This document is a Statement of Work (SOW) for the installation of communication network switches at five Access Control Points (ACPs) at Joint Base San Antonio (JBSA) Fort Sam Houston (FSH).
The key requirements include installing and configuring network switches at each ACP to provide network connectivity and enable video surveillance feeds to be transmitted to the Base Defense Operations Center (BDOC). The contractor shall attempt to utilize existing cabling where possible and will be responsible for labeling all new wiring and providing a wiring diagram. The government will provide the network switches, data lines, and Video Management System (VMS), while the contractor will provide all other required materials and equipment. The contractor must provide a one-year warranty on the installation work and on-site familiarization training for maintenance. Contractor testing and government acceptance testing are also required.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Joint Base San Antonio (JBSA)
Fort Sam Houston (FSH) Access Control Point (ACP)
Communication Network Switch Installation
15 Feb 2024
502 SFG/S5S (AETC)
1. SOW: The Government requires installation of communication network switches at five Access Control Points (ACPs) at JBSA-FSH. This requirement will incorporate both, installation and removing of nonoperational, switches and cabling. The installation and figuration is needed at each ACP with operational cameras to provide video display at the local Base Defense Operations Center (BDOC). The integrity and aesthetics of the ACP shall remain intact. The location of each communication network switch will be secured in the communication panel located at each ACP.
2. PURPOSE: The purpose of this requirement is to provide network connectivity at 5 JBSA-FSH ACPs to support and provide the required connectivity for all operational and installed Closed Circuit Television (CCTV) cameras. The installation of the communication switches will enable BDOC to remotely view the CCTV cameras. By utilizing AF approved cameras and switches, we ensure there are no need for a separate Authority to Operate (ATO), and/or additional costs to operate and sustain the equipment via a maintenance contract. The contractor work schedule will be coordinated with the military assigned project manager. This requirement will consist of work at the following JBSA-FSH locations.
JBSA-FSH:
1. Harry Wurzbach East
2. Harry Wurzbach West
3. I-35 Brooke Army Medical Center (BAMC) to include Visitor Control Center
(VCC) and Commercial Vehicle Inspection Point (CVIP)
4. Wilson
5. Jadwin CVIP
3. REQUIREMENTS: To install, configure, and test network switches at each ACP to establish CCTV feeds allowing 24/7 video surveillance and availability through the currently installed Milestone Video Management System (VMS). The connection of the network switches will be able to support each locations data needs as well as provide transmission of useable video images that are clear and highly defined of all activity during day and night operations and inclement weather conditions. The installation and network connection will have and be sustained by a 4-hour battery back-up via an uninterrupted power supply (UPS). Threshold: Proof of data connectivity and camera views with useable digitally recorded video at the BDOC. Objective: Full integration and interoperability of new cameras, viewable at BDOC via the video management system.
4. The approved network switches will be installed at the below listed ACP locations.
ACP Bldg # Switch Type # of Ports
Network Switch
1. HARRY WURZBACH EAST 2830 Ruckus/24 port 1
2. HARRY WURZBACH WEST 589 Ruckus/12 port 1
3. I-35 BAMC, VCC, CVIP 3708 Ruckus/24 port 1
4. WILSON 200 Ruckus/12 port 1
5. JADWIN CVIP 4200 Ruckus/12 port 1
TOTAL 5
5. INSTALLATION:
5.1. The contractor shall attempt to utilize the existing cabling where possible. If new switch locations are necessary, contact project manager to approve location. All wiring shall be enclosed in conduit in accordance with National Electrician Code (NEC) unless incased in the communication panel. The cabling shall maintain a professional appearance to maintain the aesthetics of the ACP.
5.2. If issues arise the contractor will contact the project manager to resolve any data connectivity. The Program Manager (PM) will facilitate coordination with base agencies as needed.
5.3. The contractor shall label all new wiring, produce, and provide to the government a wiring diagram that shows the connection topology from the gate cameras to the
VMS.
5.4. The contractor will fill and repair all holes in the infrastructure created or exposed by the contract while performing the installation of the switches.
5.5. The contractor will remove and dispose of all mounting equipment removed during the installation of the new switches, along with any packaging, debris, etc.
accumulated because of the installation. Additionally, the contractor shall ensure daily cleanup of the worksite.
5.6. Any existing communication switches or other equipment removed will be returned to the government PM.
6. GOVERNMENT FURNISHED ITEMS AND SERVICES:
6.1. Services: The government will ensure the safety of the contractor to the extent within the governments control and shall not place the contractor in any unnecessary risk situations where the situation can be avoided.
6.2. Facilities: The government will provide accessibility to all areas required for the contractor to complete the tasks under this contract. The government will provide access to all areas and rooms, to include communications closets, installation access control points and facilities where the associated communications infrastructure exists and/or will be installed and is applicable to the tasks, as well as other rooms necessary to complete the tasks.
6.3. Utilities: The Government will provide adequate lighting, water, and relief facilities during the performance of the tasks. All utilities in the facility or an adjacent facility will be available for the contractor’s use in performance of tasks outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices.
The contractor shall be responsible for opera ting under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
6.4. Equipment: The government will provide the data lines and direct fiber pathway communications links to the BDOCs as well as the Video Management Systems (VMS) and Network Video Recorders (NVR), and the network switches to be installed at the specified locations IAW para 4 in support of this contract and are listed on the Defense Information Systems Agency (DISA) published Department of Defense Information Network (DoDIN) Approved Products List (APL) located at https://aplits.disa.mil/processAPList.action.
6.5. Materials: The government will provide the appropriate number of Standard Form 710, UNCLASSIFIED INFORMATION label for marking components/equipment associated with this contract.
6.6. The government will provide to the contractor a product that outlines the type of network switch as well as the location it will be installed in accordance with this
SOW.
6.7. The government will provide to the contractor a chronological events log that shows the results of the 72-hour burn-in as part of the System Acceptance Test (SAT).
6.8. The government will provide escorts IAW local security requirements into areas where the contractors are not permitted unescorted access, such as restricted areas and or secure rooms as required, etc.
7. CONTRACTOR FURNISHED ITEMS: The contractor will provide all other materials and equipment not already mentioned in this SOW, and that is required for the installation, connection, configuration, integration, and testing of the switches to provide the appropriate data and useable video feeds through the installed VMS and other components as well as display at the local BDOC.
https://aplits.disa.mil/processAPList.action
8. WARRANTY: The contractor shall provide a one (1) year warranty for all work conducted during the installation of the CCTV system. The warranty should include the following, at a minimum:
8.1. All work done (mounting, connections, and wiring) to the infrastructure to accommodate the switches/camera for the period of one (1) year after installation.
8.2. The contractor shall be trained and certified to perform maintenance and configuration operations on the Milestone VMS to preclude issues with voiding the warranty on the already installed VMS.
9. TRAINING: Contractor will provide onsite familiarization for maintenance to ensure long life of equipment (i.e. cleaning, troubleshooting, and etc). The contractor will provide all familiarization and training materials to ensure the user has good understanding on the characteristics of the switches. The contractor shall provide the 502d Security Forces Group (SFG) Security Systems Manager, 502d Security Forces Squadron (SFS) Electronic Security Systems (ESS) Program Manager (PM)/Non-Commissioned Officer (NCO), with the salient characteristics of the switches installed, manufacturer documentation/operation manuals/pamphlets, troubleshooting training, and report of any troubleshooting needed for installation.
10. GOVERNMENT ACCEPTANCE TESTING: Contractor will perform a Contractor Verification Test (CVT) upon completion of each facility. Both the contractor and Government representative will witness this test. The test will be performed per the written testing procedures provided in the Installation Design Package (IDP).
11. REFERENCES: The following requirements apply to this requirement:
Air Force Instruction 31-101, Integrated Defense
United Facility Code (UFC) 4-022-01, Security Engineering/Access Control Points specifically paragraph 5-8.6
UFC 4-021-02, Electronic Security Systems, Change 1, 11 September 2019
UFC 3-301-01, Unified Facilities Criteria (UFC) Structural Engineering, 1 Oct 19
Unified Facilities Guide Specifications (UFGS), 11 May 23 (or current) ALL applicable https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
UFGS-28 10 05, Electronic Security Systems, May 2016
ESE-SIT-0001, Standardized Electronic Security Equipment Siting and Design Guide, 21 February 2018
TIA/EIA-570, Residential Telecommunications Cabling Standards https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for Telecommunications
NFPA 70, National Electric Code (NEC)
NFPA 101, Life Safety Code
Non-Nuclear Configuration Management Database Equipment Approval Letter, 29 Apr 2024
Occupational Safety and Health Administration guidelines
Notice to Airmen 2020-05-002, IT Systems Supporting Force Protection Operations
Department of Defense Information Network (DoDIN) Approved Products List (APL) https://aplits.disa.mil/processAPList.action
MIL-STD-130N, DoD Standard Practice, Identification Marking of US Military Property w/Change 1, 16 Nov 12
MIL-STD-882E, System Safety, 11 May 12
Controlled by: 502 SFG/S5 Controlled by: 502 SFG/S5S CUI Category: DCRIT Limited Dissemination Control: FEDCON POC: Victor Odom, (210) 652-5749 https://aplits.disa.mil/processAPList.action
File details come from the government source that posted it. Updated .