adhere to the appropriate nondisclosure requirements and shall be required to sign appropriate nondisclosure requirements. In addition to a SECRET clearance, one individual assigned to Department of the Army Management Office, Regionally Aligned Army Readiness & Modernization Model (ReARMM) Division (DAMO-TRR) require a secret clearance, and one requires a TS Sensitive Compartmented Information (SCI) clearance, at each location. See attached DD Form 254 (Department of Defense Contractor Security Classification Specification).

The contractor staff shall be required to read and adhere to the appropriate nondisclosure requirements and shall be required to sign appropriate nondisclosure requirements. Contractor personnel will be required to complete associated security paperwork and comply with associated policies. Contractor personnel may be required to access data and information proprietary to the Government while performing on this contract. Contractor personnel may also have information of such a nature that its dissemination or use, other than in performance of this contract would be averse to the interest of the Government or others.

The Contractor shall not divulge, or release data or information developed or obtained in performance of this contract except to authorize Government personnel or upon written approval of the (COR). The Contractor shall not use, disclose, or reproduce proprietary data, other than as required in the performance of this contract. The limitations above do not apply to data or information that has been made public by the Government. Further, this provision does not preclude the use of any data independently acquired by the Contractor without such limitations or prohibit an agreement at no cost to the Government between the Contractor and the data owner, which provides for greater rights to the Contractor. All products produced and their associated work papers are to be considered the property of the Government. Contractor will be responsible for completing a DD Form 254.

Contractor shall be responsible for safeguarding all Government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.1.1 AT OPSEC Requirements:

i. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within

30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel.

AT level I awareness training is available at the following website: http://jko.jten.mil

ii. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

iii. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

iv. For contractors that do not require CAC but require access to a DoD facility or installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

v. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

vi. Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems. All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

vii. For contracts that require a formal OPSEC program. The contractor shall develop an

OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

viii. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

ix. For information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.

x. For information assurance (IA)/information technology (IT) certification. Per DoD

8570.01-M, DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

xi. For contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.

xii. Threat Awareness Reporting Program. For all contractors with security clearances. Per AR

381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

xiii. Controlled Unclassified Information (CUI). Include DFARS clause 252.204-7012, which requires the contractor to comply with NIST 800-171. Also include DFARS provision 252.204-2019 into solicitations.

Acquisition officials should follow procedures outlined in DFARS 204.73 and verify vendors have an adequate NIST SP 800-171 summary assessment score within the Supplier Performance Risk System (within PIEE). If the score doesn't show a medium- or high-level assessment with a score of 110 or better (as described in the "NIST SP 800-171 DoD Assessment Methodology"), include clause 252.204-7020 and obtain the vendor's "system security plan" and "plan of action" for NIST SP 800-171 verification and assurance by Army security officials.

1.6.7.2 Physical Security. Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan.

Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR. Also, contractor personnel assigned to this contract on a full-time or close to full-time basis will be expected to acquire a Pentagon badge for access to the building and must be able to obtain a badge allowing unescorted access.

1.6.7.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the (COR), re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

1.6.7.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.8 Key Personnel; Program Manager: The Contractor shall provide a Program Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer and the Contracting Officer Representative. The Program Manager is considered a key personnel under this contract and must comply with security requirement.

1.6.8.1. The Program Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Program Manager or alternate shall be available between the hours of 0800 to 1700 Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.9 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. Contractor personnel are required to display distinguishing badges or other visible identification at all times.

They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that Contractor participation is appropriately disclosed.

1.6.9.1: Contractor Staff MUST comply with DOD 8570.01 requirements for all technical staff on this contract.

1.6.10. Travel: Contractor personnel may be required to travel CONUS and OCONUS to accomplish tasks in this PWS. The COR’s advance concurrence to planned travel is required.

Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. Local travel shall include destinations within the greater National Capital Region (NCR). Travel may also be required in support of related conferences and forums. All travel requires Government approval/authorization and notification to the COR.

1.6.11 Transition Plan:

The Contractor shall be responsible for providing a transition plan with the proposal, which includes the following:

1.6.11.1. Phase In- Plan which:

1.6.11.1.1. Clearly demonstrates a 45 day reasonable, realistic approach for assuming full contractual responsibility without disruption or degradation of performance during the transition period.

1.6.11.1.2. Identifies risk and proposes appropriate mitigation strategies.

1.6.11.1.3. Proposes a realistic, achievable, and affordable transition schedule and staffing plan.

1.6.11.1.4. Ensures sufficient resources are on hand and available to begin work on the effort.

1.6.11.1.5. Offers an approach to ensure the availability of trained and qualified personnel.

1.6.11.2. Phase-Out Plan which:

1.6.11.2.1 Enables transition to replacement services and ensures no disruption in service when the existing contract performance period ends.

1.6.11.2.2 Provides for phase-in support for 45 working days to the selected contractor if the incumbent contractor is not selected herein.

1.6.11.2.3 Allows for the transfer of knowledge, experience and lessons learned to the new contractor.

1.6.11.2.4 Includes a process to appropriately transfer all property, documentation, digital and hard copies of all in-progress working files, historical files, briefings for incoming personnel, timelines and standards for completion

1.6.12 Data Rights:

The following data rights and intellectual property clauses are applicable to this requirement and included in Section I:

• FAR 52.227-01 AUTHORIZATION AND CONSENT (JUN 2020)

• FAR 52.227-02 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (JUN. 2020)

• FAR 52.227-03 PATENT INDEMNITY (APR 1984) (ALT PARAGRAPH II)

• FAR 52.227-10 FILING OF PATENT APPLICATIONS – CLASSIFIED SUBJECT

MATTER (DEC 2007)

• FAR 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

• DFARS 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL

ITEMS (AUG 2025)

• DFARS 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE

AND NONCOMMERCIAL COMPUTER SOFTWARE DOCUMENTATION (AUG

2025)

• DFARS 252.227-7015 TECHNICAL DATA—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (JAN 2025)

• DFARS 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN

2023)

• DFARS 252.227-7017 IDENTIFICATION AND ASSERTION OF USE, RELEASE,

OR DISCLOSURE RESTRICTIONS (JAN 2025)

• DFARS 252.227-7019 VALIDATION OF ASSERTED RESTRICTIONS—

COMPUTER SOFTWARE (JAN 2025)

• DFARS 252.227-7020 RIGHTS IN SPECIAL WORKS (JUN 1995)

• DFARS 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF

GOVERNMENT- FURNISHED INFORMATION MARKED WITH RESTRICTIVE

LEGENDS (JAN 2025)

• DFARS 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR

COMPUTER SOFTWARE (APR 1988)

• DFARS 252.227-7028 TECHNICAL DATA OR COMPUTER SOFTWARE

PREVIOUSLY DELIVERED TO THE GOVERNMENT (JUN 1995)

• DFARS 252.227-7030 TECHNICAL DATA—WITHHOLDING OF PAYMENT

(MAR 2000)

• DFARS 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON

TECHNICAL DATA (JAN 2025)

• DFARS 252.227-7038 PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR

(LARGE BUSINESS) (JUN 2012)

• DFARS 252.239-7000 PROTECTION AGAINST COMPROMISING

EMANATIONS (OCT 2019)

• DFARS 252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING

AND CERTIFICATION (JAN 2008)

1.6.12.1 The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights under the applicable Data Rights clause, DFARS 252.227- 7020.

1.6.13 Manpower Reporting: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address https://contractormanpower.army.pentagon.mil.

The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Representative; (2) Contract Number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Actual direct labor hours (including sub-contractors); (6) Actual direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement.

Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year.

Contractors may use a direct Extensible Markup Language (XML) data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

1.6.14 Access to Protected Information. If during the performance of this procurement contractor personnel obtain access by any means to protected information, including, but not limited to, trade secrets or proprietary information of other contractors, Government source selection information, Privacy Act information, or any other information with distribution limited by the Government, contractor personnel shall in no way divulge any such information except as it relates to the performance of this procurement within the Army, or shall not otherwise use or disclose this information for their personnel gain, the gain of their employer, or the gain of anyone else. The Contractor shall notify the Contracting Officer (KO) of any potential organizational conflicts of interest created by any such access. However, a nondisclosure agreement will not overcome an Organizational Conflict of Interest (OCI) as defined in FAR part 9.5. Compliance with the Trade Secrets Act requires the consent of the owner of the proprietary information before another non-federal entity may be allowed access to such information. Accordingly, all Government contractors are required to mark their proprietary information and any time the Contractor is given access to such marked information it is incumbent upon the Contractor to inform the KO of the access.

Contractor personnel will ordinarily be required to sign a nondisclosure agreement before starting work under the contract. Failure to comply with this clause shall be deemed adequate cause for the removal of a contractor employee from employment with the Contractor. The Contractor’s employment contracts with their employees shall include a provision to provide for the removal under these conditions.

Part 2

Total Army Integration

2.1 The ATM must meet the needs of stakeholders at all levels for HQDA to synchronize training and operational readiness resource management across the Army and ensure that the training management community applies a consistent training resource management methodology.

The ATM are used to provide input to internal applications by Forces Command (FORSCOM), Western Hemisphere Command (WHC), T2COM and US Army Special Operations Command (USASOC). The ATM also support and receive input from the Army Centers of Excellence (CoEs), Deputy Assistant Secretary of the Army for Cost & Economics (DASA-CE) and HQDA.

The Army National Guard and the Office of the Chief, Army Reserve, along with their subordinate commands, use the ATM for decision support analysis and to make recommendations across all phases of Planning, Programming, Budgeting, and Execution.

2.2. Due to the broad usage of the Army Training Models, the Contractor will frequently interact with these stakeholders, receive data and feedback from them, and (when approved) make improvements to the software applications to support them. Any proposed modifications to the ATM that emanate from stakeholder feedback must be coordinated with the Contracting Officer’s Representative in HQDA, Office of the Deputy Chief of Staff, G3/5/7, Training Directorate (DAMO-TR) prior to formal inclusion in the model. The Contractor shall ensure no development work duplicates or is incompatible with other ATM features.

Part 3

Objectives

3.1. The overarching objective of the ATM is to provide a common understanding of training resource requirements and funding across the Army by formalizing the HQDA standard methodology for training resource management. The ATM consist of an information management system along with three primary models and a collection of enabling sub-applications.

3.2. The Training Resource Model Information System (TRMIS) is the user interface by which stakeholders access information produced by the ATM, planning factors, ATM inputs, and training execution data used to validate the models. TRMIS facilitates information sharing between HQDA and T2COM and provides the ability to calculate per capita rates.

3.2.1. The Training Resource Model (cTRM) determines the resource requirements needed for operational units to perform their collective training and operations. Sub-applications of cTRM include, but are not limited to:

3.2.1.1 The Battalion Level Training Model (BLTM) which defines activities performed by individual unit types, organizations, or entities and

3.2.1.2. The Man-Day Model (cMRM) which defines training days required above the statutory 39 days a year for the reserve component.

3.2.2. The Aviation Training Resource Model (cATRM) determines the resource requirements needed for aviation units to perform their training and operations.

3.2.3. The Institutional Training Resource Model (cITRM) determines the resource requirements needed to send individual students to be trained at Army schools. Sub-applications of ITRM include, but are not limited to:

3.2.3.1. The Course Level Training Module (CLTM) which documents Program of

Instruction (POI) data,

3.2.4. Resource Prioritization Database (1-n) which functions as a resource module for the management of Operations and Maintenance, Army (OMA) and Reserve Personnel, Army (RPA) requirements.

3.2.5. Monthly Army Performance Review (MAPR) provides Official Army equipment air and ground activity execution.

3.3. Extension of these applications and methodologies to subordinate commands provides a consistent, credible methodology for calculating and presenting training resource requirements.

These utilities support cost factor processing, force structure processing, modernization plans, and other key input data sources.

Part 4

Operating Environment

4.1. The Army continually adapts to meet changing conditions. To remain relevant, the ATM must adapt to a complex and dynamic operating environment that this contract supports.

Sources of change may include, but are not limited to, changes to force structure (both operational and generating force), training strategies, authorized equipment, deployment strategies, and cost factors.

4.2. The software must be capable of supporting revision to training strategies such as the Regionally Aligned Readiness and Modernization Model (ReARMM) or any other emerging Army strategy. Changes to Army budget data elements such as Management Decision Execution Package (MDEP), Army Management Structure Code (AMSCO), Dollar Type, Object Classes, and training readiness definitions will require the ATM to adapt accordingly. This will require the contractor to adapt these software programs and models to changing Army data structures and environments

4.3. Reports will continue to evolve to meet changing needs for data to articulate training resource requirements to agencies outside the Department of the Army, within the Army Staff and to disseminate guidance to subordinate Army Commands. These revisions will cause the Army to reassess the outputs of the ATM to ensure they are responsive to Senior Leader needs.

4.4. the Contractor requires expertise in training resource requirements development, training, force management, logistics and financial policy and systems analysis as well as fluency in the development of appropriate software tools to facilitate data analysis and training resource management. These skills are necessary to anticipate, conceptualize, and implement changes to the ATM rapidly and effectively.

4.5 As a general statement, all contractor requested travel and hiring actions shall be coordinated with the COR.

Part 5

Specific Tasks

5.1. This Performance Work Statement covers the full spectrum of software support and maintenance within the full suite of ATM, and establishes the baseline for any major software modifications, as well as full spectrum of analysis and support required to support HQDA G3 and DAMO-TR. The Contractor shall provide technical and programmatic support for the Training Directorate. Support includes but is not limited to program management, technical assistance, and subject matter expertise directly supporting the Regionally Aligned Readiness and Modernization Model (ReARMM), Munitions and Collective Training in support of the Chief of Staff, Army (CSA), as well as Operational Analysis for the G3-5/7 Training Directorate. The contractor shall furnish the necessary personnel, functional support, software, materials, facilities and other services as may be required to perform the work contained in this PWS.

5.2 BASIC TASKS.

Tasks performed on this contract generally fall within one of five categories. These categories are (1) Software maintenance, (2) Software development, (3) Training, (4) Custom Analysis (5) Staff Support.

5.2.1. Software Maintenance:

The Contractor will maintain all software necessary to accomplish the objectives of this contract.

Software maintenance includes routine enhancements to existing applications. As technology advances, the contractor will migrate the software applications as directed by the COR. The contractor is responsible for maintaining DoD/Army Risk Management Framework (RMF) and ensuring that all delivered application or modifications to software complies with RMF requirements; Also documenting all ATM models and utilities for end users.

5.2.2. Software Development

5.2.2.1. In addition to existing applications, other applications are emerging to capture information, introduce new technologies, and to better disseminate and share sensitive OPTEMPO resource decisions. Though they perform many different functions, these ATM applications are structured to operate within a common technical architecture where software code is a shared resource among multiple applications.

5.2.2.2. Shared code is efficient by design; the successful Contractor must ensure that this approach is also effective in meeting the needs of the diverse client community supported by this project.

5.2.2.3. A key feature of this requirement’s definition process is the establishment of a linkage between the force structure contained in the cTRM and the force being supported within the cITRM. This linkage is critical to ensuring that all training resource requirements are based upon common force structure decisions. Outputs of the cITRM include a projection of anticipated student workload based upon a given force structure and the costs associated with the courses anticipated to be required to support that force.

5.2.3. Development Objectives: Consistent with available time and resources, the COR will prioritize development projects which may include the following:

• Continue any work associated with migration to the cloud. (as required by the government)

• Linking ATM reports to Program Optimization and Budget Evaluation (cPROBE) to load change packages directly from TRMIS.

• Automating the reconciliation process

• Developing a user interface to resolve “Z-lines” collaboratively between HQDA and other stakeholders

• Developing a user interface to conduct cut drills and excursions (either funding based, or end strength based)

• Developing and updating as appropriate an application that tracks OPTEMPO and other training or operational readiness resources.

• Developing a user interface which allows the comparison of two non-sequential

ATM positions.

• Developing a capability to produce POM and budget reports, and produce historical program reports across 15 or more years for Army Senior Leaders (ASL), HQDA, and Army Materiel Command (AMC), Assistant Secretary of the Army (Acquisition, Logistics, & Technology (ASA (ALT)), and others

• Developing a user interface which allows users at all levels to drill down into the drivers and factors underpinning specific data. Be able to quantify the impact of updating these drivers and factors on training or operational readiness resources.

• Developing a capability to project Training Equipment Maintenance resource requirements for use in Budget Formulation and Execution.

• Developing user and software interface to train Training and Doctrine development products.

5.2.4. Training. Training includes providing materials for understanding the ATM and providing live instruction on the ATM. The Contractor shall publish a data dictionary which defines all fields used in the ATM. The data dictionary will include a list of all valid data elements for each field along with their meaning. The Contractor shall provide ATM information briefings to stakeholder staff as deemed necessary by the COR. The Contractor shall provide information briefings and assistance visits to stakeholder locations (determined by the COR) which experience ATM reporting problems or require ATM training.

5.2.5. Custom Analysis. The Contractor will provide direct on-site, analytical support to the DAMO-TR. This analytical support satisfies analytical requirements which cannot be accomplished by users using TRMIS. Custom analysis which is performed routinely will be reported to the COR so that it can be used to inform software development priorities. Database maintenance requires the contractor to understand the Army data inputs and to conform the inputs from all required systems that support the ATM. This includes data structure changes, converting data to input into ATM, and data outputs to supported systems.

5.2.6 Staff Support. The contractor shall provide staff support to select Army training commands, institutions, and centers as requested by the Commands. The contractor must have a minimum of five years military staff experience, a thorough understanding and working knowledge of training, force management, logistics and financial policies and systems within the framework of PPBE.

The scope of this task varies with the mission and is intended to represent a type of skill set needed to meet all current and anticipated requirements. This staff support is intended to capture those requirements where dedicated support is needed to satisfy mission objectives. Actions performed are similar to HQDA staff support tasks and include analysis of all inputs to the models and decision processes as well as effective use of the outputs of the models to develop training resource guidance and issues up and down the chain of command.

5.3. Specified Tasks

5.3.1. The three specified tasks are Populate, Update Per Capita Rates, and Reconcile data.

The Contractor shall populate the ATM with financial (requirements and funding), force structure (manning and equipment), training strategies, cost factors, command requirements, workload and student data and conduct focused, functional and technical analyses in support of Program Development and Budget Formulation and Execution.

5.3.2. Working through the COR, the Contractor will annually execute a data call to update to all Per Capita cost factors. Once collected, the Contractor will review the data for completeness and validity and present to the COR for validation. The Contractor will assist government Subject Matter Expert (SMEs) as they research and explain any significant variations from the previous year’s data. Once the data is validated, the Contractor will compute the Per Capita rates which will then be delivered to the COR. Development of the Per Capita rates must consider financial (one-time and enduring obligations and Special Items of Interest (SIIs) and workload (population and student load) data. The Contractor shall report any shortfalls experienced during the data collection and validation process to the COR and suggest modifications to remedy these issues.

Additionally, this task addresses the interoperability of the training models with other systems and agencies and includes verification of external data compatibility with the training application processes.

5.3.3. The contractor shall facilitate reconciliation of program requirements and funded levels. The contractor will use Budget Obligation (BO) definitions from cPROBE to distinguish program requirements and funding levels. Each ATM position file will include metadata identifying the information used to calculate the data. This includes but is not limited to the DASA-CE rate file and Army Program for Individual Training (ARPRINT), Training Strategies and FM Force File. The Contractor shall provide an archived version of ATM output for each position published in cPROBE including resource requirement data and an audit of changes from the previous position of the ATM. These outputs will be accessible by stakeholders through Training Resource Model Information System (TRMIS).

5.3.4: Tasks performed on this contract generally fall within one of 3 categories. These categories are (1) Support to Army modernization, (2) Mobilization Common Operating Picture (MODCOP) development, (3) Operations and Research Staff Support

5.3.4.1. ReARMM. Contractor shall support ReARMM and synchronization of signature modernization efforts. At a minimum, primary effort shall include the following: Compile and analyze data related to the Army's responsibility as the Executive Agent for ReARMM. Analyze and provide information related to signature modernization efforts for Army leadership, Program Evaluation Groups, and the Director of Training. Prepare and present briefings to Army leadership, DoD, and Congressional staffs on topics related to ReARMM. Support to DAMO-TRR in synchronization of ReARMM business rules into Total Army Analysis 26-30, Strategic Portfolio Analysis Review (SPAR) 26, the Directed Readiness Training (DRT), and Global Force Management Allocation Plan (GFMAP). Coordinate with HQDA G-3/5/7 Army Transformation Office (DAMO-ZT) on all ReARMM related issues for DAMO-TR. Review prioritized unit equipping requirements and provide analysis on all positions in the DRT. Support HQDA G-3/5/7, DAMO-TR efforts to review and revise regulations, policy, procedure, doctrine, and field manuals, and coordinating their implementation. Responsible for supporting the planning, preparation, implementation, and after-action reviews for conferences/forums/meetings. Preparing the Army Leaders for Congressional inquiries and other key meetings. Preparing executive summaries, information papers, briefings, and other correspondence.

Responsible for the implementation and integration of policy, doctrine, organization, training, materiel, leadership and education, personnel, and facilities (P-DOTLMLPF) solutions to enhance the mission of the Army G-3/5/7. Support the Total Army Readiness Review (TARR) with analysis of special interest units against current Army Synchronization Tool (AST) life cycles and current readiness reporting. Organize, implement, and facilitate Operational Planning Teams (OPTs) and analysis teams to support studies and working groups. Coordinate meetings, briefings, time locations, and all support requirements for on-site and video teleconference (VTC) meetings.

Support Government personnel with participation in ReARMM Council of Colonels (CoC), OPTs, General Officer Steering Committee (GOSC), Army Management Action Groups (AMAGs), and senior leader updates.

5.3.4.1.1 Prepare updates for:

• The Director of Training

• The Deputy Director of Training

• Quarterly Training General Officer Steering Committee (TGOSC) meetings

• The Deputy Assistance Chief of Staff, G-3/5/7, Army

• The Assistance Chief of Staff, G-3/5/7, Army

• Army Three- and Four-Star Reviews

• The Chief of Staff, Army (CSA)

• Other senior leaders as required.

5.3.4.2. MODCOP Represent DAMO-TR as the functional lead for the MODCOP development. At a minimum, primary effort shall include the following: Provide input regarding AST in Qlik development and report output from AST using Qlik functionality.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .