Atch2-VWR_PricingWkst.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Malmstrom AFB Vehicle Wash Rack Update Federal contract opportunity
Solicitation number
FA4626-22-R-0016
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Malmstrom AFB Vehicle Wash Rack Update, newest first.
File Type Posted
Atch5_PWS_Veh.Wash.Rack.pdf PDF
Atch4_Installation Perimeter Access Control.pdf PDF
COMBO_23Jun22.pdf PDF
Atch3_Base_Access_Info_Real_ID.pdf PDF
Atch1_VWR_Specs_15Jun22_v2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Pricing Worksheet

Position DescriptionFTE(s)Periord of PerformanceDuty HoursTotal Cost
Duty HoursBurdened Hourly Rate
Utilization Manager1.0Base Period1176$ - 0$ - 0
Option Period 11920$ - 0$ - 0
Option Period 21920$ - 0$ - 0
Option Period 31920$ - 0$ - 0
Total:$ - 0

Attachment 3

VWR Pricing Sheet

DESCRIPTIONQTYLIST PRICEEXTENDED PRICE
Stationary Hot Water NG-Fired Electric Pressure Washer w/Customizable Smart Relay Control Functionality - 6.0 GPM @ 3000 PSI, 15HP 208V/3PH 41 AMP Electric Motor, Belt Drive Triplex Pump w/NESTechnology.2
50' High Pressure Hose2
Trigger Gun Shut-Off2
Auto Start/Stop (Smart Relay Control)
25 Foot Hose, 2-wire (Off of Boom)2
10 Foot Boom Kit2
5 Foot Jumper Hose (boom to pipe) 2-wire2
Stainless swivel for boom & hose4
Replace Q.C. w/Fixed Nozzles2
6 Foot hose (between machine & pipe)2
10 inch Draft Diverter2
Flex Bottom Wand Holder, Stainless Steel2
15 Foot Garden Hose2
Rocker Switch for 2 Remote Boxes6
Soap Kit for Remote Boxes2
Provide Labor and Materials for the following:
Demo existing piping
Provide & Install new piping to pressure washer.
Provide & Install new ball Valves w/hose end
Provide & Install new gas piping
Provide & install new pressure piping to wand
Install new mounting plate for wand
Remove and disposal of excess materail & scrap
Disconnect existing draft hood.
Reconnect new draft hood to existing venting
Provide Labor and Materials for the following:
Disconnect 2 existing power washers
Connect 2 new power washers to existing power
Install 1 new conduit and wiring to unit
WARRANTIES
Crankcase on pump
Burner Coil
Parts and Labor
Frame Welds
15 HP Motor
Sub-Total
Shipping & Handling
Total Discounts
Total

Sheet3

File details come from the government source that posted it. Updated .