This document contains drawings and specifications for the construction of a new 25-foot diameter ground storage tank at the USDA-APHIS-PPQ Moore Air Base water treatment plant in Edinburg, Texas. The project includes installing new piping connections between the new tank and the existing ground storage tank, as well as integrating the new tank with the facility's instrumentation and control system. The drawings provide details on the tank foundation, inlet/outlet piping, overflow/drain system, and required instrumentation. This appears to be part of Solicitation 12639424R0017 for the Above Ground Water Storage Tank project at the Edinburg, Texas site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
M
O
O
R
E
F
I E
L D
R
N
M
O
O
R
E
F
I E
L
C
O
U
N
T
Y
A
C
O
U
N
Y
WATER TREATMENT
PLANT
MOORE AIR BASE
COVER SHEET AND DRAWING INDEX
GG001 0
NONE
AM ROMERO
DL WILGES
MAY 23, 2023
ER SCHALLERT
PJ HANEY
NORTH
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
USDA CONTRACT NO: AG-6395-C-16-0119
PROJECT LOCATION PLAN
PROJECT LOCATION MAP
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
141762
PATRICK J. HANEY
05/23/23
Solicitation 12639524R0017, Attachment 3
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
GENERAL LEGEND
GG002 0
NONE
AM ROMERO
DL WILGES
MAY 23, 2023
ER SCHALLERT
PJ HANEY
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
OR CL
OR PL
OPENING OR DEPRESSION IN SLAB OR WALL
OPENING WITH GRATING COVER (PLAN)
ROUGHENED CONSTRUCTION JOINT
CONSTRUCTION JOINT (KEYWAY)
CONSTRUCTION JOINT (KEYWAY) WITH WATERSTOP
MASONRY CONTROL JOINT (IN PLAN)
MASONRY EXPANSION JOINT (IN PLAN)
ROUGHENED CONSTRUCTION JOINT WITH WATERSTOP
OPENING WITH CHECKERED PLATE COVER (PLAN)
S P
A N
DRAWING NUMBER(S)
ON WHICH VIEW IS
CALLED OUT
VIEW IDENTIFICATION
NUMBER
DESIGNATES LOCATION
OF DETAIL
DESIGNATES DIRECTION
FROM WHICH PLAN OR
ELEVATION IS VIEWED
DESIGNATES CUTTING
PLANE OF SECTION
DIMENSIONS AND/OR ELEVATIONS MARKED THUS (+/-) MUST BE VERIFIED IN THE
FIELD BY THE CONTRACTOR.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE ASSUMED AND SHALL BE
VERIFIED OR MODIFIED AS REQUIRED BY THE CONTRACTOR TO SUIT EQUIPMENT
FURNISHED. FINAL DIMENSIONS ARE SUBJECT TO THE REVIEW OF THE DESIGNER
OF RECORD.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE APPROXIMATE.
OBTAIN FINAL DIMENSIONS FOR CONSTRUCTION FROM THE DESIGNER OF RECORD.
1 1
1. ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE APPROXIMATE. CONTRACTOR SHALL SURVEY AND
MAKE ALL NECESSARY FIELD MEASUREMENTS OF EXISTING STRUCTURES AND EQUIPMENT TO VERIFY
DIMENSIONS SHOWN ON DRAWINGS, AND TO PROVIDE DIMENSIONS NOT SHOWN, PRIOR TO
FABRICATION. ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED SHALL BE REPORTED IN
WRITING TO THE DESIGN PROFESSIONAL AND OWNER'S REPRESENTATIVE WITHIN TWENTY-FOUR (24)
HOURS. COSTS FOR MODIFICATIONS OF NEW CONSTRUCTION, DUE TO LACK OF CONFIRMATION OF
DIMENSIONS BY FIELD MEASUREMENTS, SHALL BE BORNE BY CONTRACTOR.
2. CONTRACTOR SHALL REVIEW CONTRACT DOCUMENTS TO DETERMINE THE EXACT LOCATION OF ALL
WORK AND VERIFY SPATIAL RELATIONSHIPS OF ALL WORK. ANY QUESTION CONCERNING LOCATION OR
SPATIAL RELATIONSHIPS SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE. SPECIFIC
LOCATIONS FOR EQUIPMENT, PIPELINES, DUCTWORK AND OTHER SUCH ITEMS OF WORK, WHERE NOT
DIMENSIONED ON DRAWINGS, SHALL BE DETERMINED IN CONSULTATION WITH OWNER'S
REPRESENTATIVE AND DESIGN PROFESSIONAL BY CONTRACTOR. CONTRACTOR SHALL BE
RESPONSIBLE FOR THE PROPER FITTING OF THE WORK IN PLACE.
NOTES:
1. ALL ELBOWS ARE SHORT RADIUS UNLESS NOTED OTHERWISE.
2. ALL REDUCERS ARE CONCENTRIC UNLESS NOTED OTHERWISE.
NORMALLY
OPEN
NORMALLY
CLOSED
SWING CHECK
HOSE BIBB
W/ HYDRANT
SLEEVE TYPE
MECHANICAL COUPLING
ED
FD
HB
AFF
ALUM
ATS
CL
CL
CLR
CMU
CTRS
DIA
ED
EEWS
EF
EL
EW
EXST
FD
FT
HB
HCID
HM
HSP-#
HYD
IE
IEX
LAS
LVR
MCC
pH
PL
PW
RWP-#
SD
SK
SPAC
T & B
TOC
TP-#
TP-##
(TYP)
UH
VT
VTR
WH
WTP
WTR
- ABOVE FINISH FLOOR
- ALUMINUM SULFATE
- AUTOMATIC TRANSFER SWITCH
- CENTERLINE
- CHLORINE GAS
- CLEAR / CLEARANCE
- CONCRETE MASONRY UNIT
- CENTERS
- DIAMETER
- EQUIPMENT DRAIN
- EMERGENCY EYE WASH STATION
- EXHAUST FAN
- ELEVATION
- EACH WAY
- EXISTING
- FLOOR DRAIN
- FEET / FOOT
- HOSE BIBB
- HIDALGO COUNTY IRRIGATION DISTRICT
- HOLLOW METAL
- HIGH SERVICE PUMP
- HYDRANT
- INVERT ELEVATION
- ON EXCHANGE
- LIQUID AMMONIUM SULFATE
- LOUVER
- MOTOR CONTROL CENTER
- POTENTIAL HYDROGEN
- PLATE / PLASTIC LAMINATE
- POTABLE WATER
- RAW WATER PUMP
- SANITARY DRAIN
- SINK
- SUPERVISORY PANEL
- TOP & BOTTOM
- TOP OF CONCRETE
- TRANSFER PUMP (WATER PLANT DISCHARGE, ON SKID)
- TIE POINT NUMBER (SEE GG05)
- TYPICAL
- UNIT HEATER
- VENT
- VENT THRU ROOF
- WATER HEATER
- WATER TREATMENT PLANT
- WATER
VIEW MARKERS GENERAL SYMBOLS ABBREVIATIONS GENERAL NOTES
GENERAL MATERIALS LEGEND
MECHANICAL
SECTION
ELEVATION
DETAIL
DIMENSIONS AND SCALE
A-SF1
B-SF1
C-SF1
FIELD MEASURMENT NOTES
NUMERIC SCALE VALUES (1/4"=1'-0", ETC) APPLY ONLY AT FULL SIZE.
DIMENSIONS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED. USE
DIMENSIONS SHOWN. NTS (NOT TO SCALE) IS SHOWN ONLY WHERE DIMENSION IS
OBVIOUSLY OUT OF SCALE.
ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND
MAY NOT APPEAR ON THIS SET OF DRAWINGS.
1.
FLEX CONNECTION
CONCENTRIC REDUCER
ECCENTRIC REDUCER
EQUIP DRAIN
FLOOR DRAIN
EXPANSION JOINT
90° BEND PIPE TURN DOWN
90° BEND PIPE TURN UP
FLANGED JOINT
MECHANICAL JOINT
EXPANSION JOINT
CENTRIFUGAL PUMP
EARTH
ROCK
SAND, CMU, PLASTER, CRUSHED ROCK
GRANULAR FILL
CONCRETE
STEEL (IN SECTION)
NON-FERROUS METAL
BRICK IN SECTION
ROUGH WOOD (IN SECTION)
PLYWOOD
RIGID INSULATION
BATT INSULATION
GLASS (ELEVATION)
SQUARE
DIAMETER OR ROUND
CENTERLINE
PROPERTY LINE
GUARDRAIL/HANDRAIL
ELEVATION DESIGNATION
EXISTING OBJECT LINE
EXISTING OBJECT TO BE REMOVED OR RELOCATED
OUTLINE OF NEW OR RELOCATED OBJECT
OUTLINE OF FUTURE OBJECT
CENTER LINE
HIDDEN LINE
SURFACE BREAK LINE
MATERIAL BREAK LINE
MATCH LINE
EL 100'-0"
WELDED WIRE FABRIC
REINFORCING BARS IN CONCRETE
GATE
BALL
BUTTERFLY
CONTRACT IDENTIFICATION:
NUMBER AT LEFT INDICATES CONTRACT FURNISHING,
NUMBER AT RIGHT INDICATES CONTRACT INSTALLING.
COLUMN IDENTIFICATION:
SUBSTITUTE LETTER OR NUMBER FOR ASTERISK
REVISION IDENTIFICATION SYMBOL:
THE NUMBER IN THE TRIANGLE INDICATES THE REVISION
NUMBER IDENTIFIED. THE LETTER "A" IMMEDIATELY TO THE
RIGHT OF THE TRIANGLE INDICATES THE REVISION IS PART OF
A CONTRACT ADDENDUM. WHEN REVISIONS INVOLVE LESS THAN
ENTIRE DRAWING, PRINCIPAL ASPECTS OF REVISIONS ARE
"CLOUDED".
SF1,SF2
A-SF1
B-SF1
C-SF1
SF1,SF2
SF1,SF2
A
M
141762
PATRICK J. HANEY
05/23/23
AutoCAD SHX Text
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
IN
cm0 1
3 4
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
T O
T A
L
C
H L O
R I N
E
FM
GROUND STORAGE TANK NO. 1
P H
T U
R B
I D
I T
Y
FM
C H
L O
R I N
E
D
I O
X I D
E
A L U
M
WATER BOY UNIT 1
WATER BOY UNIT 2
L A
S
C H
L O
R I N
E
FM
TRANSFER PUMPS
TRANSFER PUMPS
AERATED 5 MILLION
GALLON RAW WATER
RESERVOIR
HCID #6 IRRIGATION
CANAL
T U
R B
I D
I T
Y
P H
NOTES:
1. ITEMS SHOWN GREY ARE EXISTING; ITEMS SHOWN IN
BLACK ARE NEW, BY CONTRACTOR.
2. VALVES ARE NOT SHOWN.
3. DISTRIBUTION SYSTEM LOOPS ARE SHOWN FOR
REFERENCE ONLY. VALVES, ETC. ARE OMITTED FOR
CLARITY.
4. FOR LIST OF ABBREVIATIONS SEE SHEET GG002.
LEGEND:
FM
SAMPLE
CHEMICAL APPLICATION
FLOW METER
C H
L O
R I N
E
D
I O
X I D
E
A L U
M
RAW WATER PUMPS
HIGH SERVICE PUMPS
ELEVATED WATER
STORAGE TANK
PROCESS SCHEMATIC
GG004 0
NONE
AM ROMERO
DL WILGES
MAY 23, 2023
ER SCHALLERT
PJ HANEY
BOUNDARY OF WATER
TREATMENT PLANT BUILDING
DISTRIBUTION LOOPS
T U
R B
I D
I T
Y
GROUND STORAGE TANK NO. 2
PI002-TP02
PI002-TP01
FM
FM
141762
PATRICK J. HANEY
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
PIPING AND INSTRUMENTATION
LEGEND
GG005 0
NONE
AM ROMERO
DL WILGES
MAY 23, 2023
ER SCHALLERT
PJ HANEY
MODIFIER
OUTPUT
FUNCTION
DOWN OR
CLOSED, CONFIRM
AMBER, AUTO,
BLUE
ALARM
PASSIVE FUNCTION
READOUT OR
USER'S CHOICE
MEASURED OR
B
C
CONDUCTIVITY
BURNER FLAME
(ELECTRICAL)
A ANALYSIS
INITIATING VARIABLE
MODIFIER
CONTROL
BUTTON
GREEN, GROUND
FLOOR, FORWARD
HIGH, HAND
OFF, FAULT
DCS
OPEN, ON (RUN),
LOW, LEAD
MOTOR
UP
RED, REMOTE
START
WHITE
VALVE, REVERSE
GLASS, VIEWING
INDICATE
SENSOR
LIGHT (PILOT)
(RESTRICTION)
ORIFICE
E
F
FLOW RATE
VOLTAGE (EMF)
H
I
(DIMENSIONAL)
INITIATED)
CURRENT
G
GAUGING
HAND (MANUALLY
SPECIFIC GRAVITY
SCAN
J
K
L
TIME OR TIME-
MOISTURE OR
SCHEDULE
LEVEL
POWER
N
O
PRESSURE OR
USER'S CHOICE
PLC/DCS INPUT
HUMIDITY
M
(ELECTRICAL)
RATIO (FRACTION)
RECORD OR PRINT
MULTIFUNCTION
WELL
TOTALIZE
SAFETY
Q
R
RADIATION
QUANTITY
VACUUM
S
U
T
MULTIVARIABLE
TEMPERATURE
FREQUENCY
SPEED OR
W
Y
X
EVENT, STATE, OR
Z POSITION
PLC/DCS OUTPUT
WEIGHT OR FORCE
VISCOSITY/VIBRATIONV
INTEGRATE OR
REGULATING
P
CONNECTION)
POINT (TEST
RELAY, COMPUTE
UNCLASSIFIED
ELEMENT
FINAL CONTROL
OR UNCLASSIFIED
DRIVE, ACTUATOR
SWITCH
TRANSMIT
MULTIFUNCTION
LOUVER
VALVE, DAMPER,
STATION
CONTROL
DIFFERENTIAL
DENSITY (MASS) OR
D
2.
1.
FOR GENERAL LEGEND AND ABBREVIATIONS, SEE GG002.
ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND
MAY NOT APPEAR ON THIS SET OF DRAWINGS.
PRESENCE
READY
STOP
DEVICE
AVAILABLE
OVERLOAD
(PRIMARY ELEMENT)
CONTROL PANEL
MOUNTED (REAR)
AUXILIARY PANEL
MOUNTED (FRONT)
CONTROL PANEL
MOUNTED (FRONT)
FIELD
MOUNTED
= ANALOG INPUT
= ANALOG OUTPUT
= DISCRETE INPUT
= DISCRETE OUTPUT
= THERMOCOUPLE
= RELAY OUTPUT
= RESISTANCE TEMPERATURE DETECTOR
AI
AO
DI
DO
TC
RO
RTD
GGG
= FUNCTION IDENTIFICATION LETTERS
= CONTROL LOOP NUMBER
= UNIQUE MODIFIER (OPTIONAL)
= I/O TYPE:
CCCCC
DDDD
E
GGG
CCCCC
DDDDD
AMM
CIO₂
CI₂
CO₂
CL
CO
COMB
COND
DO₂
H
H₂
NA
NOX
N₂ O₂
ORP
PH
SMOKE
SO₂
SI0₂
TRB
XXXXX CODE:
XXXXX
AE
= AMMONIA
= CHLORINE DIOXIDE
= CHLORINE GAS
= CARBON DIOXIDE
= CHLORIDE
= CARBON MONOXIDE
= COMBUSTIBLE
= CONDUCTIVITY
= DISSOLVED OXYGEN
= DISSOLVED HYDROGEN
= GASEOUS HYDROGEN
= SODIUM
= NITROGEN OXIDES
= NITROGEN
= GASEOUS OXYGEN
= OXIDATION REDUCTION POTENTIAL
= POTENTIAL HYDROGEN
= SMOKE DENSITY
= SULFUR DIOXIDE
= SILICA
= TURBIDITY
PROCESS LINE (W/ FLOW ARROW)
EXISTING LINE OR FURNISHED WITH THE EQUIPMENT
SOFTWARE LINK
DRAWING NUMBER
DESCRIPTION
STREAM ARROW INDICATES FLOW
ENTERING OR LEAVING DRAWING
AND CONTINUED ON OTHER DRAWING.
PROCESS LINE EXITING DRAWING AND NOT CONTINUED
ON ANOTHER DRAWING
TIE POINT INTO AN EXISTING SYSTEM
YYYY = P&ID DRAWING NUMBER
XX = TIE POINT NUMBER
-TPYYYY
MAGNETIC FLOWMETER
FE
M
XXX
W-YYYY
CONNECTION NUMBER
XX
HARDWIRED SIGNAL INPUT/OUTPUT
FIBER OPTIC SIGNAL
141762
PATRICK J. HANEY
05/23/23
AutoCAD SHX Text
FIRST LETTER
AutoCAD SHX Text
SUCCEEDING LETTERS
AutoCAD SHX Text
FUNCTION IDENTIFICATION
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
PLC
AutoCAD SHX Text
DCS
AutoCAD SHX Text
DEVICE
AutoCAD SHX Text
INSTRUMENT TAG IDENTIFICATION
AutoCAD SHX Text
COMPUTER FUNCTION
AutoCAD SHX Text
INSTRUMENT TAG DESIGNATIONS
AutoCAD SHX Text
ANALYZER IDENTIFICATION
AutoCAD SHX Text
LINES
AutoCAD SHX Text
TIE POINT DESIGNATORS
FLOW ELEMENTS
S
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
E
E
E
E
E
E
E
T
T
T
A
D
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
S
D
S
D
W
W
W
W
W
W
W
W
W
S
S
S
S
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
IN
cm0 1
3 4
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
SITE PIPING
CU101 0
1"=10'
AM ROMERO
DL WILGES
MAY 23, 2023
ER SCHALLERT
PJ HANEY
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
IN
cm0 1
3 4
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
N
O
R
T
H
PROPOSED GROUND
STORAGE TANK
(25'-8" DIA)
6" DI PIPE
EXST GROUND
STORAGE TANK
(21'-6" DIA)
EXST 1" PVC
CHEM LINES
EXST 1" SAMPLE
LINE FROM HSP
SEE NOTE 3
6" PVC PIPE
SEE NOTE 2
NOTES:
1. PROVIDE A 5' WIDE AREA OF AGGREGATE SURFACE CENTERED
BELOW ABOVE GROUND TANK DISCHARGE PIPING.
2. REMOVE EXISTING 6" 90 DEGREE BEND AND REPLACE WITH A
TEE. CONNECT TEE TO BOTH THE EXISTING AND NEW TANK
INLET PIPES.
3. REMOVE BLIND FLANGE AND CONNECT TO PROPOSED PIPING
WITH FLANGE ADAPTER.
4. TANK INLET VALVES ARE LOCATED IN VERTICAL PIPING. SEE
TANK INLET DETAIL ON MP101 FOR PROPOSED TANK INLET
PIPING AND VALVE. NEW INLET VALVE FOR EXISTING TANK
SHALL BE LOCATED 4'-0" ABOVE GRADE.
5. PROVIDE DRAIN CONNECTION ON BOTTOM OF PIPE TO ALLOW
FOR TANK OUTLET PIPE TO BE DRAINED. SEE TANK DRAIN
DETAIL ON MP101.
6. EXACT ROUTING OF EXISTING 1" SAMPLE LINE FROM HSP
DISCHARGE TO WTP BUILDING IS UNKNOWN. CONTRACTOR
SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING THIS
LINE. NOTIFY OWNER IF LINE IS IN CONFLICT WITH ANY
PROPOSED CONSTRUCTION.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL PIPE
SUPPORT LAYOUT. SEE PIPE SUPPORT DETAIL ON CU102.
8. FOR DETAILED TANK INFORMATION, SEE MP101.
9. COORDINATE CONSTRUCTION OPERATIONS WITH OWNER.
COORDINATE CONSTRUCTION PHASING WITH HIGH SERVICE
PUMP OPERATION. SUBMIT SCHEDULE INDICATING CHANGES
OR INTERRUPTIONS TO NORMAL WTP OPERATIONS FOR
OWNER'S APPROVAL
SEE NOTE 5
CONSTRUCTION PHASING:
1. FIELD VERIFY LOCATION AND ELEVATION OF EXISTING TANK
(INCLUDING OVERFLOW WEIR), EXISTING PIPES, AND SITE
FEATURES IN PROXIMITY OF PROPOSED CONSTRUCTION.
2. CONSTRUCT TANK FOUNDATION, TANK, AND ACCESSORIES.
3. CONSTRUCT NEW TANK OUTLET PIPING BETWEEN NEW TANK
AND CONNECTION TO EXISTING HIGH SERVICE PUMP SUCTION
HEADER, BUT DO NOT MAKE CONNECTION.
4. FILL EXISTING TANK AND THEN CLOSE BOTH WATERBOY
EFFLUENT VALVES. CONSTRUCT NEW TANK INLET PIPING AND
CONNECT TO EXISTING PLANT OUTLET PIPE.
5. INSTALL NEW INLET VALVE ON EXISTING TANK BEFORE
PROCEEDING.
6. CLOSE INLET VALVE ON EXISTING TANK, OPEN INLET VALVE ON
NEW TANK, AND OPEN WATERBOY EFFLUENT VALVES.
7. FILL NEW TANK. CONDUCT DISINFECTION, TESTING AND
FLUSHING OF NEW TANK. EXISTING TANK MAY BE RETURNED TO
SERVICE ONCE NEW TANK IS FILLED.
8. CLOSE EXISTING TANK OUTLET VALVE. CONNECT NEW TANK
OUTLET PIPING TO EXISTING HSP SUCTION HEADER.
9. OPEN TANK INLET AND OUTLET VALVES AND PLACE BOTH
TANKS IN SERVICE.
EXST HIGH
SERVICE PUMPS
6" GATE VALVE
SEE NOTE 4
SEE NOTE 4
SEE NOTE 6
PIPE SUPPORT
(TYP) SEE NOTE 7
SEE DETAIL
ON CU102
EXST WATER
TREATMENT PLANT
BUILDING 3207
EXST 6" FILTERED
WATER PIPE
EXST 1" SAMPLE LINE
SEE NOTE 6
SLOPE GROUND AWAY FROM TANK
FOUNDATION AT 1V:10H TO MEET
EXISTING GROUND. TOP SLOPE TO
START AT 4" BELOW TOP OF
CONCRETE FOUNDATION.
141762
PATRICK J. HANEY
05/23/23
ASPHALT REMOVED IN THE
COURSE OF EXCAVATION FOR
THE TANK FOUNDATION MAY BE
DISPOSED OF ONSITE AT THE
LOCATION BEING USED FOR THE
UNDERGROUND UTILITIES
PROJECT
AutoCAD SHX Text 21001
AutoCAD SHX Text 213.650
AutoCAD SHX Text
GV
AutoCAD SHX Text 214.960
GV
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
CIVIL DETAILS
CU102 0
AS NOTED
AM ROMERO
BM GOODNIGHT
MAY 23, 2023
ER SCHALLERT
PJ HANEY
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
2'-6" SQ
1'-4"
8"8"
2" CLR
(TYP)
M
I N
FOOTING
C
L R
(2) #5 TIES
EQ SPACED
#5 DOWELS
W/STD HOOK
(TYP FOR 4)
(3) #3 TIES
THUS:
16" SQ
CONC PIER
(3) #3
EA WAY
2'-6"X2'-6"X1'-0"
THICK CONC FOOTING
A-CU102
1'-4"
2" CLR
(TYP)
SECTION
A-CU102
CU102
SCALE: 1 1/2"=1'-0"
PIPE SUPPORT DETAIL
SCALE: 1 1/2"=1'-0"
NOTES:
1. POST INSTALL ANCHORS USING
HILTI HIT-HT200 ADHESIVE SYSTEM
(6" MIN EMBED)
CONCRETE SPLASH BLOCK DETAIL
SCALE: 1"=1'-0"
5'-0"
2'-2" 2'-6"4"
6"
#4 11" O.C.
EA WAY
PLAN
SLOPE
A-CU102
5'-0"
2'-6" 2'-6"
4"
REMAINING
BACKFILL
PIPE BEDDING
PRESSURE
PIPE
INITIAL
BACKFILL
SEE NOTE 1
M I N
M I N
P I P
E
E
N V
E L
O P
E
NOTES:
1. MAXIMUM TRENCH WIDTH = PIPE OUTSIDE DIAMETER PLUS 2'.
2. SEE SPECIFICATION SECTION 31 23 00 FOR BEDDING AND
BACKFILL REQUIREMENTS.
TYPICAL TRENCH CROSS-SECTION
SCALE: NONE
WARNING TAPE
C-CU102
C-CU102
4'-0"
3'-0" 6"6"
SECTION
C-CU102
CU102
SCALE: 1"=1'-0"
B-CU102
B-CU102
SECTION
B-CU102
CU102
SCALE: 1"=1'-0"
S L O
P E
141762
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
STRUCTURAL LEGEND
AND NOTES
SG001 0
NONE
TW DEIBERT
BM GOODNIGHT
APRIL 19, 2024
JK WOODS
DT CHEN
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
1.
STRUCTURAL DESIGN CRITERIA
REQUIRED SAFE NET ALLOWABLE SOIL BEARING PRESSURE: 1800 PSF.
MINIMUM FOOTING DEPTH: 2 FEET.
ROOF LIVE LOADS: 20 PSF (UNIFORM), 300 LB (CONCENTRATED)
FIELD MEASUREMENT NOTES
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
DIMENSIONS AND SCALE
MECHANICAL ANCHOR (MA)
(EXPANSION ANCHOR, UNO)
ADHESIVE ANCHOR (AA)
SLOPE ARROW
ANCHOR BOLT (AB)
CONCRETE NOTES
GENERAL STRUCTURAL SYMBOLS
1.
2.
3.
4.
5.
6.
7.
A.
B.
C.
8.
9.
10.
11.
12.
13.
14.
15.
REINFORCING STEEL NOTES
REINFORCING BAR
MINIMUM SPLICE LAP LENGTH IN INCHES
BAR SIZE
TOP BARS
OTHER BARS
#3 #4 #5 #6 #7 #8 #9 #10 #11
24 32 40 48 70 80 90 102 113
19 25 31 37 54 62 70 78 87
ANCHOR BOLT DIAMETER
<1 1/2"
HAIRPIN SIZE (UNO)
#3
1-5/8" TO 2" INCL #4
>2" #5
SPECIFIED
COVER
3/4"
D ≤ 12"
-1/8", + 1/4"
1"
1 1/2" OR GREATER
TOLERANCE
D > 12"
-1/8", + 3/8"
+/- 1/4" -1/4", + 3/8"
+/- 3/8" -3/8", + 1/2"
D
SPECIFIED COVER
+ TOLERANCE
BUILDING CODE: INTERNATIONAL BUILDING CODE (IBC) 2018; PUBLISHED BY
INTERNATIONAL CODE COUNCIL, INC.
ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES; PUBLISHED BY AMERICAN SOCIETY OF CIVIL ENGINEERS.
CONCRETE DESIGN CODE: BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318-14; PUBLISHED BY AMERICAN CONCRETE INSTITUTE.
CONCRETE COMPRESSIVE STRENGTH: 4000 PSI AT 28 DAYS.
REINFORCING STEEL: ASTM A615, GRADE 60.
WELDED WIRE FABRIC: ASTM A185.
FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL INVESTIGATION PREPARED
BY MEG ENGINEERS REPORT NO. 01-22-29141 DATED SEPTEMBER 22, 2022
WIND DESIGN DATA
A. RISK CATEGORY: III
B. BASIC WIND SPEED (3 SEC GUST): 140 MPH
C. WIND EXPOSURE: C
D. EXTERNAL PRESSURE COEFFICIENT GCp: 0.85*0.6 = 051
E. TOPOGRAPHIC FACTOR, (Kzt): 1.0
EARTHQUAKE DESIGN DATA:
A. RISK CATEGORY: III
B. SEISMIC IMPORTANCE FACTOR (I): 1.25
C. SHORT PERIOD SPECTRAL RESPONSE ACCELERATION (SDS): 0.046
D. 1 SECOND SPECTRAL RESPONSE ACCELERATION (S1): 0.013
E. SITE CLASS: D
F. SHORT PERIOD SPECTRAL RESPONSE PARAMETER (SD1): 0.012
G. SEISMIC DESIGN CATEGORY (SDC): A
H. ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL FORCE
I. BASIC SEISMIC-FORCE-RESISTING SYSTEM: ORDINARY MASONRY SHEAR
WALLS AND ORDINARY CONCENTRIC STEEL BRACED FRAMES
J. RESPONSE MODIFICATION FACTOR (R=3): 2 FLAL-BOTTOM GROUND
SUPPORTED STEEL TANK
K. SEISMIC RESPONSE COEFFICIENT (CS): 0.019
L. DESIGN BASE SHEAR (V): 10.0 KIPS
ALL DIMENSIONS OF EXISTING CONSTRUCTION ARE APPROXIMATE; CONTRACTOR
SHALL MAKE ALL NECESSARY FIELD MEASUREMENTS OF EXISTING STRUCTURES,
BREECHING AND EQUIPMENT TO VERIFY DIMENSIONS SHOWN ON DRAWINGS AND TO
PROVIDE DIMENSIONS NOT SHOWN, PRIOR TO FABRICATION. COSTS FOR
MODIFICATIONS OF NEW CONSTRUCTION, DUE TO LACK OF CONFIRMATION OF
DIMENSIONS BY FIELD MEASUREMENTS SHALL BE BORNE BY CONTRACTOR.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS (*) ARE APPROXIMATE. OBTAIN FINAL
DIMENSIONS FOR CONSTRUCTION FROM THE DESIGNER OF RECORD.
DIMENSIONS AND/ OR ELEVATIONS MARKED THUS (‡) ARE ASSUMED AND SHALL BE
VERIFIED OR MODIFIED AS REQUIRED BY THE CONTRACTOR TO SUIT EQUIPMENT
FURNISHED.
FINAL DIMENSIONS ARE SUBJECT TO THE REVIEW OF THE DESIGNER OF RECORD.
DIMENSIONS AND/ OR ELEVATIONS MARKED THUS (+/-) MUST BE VERIFIED IN THE FIELD BY
THE CONTRACTOR.
DIMENSIONS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED. USE DIMENSIONS
SHOWN. NTS (NOT TO SCALE) IS SHOWN ONLY WHERE DIMENSION IS OBVIOUSLY OUT OF
SCALE.
NUMERIC SCALE VALUES (1/4"=1'-0", ETC) APPLY ONLY AT FULL SIZE.
EXPOSED CONCRETE CORNER CHAMFER: 1" UNLESS SHOWN OTHERWISE.
KEYWAY DIMENSIONS: DEPTH 1-1/2"; WIDTH ONE-THIRD THAT OF MEMBER
UNLESS SHOWN OTHERWISE.
ALL CONSTRUCTION JOINTS SHALL HAVE KEYWAYS UNLESS SHOWN
OTHERWISE.
CONSTRUCTION JOINTS AS SHOWN MAY BE VARIED TO SUIT PLACING
SEQUENCE PROVIDED THE RELOCATION, ADDITION, OR DELETION OF
CONSTRUCTION JOINTS IS APPROVED BY THE DESIGNER OF RECORD
PRIOR TO PREPARATION OF REINFORCING STEEL SHOP DRAWINGS.
PROVIDE PIPE SLEEVE FOR ALL PIPES AND CONDUITS THAT PASS
THROUGH CONCRETE. MAKE SLEEVES IN WALLS FLUSH AND EXTEND
SLEEVES IN FLOORS 4" ABOVE TOP OF FLOOR UNLESS SHOWN OTHERWISE.
PIPE AND PIPE SLEEVES FOR PIPES ARE NOT SHOWN. SEE SPECIFICATIONS.
FINAL LOCATION SUBJECT TO DESIGNER OF RECORD'S APPROVAL.
PROVIDE SETTING TEMPLATES TO POSITION ANCHOR BOLTS PRIOR TO
PLACING CONCRETE. ACCURATELY POSITION BOLTS TO ASSURE CORRECT
VERTICAL AND HORIZONTAL LOCATION TO MATCH STEEL OR EQUIPMENT
BOLT PATTERN.
ALL METAL FABRICATIONS EMBEDDED IN CONCRETE, OTHER THAN
REINFORCING AND ANCHOR BOLTS, SHALL BE HOT-DIP GALVANIZED AFTER
FABRICATION IN ACCORDANCE WITH ASTM A123.
CONCRETE SHALL NOT BE LOADED UNTIL IT HAS ATTAINED SUFFICIENT
STRENGTH TO SAFELY WITHSTAND LOADING AND UNTIL REQUIRED
SHORING AND BRACING HAVE BEEN INSTALLED.
DO NOT PLACE LOADS WITHIN 6 FEET OF CONSTRUCTION JOINT IN SLABS
FOR AT LEAST 7 DAYS AFTER SLAB IS PLACED.
DO NOT PERFORM ANY OPERATIONS NEAR GROUND FLOOR SLAB
PLACEMENT WHICH COULD CAUSE VIBRATION OR SETTLEMENT OF THE
SUPPORTING SOIL STRATA FOR AT LEAST 7 DAYS AFTER SLAB IS PLACED.
CONSTRUCTION CRANE OR OTHER HEAVY ERECTION EQUIPMENT WILL NOT
BE PERMITTED ON SLABS.
CONTRACTOR IS RESPONSIBLE FOR PREVENTION OF FLOATATION OF
STRUCTURES DURING CONSTRUCTION.
DO NOT PLACE CONCRETE UNTIL REINFORCING STEEL PLACEMENT HAS
BEEN VERIFIED BY SPECIAL INSPECTOR.
MAXIMUM LENGTH OF CONCRETE PLACEMENT IN ANY DIRECTION, UNLESS
SHOWN OTHERWISE:
A. SLABS: 50 FEET.
B. OTHER SECTIONS: 50 FEET.
CONFORM WITH ACI 318 AND ACI STANDARD FOR "DETAILS AND DETAILING OF CONCRETE
REINFORCEMENT."
SHIFT REINFORCING BARS TO CLEAR ANCHOR BOLTS AND EMBEDDED ITEMS; OBTAIN
DESIGNER OF RECORD'S APPROVAL AND ADD EXTRA REINFORCING BAR IF REQUESTED
BY DESIGNER OF RECORD. CUTTING OF REINFORCING BARS NOT PERMITTED.
REINFORCING SHALL BE CONTINUOUS THROUGH CONSTRUCTION JOINTS UNLESS
SHOWN OTHERWISE.
TACK WELDING TO REINFORCING BARS IS NOT PERMITTED.
LAP OR MECHANICALLY CONNECT ALL #11 AND SMALLER BAR SPLICES AND WELD OR
MECHANICALLY CONNECT ALL #14 AND LARGER BAR SPLICES UNLESS APPROVED
OTHERWISE BY DESIGNER OF RECORD.
MINIMUM BAR SPLICE LAP LENGTH SHALL BE AS SHOWN. WHERE LAP LENGTH IS NOT
SHOWN ON DRAWINGS, USE MINIMUM LENGTH SHOWN IN THE FOLLOWING TABLE.
REINFORCING SHALL BE CONTINUOUS AROUND ALL CORNERS UNLESS SHOWN OTHERWISE.
CLASS B SPLICE FOR fy = 60,000 PSI, f'c = 4000 PSI, NORMAL WEIGHT CONCRETE, UNCOATED BARS AND FOLLOWING:
1. CLEAR SPACING OF BARS ≥ 2 BAR DIA AND COVER ≥ BAR DIA, OR
2. CLEAR SPACING OF BARS ≥ DIA BAR AND COVER ≥ DIA BAR, AND STIRRUPS OR
TIES THROUGHOUT LAP NOT LESS THAN ACI CODE
TOP BAR ARE DEFINED AS HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF
CONCRETE IS CAST IN THE MEMBER BELOW THE BAR.
EPOXY COATED REINFORCING STEEL:
1. USE 1.5 TIMES LAP LENGTH LISTED IN TABLE WHERE COVER IS LESS THAN THREE
BAR DIAMETERS OR CENTER TO CENTER SPACING OF BARS IS LESS THAN 7 BAR
DIAMETERS.
2. USE 1.2 TIMES LAP LENGTH LISTED IN TABLE FOR BARS WHERE COVER AND
SPACING BOTH EXCEED VALUES LISTED IN ITEM 1.
SPLICE LAP LENGTH FOR WELDED WIRE FABRIC SHALL BE NOT LESS THAN 6" OR
SPACING OF WIRES PLUS 2" WHICHEVER IS GREATER.
LOCATE SPLICES WHERE SHOWN. WHERE NO SPLICES ARE SHOWN, TOP
REINFORCING IN SLABS AND BEAMS MAY BE SPLICED IN MIDDLE ONE-HALF OF SPAN
BETWEEN SUPPORTS AND BOTTOM REINFORCING MAY BE SPLICED OVER OR NEAR
SUPPORTS.
REINFORCING BAR SPLICES PERMITTED ONLY WHERE SHOWN OR APPROVED BY
DESIGNER OF RECORD.
EXTRA REINFORCING SHALL BE IN ADDITION TO REINFORCING SHOWN OR NOTED.
PROVIDE ONE #4 X 4'-6" EXTRA DIAGONAL REINFORCING EACH FACE AT CORNERS OF
ALL RECTANGULAR OPENINGS AND AT 45 DEGREES TO MAIN REINFORCING FOR
CIRCULAR OPENINGS UNLESS SHOWN OTHERWISE.
PROVIDE ONE #4 EXTRA REINFORCING ALONG OPENING EDGE EACH FACE; EXTEND
BARS MINIMUM OF 2'-0" BEYOND EDGE OF RECTANGULAR OPENING AND BEYOND
PERPENDICULAR PROJECTION OF ROUND OPENING ON REINFORCING BAR UNLESS
SHOWN OTHERWISE.
ALL BARS INDICATED AS BEING BENT SHALL HAVE STANDARD 90 DEGREE HOOKS
UNLESS SHOWN OTHERWISE. 180 DEGREE HOOKS ARE AN ACCEPTABLE ALTERNATE
WHERE APPROVED BY DESIGNER OF RECORD.
PROVIDE EXTRA HAIRPIN REINFORCING AROUND ALL ANCHOR BOLTS LARGER THAN
3/4" DIAMETER. EXTEND LEGS OF HAIRPIN THE STANDARD EMBEDMENT LENGTH.
SPACE HAIRPINS, ALONG BOLT, 1-1/2" FROM SURFACE AND AT 3" ON CENTER AROUND
UPPER 1/3 OF ANCHOR BOLT EMBEDMENT (8" MAXIMUM). REINFORCING BAR SPLICES
PERMITTED ONLY WHERE SHOWN OR APPROVED BY DESIGNER OF RECORD.
NOTE:
TOLERANCES APPLY ONLY AT LOCAL ANOMALIES.
SIZE CHAIRS AND SPACERS FOR SPECIFIED COVER.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TESTING LABORATORY SERVICES
CONTRACTOR MUST RETAIN THE SERVICES OF INDEPENDENT TESTING LABORATORY
TO PERFORM SPECIFIED SERVICES AND TESTING.
LABORATORY MUST MEET "RECOMMENDED REQUIREMENTS FOR INDEPENDENT
LABORATORY QUALIFICATIONS," PUBLISHED BY AMERICAN COUNCIL OF
INDEPENDENT LABORATORIES, MEET BASIC REQUIREMENTS OF ASTM E329
"STANDARD SPECIFICATION FOR AGENCIES ENGAGED IN CONSTRUCTION
INSPECTION, TESTING, OR SPECIAL INSPECTION", AND BE AUTHORIZED TO OPERATE
IN THE STATE OF TEXAS.
LABORATORY IS RESPONSIBLE FOR INSPECTION OF SUBGRADES IN ACCORDANCE
WITH SPECIFICATION 31 23 00, INSPECTION OF CONCRETE FORMWORK AND
ACCESSORIES IN ACCORDANCE WITH SPECIFICATION 03 10 00, INSPECTION OF
FOUNDATION REINFORCEMENT AND EMBEDMENT PLACEMENT PRIOR TO CONCRETE
PLACEMENT IN ACCORDANCE WITH SPECIFICATION 03 20 00, INSPECTION OF
CONCRETE PLACEMENT AND TESTING OF CONCRETE IN ACCORDANCE WITH
SPECIFICATION 03 30 00, AND INSPECTION OF TANK INSTALLATION IN ACCORDANCE
WITH SPECIFICATION 33 16 13-13.
CONTRACTOR MUST PROVIDE LABORATORY PERSONNEL SUFFICIENT ADVANCED
NOTICE OF INSPECTIONS, ENSURE WORK IS ACCESSIBLE AND EXPOSED FOR
INSPECTION PURPOSES, AND PROVIDE LABORATORY PRELIMINARY DESIGN MIX
PROPOSED TO BE USED FOR CONCRETE.
POST INSTALLED ANCHORS REQUIRE PERIODIC INSPECTION PER MANUFACTURER
REQUIREMENTS.
WATER TANK MUST BE INSPECTED AND TESTED IN ACCORDANCE WITH AWWA D103.
LABORATORY MUST KEEP ALL RECORDS OF TESTING AND INSPECTIONS, AND MUST
FURNISH TESTING AND INSPECTION REPORTS ON A WEEKLY BASIS TO THE
CONTRACTING OFFICER, DESIGNER OF RECORD, AND CONTRACTOR. REPORTS
SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT COMPLETED IN
CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES MUST
BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR
CORRECTION. IF THEY ARE NOT CORRECTED, THE DISCREPANCIES MUST BE
BROUGHT TO ATTENTION OF THE DESIGNER OF RECORD AND CONTRACTING
OFFICER PRIOR TO THE COMPLETION EACH PHASE OF WORK.
LABORATORY MUST FURNISH FINAL REPORT STATING WHETHER THE WORK
REQUIRING INSPECTION WAS, TO THE BEST OF THE LABORATORY'S KNOWLEDGE, IN
CONFORMANCE TO THE CONSTRUCTION DOCUMENTS AND THE APPLICABLE
PROVISIONS OF THE BUILDING CODE.
LABORATORY WILL HAVE NO AUTHORITY TO CHANGE PROVISIONS OF THE
CONTRACT DOCUMENTS OR APPROVE SUBSTITUTIONS. CHANGES AND
SUBSTITUTION REQUESTS MUST BE SUBMITTED TO THE CONTRACTING OFFICER AND
DESIGN OF RECORD FOR REVIEW.
LABORATORY INSPECTIONS DO NOT PRECLUDE THE USE OF NORMAL CONTRACTOR
QUALITY CONTROL PROCEDURES AND REQUIREMENTS.
147613
DONG (TONY) CHEN
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
GROUND STORAGE TANK NO. 2
FOUNDATION PLAN
AND SECTION
SF101 0
AS NOTED
TW DEIBERT
DL WILGES
MAY 23, 2023
JK WOODS
TW DEIBERT
GROUND STORAGE TANK NO. 2
SCALE: 1/2"=1'-0"
8" THICK
CONCRETE SLAB
I
N
S
I
E
N
K
D
I
U
S
℄ STORAGE TANK
℄ STORAGE TANK
TANK WALL
A-SF101
TANK DIAMETER 25'-9"
TANK INTERIOR
BY TANK MFR
8"8"8"8"1'-6"
SECTION
A-SF101
SF101
SCALE: 1 1/2"=1'-0"
GRADE
CAULK EXTERIOR
SHIMS, CLIPS,
AND ANCHORS
BY TANK MFR
GROUT FILL NON-SHRINK
TOP OF FOUNDATION
ANCHOR DETERMINED
AFTER TANK DESIGN
IS COMPLETE
#5@12 EW IN
CIRCULAR PATTERN
(TYP)
#5 (TYP)
M
I N
ENGINEERED FILL
SEE NOTES 2
THRU 4 BELOW
#5@12 EW IN
RECTANGULAR
PATTERN
CONCRETE SLAB
3/8" X 3/8"
MASTIC
KEYWAY
RX 102
WATER
STOP BY
TANK MFR
TOC
FOUNDATION EDGE
THICKENED EDGE
TANK WALL GROUT
SEE SPECIFICATION FOR
SURFACE PREPARATION
AND SEALANT
EMBEDDED TANK
SHELL
(SEE NOTE 5)
M
I N
NOTES:
1. SEE SHEET SG001 FOR STRUCTURAL NOTES.
2. REFER TO GEOTECHNICAL REPORT FOR SECTION 6.2
OUTLINING REQUIRED SUBGRADE MODIFICATIONS PRIOR TO
CONSTRUCTION OF TANK FOUNDATION.
3. REFER TO GEOTECHNICAL REPORT SECTION 8 FOR
CONSIDERATIONS DURING CONSTRUCTION
4. SUBGRADE SHALL BE TESTED AND WORK OBSERVED TO
VALIDATE GEOTECHNICAL RECOMMENDATIONS AND CERTIFY
FOR PLACEMENT OF THE TANK FOUNDATION. REFER TO
SECTION 9, QUALITY CONTROL, OF THE SOILS REPORT.
5. EMBEDMENT OF THE TANK FOUNDATION SHELL SHOWN IN
SECTION "A" MAY VARY BASED ON SELECTION OF TANK
MANUFACTURER. CONTRACTOR SHALL COORDINATE ALL
EMBEDDED ITEMS WITH THE TANK SUPPLIED SHOP DRAWINGS
TO ENSURE PROPER INSTALLATION OF EMBEDDED SHELL.
BOLTED CONNECTION BY
TANK MANUFACTURER
LEVEL SHIMS
104122
THOMAS G. DEIBERT
INFLUENT
TURBIDITY
INFLUENT
pH
HMI
PLC-MTU
FIELD
DUPLEX RAW WATER PUMP CONTROL
PANEL (EXST, SEE PI01)
TO NEW COMMON
INFLUENT ANALYZERS SEE
DWG PI01
M-4M-3
YL
YL
YL
KQI
YL
YL
YL
S
AAH
AAL
AIR
AIT
AAH
AIR
AIT
L
S
A
L
S
A
AI
AI
AI
AI
DI DIDIDI
DI DI DI
IN
HOA
HAND IN AUTO
PUMP
RUN
ELAPSED
TIME
SW HOA SW
RAW WATER PUMP NO. 3
WATER PLANT
NO. 2 LOAD
CENTER
VENDOR
SUPPLIED
INFLUENT RATE
CONTROL VALVE
VENDOR
SUPPLIED
CHLORINE
DIOXIDE
CONNECTION TO
WATER PLANT
ALUM
M
M
M
SIPHON
CONTROL
SOLENOID
VALVE
EFFLUENT PUMP
PROTECTION
SWITCH
RAPID
MIX
FLOC
CHAMBER
SETTLING
TUBE
CHAMBER
FILTER
BACKWASH
WASTE PIPE
WASTEWATER TO
SEWER SYSTEM
BACKWASH
RATE
CONTROL
VALVE
BACKWASH
VALVE
BACKWASH
SUPPLY
EFFLUENT RATE
CONTROL VALVE
TP-4
TP-3
HEADLOSS
GAUGE/SWITCH
WATER PLANT NO.
2 JUNCTION BOX
MULTIPLE
CONNECTIONS TO
WATER PLANT NO. 1
CONTROLLER
M
FE
FIT
TO WATER PLANT NO.
1 CONTROLLER
OPERATOR
SAMPLE
TURBIDITY
FILTER TO
WASTE VALVE
CONTINUED FROM
DRAWING PI01
AIT
pH
LT
FROM BACKWASH
SUPPLY FLOW METER
2-PI01
FROM RAW WATER PUMP
DISCHARGE HEADER
1-PI01
TO WATER PLANT NO. 1
BACKWASH SUPPLY
4-PI01
120V
BOUNDARY OF WATER PLANT NO. 2 SUPPLIER
SCOPE OF SUPPLY. CONDUIT, WIRING, AND PIPING
BY CONTRACTOR AS SPECIFIED/REQUIRED.
AIT
TRB
VENDOR SUPPLIED EQUIPMENT REF
SPEC SEC 46 07 13
HIGH SERVICE PUMPS
DISTRIBUTION LOOPS
L
S
A
PAHH
PAHH
PALL
DO
DISTRIBUTION LINE
PRESSURE
ELEVATED
STORAGE TANK
LEVEL
PALL
DO
DI
DI
ELEVATED
STORAGE
TANK
GROUND STORAGE
TANK NO. 1
LIT
500A
ELEVATED
STORAGE
TANK
LIT
500A
AI
AI
TO SURFACE WASH
SYSTEM
TO WATER PLANT NO.
1 DISCHARGE HEADER
3-P101
GROUND STORAGE
TANK NO. 2
ZSO
302B
ZSO
302A
ZSO
302A
ZSC
302A
DI
LG
ZSC
302B
ZSC
302A
PI002-TP01
PI002-TP02
ZSC
301A
ZSO
301A
EXST PIPE (TYP)
ZSO
301B
ZSC
301B
FROM WATER PLANT
NO. 1 DISCHARGE
HEADER 5-PI01
ZSO
302B
ZSC
302B
ZSO
301A
ZSC
301A
DI
ZSO
301B
ZSC
301B
SEE NOTE 6
YO
GST-1
IN
SERVICE
DI
ZS0
301A
GST-1
INLET
OPENED
DI
ZSC
301A
GST-1
INLET
CLOSED
DI
ZS0
301B
GST-1
OUTLET
OPENED
DI
ZSC
301B
GST-1
OUTLET
CLOSED
DI
YO
GST-2
IN
SERVICE
DI
ZS0
302A
GST-2
INLET
OPENED
DI
ZSC
302A
GST-2
INLET
CLOSED
DI
ZS0
302B
GST-2
OUTLET
OPENED
DI
ZSC
302B
GST-2
OUTLET
CLOSED
DI
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
WATER PLANT NO. 2
NOTES:
V
D
G
N A
L
V
F
B
E
P T
C
H
R
D W
I R
E
PIPING AND
INSTRUMENTATION DIAGRAM
WATER PLANT NO. 2
PI002 0
NONE
ZM CARTER
DL WILGES
MAY 23, 2023
NJ BATH
DD ERIKSON
1. ITEMS SHOWN GREY ARE EXISTING. ITEMS SHOWN IN BLACK
ARE NEW, BY CONTRACTOR, UNLESS NOTED OTHERWISE.
2. NOT USED.
3. DISTRIBUTION SYSTEM LOOPS ARE SHOWN FOR REFERENCE
ONLY. VALVES, ETC. ARE OMITTED FOR CLARITY.
4. NEW GROUND STORAGE TANK NO. 2 ISOLATION VALVES
INCLUDE LIMIT SWITCHES FOR REMOTE INDICATION.
5. EXISTING GROUND STORAGE TANK NO. 1 ISOLATION VALVES
ARE NEW OR REPLACED AS REQUIRED TO FACILITATE LIMIT
SWITCHES FOR REMOTE INDICATION.
6. EXISTING GROUND STORAGE TANK NO. 1 OUTLET PRESSURE
SENSOR TAP IS NOT PRESENTLY AS SHOWN ON P&ID BUT
RATHER IS CONNECTED DIRECTLY TO TANK. SEE
INSTRUMENTATION LOCATION PLAN IP101 FOR NOTE
DESCRIBING REQUIREMENTS TO RELOCATE THE TAP TO THE
HIGH SERVICE PUMP SUCTION HEADER, AS SHOWN HERE ON
P&ID.
134005
DEVIN D. ERIKSON
N
S
A
N
S
A
N
S
A
N
S
A
N
E
E
E
E
E
E
E
T
A
D
O
E
O
E
O
E
W
W
W
W
W
W
W
W
S
S
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
IN
cm0 1
3 4
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
INSTRUMENTATION AND CONTROLS
PLAN
IP101 0
1"=10'
ZM CARTER
BM GOODNIGHT
MAY 23, 2023
NJ BATH
DD ERIKSON
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
IN
cm0 1
3 4
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
N
O
R
T
H
PROPOSED GROUND
STORAGE TANK NO. 2
(25'-8" DIA)
6" DI PIPE
EXST GROUND
STORAGE TANK NO. 1
(21'-6" DIA)
EXST 1" PVC
CHEM LINES
EXST 1" SAMPLE
LINE FROM HSP
6" PVC PIPE
NOTES:
1. PROVIDE INSTRUMENTATION AND CONTROLS CABLES AND
CONDUIT. USE PVC CONDUIT BELOW GRADE AND TRANSITION
TO PVC COATED RIGID GALVANIZED CONDUIT FOR ABOVE
GRADE. ENTER WATER PLANT BUILDING NEAR OFFICE, ABOVE
CEILING AND ROUTE DOWN THROUGH CEILING TO CONTROL
PANEL.
1.A. 5C#14 IS 5-CONDUCTOR 14AWG FOR CONTROLS SIGNALS
(24VDC OR 120VAC)
1.B. TSP#16 IS TWISTED SHIELDED PAIR 16 AWG FOR
INSTRUMENTATION SIGNALS (24VDC)
1.C. MAINTAIN SEPARATION OF CONTROLS AND
INSTRUMENTATION RACEWAY AND CABLING.
2. CONTRACTOR TO DETERMINE BEST CONDUIT ROUTING AND
UNDERGROUND UTILITIES.
3. ZSC/ZSO ARE LIMIT SWITCHES ON NEW MANUAL VALVES.
ZSC/ZSO-302A
ZSC/ZSO-301A
ZSC/ZSO-301B
WATER TREATMENT
BUILDING
EXST GST LEVEL
PRESSURE SENSOR
CABINET (LT-300)
3/4"C, 1-5C#14
(CONTROLS)
1"C, 2-5C#14
(CONTROLS)
2"C, 4-5C#14
(CONTROLS)
3/4"C, 1-5C#14
(CONTROLS)
ZSC/ZSO-302B
A-IP101
INSTRUMENTATION AND CONTROLS PLAN
SCALE: 1'=10'-0"
DETAIL
A-IP101
IP101
SCALE: 3"=1'-0"
EXST POWER
PANEL A
EXST BAS CONTROL
PANEL ABOVE
EXST MTU CONTROL
PANEL BELOW
1. CONTRACTOR TO PERFORM WORK IN MTU SCADA PANEL AND
UPDATE SCADA PROGRAM AS DESCRIBED IN SECTION 40-61-96
CONTROL SYSTEM OPERATIONAL DESCRIPTION, TO INCLUDE
SCADA GRAPHICAL DISPLAY. SEE DETAIL A-II002 FOR
ADDITIONAL INFORMATION.
2. RELOCATE GROUND STORAGE TANK NO. 1 OUTLET PRESSURE
SENSOR TAP FROM TANK TO HIGH SERVICE PUMP SUCTION
HEADER. LEAVE TANK SIDE WALL CONNECTION, MANUAL
VALVE AND HOSE BIBB AND CAP. LEAVE VALVE IN CLOSED
POSITION. PROVIDE NEW TAP PIPING WITH NEW HAND BALL
VALVE, HOSE BIBB, AND HEADER BLIND FLANGE ADAPTER.
SEE DETAIL B-IP101.
KEYNOTES:
OFFICE
SEE DETAIL B-IP101
DETAIL
B-IP101
IP101
SCALE: NONE
NOTES:
1. DEMOLISH EXISTING TRANSMITTER SENSING LINE TO HOSE BIBB AND ISOLATION VALVE (NOT
SHOWN).
2. BLIND FLANGE ADAPTER FOR 1/2" STAINLESS STEEL IMPULSE TUBING. ROUTE NEW SEAMLESS
IMPULSE TUBING TO SENSOR PROCESS CONNECTION. REUSE AND RESEAL CABINET PENETRATION.
PROVIDE TUBING SUPPORT (NOT SHOWN), AFFIXED FROM EXISTING CABINET STRUT STANCHION.
3. PROVIDE BLOCK AND BLEED TWO-VALVE MANIFOLD AND PURGE AIR AND VERIFY SIGNAL WITH
OPERATORS, FOR COMPLETE INSTALLATION.
EXST PRESSURE
SENSOR CABINET
(PT-300)
EXST PT-300
(INSIDE)
SEE NOTE 3
SEE NOTE 2
RE-TAP GROUND STORAGE TANK LEVEL TRANSMITTER PT-300
/F
T
134005
DEVIN D. ERIKSON
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
INSTRUMENTATION INSTALLATION
DETAILS
EXECUTION REQUIREMENTS
II001 0
NONE
ZM CARTER
BM GOODNIGHT
MAY 23, 2023
NJ BATH
DD ERIKSON
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
NOTES:
1. ALL WORK ON THIS DRAWING BY CONTRACTOR, UNLESS NOTED
OTHERWISE.
MATERIAL LIST
NO. SIZE DESCRIPTION
1 3/8" OD SEE DRAWINGS FOR TUBING REQUIREMENTS
2 1/2" OD SEE DRAWINGS FOR TUBING REQUIREMENTS
3 1/2" T X 1/2" NPT
MALE CONNECTOR, 316SS
4 1/2" T X 3/4" NPT
MALE CONNECTOR, 316SS
5 1/2" T X 1" NPT
MALE CONNECTOR, 316SS
6 1/2" T X 1" WELD
MALE CONNECTOR, 316SS
7 1/2" T
TEE, 316SS
8 3/4" OD RIGID CONDUIT
9 1/2" OD FLEXIBLE CONDUIT
10 2"
PIPE, SCH 40 CS
11 1/2" NPT DRAIN BREATHER
12 1/2" NPT FLEXIBLE CONDUIT CONNECTOR
13 1 1/2" X 3/4" THERMOWELL BUSHING
14 1 1/2" X 1/2" TEMPERATURE SWITCH BUSHING
15 1/2"
NIPPLE, SCH 80 CS
16 1/2" X 3/4" REDUCER BUSHING
17 3/4" NPT TEE W/COVER
18 1/2" T
HAND VALVE, 316SS
19 3/8"
BALL VALVE, 316SS
20 ---
2-VALVE MANIFOLD, 316SS
21 ---
3-VALVE FLANGE MANIFOLD, 316SS
22 1/2" BOLT W/NUT & LOCK WASHER
23 ---
CONDENSATE POT (SEE DETAIL I-901)
24 1/2" EXPANSION ANCHORS
25 3/8" T
TEE, 316SS
26 3/8"
PLUG, 316SS
27 1/4" X 2" X 6"
PLATE, CS
28 1/2" X 6" X 6"
PLATE, CS
29 1/2" X 8" X 8"
PLATE, CS
30 1 1/2"
TEE, 316SS
31 1/2" OD
PRE-INSTALLED, ELECTRICAL HEAT TRACE,
SEE DRAWINGS FOR TUBING REQUIREMENTS
32 --- INSTRUMENT INCLOSURE
33 2"
WELD CAP, SCH 40 CS
34 1/2" DIAPHRAGM
35 1/2"
SIPHON, 316SS (SEE SPEC FOR THICKNESS)
36 3/8" T X 3/8" NPT
MALE CONNECTOR, 316SS
37 3/8" FLEXIBLE TUBING W/316SS TUBE ADAPTERS
38 1/2" T
UNION, 316SS
39 3/8" T
UNION, 316SS
40 2" NPT
HALF COUPLING, 3000# CS
41 2" NPT
LATERAL, 3000# CS
42 2" NPT
PLUG, CS
43 2" SW
BALL VALVE, CS
44 2" NPT
CAP, 3000# CS
45 ---
2-VALVE FLANGE MANIFOLD, 316SS
46 1/2" T X 1/2" WELD
MALE CONNECTOR, 316SS
47 1/2" NPT CONDUIT PLUG
INSTRUMENT INSTALLATION DETAIL INDEX
CATEGORY DETAIL TITLE INCLUDED
000-PRESSURE I-011
PRESSURE SWITCH, TRANSMITTER OR INDICATOR
I-012 FLUE GAS DUCT TAP WITH ROD OUT CAPABILITY
I-081
DIFFERENTIAL PRESSURE SWITCH, TRANSMITTER OR INDICATOR
I-090
LOCAL PRESSURE SWITCH, GAUGE - PIPE MOUNTED
100-FLOW MEASUREMENT I-110 DIFFERENTIAL PRESSURE FLOW TRANSMITTER
I-115 DIFFERENTIAL PRESSURE TEMPERATURE COMPENSATION
I-120 INLINE DIFFERENTIAL PRESSURE FLOW ELEMENT
I-130 INSERTION DIFFERENTIAL PRESSURE FLOW ELEMENT
I-140 INLINE FLOW ELEMENT WITH ELECTRONIC SENSING
I-150 INSERTION FLOW ELEMENT WITH ELECTRONIC SENSING
200- LEVEL MEASUREMENT I-200 LIQUID LEVEL TRANSMITTER - PRESSURIZED VESSEL
I-201 LIQUID LEVEL TRANSMITTER - VENTED TANK
I-202 LIQUID LEVEL TRANSMITTER - FLANGE MOUNTED
I-210
LIQUID LEVEL MEASUREMENT (HYDROSTATIC PRESSURE)
I-221 LIQUID LEVEL INSTRUMENT
I-222
LIQUID LEVEL INSTRUMENT (NON-CONTACT)
I-275 LEVEL GLASS GAUGE WITH TRANSMITTER
I-280 LEVEL SWITCH ASSEMBLY
I-290 LEVEL GLASS GAUGE - WATER SERVICE
300-TEMPERATURE MEASUREMENT I-370 THREADED THERMOWELL
I-371 WELDED THEROWELL
I-372
THERMOWELLS (SCREWED) INSTALLATION
I-373
THERMOWELLS (SCREWED) OR TEMPERATURE SWITCH INSTALLATION IN PIPES 1 1/2" AND SMALLER
I-374 SOCKET WELD THERMOWELL
400-ANALYSIS I-406 CONDUCTIVITY OR PH PROBE AND ANALYZER
900-MISCELLANEOUS I-901 CONDENSATE POTS
I-905 INSTRUMENT CONDUIT CONNECTION ●
I-920 INSTRUMENT AIR BRANCH HEADER AND DEVICE CONNECTION
I-950 PIPE STAND MOUNTING BRACKET FOR TRANSMITTER
I-952 INSTRUMENT MOUNTING COLUMN OR CONCRETE WALL
I-953 PIPE STAND MOUNTING ●
I-954 PIPE STAND MOUNTING FOR INSTRUMENT GROUP
I-955 PIPE STAND GRATING MOUNT
I-956 PIPE PRESSURE TAP GUIDE
INSTRUMENT INSTALLATION EXECUTION REQUIREMENTS
2. INSTRUMENT EQUIPMENT MOUNTING
4. IMPULSE TUBING INSTALLATION
5. CONTROL TUBING AND INSTRUMENT AIR SUPPLY TUBING INSTALLATION
6. CLEANING
A. INSTALL INSTRUMENT AND CONTROL DEVICES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, INSTALLATION DETAILS, AND/OR WHERE APPROVED BY OWNERS REPRESENTATIVE.
B. LOCATE INSTRUMENTS AND CONTROL DEVICES WHERE SHOWN ON DRAWINGS AND/OR DESIGNATED BY OWNERS REPRESENTATIVE.
C. MOUNT INSTRUMENTS SO THEY ARE RIGIDLY SUPPORTED, LEVEL AND PLUMB, AND IN SUCH A MANNER AS TO PROVIDE ACCESSIBILITY; PROTECTION FROM DAMAGE; ISOLATION FROM HEAT, SHOCK AND
VIBRATION; AND FREEDOM FROM INTERFERENCE WITH OTHER EQUIPMENT, PIPING, AND ELECTRICAL WORK.
D. DO NOT INSTALL INSTRUMENTS UNTIL HEAVY CONSTRUCTION WORK ADJACENT TO INSTRUMENTS HAS BEEN COMPLETED TO EXTENT THAT DAMAGE WILL BE UNLIKELY TO INSTALLATION BY SUCH
CONSTRUCTION WORK.
E. MANUFACTURER'S RECOMMENDATIONS REFERRED TO HEREIN SHALL BE AS STATED IN MANUFACTURER'S INSTALLATION MANUAL AND/OR BY MANUFACTURER'S SERVICE REPRESENTATIVE. FINAL
INTERPRETATION OF "INSTALLATION REQUIREMENTS" WILL BE BY OWNERS REPRESENTATIVE.
F. INSTALL TEMPERATURE ELEMENTS SUFFICIENTLY DOWNSTREAM OF STEAM ATTEMPERATORS, WITH SUFFICIENT STRAIGHT RUN DOWNSTREAM OF ATTEMPERATOR PER MANUFACTURER'S
RECOMMENDATIONS.
G. ALL INSTALLATIONS SHALL CONFORM TO ASME B31.3 CODE REQUIREMENTS AS APPLICABLE.
H. ALL WELDING TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE PIPING OR STRUCTURAL WELDING SPECIFICATIONS AND PROCEDURES.
I. FOLLOW MANUFACTURES RECOMMENDATIONS FOR UPSTREAM AND DOWN STREAM STRAIGHT PIPE RUNS FOR FLOW METERS. CONTACT OWNER'S REPRESENTATIVE IF SPECIFIED AMOUNT OF STRAIGHT
PIPE RUN IS NOT AVAILABLE.
J. SEE INSTRUMENT SPECIFICATION FOR ADDITIONAL REQUIREMENTS SPECIFIC TO INDIVIDUAL DEVICES.
A. INSTRUMENT IMPULSE PIPING WORK SHALL BE FROM LAST BLOCK VALVE THROUGH, AND INCLUDING, BLOWDOWN PIPING TO NEAREST EQUIPMENT DRAIN OR SAFE LOCATION.
B. INSTALL HORIZONTAL IMPULSE PIPING WITH SLOPE OF 1" PER FOOT.
1. SLOPE IMPULSE PIPING DOWNWARD TOWARD INSTRUMENT FOR LIQUID AND STEAM SERVICE TO ALLOW AIR TO VENT AWAY FROM INSTRUMENT.
2. SLOPE IMPULSE PIPING DOWNWARD AWAY FROM INSTRUMENT FOR GAS SERVICE TO ALLOW CONDENSATE TO DRAIN AWAY FROM INSTRUMENT.
C. BLOWDOWN AND DRAIN VALVES ARE REQUIRED IN IMPULSE LINES TO ALL TRANSMITTERS AND INSTRUMENT USED ON WATER, STEAM, AND CONDENSING VAPOR SERVICES.
D. ATTACH ISOLATION VALVES TO INSTRUMENTS SO THAT IT IS POSSIBLE TO DISCONNECT INSTRUMENT FROM CONNECTING PIPE WITHOUT HAVING TO DRAIN PIPE.
E. INSTALL EXPANSION LOOPS IN IMPULSE PIPING INSTALLATIONS TO ALLOW FOR THERMAL EXPANSION OR VIBRATION.
F. SUPPORT PRESSURE GAUGE AND OTHER INSTRUMENTS CONNECTED TO IMPULSE PIPING INDEPENDENTLY OF TUBING. PROVIDE AMPLE EXPANSION LOOPS IN TUBING CONNECTIONS TO INSTRUMENTS
SUBJECT TO VIBRATIONS TO PREVENT FAILURE DUE TO METAL FATIGUE.
G. FURNISH AND INSTALL ACCESSORIES REQUIRED FOR COMPLETE IMPULSE PIPING SYSTEM INCLUDING INSTRUMENT ISOLATION VALVES, SNUBBERS, SIPHONS, AND CALIBRATION AND TEST
CONNECTIONS AT INSTRUMENT.
H. INSTALL MINIMUM OF 10' OF TUBING FOR INSTRUMENTS, SIPHONS OR REMOTE SEALS NOT RATED FOR THE PROCESS TEMPERATURES.
A. SEE TABLE FOR PROCESS CONTROL AND INSTRUMENT AIR SUPPLY TUBING REQUIREMENTS.
B. INSTRUMENT TUBING SHALL BE ROUTED AN ADEQUATE DISTANCE FROM OUTSIDE WALLS, DOORWAYS, AND AREAS OF EXTREME HEAT TO MINIMIZE AMBIENT EFFECTS ON CONTROL LINES.
C. SIGNAL TUBING TERMINATION AT EACH INSTRUMENT SHALL HAVE GAUGE TEE WITH PLUG FOR CALIBRATION AND SERVICE.
A. BEFORE ASSEMBLY OR ERECTION, THOROUGHLY CLEAN INSTRUMENTS OF TEMPORARY PROTECTIVE COATINGS AND FOREIGN MATERIALS.
B. AFTER ERECTION OF EQUIPMENT, CLEAN EXTERNAL SURFACES OF OIL, GREASE, DIRT, OR OTHER FOREIGN MATERIAL.
C. BLOWOUT INSTRUMENT AIR SUPPLY LINES BEFORE FINAL ATTACHMENT TO VALVE OR INSTRUMENT.
3. TUBING INSTALLATION - GENERAL
A. INSTALL TUBING PARALLEL (EXCEPT FOR SLOPE) TO BUILDING LINES AND OTHER PIPING FOLLOWING INSTRUMENT MANUFACTURER'S INSTRUCTIONS.
B. TUBING SHALL BE CONTINUOUSLY SUPPORTED WITH 12-GAGE ALUMINUM ANGLE OR TUBE TRAY AND HELD IN PLACE WITH APPROPRIATE TUBING CLIPS AND FASTENERS. INSTALL TUBING SUPPORTS IN
SUCH A MANNER TO PRECLUDE FATIGUE FAILURE OF TUBING DUE TO VIBRATION.
C. ONLY TOOL-MADE BENDS SHALL BE ACCEPTABLE.
D. MINIMIZE NUMBER OF UNIONS USED TO JOIN TUBING LENGTHS.
1. INSTALLATION - GENERAL
A. MOUNT INSTRUMENT EQUIPMENT TO BUILDING STEEL, CONCRETE FLOORS, OR WALLS USING PIPE MOUNTING STANDS OR FIELD-FABRICATED MOUNTING BRACKETS.
1. SECURE INSTRUMENT EQUIPMENT MOUNTING BRACKET TO BUILDING STEEL BY WELDING OR BOLTING, AND TO CONCRETE OR MASONRY BUILDING STRUCTURE BY EXPANSION-TYPE ANCHORS. DO
NOT MOUNT INSTRUMENTATION EQUIPMENT TO EXTERIOR REMOVABLE PANELS OR HANDRAILS.
2. GROUT MOUNTING BRACKETS ON CONCRETE FLOORS WITH NONMETALLIC, CHLORIDE-FREE GYPSUM MATERIAL, ASTM C1107, GRADE A; FORMULATION SUITABLE FOR APPLICATION.
3. IF VIBRATION-FREE LOCATION IS NOT AVAILABLE FOR INSTRUMENT MOUNTING, APPROPRIATE VIBRATION SHOCK MOUNTING SHALL BE PROVIDED BY USE OF RUBBER GROMMETS OR OTHER
VIBRATION DAMPENERS DESIGNED FOR VIBRATION ABSORPTION SUBJECT TO OWNERS REPRESENTATIVE REVIEW. MOUNTING OF PROCESS PRESSURE AND TEMPERATURE GAUGE OR PROCESS
PRESSURE AND TEMPERATURE SWITCHES TO PROCESS PIPING SHALL BE ALLOWABLE ONLY IF VIBRATION IS MINIMIZED.
4. INSTALL INSTRUMENT EQUIPMENT MOUNTED OUTDOORS WITHIN SUN PROTECTION ENCLOSURES. ENCLOSURE OPENING SHALL FACE NORTH OR EAST, INSOFAR AS PRACTICABLE.
5. INSTRUMENT EQUIPMENT MOUNTED OUTDOORS IN ENVIRONMENTS SUBJECT TO FREEZING:
a. INSTALL IN INSULATED/HEATED HOUSINGS TO MAINTAIN OPERATIONAL TEMPERATURE LIMITS.
b. INSTALL PREFABRICATED, PRE-INSULATED TUBING BUNDLE WITH ELECTRIC TRACING OR INSTALL HEAT TRACE AND INSULATE TUBING.
B. INSTRUMENT ACCESSIBILITY: FOLLOWING GENERAL RULES SHALL BE ADHERED TO, UNLESS LIMITED BY OTHER REQUIREMENTS IN DESIGN OF SYSTEM.
1. LOCATE INSTRUMENT PROCESS CONNECTIONS FOR MAXIMUM CONVENIENCE IN OPERATION AND SERVICING OF INSTRUMENT. USE MANUFACTURER'S RECOMMENDED CLEARANCE DISTANCES.
ORIENT CONNECTIONS SO INSTRUMENTS OR PIPING WILL NOT OBSTRUCT AISLES, WALKWAYS, PLATFORMS, OR PERMANENT LADDERS.
2. INSTALL FIELD-MOUNTED INSTRUMENTS AND CONTROL DEVICES SO THEY ARE READABLE AND ACCESSIBLE FOR SERVICING FROM GRADE, WALKWAY, PLATFORM, OR PERMANENT LADDER.
3. LOCATE REMOTE INSTRUMENTS AND CONTROL DEVICES (DEVICES NOT LOCATED IN OR ON PROCESS LINES) AT NOMINAL HEIGHT OF 4-1/2' ABOVE FINISHED FLOOR, GRADE, OR PLATFORM. PROVIDE
INSTRUMENT RACKS FOR LOCATION IN WHICH 3 OR MORE INSTRUMENTS OR CONTROL DEVICES ARE LOCATED WITHIN CLOSE PROXIMITY OF EACH OTHER.
PROCESS TUBING REQUIREMENTS
PROCESS APPLICATION
TUBE TYPE
OUTSIDE DIAMTER
MINIMUM WALL
THICKNESS
MATERIAL (ASTM)
TYPE CONSTRUCTION
WATER/AIR/STEAM/GAS BELOW 1500 PSIG AND 1000°F 1/2" 0.049"
A269 316 SS SEAMLESS
CONTROL AND INSTRUMENT AIR SUPPLY ONE LINE FOR EACH 3/8" 0.035"
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
INSTRUMENTATION INSTALLATION
DETAILS
II002 0
NONE
ZM CARTER
BM GOODNIGHT
MAY 23, 2023
NJ BATH
DD ERIKSON
D
A
1 2
C A
R
C
B
3 4 5
F
E
G
D
6 7 8 9
REV.
10 11
CHECKED
DESIGNED
APPROVED
APPROVED
DATE
DRAWN
SCALE:
NO.
A
DATENO. REVISIONS APVDCHKDDSGN
B
C
E
F
G
C STANLEY CONSULTANTS
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
USDA-APHIS-PPQ
MOORE AIR BASE
WATER STORAGE TANK
EDINBURG, TEXAS
30300.02
Texas Firm Registation No.: F-174
NOTE 2
INSTRUMENT
NOTE 3
SLOPE
DETAIL I-905
INSTRUMENT CONDUIT CONNECTION
1. REFER TO INSTRUMENTATION AND CONTROLS PLAN DRAWING FOR CABLE AND CONDUIT
REQUIREMENTS.
2. LIMIT FLEXIBLE LIQUID TIGHT CONDUIT TO MAX LENGTH 3'-0" AND MINIMUM LENGTH 1'-6".
3. MOUNT CONDUIT CONNECTION ELBOW BELOW BODY OF INSTRUMENT TO ALLOW
CONDENSATION TO DRAIN FROM INSTRUMENT TOWARD CONDUIT DRAIN.
NOTES:
DETAIL I-953
PIPE STAND MOUNTING
EXPANSION
ANCHOR
TO FLOOR
1/4" WEEP
HOLE (TYP)
MULTIPLE
DOUBLE
SINGLE
22 AND 24
1'-6"
1'-6"
6'-0" MAX
6"
8"
1. WIDTH DEPENDS UPON NUMBER OF PIPE STANDS REQUIRED.
2. ALL BARE METAL SHALL BE CLEANED AND PAINTED WITH
ANTI-RUST PRIMER PRIOR TO MOUNTING INSTRUMENT.
3. GROUT BELOW EXPANSION ANCHOR TO BE 2" MIN.
NOTES:
1/4" WEEP HOLE
MATERIAL LIST
NO. SIZE DESCRIPTION
1 3/8" OD SEE DRAWINGS FOR TUBING REQUIREMENTS
2 1/2" OD SEE DRAWINGS FOR TUBING REQUIREMENTS
3 1/2" T X 1/2" NPT
MALE CONNECTOR, 316SS
4 1/2" T X 3/4" NPT
MALE CONNECTOR, 316SS
5 1/2" T X 1" NPT
MALE CONNECTOR, 316SS
6 1/2" T X 1" WELD
MALE CONNECTOR, 316SS
7 1/2" T
TEE, 316SS
8 3/4" OD RIGID CONDUIT
9 1/2" OD FLEXIBLE CONDUIT
10 2"
PIPE, SCH 40 CS
11 1/2" NPT DRAIN BREATHER
12 1/2" NPT FLEXIBLE CONDUIT CONNECTOR
13 1 1/2" X 3/4" THERMOWELL BUSHING
14 1 1/2" X 1/2" TEMPERATURE SWITCH BUSHING
15 1/2"
NIPPLE, SCH 80 CS
16 1/2" X 3/4" REDUCER BUSHING
17 3/4" NPT TEE W/COVER
18 1/2" T
HAND VALVE, 316SS
19 3/8"
BALL VALVE, 316SS
20 ---
2-VALVE MANIFOLD, 316SS
21 ---
3-VALVE FLANGE MANIFOLD, 316SS
22 1/2" BOLT W/NUT & LOCK WASHER
23 ---
CONDENSATE POT (SEE DETAIL I-901)
24 1/2" EXPANSION ANCHORS
25 3/8" T
TEE, 316SS
26 3/8"
PLUG, 316SS
27 1/4" X 2" X 6"
PLATE, CS
28 1/2" X 6" X 6"
PLATE, CS
29 1/2" X 8" X 8"
PLATE, CS
30 1 1/2"
TEE, 316SS
31 1/2" OD
PRE-INSTALLED, ELECTRICAL HEAT TRACE,
SEE DRAWINGS FOR TUBING REQUIREMENTS
32 --- INSTRUMENT INCLOSURE
33 2"
WELD CAP, SCH 40 CS
34 1/2" DIAPHRAGM
35 1/2"
SIPHON, 316SS (SEE SPEC FOR THICKNESS)
36 3/8" T X 3/8" NPT
MALE CONNECTOR, 316SS
37 3/8" FLEXIBLE TUBING W/316SS TUBE ADAPTERS
38 1/2" T
UNION, 316SS
39 3/8" T
UNION, 316SS
40 2" NPT
HALF COUPLING, 3000# CS
41 2" NPT
LATERAL, 3000# CS
42 2" NPT
PLUG, CS
43 2" SW
BALL VALVE, CS
44 2" NPT
CAP, 3000# CS
45 ---
2-VALVE FLANGE MANIFOLD, 316SS
46 1/2" T X 1/2" WELD
MALE CONNECTOR, 316SS
47 1/2" NPT CONDUIT PLUG
SEE NOTE 1
1. PROVIDE, INSTALL AND COMMISSION NEW JACE INPUT/OUTPUT
MODULE (IO-R-16). SIDEWALL INSTALLATION SHALL BE
ACCEPTABLE. EXTEND 15VDC POWER SOURCE AND RS-485 BUS
FROM EXISTING BACKPLANE TO NEW IO-R-16 USING 5
CONDUCTOR EXTENSION CABLE AS RECOMMENDED BY
MANUFACTURER. COMPLY WITH ALL MANUFACTURER
INSTALLATION REQUIREMENTS. PROVIDE INSTALLATION
ACCESSORIES AS NEEDED. USE NEW I/O MODULE FOR NEW
VALVE LIMIT INPUTS.
2. POINT LIST (TYPE, TAG, DESCRIPTION)
NOTES:
1. DI, ZSC-301A, GST-1, INLET CLOSED
2. DI, ZSO-301A, GST-1, INLET OPENED
3. DI, ZSC-301B, GST-1, OUTLET CLOSED
4. DI, ZSO-301B, GST-1, OUTLET…