Atch 5_PPQ Form Paramedic Services.docx
DOCX document 39 KB Posted
- Attached to
- Paramedic Services Federal contract opportunity
- Solicitation number
- FA483022QS001
About this file
This document is a combined synopsis and solicitation for paramedic services at Moody Air Force Base, Georgia. The Air Force is seeking quotations for paramedic services for a base period from March 2022 through December 2022 with four one-year option periods. The solicitation is set aside 100% for small businesses and has an estimated value of $8 million over the five-year period. Quotations are due by January 20, 2022 and must include pricing, technical and past performance submissions, insurance certification, and contractor information. The technical submission must demonstrate how the offeror will meet the requirements in the performance work statement including staffing plans and maintaining emergency response capabilities. The past performance submission is limited to three references within the last three years for similar emergency medical services. The Air Force will evaluate quotations based on price, technical acceptability, and past performance records.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Letter_Amendment 02.pdf | ||
| Letter_Amendment 01.pdf | ||
| Atch 1_Provisions and Clauses 22QS001 Rev 1.pdf | ||
| QandA Document 20220112.pdf | ||
| Atch 2_PWS Paramedic Services.pdf | ||
| Atch 8_AFMS BAA.docx | DOCX document | |
| 1. RFQ, Paramedics 22QS001.pdf | ||
| Atch 1_Provisions and Clauses 22QS001.pdf | ||
| Atch 3_Pricing Schedule.xlsx | XLSX spreadsheet | |
| Atch 6_Insurance Compliance.pdf | ||
| Atch 4_WD 2015-4493 Rev 16.pdf | ||
| Atch 7_Contractor Information.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA483022QS001
Attachment 5
PRESENT / PAST PERFORMANCE EVALUATION QUESTIONNAIRE PARAMEDIC SERVICES, MOODY AFB, GA
SOLICITATION NO: FA483022QS001
FORM COMPLETION INSTRUCTIONS: Please complete questionnaire by typing for legibility purposes, and email the results to the Contracting Specialist, SrA Jordon Bongcayao at jordon.bongcayao@us.af.mil and to the Contracting Officer, Gerard Entwisle at gerard.entwisle.2@us.af.mil. Please submit completed questionnaire via email.
Please direct questions to SrA Bongcayao at 229-257-3676 or Gerard Entwisle at 229-257-2509. Your Participation is greatly appreciated.
PLEASE RETURN NO LATER THAN: 20 January 2022, at 2:00 PM (Eastern Standard Time)
Your assistance is respectfully requested in providing information on the attached performance questionnaire. The importance of your opinion cannot be overstated. This survey measures the present/past performance of the prospective Contractor for providing Paramedic Services at Moody AFB, GA.
Name and Address of Contractor questionnaire is being completed for:
Point of Contact/Email Address/Phone Number:
CAGE Code:
DUNS Number:
Contract Number:
Contract Type:
Performance Period (base plus any options):
Total Contract Dollar Value:
Description of Services Performed:
Contractor Performed As:
Prime
Subcontractor
Joint Venture Team Member
Is performance on this contract being reported in CPARS:
Yes
No
Name of Agency/Company completing questionnaire:
Name/Title of person completing questionnaire:
Phone number/email of person completing questionnaire:
Date questionnaire is being completed:
RATING SCALE: Please use the following ratings to answer the questions on pages 2-4.
| Rating |
| Definition |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
| Neutral |
| No record exists. |
| N/A |
| (Not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation. |
NOTE: For any ratings less than satisfactory rating, please provide explanation in Remarks section below.
CONTRACTOR PAST PERFORMANCE EVALUATION SURVEY FOR SERVICES
| N/A |
| Neutral |
| Unsatisfactory |
| Marginal |
| Satisfactory |
| Very Good |
| Exceptional |
1.)Management Effectiveness:
a. Contractor provided experienced managers and supervisors with technical and administrative abilities to meet contract requirements.
b. The Contractor provided qualified personnel in accordance with the terms and conditions of the contract requirements.
c. Recruited, placed and retained qualified personnel with minimal disruption for hard-to-fill (specialty) positions.
d. The Contractor utilized personnel that were appropriate to the effort performed.
e. Contractor demonstrated effective management over the effort performed.
f. Contractor maintained an open line of communication so that the Contracting Officer’s Representative (COR) and/or Contracting Officer were apprised of any schedule issues.
g. Contractor demonstrated effective management of its subcontractor(s) and or teaming partner as it relates to the contract.
h. Contractor’s overall management effectiveness.
PLEASE PROVIDE COMMENTS ON LAST PAGE IF RATED ABOVE OR BELOW SATISFACTORY
2.) Quality of Service and Workmanship:
a. Contractor provided professional staff.
b. Contractor maintained quality of staff care.
c. Contractor provided complete and accurate qualifying documentation for contractor personnel in accordance with the terms and conditions of the contract.
d. Tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.
e. Contractor presented information and correspondence in a clear, concise, and businesslike manner.
g. Contractor promptly notified the COR and/or Contracting Officer in a timely manner regarding urgent issues.
PLEASE PROVIDE COMMENTS ON LAST PAGE IF RATED ABOVE OR BELOW SATISFACTORY
3.) Manpower Efficiencies
a. Contractor provided new hires in a timely manner
b. Labor turnover in key personnel labor categories was minimal and did not adversely affect Contractor performance.
c. Contractor proposed qualified personnel to fulfill the requirements of the contract without frequent turnover and minimal operation disruption.
d. Contractor illustrated the capability to manage large workforce at one location (25+ employees)
PLEASE PROVIDE COMMENTS ON LAST PAGE IF RATED ABOVE OR BELOW SATISFACTORY
4.) Quality Control
a. Contractor provided an adequate quality control plan.
b. Contractor adhered to its quality control plan.
c. Contractor documented its quality control checks/corrective actions.
d. Contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.
e. Contractor demonstrated ability to adequately address performance problems.
f. Contractor’s overall quality control.
PLEASE PROVIDE COMMENTS ON LAST PAGE IF RATED ABOVE OR BELOW SATISFACTORY
5.) Customer Satisfaction
a. Services provided adequately met the needs of the program.
b. Contractor was able to perform with minimal direction from the COR or the Contracting Officer.
c. Contractor's reasonableness, cooperation, and commitment to customer satisfaction.
d. I am satisfied with the performance of the Contractor under this effort.
PLEASE PROVIDE COMMENTS ON LAST PAGE IF RATED ABOVE OR BELOW SATISFACTORY
PERFORMANCE SUMMARY:
Would you award this firm another contract? Yes No
If you answered No provide an explanation in the additional comments section
ADDITIONAL COMMENTS:
| __________________________________________ | ______________________ | |
| Signature | Date |
File details come from the government source that posted it. Updated .