Atch1_Pre-proposal Conf Slides_JNCO 29units_9Feb24.pdf

PDF 578 KB Posted

Attached to
Project No. QKKA204002, Repair MFH JNCO, 29 Units (Bldgs. 221, 712, 716, 718, 723, 812, 817, 818), Misawa Air Base, Japan
Solicitation number
Not on record
Issued by

About this file

This document is the pre-proposal conference minutes and record of a site visit for a federal contract opportunity to repair 29 military family housing (MFH) units at Misawa Air Base, Japan.

The project, with a contract number of QKKA204002, requires the contractor to provide all supervision, management, quality control, labor, tools, equipment, materials, and performance of all work necessary to construct improvements for the renovation of the 29 MFH buildings. The contract type is firm-fixed-price with a performance period of 634 calendar days including 30 days for mobilization. Key solicitation details include requirements for antiterrorism awareness training, liquidated damages, hazardous material handling, and past performance information. Offerors must be registered in the System for Award Management. The award will be made using a subjective tradeoff process where past performance is approximately equal to price in importance. The solicitation closing date is February 26, 2024 at 2:00 PM Japan Standard Time, with questions due no later than February 16, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mission – Family – Warrior

35th Fighter Wing

Pre-proposal Conference / Site Visit RFP No. FA520524R0001 Project No. QKKA204002, Repair JNCO Homes, MFH 29 units (221, 712, 716, 718, 723, 812, 817, 818), Misawa Air Base, Japan

35 CONS/PKP

35 CES/CENM

9 Feb 24, 0900 hours

Mission – Family – Warrior

Summary

Introduction

Scope & Requirements General Requirement

Solicitation CONS remarks for solicitation / filling instructions

CES Technical Briefing

Site Visit to Bldgs 712, 716, 718, 723, 812, 817, and 818 (Site visit for Bldg. 221 was conducted on 30 Jan 24)

Introduction

35 CONS

MSgt Derek Crader, Contracting Officer

Ms. Miyako Fujimoto, Contracting Officer

Mr. Kazuo Miura, Contract Administrator

Mr. Takafumi Nosaki, Contract Administrator

Mr. Akito Miura, Contract Administrator

35 CES

Introduced by CES Technical Briefing later

Mission – Family – Warrior

Scope & Requirements

Scope & Requirements (cont’d)

Project Description (Sec. B):

The contractor shall provide all supervision, management, quality control, labor, tools, equipment, materials, and performance of all work necessary to construct improvements for the renovation of the housing buildings.

Place: MFH 221, 712, 716, 718, 723, 812, 817, and 818

Contract Type: Firm-Fixed-Price (FFP)

Performance Period: 634 calendar days (incl. 30 CDs mobilization)

Mission – Family – Warrior

Solicitation

Fill-in

Complete block 14 through 20

RFP – Page 2

Solicitation (Cont’d)

Fill-in

RFP – Page 4

Mission – Family – Warrior

Solicitation (Cont’d)

Section I

DFARS 252.204-7004 Antiterrorism Awareness Training for Contractors

Contractor personnel who require routine physical access to military installation shall complete Level 1 antiterrorism awareness training within 30 days of requiring access and annually thereafter

FAR 52.211-12 Liquidated Damages

@¥113,027 (1st day) & @¥69,779 (2nd day ~)

FAR 52.223-3 Hazardous Material

RFP – Page 12

RFP – Page 13

Fill-in

RFP – Page 13

Solicitation (Cont’d)

Section J RFP – Page 33

DatePageDescriptionDocument Type

8 Dec 231,148SpecificationsAttachment 1

8 Dec 23319DrawingsAttachment 2

14 Dec 236Other Contract RequirementsAttachment 3

6 Sep 2347Schedule of Material SubmittalsAttachment 4

26 Oct 233List of Contractor Furnished U.S. MaterialAttachment 5

26 Oct 231List of Gov’t Furnished Contractor Installed ItemsAttachment 6

15 Jun 23431Hazardous Materials Inspection ReportAttachment 7

14 Dec 231Past Performance Questionnaire (PPQ) Cover LetterAttachment 8

14 Dec 235Past/Present Performance QuestionnaireAttachment 9

Mission – Family – Warrior

Solicitation (Cont’d)

Section K

FAR 52.204-8 Annual Reps & Certs

FAR 52.204-24 Reps Certain Telecom & Video Surveillance Svc or Equipment

FAR 52.209-7 Responsibility Matters

DFARS 252.204-7007 Alt. A, Annual Reps & Certs

Fill-in

RFP – Page 34 ~

RFP – Page 37 ~

RFP – Page 38 ~

RFP – Page 39 ~

Other Contract Requirements

Para. 6, Special Contract Requirements:

H002 Required Insurance

Property Damage - ¥2,000,000

H003 Performance Bond

Submit within 30 CD after the award date of contract or prior to issuance of the Notice to Proceed whichever comes first.

Require additional if Mod > $10,000

Atch 3 – Page 3

Mission – Family – Warrior

Other Contract Requirements (Cont’d)

Para. 8, Reps, Certs & Other Statements of Offerors

K001 Tax Exemption under SOFA

Total amount of consumption tax

¥53.80 x Est. Gas Quantity

¥32.10 x Est. Diesel Quantity

Fill-in

Atch 3 – Page 4

Other Contract Requirements (Cont’d)

Para. 8, Reps, Certs & Other Statements of Offerors (cont’d)

K002 Contractor’s Cert

K003 Const. Contractor License

Offeror shall submit “special construction license” under applicable law together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042

Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offer

Such offer that fails in representation of the above required license will not be considered for award

Fill-in

Atch 3 – Page 5

Submit

Mission – Family – Warrior

Solicitation (Cont’d)

Section L

L-100 Proposal Preparation Instructions

Offerors are required to meet all sol. requirements, terms & conditions, reps & certs, and tech. requirements

Prepare & Submit:

Part I – Summary and Misc. Data (Submit 1 Orig.+ E-copy)

Part II – Price Proposal (Submit 1 Orig.+ E-copy)

Part III – Past Performance Proposal (Submit 1 Orig. + E-copy)

Submit

RFP – Page 41

Solicitation (Cont’d)

Section L (cont’d)

Part I – Summary & Misc. Data (Submit 1 Orig.+ E-copy)

Concise summary & Master Table of Contents of the Entire Proposal

Signed SF 1442 (Page 1 & 2)

Acknowledgement of the all sol. amendments, if issued

Fill-ins/Cert in Section I thru K and Atch 3

Section I (pages require a fill-in)

Section K (its entirely)

Atch 3 para. 8 (pages require a fill-in)

Affirmation of no exceptions, deviations, or waivers, if none proposed

Submit

Mission – Family – Warrior

Solicitation (Cont’d)

Section L (cont’d)

Part II – Price Proposal (Submit 1 Orig.+ E-copy)

Completed Section B (Page 4)

Submit

Solicitation (Cont’d)

Section L (cont’d)

Part III – Past Performance Proposal (No more than 5 pages per contract / Submit 1 Orig.+ E-copy)

Past Performance Information (see next slide for detail) No more than 5 contracts within 5 years

Quality & Satisfaction Rating of Contracts Any info currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts

Past/Present Performance Questionnaire (PPQ) Use Atch. 9 of RFP Customer/POC evaluator must directly send PPQ to the CO Do not include in proposal package

Submit

Mission – Family – Warrior

Solicitation (Cont’d)

Past Performance Information Company/Division Name1

Contract/Project Title2

Contracting Agency/Customer3

Contract Number4

Contract Dollar Value (use FY24 budget rate of ¥139.1635 if conversion is necessary)5

Period of Performance6

Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer (Point-of-Contact)

Comments regarding compliance with contract terms and conditions8

Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions

Include rationale supporting your assertion of relevance and identify aspects (scope, magnitude of effort, and complexity) of the contracts deemed relevant and how they relate to the proposed effort

Solicitation (Cont’d)

Section L (cont’d)

Past Performance Questionnaire (PPQ) Atch 9

Submit

Request for PPQ

Send a completed PPQ within 10 days after receipt of PPQ request

Offeror Customer/POC

Evaluator 35 CONS/PKP

E-mail:

miyako.fujimoto.jp@us.af.mil kazuo.miura.jp@us.af.mil

FAX: 0176-52-4793

Mail: 35th Contracting Squadron Attn: Mr. Kazuo Miura Bldg. 656, Misawa Air Base, Hirahata, Misawa-shi, Aomori-ken, Japan 033-0012

Mission – Family – Warrior

Solicitation (Cont’d)

Section L (cont’d)

FAR 52.204-7 System for Award Management

Offeror is required to be registered in SAM when submitting an offer

RFP – Page 44

Solicitation (Cont’d)

Section M

M-900 Basis for Contract Award

Subjective Tradeoff (STO) best value source selection

Weight of Importance: Past performance is approximately equal to price

Evaluation Process:

Price – Fairness and reasonableness of the price. The Gov’t reserves the right to perform price realism analysis

Past Performance – Recent and Relevant performance information

RFP – Page 49 ~

Mission – Family – Warrior

Solicitation (Cont’d)

Section M (cont’d)

Past Performance Factor

Recency: Work within the last 5 years prior to the issuance date of the solicitation

Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation

Integrated Assessment

The Gov’t reserves the right to award a contract to other than the lowest price offer

Best value award decision using the Price and the Past Performance Confidence Rating

CES Technical Briefing

CES Technical Briefing

Mission – Family – Warrior

Q&A

All questions asked must be formally submitted to 35 CONS in the form of questionnaire and/or request for clarification later.

Any technical questions deemed to be critical by the government engineers and the Contracting Officer must be submitted in writing to 35

CONS.

Example:

Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing (ref. Solicitation Attachment 3, “Other Contract Requirements”, para 9, L001(c))

Q&A / RFP Closing Date

RFP Closing Date / Time:

26 Feb 24 / 02:00 PM (JST)

Questions shall be submitted to 35 CONS/PKP miyako.fujimoto.jp@us.af.mil / kazuo.miura.jp@us.af.mil / takafumi.nosaki.jp@us.af.mil

NLT 16 Feb 24

Let’s move on to Site Visit

Mission – Family – Warrior

Site Visit

Bus transportation will be provided from the main entrance of Torii Bldg. 656