Atch 2 - SOR-v2 Gdynia Poland (Final) (BM) 12-22-20 signed (1.5 years).xlsx

XLSX spreadsheet 63 KB Posted

Attached to
S&RTS GDYNIA, POLAND Federal contract opportunity
Solicitation number
HTC711-21-Q-R007
Issued by
Department of Defense United States Transportation Command

View the file

Other files for this federal contract opportunity

Other files attached to S&RTS GDYNIA, POLAND, newest first.
File Type Posted
HTC711-21-Q-R007 (0001).pdf PDF
Round 1 Questions and Answers.pdf PDF
Round 1 Questions and Answers.pdf PDF
HTC711-21-Q-R007(0002).pdf PDF
HTC711-21-Q-R007.pdf PDF
HTC711-21-Q-R007.pdf PDF
Atch 3 - RFQ Information Sheet.docx DOCX document
Atch 1 - PWS v1 Gdynia Poland Final 1-14-21.pdf PDF
Atch 4 - Technical Worksheet Gdynia 12-17-20.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Definitions Controlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)

WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay ShiftMonday to Friday 8AM - 16PM
Night shift
Regular8 AM to 4 PM1st ShiftMo to Fr 0600 - 1400, Sa 0600 - 1400, So 0600 - 1200
duty hours2nd ShiftMo to Fr 1430 - 2230, Sa 1430 - 2030, So 1200 - 1800
3rd ShiftMo to Fr 2230 - 0600, 2030 - 0230, So 1800 - 2400
Regular OverBefore 8 AM and after 4 PM4th ShiftOnly applicable on Sundays from 2400 - 0600
Time (OT)
Swing / Hoot Owl
Meal HoursMo - Sa 0945 - 1015, So 0845 - 0915
Mo - Fr 1815 -1845, Sa 1715 -1745, So 1415 - 1515Normal work day hours
Mo - Fr 0230 - 0300, Sa 2315 - 2345, So 2045 - 2115
Sunday the 4th shift 0245 - 0315** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

Summary

OFFEROR NAME:838th Trans BN/ BALTIC SEA DET
INSTRUCTIONS TO OFFEROR:
- Input Offeror Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to offer a price).
- Offeror should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for all Port LocationsControlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
Year 16mo Extension
PORT OF GDYNIA, POLAND$ 60,000.00$ - 0$ - 0$ - 0$ - 0$ 30,000.00

TOTAL $ 60,000.00 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,000.00

TOTAL ESTIMATED VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR PORT OF GDYNIA, POLAND $ 90,000.00

TOTAL EVALUATED VALUE OF ALL YEARS COMBINED FOR ALL PORT LOCATIONS $ 90,000.00

TOTAL LIFE CYCLE YR + 6 MO EXT. + CEILING$ 90,000.00
↓↓↓ PORT(S) SUMMARYS BELOW ↓↓↓
SUMMARY PORT OF GDYNIA, POLANDControlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
Year 16mo Extension
Schedule1A1LOAD VESSEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Schedule 1A1a LASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1A2 DISCHARGE VESSEL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1B1 LOAD RAIL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1B2 DISCHARGE RAIL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1B3 LOAD TRUCKS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule1B4DISCHARGE TRUCKS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0
Schedule1CRECEPTION$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Schedule 1D DISPOSITION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1E STUFFING/UNSTUFFING $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1F INTRA PORT TRANSFER $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 1Fa CROSS DOCKING $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2 EXTRA LABOR $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3A DETENTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3B OVERTIME DIFFERENTIALS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3C MINIMUM TIME $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 5 STORAGE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 6 FACILITIES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 7 LUMBER / DUNNAGE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 8 MISCELLANEOUS $ 60,000.00 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,000.00

Schedule 9 INLAND TRANSPORTATION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 10 3PL SERVICES $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

TOTAL $ 60,000.00 $ - 0 $ - 0 $ - 0 $ - 0 $ 30,000.00

TOTAL EVALUATED PRICE PORT OF GDYNIA, POLAND $ 90,000.00

&"Times New Roman,Bold"&18&K00B050UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO

GDYNIA POLAND

Controlled Unclassified Information – CUI//SP-BUDG” (BUDG = Budget)
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 May 2021through31 Oct 2022(including 6 mo extension, if applicable)
LOCATION:PORT OF GDYNIA, POLANDinput start dateinput final end date
Attachment #TOTAL COST ALL SCHEDULES PORT 1$ 60,000.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
2Commodity1A1LOAD VESSEL25aMILVAN-CONTAINER PACKED W/ EXPLOSIVES | LO/LO - Shore Crane ( Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
4Commodity1A1LOAD VESSEL25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
7Commodity1A1LOAD VESSEL35cAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by rampEA$ - 010$ - 0
8Commodity1A1LOAD VESSEL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 096.00$ - 0
9Commodity1A1LOAD VESSEL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 096.00$ - 0
10Commodity1A1LOAD VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0144$ - 0
12Commodity1A1LOAD VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 050$ - 0
13Commodity1A1LOAD VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
14Commodity1A1LOAD VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 010$ - 0
15Commodity1A1LOAD VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
17Commodity1A1LOAD VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
18Commodity1A1LOAD VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
19Commodity1A1LOAD VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
20Commodity1A1LOAD VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
21Commodity1A1LOAD VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
22Commodity1A1LOAD VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
23Commodity1A1LOAD VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
24Commodity1A1LOAD VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
25Commodity1A1LOAD VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
26Commodity1A1LOAD VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
27Commodity1A1LOAD VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
28Commodity1A1LOAD VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
29Commodity1A1LOAD VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
30Commodity1A1LOAD VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
31Commodity1A1LOAD VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL 1A1 - Loading Vessel$ - 0
32Commodity1A1aLASHING ONLY20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON$ - 01.60$ - 0
33Commodity1A1aLASHING ONLY25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA$ - 01$ - 0
34Commodity1A1aLASHING ONLY35AIRCRAFT, WHOLE OR UNBOXEDEA$ - 010$ - 0
35Commodity1A1aLASHING ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 050.00$ - 0
36Commodity1A1aLASHING ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 020$ - 0
37Commodity1A1aLASHING ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 020$ - 0
39Commodity1A1aLASHING ONLY60MEDIUM VEHICLES OR TRAILERSEA$ - 0100$ - 0
40Commodity1A1aLASHING ONLY61LIGHT VEHICLES OR TRAILERSEA$ - 050$ - 0
41Commodity1A1aLASHING ONLY67HEAVY VEHICLES OR TRAILERSEA$ - 050$ - 0
TOTAL 1A1a - Lashing Only$ - 0
43Commodity1A2DISCHARGE VESSEL25aMILVAN-CONTAINER PACKED W/ EXPLOSIVES | LO/LO - Shore Crane ( Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
45Commodity1A2DISCHARGE VESSEL25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
48Commodity1A2DISCHARGE VESSEL35cAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by rampEA$ - 010$ - 0
49Commodity1A2DISCHARGE VESSEL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 096.00$ - 0
50Commodity1A2DISCHARGE VESSEL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 096.00$ - 0
51Commodity1A2DISCHARGE VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0144$ - 0
53Commodity1A2DISCHARGE VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 050$ - 0
54Commodity1A2DISCHARGE VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
55Commodity1A2DISCHARGE VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 010$ - 0
56Commodity1A2DISCHARGE VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
58Commodity1A2DISCHARGE VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
59Commodity1A2DISCHARGE VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
60Commodity1A2DISCHARGE VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
61Commodity1A2DISCHARGE VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
62Commodity1A2DISCHARGE VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
63Commodity1A2DISCHARGE VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
64Commodity1A2DISCHARGE VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
65Commodity1A2DISCHARGE VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
66Commodity1A2DISCHARGE VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
67Commodity1A2DISCHARGE VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
68Commodity1A2DISCHARGE VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
69Commodity1A2DISCHARGE VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01$ - 0
70Commodity1A2DISCHARGE VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
71Commodity1A2DISCHARGE VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
72Commodity1A2DISCHARGE VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL - 1A2- Discharge Vessel$ - 0
73Commodity1A2aUNLASHING ONLY20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON$ - 01.60$ - 0
74Commodity1A2aUNLASHING ONLY25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA$ - 01$ - 0
75Commodity1A2aUNLASHING ONLY35AIRCRAFT, WHOLE OR UNBOXEDEA$ - 010$ - 0
76Commodity1A2aUNLASHING ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 050.00$ - 0
77Commodity1A2aUNLASHING ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 020$ - 0
78Commodity1A2aUNLASHING ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 020$ - 0
80Commodity1A2aUNLASHING ONLY60MEDIUM VEHICLES OR TRAILERSEA$ - 0100$ - 0
81Commodity1A2aUNLASHING ONLY61LIGHT VEHICLES OR TRAILERSEA$ - 050$ - 0
82Commodity1A2aUNLASHING ONLY67HEAVY VEHICLES OR TRAILERSEA$ - 050$ - 0
TOTAL 1A2a Unlashing only$ - 0
86Commodity1B1LOAD RAIL25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
90Commodity1B1LOAD RAIL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00$ - 0
91Commodity1B1LOAD RAIL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00$ - 0
92Commodity1B1LOAD RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0144$ - 0
94Commodity1B1LOAD RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0144$ - 0
95Commodity1B1LOAD RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
97Commodity1B1LOAD RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
99Commodity1B1LOAD RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
101Commodity1B1LOAD RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
102Commodity1B1LOAD RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
103Commodity1B1LOAD RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
104Commodity1B1LOAD RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
106Commodity1B1LOAD RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
107Commodity1B1LOAD RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
108Commodity1B1LOAD RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
109Commodity1B1LOAD RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
111Commodity1B1LOAD RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
112Commodity1B1LOAD RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
113Commodity1B1LOAD RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL 1B1 Load Railcars$ - 0
117Commodity1B2DISCHARGE RAIL25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
121Commodity1B2DISCHARGE RAIL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00$ - 0
122Commodity1B2DISCHARGE RAIL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00$ - 0
123Commodity1B2DISCHARGE RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0144$ - 0
125Commodity1B2DISCHARGE RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 050$ - 0
126Commodity1B2DISCHARGE RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 010$ - 0
128Commodity1B2DISCHARGE RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
130Commodity1B2DISCHARGE RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01$ - 0
132Commodity1B2DISCHARGE RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
133Commodity1B2DISCHARGE RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
134Commodity1B2DISCHARGE RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
135Commodity1B2DISCHARGE RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
137Commodity1B2DISCHARGE RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
138Commodity1B2DISCHARGE RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
139Commodity1B2DISCHARGE RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
140Commodity1B2DISCHARGE RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 02$ - 0
142Commodity1B2DISCHARGE RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
143Commodity1B2DISCHARGE RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
144Commodity1B2DISCHARGE RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL 1B2 Discharge Railcars$ - 0
148Commodity1B3LOAD TRUCKS25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
152Commodity1B3LOAD TRUCKS40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00$ - 0
153Commodity1B3LOAD TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00$ - 0
156Commodity1B3LOAD TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0144$ - 0
159Commodity1B3LOAD TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
163Commodity1B3LOAD TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
164Commodity1B3LOAD TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
165Commodity1B3LOAD TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
168Commodity1B3LOAD TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
169Commodity1B3LOAD TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
170Commodity1B3LOAD TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
173Commodity1B3LOAD TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
174Commodity1B3LOAD TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
175Commodity1B3LOAD TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL 1B3 Loading Trucks$ - 0
179Commodity1B4DISCHARGE TRUCKS25cMILVAN-CONTAINER PACKED W/ EXPLOSIVES | RO/RO Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 01$ - 0
183Commodity1B4DISCHARGE TRUCKS40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 032.00$ - 0
184Commodity1B4DISCHARGE TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 032.00$ - 0
187Commodity1B4DISCHARGE TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0144$ - 0
190Commodity1B4DISCHARGE TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA$ - 0200$ - 0
194Commodity1B4DISCHARGE TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0400$ - 0
195Commodity1B4DISCHARGE TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0300$ - 0
196Commodity1B4DISCHARGE TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
199Commodity1B4DISCHARGE TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0200$ - 0
200Commodity1B4DISCHARGE TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0200$ - 0
201Commodity1B4DISCHARGE TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
204Commodity1B4DISCHARGE TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0200$ - 0
205Commodity1B4DISCHARGE TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0100$ - 0
206Commodity1B4DISCHARGE TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 02$ - 0
TOTAL 1B4 Discharge Trucks$ - 0
230Commodity1ESTUFFING/UNSTUFFING40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 0100.00$ - 0
TOTAL 1E Stuffing-Unstuffing$ - 0
237Commodity1FINTRA PORT TRANSFER20EXPLOSIVES CARGO, PALLETIZED OR UNITIZED - PAYABLE AT THE EXPLOSIVE RATEMTON$ - 02$ - 0
238Commodity1FINTRA PORT TRANSFER25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA$ - 01$ - 0
240Commodity1FINTRA PORT TRANSFER40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON$ - 01$ - 0
241Commodity1FINTRA PORT TRANSFER44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA$ - 01$ - 0
242Commodity1FINTRA PORT TRANSFER45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA$ - 01$ - 0
244Commodity1FINTRA PORT TRANSFER60MEDIUM VEHICLES OR TRAILERSEA$ - 01$ - 0
245Commodity1FINTRA PORT TRANSFER61LIGHT VEHICLES OR TRAILERSEA$ - 01$ - 0
246Commodity1FINTRA PORT TRANSFER67HEAVY VEHICLES OR TRAILERSEA$ - 01$ - 0
TOTAL 1F Intra Port Transfer$ - 0
257Manhours2EXTRA LABOR (XL)[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 020$ - 0
258Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 020$ - 0
259Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 020$ - 0
260Manhours2EXTRA LABOR (XL)[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 020$ - 0
262Manhours2EXTRA LABOR (XL)[ Straight Time ] - WALKING BOSSHR$ - 020$ - 0
263Manhours2EXTRA LABOR (XL)[ Straight Time ] - CLERK | CHECKERHR$ - 020$ - 0
265Manhours2EXTRA LABOR (XL)[ Straight Time ] - CARPENTERHR$ - 020$ - 0
266Manhours2EXTRA LABOR (XL)[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 020$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
267Manhours3ADETENTION[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 020$ - 0
268Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 020$ - 0
269Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 020$ - 0
270Manhours3ADETENTION[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 020$ - 0
272Manhours3ADETENTION[ Straight Time ] - WALKING BOSSHR$ - 020$ - 0
273Manhours3ADETENTION[ Straight Time ] - CLERK | CHECKERHR$ - 020$ - 0
275Manhours3ADETENTION[ Straight Time ] - CARPENTERHR$ - 020$ - 0
276Manhours3ADETENTION[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 020$ - 0
TOTAL 3A Detention$ - 0
277Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 010$ - 0
278Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 010$ - 0
279Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 010$ - 0
280Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 010$ - 0
282Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - WALKING BOSSHR$ - 010$ - 0
283Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CLERK | CHECKERHR$ - 010$ - 0
285Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CARPENTERHR$ - 010$ - 0
286Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR$ - 010$ - 0
287Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 010$ - 0
288Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 010$ - 0
289Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 010$ - 0
290Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 010$ - 0
292Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - WALKING BOSSHR$ - 010$ - 0
293Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - CLERK | CHECKERHR$ - 010$ - 0
295Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - CARPENTERHR$ - 010$ - 0
296Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] - MECHANIC | DRIVER | GEARMANHR$ - 010$ - 0
TOTAL 3B Overtime Differentials$ - 0
297Manhours3CGUARANTEED TIME[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 05$ - 0
298Manhours3CGUARANTEED TIME[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR$ - 05$ - 0
299Manhours3CGUARANTEED TIME[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR$ - 05$ - 0
300Manhours3CGUARANTEED TIME[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 05$ - 0
302Manhours3CGUARANTEED TIME[ Straight Time ] - WALKING BOSSHR$ - 05$ - 0
303Manhours3CGUARANTEED TIME[ Straight Time ] - CLERK | CHECKERHR$ - 05$ - 0
305Manhours3CGUARANTEED TIME[ Straight Time ] - CARPENTERHR$ - 05$ - 0
306Manhours3CGUARANTEED TIME[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 05$ - 0
TOTAL 3C Guaranteed Time$ - 0
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
309Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 7.01 LT - 10 LT capacityHR30EA$ - 01$ - 0
311Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 15.01 LT - 25 LT capacityHR30EA$ - 01$ - 0
312Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / top lift, 80,000 LB lifting capacityHR30EA$ - 01$ - 0
313Manhours4EQUIPMENT RENTAL (EQR)YARD TRACTOR (HUSTLER, YARD DOG)HR30EA$ - 01$ - 0
316Manhours4EQUIPMENT RENTAL (EQR)20 or 40 FOOT FLAT BED TRAILERS | MAFIs or MAFIs WITH PROBEHR10EA$ - 01$ - 0
317Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY MEDIUM TUG or TRACTORHR30EA$ - 01$ - 0
318Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY LARGE TUG or TRACTORDY1EA$ - 01$ - 0
319Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 50 LT capacityDY10EA$ - 01$ - 0
320Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 50 LT capacityHR10EA$ - 01$ - 0
321Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 100 LT - capacityDY1EA$ - 01$ - 0
322Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 100 LT - capacityHR10EA$ - 01$ - 0
323Manhours4EQUIPMENT RENTAL (EQR)Gantry Crane 65Ton CapacityHR10EA$ - 01$ - 0
324Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 160 LT - capacityHR1EA$ - 01$ - 0
326Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 10 kilowattDY20EA$ - 01$ - 0
327Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 60 kilowattDY20EA$ - 01$ - 0
328Manhours4EQUIPMENT RENTAL (EQR)SweeperDY1EA$ - 01$ - 0
329Manhours4EQUIPMENT RENTAL (EQR)PREASURE WASHER 2500 PSI, with attachmentsDY1EA$ - 05$ - 0
330Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 wattDY1EA$ - 025$ - 0
TOTAL 4 Equipment Rental$ - 0
340Miscellaneous6PORT FACILITIESOFFICE SPACE, PORTABLE | see PWS for specific detailsMTH1EA$ - 05$ - 0
341Miscellaneous6PORT FACILITIESRental Traffic Cones (25ea per lot)MTH4LOT$ - 06$ - 0
342Miscellaneous6PORT FACILITIESTelephone, DSL Lines, laser printer, FAX and Modem for Local Network (See PWS for specific)MTH4EA$ - 01$ - 0
343Miscellaneous6PORT FACILITIESDesksMTH1EA$ - 01$ - 0
344Miscellaneous6PORT FACILITIESChairsMTH4EA$ - 01$ - 0
345Miscellaneous6PORT FACILITIESRadio Communication Equipment - Mobile radio (5 channel)DY10LOT$ - 01$ - 0
348Miscellaneous6PORT FACILITIESCopy Machine - with 1000 sheet per day capacity - with maintenanceMTH4EA$ - 01$ - 0
349Miscellaneous6PORT FACILITIESLatrines | hand washing stations - with delivery, pickup, cleaning and supply replanement (see PWS for specific details)MTH4EA1$ - 0
350Miscellaneous6PORT FACILITIESRefuse / Trash / recycle container | see PWS for specific detailsMTH4EA1$ - 0
351Miscellaneous6PORT FACILITIESOPEN STAGING AREA, hard stand, Lots, storage areas | see PWS for specific detailsDY30SQMT65000$ - 0
352Miscellaneous6PORT FACILITIESWAREHOUSE - CLOSED STAGING AREA | see PWS for specific detailsDY10SQMT5000$ - 0
354Miscellaneous6PORT FACILITIESCONTAINER WALL 20FT- 40FT CONTAINERS (combination of both)DY10EA$ - 025$ - 0
355Miscellaneous6PORT FACILITIESCONTAINER WALL 20'-40' Delivered, setup, and removal,EA$ - 025$ - 0
TOTAL 6 Facilities$ - 0
357Miscellaneous7LUMBER / DUNNAGE / MATERIALS2" x 4" x 8" - PC CUT LUMBER - ISPM# CERTIFIEDPC$ - 0100$ - 0
362Miscellaneous7LUMBER / DUNNAGE / MATERIALS4" x 4" x 10" - PC - CUT LUMBER - ISPM# CERTIFIEDPC100$ - 0
364Miscellaneous7LUMBER / DUNNAGE / MATERIALS6" x 6" x 12" - PC - CUT LUMBER - ISPM# CERTIFIEDPC100$ - 0
365Miscellaneous7LUMBER / DUNNAGE / MATERIALS4" x 8" x 1/2" - PLYWOOD SHEETPC25$ - 0
366Miscellaneous7LUMBER / DUNNAGE / MATERIALS4" x 8" x 1" - PLYWOOD SHEETPC$ - 025$ - 0
368Miscellaneous7LUMBER / DUNNAGE / MATERIALS#8 - Nail, Steel, 75mm length, 25kg per boxBX$ - 010$ - 0
370Miscellaneous7LUMBER / DUNNAGE / MATERIALS#16 - 120mm length, 25kg per boxBX$ - 010$ - 0
373Miscellaneous7LUMBER / DUNNAGE / MATERIALSSecuring Belt (polyester) CW200. breaking load 8.5 tEA$ - 020$ - 0
374Miscellaneous7LUMBER / DUNNAGE / MATERIALSBelt ClipEA20$ - 0
375Miscellaneous7LUMBER / DUNNAGE / MATERIALSChain, 6 links. Breaking Load: 20 to.EA60$ - 0
376Miscellaneous7LUMBER / DUNNAGE / MATERIALSChain, 12 links. Breaking Load: 20 to.EA20$ - 0
377Miscellaneous7LUMBER / DUNNAGE / MATERIALSShackle, 3 to.. Breaking Load: 15 to.EA60$ - 0
378Miscellaneous7LUMBER / DUNNAGE / MATERIALSTurnbuckle 1 1/8''. Breaking Load: 20 to.EA80$ - 0
379Miscellaneous7LUMBER / DUNNAGE / MATERIALSWire, 16 mm..METER20$ - 0
380Miscellaneous7LUMBER / DUNNAGE / MATERIALSClips for Wire, 16 mm.EA20$ - 0
381Miscellaneous7LUMBER / DUNNAGE / MATERIALSLumber 10x10EA250$ - 0
382Miscellaneous7LUMBER / DUNNAGE / MATERIALSLumber 20x20EA$ - 0200$ - 0
383Miscellaneous7LUMBER / DUNNAGE / MATERIALSChock Block 35,5x11,5x17 cmEA$ - 0100$ - 0
384Miscellaneous7LUMBER / DUNNAGE / MATERIALSNails, 5.5 x 160KG$ - 050$ - 0
385Miscellaneous7LUMBER / DUNNAGE / MATERIALSPolyesterline, whiteMETER50$ - 0
386Miscellaneous7LUMBER / DUNNAGE / MATERIALSScotchtape, NylonREEL20$ - 0
387Miscellaneous7LUMBER / DUNNAGE / MATERIALSStrip Iron 16mmMETER100$ - 0
388Miscellaneous7LUMBER / DUNNAGE / MATERIALSStrip iron 32mmMETER100$ - 0
TOTAL 7 Lumber/Dunnage/Materials$ - 0
389Miscellaneous8MISCELLANEOUSOUT-OF-POCKET POOLMTH12USD$ 5,000.001$ 60,000.00
TOTAL Miscellanious OOP$ 60,000.00

File details come from the government source that posted it. Updated .