Atch 3 - Reference 1 - Three Year Electric Test SOW 2026 - Equipment List.pdf
PDF 79 KB Posted
- Solicitation number
- 36C25026Q0823
About this file
This document is a comprehensive schedule for a 3-Year Electrical Testing and Maintenance program consisting of seven testing days scheduled across October and November 2026. The program involves systematic testing and maintenance of electrical equipment across multiple buildings at a facility.
Day 1 (October 10, 2026) focuses on the FTD facility's primary electrical infrastructure, including the Main Switchboard with 26 breakers, one transformer, Motor Control Centers, Emergency Power Distribution (MEDP), and Automatic Transfer Switches (ATS-1, ATS-2, ATS-3). Duke Energy will disconnect electrical service at 8:00 AM and restore it at 12:00 PM. Day 2 (October 17, 2026) tests Unit Substations and distribution panels across Building 1, requiring testing of 89 breakers and 6 transformers. Day 3 (October 24, 2026) covers additional primary switchgear and distribution equipment in Buildings 1 and 14, testing 77 breakers and 4 transformers. Day 4 (October 31, 2026) is designated "ALL EMERGENCY POWER" and tests emergency switchboards, multiple Automatic Transfer Switches (ATS-4 through ATS-8), parallel switch gear breakers, and fire pump systems across Buildings 1 and 15, totaling 15 breakers, 1 transformer, and 5 ATS units. Day 5 (November 7, 2026) involves primary switchgear testing with Duke Energy disconnect at 8:00 AM, covering fusable primary switches and main distribution panels with 35 breakers and 1 transformer. Day 6 (November 14, 2026) is "ALL EMERGENCY POWER" testing across Buildings 1, 2, 15, and 25, addressing emergency switchboards, multiple ATS units, and related equipment totaling 69 breakers, 26 transformers, and 22 ATS units. Day 7 (November 21, 2026) tests unit substations and high-voltage switch equipment across Buildings 2, 3, 8, 13, and the Parking Garage, requiring 47 breakers and 22 transformers. Total facility equipment inventory includes 416 breakers, 68 transformers, 43 ATS units, and 17 Motor Control Centers, accounting for a 10% variance allowance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026Q0823 0001.docx | DOCX document | |
| Atch 4 - Wage Rates 2015-4719.pdf | ||
| Atch 1 - Instructions for VAAR 852.219-75.docx | DOCX document | |
| Atch 5 - Security Information.pdf | ||
| 36C25026Q0823.docx | DOCX document | |
| Atch 6 - Arc Flash Study Single Lines - FOR REFERENCE ONLY.pdf | ||
| Atch 2 - VHA Directive 1192-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 Year Electrical Testing and Maintenance Day 1
Test Date: 10-Oct-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
FTD Gen Room 8am - 12pm Main Switchboard "MS" 26 FTD Gen Room 8am - 12pm TRANSFORMER 1 FTD 004C 8am - 12pm MCC MSP 2 1
FTD Boiler Room 12:30pm -
4:00pm Motor Control Center 1 1
FTD Gen Room 12:30pm -
4:00pm MEDP (Emergency Power) 3
FTD Gen Room 12:30pm -
4:00pm EDP-C, EDP-E (6 CB's), EDP-L 6
FTD Gen Room 12:30pm -
4:00pm
ATS-1, ATS-2, ATS-3 3
FTD Gen Room 12:30pm -
4:00pm Generator Main Breaker 1
FTD Gen Room 12:30pm -
4:00pm Reserve (Spare) Breakers 7
46 1 3 2
Breakers Xfmrs ATS MCC
Equipment Listed 378 61 39 15 +10% Variance 38 7 4 2
Total 416 68 43 17
TOTAL FACILITY EQIPMENT
Disconnect Electric Service by Duke Energy- 8 am
Restore Electric Service by Duke Energy- 12 pm
3 Year Electrical Testing and Maintenance Day 2
Test Date: 17-Oct-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
1 B013a 8am - 6pm Unit Substation US-1A (10 CB's) 10 1 1 B16A - DPB (8 CB's) 8
15 B02 - 15MDP (8 CB's) 8 1 B013a - Unit Substation US-1B (11 CB's) 11 1
1 A019 - DPP 2
1 A022A - DPE 8
1 A023 - Unit Substation US-1X, MCC-2 11 1 1
1 C008 - DS-1A, MCC-E 7 1 1
1 C008 - DS-1X 3
1 A0004 - DPF (3FT1 Transformer) (Kitchen) 5 1 1 A023 - Unit Substation US-1P (10 CB's) 10 1 1 - MCCB, MCC-D/G, MCC-C (5th Flr.) 4
1 - MCC-5, MCC-5A 3 2
1 C008 - DS-1P 3
89 6 0 8
3 Year Electrical Testing and Maintenance Day 3
Test Date: 24-Oct-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
1 A023 8am - 5pm US-1C (CB's & Transformer) 10 1 1 A019 - DPA (8 CB's) 8 1 A001D - DPC (8 CB's) 8 1 A10001 - MCP (Penthouse) 1 1 A023 - US-1D (CB's & Transformer) 9 1 1 A032F - DPD (8 CB's) 8 1 C008 - DS-1B (9 CB's), DP2 (1 CB + TRANS), DPF (1) 11 1 A0004 - DP-LF (7 CB's), DP-LF3 (1 CB), BF1 (1 CB), BF2 (1 CB) 10
14 204 / 205 - 14ESWB (4 CB's), 14OSPDP1 (1 CB), 14OSDP1 (8 CB's), 14TEM, 14TOS1, ATS LR, ATS EM, ATS OS1, ATS OS2
13 2 4
77 4 4 1
3 Year Electrical Testing and Maintenance ALL EMERGENCY POWER Day 4
Test Date: 31-Oct-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
1 B013 8am - 2pm Emergency Switchboard "ESB" 8 1 1 B013 8am-10am ATS 4 "1E4" P1 and P2 1 1 B013 10am -12pm ATS 5 "1E5" P3 and P4 1 1 B013 12pm - 2pm ATS 6 "1E6" S5 and S6 1 1 SB06 8am-11am ATS 8 "1E8" Fire Pump 1 1 B013 8am - 2pm Parallel Switch Gear Breakers 7
15 B015 11am-2pm Bldg 15 Fire Pump ATS 1 15 1 5 0
3 Year Electrical Testing and Maintenance Day 5
Test Date: 7-Nov-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
Disconnect Electric Service by Duke Energy- 8 am
1 B013a 8am - 4pm Primary Switchgear, Preferred and Alternate(Air Breakers and Metering)
1 B013a - US-1A & US-1B Fusable Primary Switch 4 1 A023 - Primary Switchgear, "PS1" (6 - Fusable Primary Switches) 6 1 B013a - Main Capacitor Bank
14 205 - US-14 Fusable Primary Switch US-14 Transformer 1 1 14 204 / 205 - 14 MDP (9 CB's), 14 DP1 (7 CB's) 16
35 1 0 0
3 Year Electrical Testing and Maintenance ALL EMERGENCY POWER Day 6
Test Date: 14-Nov-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
15 B02 8am - 8pm
15 ATS-1, 15 ATS-2, 15 ATS-3, 16 ATS FISHER HOUSE, ATS
Disconnect CB's (4), Elevator transformer, Panel WH (1 CB), Panel
15E1 (1 CB)
6 1 4
1 B013a - ATS 3 "1E3" Medical Air 6 1 1 B013a - ATS 7 "1E7" IRM 5 1 1 A023 - GDE (6 CB's + TRANS) 6 1 1 A023 - ATS-27 LSDP (3 CB's + Trans) 3 1 1 A023 - ATS-28 CDP (8 CB's) 8 1 1 A023 - ATS-29 Liebert and Disconnect CB 1 1 1 C003A - ESWB (11 CB's), ESWB-20 (3 CB's), ESWB-40 A&B (6 CB's) 20 15
1 C003A - ATS-9, ATS-10, ATS-11, ATS-12, ATS-21, ATS-26 6
1 C008 - ATS-30, ATS-1 2
1 A023 - ATS-24 1
1 A001 - EDPEQ 4 2
3RD
FLR.MECH
- EDPEQ3, 30kva Trans, MCC EEQM3 2 1 1
4th Flr.
Mech
- MCC-E/F 2 1
2 5 - EDP (2) (ATS-18, ATS-19 (ECDP1, Trans), ATS-20 (EQDP1, TRANS), ATS-15 (ECDP2, Trans), (LSDP1 Trans))
8 4 4
69 26 22 2
3 Year Electrical Testing and Maintenance Day 7
Test Date: 21-Nov-26 Saturday Building Number
Room Number Time Period Equipment to be tested Breakers Xfmrs ATS MCC
3 13 8am - 6pm Unit Substation US-3 & Dist. Panelboard 5 1 0 8 - Transformers & Gen Breaker, ATS's 2 3 0 1
13 - All normal power equipment 12 8 3 1 2 - Unit Substation US-2, DP1, DP2, MDP 21 7
PG -
MDP (5 CB's), 2-ATS's, GPEM (1 MCB), Elevator transformers (2), Gen Breaker & Transformer
7 3 2
- PPSU - High Voltage Switch for Bldg. 2/3/8/13/PG 47 22 5 2
| Reference 1 - Equipment List - Day 1.pdf |
| Reference 1 - Equipment List - Day 2.pdf |
| Reference 1 - Equipment List - Day 3.pdf |
| Reference 1 - Equipment List - Day 4.pdf |
| Reference 1 - Equipment List - Day 5.pdf |
| Reference 1 - Equipment List - Day 6.pdf |
| Reference 1 - Equipment List - Day 7.pdf |
File details come from the government source that posted it. Updated .