Atch 2 Repair Transient Parking ramp 2048 Specifications-Final Design Submittal 483 pages (16 August 2019).pdf

PDF 2 MB Posted

Attached to
Repair Transient Parking Ramp Federal contract opportunity
Solicitation number
FA670320B0005
Issued by
Department of the Air Force Reserve Command

About this file

This is a solicitation notice for repair work on a transient parking ramp at Dobbins Air Reserve Base in Georgia. The project involves full depth doweled joint replacement of approximately 63,600 square yards of Portland cement concrete slabs with longitudinal or transverse cracks, as well as installation of anchors and mooring points. Replacement slabs must be designed to support both MV-22 and C-17 aircraft. The requirement is set aside for small businesses with annual revenues less than $39.5 million. The solicitation will be an invitation for bid, with a firm-fixed-price contract and a period of performance of 420 calendar days. The bid closing date is September 24, 2020 at 2:00 PM Eastern, with bid opening anticipated approximately 30 minutes later. Interested parties should monitor the website for any updates or amendments. The primary point of contact is listed as the contracting specialist Antwain Burks, with Patrina Sheffield as alternate contact and contracting officer.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared for:

AIR FORCE RESERVE COMMAND

94TH MSG/CEC

884 INDUSTRIAL DRIVE

DOBBINS ARB, GA 30069-4210

Specifications – Final Design Submittal

August 16, 2019

Prepared By:

Repair Transient Parking Ramp 2048

Dobbins Air Reserve Base- Marietta, GA Project No.: FGWB 16-0020

Dobbi ns Ai r Reser ve Base FI NAL SUBMI TTAL Repai r Tr ansi ent Par ki ng Ramp 2048 16 AUG 2019

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 01 00 GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 13 SPECI AL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 56 00 DOBBI NS ARB ENVI RONMENTAL REQUI REMENTS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL

01 78 00 CLOSEOUT SUBMI TTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE

DI VI SI ON 26 - ELECTRI CAL

26 56 20 AI RFI ELD LI GHTI NG AND VI SUAL NAVI GATI ON AI DS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 23 AGGREGATE BASE COURSES

32 11 23. 23 BASE COURSE DRAI NAGE LAYERS

32 11 36. 13 LEAN CONCRETE BASE COURSE

32 12 13 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS AND TAXI WAY SHOULDERS

32 13 14. 13 CONCRETE PAVI NG FOR AI RFI ELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 17 23 PAVEMENT MARKI NGS

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 46 16 SUBDRAI NAGE PI PI NG

DI VI SI ON 34 - TRANSPORTATI ON

PROJECT TABLE OF CONTENTS Page 1

34 73 13 MOORI NG AND GROUNDI NG POI NTS FOR AI RCRAFT

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 2

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 01 00

GENERAL REQUI REMENTS

06/19

PART 1 GENERAL

1. 1 PROJECT I NFORMATI ON

1. 1. 1 Cont r act Dr awi ngs and Speci f i cat i ons

1. 2 SUBMI TTALS

1. 2. 1 Admi ni st r at i ve or Cl ose- out Submi t t al

1. 3 GENERAL DESCRI PTI ON

1. 3. 1 Locat i on

1. 3. 2 Pr oj ect Descr i pt i on

1. 4 GOVERNMENT I NSPECTOR

1. 5 ORAL STATEMENTS

1. 6 NO GOVERNMENT WAI VER

1. 7 AS- BUI LT RECORDS

1. 7. 1 As- Bui l t Dr awi ngs

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON

3. 1 BASE REGULATI ONS

3. 2 WORK SCHEDULE

3. 2. 1 Const r uct i on Phasi ng

3. 3 WORK HOURS

3. 4 OPERATI ONS ON THE AI RFI ELD

3. 5 EXI STI NG WORK

3. 6 SANI TATI ON

3. 7 UTI LI TI ES

3. 8 UTI LI TY SERVI CE I NTERRUPTI ON

3. 9 OPTI ONAL REQUI REMENTS

3. 10 MATERI AL APPROVAL SUBMI TTAL PREPARATI ON

3. 11 MATERI AL DI SPOSI TI ON

3. 11. 1 Mat er i al / Equi pment Ti t l e

3. 11. 2 Cont r act or Sal vage

3. 12 CLEAN- UP

3. 13 SAFETY REQUI REMENTS

3. 14 FI RE PROTECTI ON

3. 15 FACI LI TI ES AND SERVI CES

3. 16 RESTRI CTI ONS

3. 16. 1 Radi o Tr ansmi t t er Rest r i ct i ons

3. 16. 2 Mat er i al s Bur ni ng

3. 17 REQUI RED CONTRACTOR ACTI ONS

3. 17. 1 Base Per mi t s

3. 17. 1. 1 Gover nment Di ggi ng Per mi t s

3. 17. 1. 1. 1 Pr ocedur es f or Gover nment Di ggi ng Per mi t s

3. 17. 1. 2 UPC Di ggi ng Per mi t s

SECTI ON 01 01 00 Page 1

3. 17. 1. 3 Ut i l i t y Damage

3. 17. 1. 4 Wel di ng Per mi t s

3. 17. 2 Sever e Weat her Pr ot ect i on

3. 17. 3 Cl ean Ti r e Pol i cy

3. 17. 4 Er osi on and Sedi ment Cont r ol

3. 17. 5 Envi r onment al Requi r ement s

3. 17. 6 Qual i t y Cont r ol Pl an

3. 17. 7 Hazar dous Spi l l Repor t i ng

3. 18 DD FORM 1354

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 01 00 Page 2

SECTI ON 01 01 00

GENERAL REQUI REMENTS

06/19

PART 1 GENERAL

1. 1 PROJECT I NFORMATI ON

Thi s pr oj ect ( FGWB 16- 0020) consi st s of t he r econst r uct i on of t he ent i r e Tr ansi ent Ramp 2048 bet ween Taxi way A and Taxi way B on t he nor t h por t i on of t he ai r f i el d at Dobbi ns Ai r Reser ve Base.

1. 1. 1 Cont r act Dr awi ngs and Speci f i cat i ons

PROJECT DRAWI NGS LI ST

SHEET NUMBER SHEET TI TLE

GI001 TI TLE SHEET

GI002 SHEET I NDEX

GI003 LEGEND AND ABBREVI ATI ONS

GC111 PROJECT LAYOUT PLAN

GC121 SURVEY CONTROL PLAN

GC141 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS

GC142 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS

GC143 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS

GC144 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS

GC145 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS PHASE 1

GC146 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS PHASE 2

GC147 CONSTRUCTI ON OPERATI ONS AND PHASI NG PLANS PHASE 3

GC151 CONSTRUCTI ON OPERATI ONS AND PHASI NG NOTES

GC152 CONSTRUCTI ON OPERATI ONS AND PHASI NG NOTES

GC101 EROSI ON CONTROL PLAN

GC501 EROSI ON CONTROL DETAI LS

BB101 SOI L BORI NGS PLAN

SECTI ON 01 01 00 Page 3

PROJECT DRAWI NGS LI ST

BB102 SOI L BORI NGS LOGS

BB103 SOI L BORI NGS LOGS

BB104 SOI L BORI NGS LOGS

CS101 EXI STI NG SI TE PLAN

CS102 EXI STI NG SI TE PLAN

CS103 EXI STI NG PAVEMENT I DENTI FI CATI ON PLAN

CS104 EXI STI NG PAVEMENT I DENTI FI CATI ON PLAN

CD101 DEMOLI TI ON PLAN

CD102 DEMOLI TI ON PLAN

CS111 PROJECT GEOMETRI CS

CS112 PROJECT GEOMETRI CS

CG111 GRADI NG AND DRAI NAGE PLAN

CG112 GRADI NG AND DRAI NAGE PLAN

CP121 JOI NTI NG PLAN

CP122 JOI NTI NG PLAN

CP123 JOI NTI NG PLAN ENLARGED VI EWS

CP131 PAVEMENT ELEVATI ON PLAN

CP132 PAVEMENT ELEVATI ON PLAN

CP133 PAVEMENT ELEVATI ON PLAN

CP134 PAVEMENT ELEVATI ON PLAN

CP135 PAVEMENT ELEVATI ON PLAN

CP136 PAVEMENT ELEVATI ON PLAN

CP137 PAVEMENT ELEVATI ON PLAN

CP301 TYPI CAL SECTI ONS

CP302 TYPI CAL SECTI ONS

CP501 JOI NTI NG DETAI LS

CP502 JOI NTI NG DETAI LS

SECTI ON 01 01 00 Page 4

PROJECT DRAWI NGS LI ST

CU111 UNDERDRAI N PLAN

CU521 DRAI NAGE AND UTI LTY DETAI LS

CU522 DRAI NAGE AND UTI LTY DETAI LS

CU523 UNDERDRAI N DETAI LS

CS171 MARKI NG LAYOUT PLAN

CS172 MARKI NG LAYOUT PLAN

CS501 MARKI NG DETAI LS

CI181 TI EDOWN LAYOUT PLAN

CI182 TI EDOWN LAYOUT PLAN

CI501 TI EDOWN POI NT TABLE

CI502 TI EDOWN DETAI LS

CX111 CROSS SECTI ON LOCATI ON PLAN

CX112 CROSS SECTI ONS

CX113 CROSS SECTI ONS

CX114 CROSS SECTI ONS

CX115 CROSS SECTI ONS

CX116 CROSS SECTI ONS

CX117 CROSS SECTI ONS

CX118 CROSS SECTI ONS

CX119 CROSS SECTI ONS

CX121 UNDERDRAI N CROSS SECTI ONS

CX122 UNDERDRAI N CROSS SECTI ONS

CX123 UNDERDRAI N CROSS SECTI ONS

PROJECT SPECI FI CATI ONS LI ST

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 01 00 Page 5

PROJECT SPECI FI CATI ONS LI ST

01 01 00 GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 13 SPECI AL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 56 00 DOBBI NS ARB ENVI RONMENTAL REQUI REMENTS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL

01 78 00 CLOSEOUT SUBMI TTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE

DI VI SI ON 26 - ELECTRI CAL

26 56 20 AI RFI ELD LI GHTI NG AND VI SUAL NAVI GATI ON AI DS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

SECTI ON 01 01 00 Page 6

PROJECT SPECI FI CATI ONS LI ST

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N

RI GI D PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 23 AGGREGATE BASE COURSES

32 11 23. 23 BASE COURSE DRAI NAGE LAYERS

32 11 36. 13 LEAN CONCRETE BASE COURSE

32 12 13 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS AND TAXI WAY

SHOULDERS

32 13 14. 13 CONCRETE PAVI NG FOR AI RFI ELDS AND OTHER HEAVY

DUTY PAVEMENTS

32 17 23 PAVEMENT MARKI NGS

32 92 23 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAI N UTI LI TI ES

33 46 16 SUBDRAI NAGE PI PI NG

DI VI SI ON 34 - TRANSPORTATI ON

34 73 13 MOORI NG AND GROUNDI NG POI NTS FOR AI RCRAFT

1. 2 SUBMITTALS

Submi t t al s shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES.

NOTE: The Cont r act or shal l obt ai n Gover nment appr oval of al l mat er i al s and equi pment r equi r i ng submi t t al s pr i or t o br i ngi ng t hese mat er i al s and equi pment ont o Dobbi ns ARB f or i nst al l at i on and i ncor por at i on i nt o t he wor k. The Cont r act or shal l f ol l ow Sect i on 01 33 00 of t he basi c cont r act i n obt ai ni ng Gover nment appr oval .

1. 2. 1 Admi ni st r at i ve or Cl ose- out Submi t t al

a. Const r uct i on Phasi ng ( See Par agr aph 3. 2. 1 of t hi s speci f i cat i on)

b. Dai l y Pr ogr ess Repor t s t o Cont r act i ng Of f i cer wi t hi n t wo ( 2) hour s of

SECTI ON 01 01 00 Page 7 shi f t compl et i on

c. Qual i t y Cont r ol Pl an ( See Par agr aph 3. 17. 6 of t hi s speci f i cat i on)

d. As- bui l t Dr awi ngs ( af t er const r uct i on i s compl et e)

1. 3 GENERAL DESCRI PTI ON

1. 3. 1 Location

The pr oj ect i s l ocat ed at Dobbi ns Ai r Reser ve Base, Geor gi a. The pr oj ect s i t e i s at t he t r ansi ent r amp east of Taxi way A and nor t h of Taxi way B.

1. 3. 2 Pr oj ect Descr i pt i on

The pr oj ect r emoves and r epl aces appr oxi mat el y 55, 000 SY of concr et e ai r cr af t par ki ng r amp al ong wi t h associ at ed f aci l i t i es f ur t her def i ned i n pl ans and speci f i cat i ons.

1. 4 GOVERNMENT I NSPECTOR

The Base Ci v i l Engi neer , or hi s aut hor i zed r epr esent at i ve, i s desi gnat ed as t he r epr esent at i ve of t he Cont r act i ng Of f i cer f or t he pur pose of t echni cal sur vei l l ance of wor kmanshi p and i nspect i on of mat er i al s f or wor k bei ng per f or med under t hi s Cont r act . Thi s c l ause does not aut hor i ze anyone ot her t han t he Cont r act i ng Of f i cer t o commi t t he Gover nment t o changes i n t he t er ms of t he Cont r act .

1. 5 ORAL STATEMENTS

No or al st at ement by any Gover nment of f i c i al shal l i n any manner or degr ees modi f y or ot her wi se af f ect t he t er ms of t he Cont r act .

1. 6 NO GOVERNMENT WAI VER

The f ai l ur e of t he Gover nment i n any one or mor e i nst ances t o i nsi st upon st r i c t per f or mance t o any of t he t er ms of t hi s Cont r act or t o exer c i se any opt i on her ei n conf er r ed wi l l not be const r ued as a wai ver or r el i nqui shment t o any ext ent of t he r i ght t o asser t or r el y upon such t er ms or opt i on on any f ut ur e occasi on.

1. 7 AS- BUI LT RECORDS

1. 7. 1 As- Bui l t Dr awi ngs

Mai nt ai n at t he j obsi t e t wo ( 2) set s of f ul l - s i ze Cont r act dr awi ngs. Any devi at i ons f r om t he Cont r act dr awi ngs shal l be mar ked l egi bl y and accur at el y wi t h a r ed pen. These dr awi ngs shal l be avai l abl e f or r evi ew by t he Cont r act i ng Of f i cer at al l t i mes. Submi t one mar ked set of pr i nt s t o t he Cont r act i ng Of f i cer no l at er t han t hi r t y ( 30) cal endar days af t er wor k i s deemed subst ant i al l y per f or med or benef i c i al occupancy i s t aken.

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON

3. 1 BASE REGULATI ONS

The Cont r act or and hi s empl oyees and subcont r act or ( s) shal l become f ami l i ar

SECTI ON 01 01 00 Page 8 wi t h and obey al l Base r egul at i ons, i ncl udi ng f i r e, t r af f i c , ai r f i el d, saf et y, envi r onment al , and secur i t y r egul at i ons. Regul at i ons ar e avai l abl e upon r equest . Al l per sonnel empl oyed on subj ect cont r act shal l keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Do not ent er any r est r i c t ed ar eas unl ess pr evi ousl y c l ear ed f or such ent r y. The Cont r act or ' s equi pment shal l be conspi cuousl y mar ked f or i dent i f i cat i on.

3. 2 WORK SCHEDULE

The Cont r act or shal l schedul e hi s wor k t o cause t he l east amount of i nt er f er ence wi t h Base oper at i ons. Wor k schedul es shal l be subj ect t o t he appr oval of t he Cont r act i ng Of f i cer . Under no c i r cumst ances shal l f i r e wat er syst em be out of ser vi ce f or mor e t han f i ve ( 5) cal endar days.

Per mi ssi on t o i nt er r upt any base r oads and/ or ut i l i t y ser vi ce shal l be r equest ed i n wr i t i ng a mi ni mum of t en ( 10) cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on. I nt er r upt i on shal l not t ake pl ace wi t hout speci f i c appr oval f r om t he Cont r act i ng Of f i cer .

3. 2. 1 Const r uct i on Phasi ng

Thi r t y ( 30) days pr i or t o commenci ng wor k, pr ovi de t o t he Cont r act i ng Of f i cer , f or appr oval , a pl an, whi ch i ndi cat es t he t i mel i ne of st ar t t o compl et i on of each const r uct i on phase.

3. 3 WORK HOURS

The nor mal hour s of wor k f or t he per f or mance of t hi s cont r act wi l l be f r om 6: 00 AM t o 5: 00 PM except as ot her wi se expr essl y pr ovi ded i n t hi s Cont r act . The wor kdays wi l l be Monday t hr ough Fr i day, wi t h Feder al hol i days excl uded. Al t er nat e wor k hour s r equi r e wr i t t en per mi ssi on of t he Cont r act i ng Of f i cer . The Cont r act or must submi t a wr i t t en r equest f or per mi ssi on t o wor k t o t he Cont r act i ng Of f i cer at l east t wo ( 2) wor k i ng days i n advance of t he dat e when t he Cont r act or desi r es t o devi at e f r om t he nor mal hour s and days. Addi t i onal t i me may be r equi r ed f or speci f i c r equest s as f ur t her def i ned i n t he const r uct i on phasi ng pl ans. Per mi ssi on t o devi at e wi l l be pr edi cat ed on compl et e j ust i f i cat i on f or t he r equest af t er due consi der at i on t o a l ar ger wor k f or ce and mor e equi pment dur i ng nor mal hour s, and pr ovi di ng t he Cont r act or def r ays t he addi t i onal cost s t o t he Gover nment i ncl udi ng, but not l i mi t ed t o, i nspect i on comput ed i n accor dance wi t h exi st i ng Gover nment r egul at i ons. I f per mi ssi on i s gr ant ed by t he Cont r act i ng Of f i cer , wr i t t en aut hor i t y wi l l be f ur ni shed t o t he Cont r act or pr i or t o t he dat e t he Cont r act or desi r es t o devi at e f r om t he nor mal hour s or days. The Cont r act i ng Of f i cer may al so di r ect per f or mance as aut hor i zed by t he Gener al Pr ovi s i ons by r ef er ence cl ause ent i t l ed " Schedul e f or Const r uct i on Cont r act . "

I t i s under st ood t hat due t o t he nat ur e of t he pr oj ect , ni ght , weekend and ext ended hour s may be necessar y f or pr oper compl et i on of t he wor k. Up t o 45 24- hour per day per i ods ar e i ncl uded i n t he Gover nment ' s wor kf or ce cal cul at i ons. Speci f i c per i ods t hat t he cont r act or i s assumed t o r equi r e suppl ement al t i me i ncl udes dur i ng concr et e pl acement , saw cut t i ng, cur i ng and r el at ed i t ems.

3. 4 OPERATI ONS ON THE AI RFI ELD

Wor k wi l l occur on a c l osed por t i on of t he ai r f i el d. Cl osur e, access and r el at ed i t ems ar e i dent i f i ed i n t he const r uct i on saf et y and phasi ng pl ans r egar di ng how t o c l ose, and manage access t o t he s i t e dur i ng const r uct i on.

SECTI ON 01 01 00 Page 9

3. 5 EXI STI NG WORK

The r emoval or al t er i ng i n any way of exi st i ng wor k shal l be car r i ed on i n such a manner as t o pr event per sonal i nj ur y or damage t o any por t i ons of t he exi st i ng wor k t hat r emai ns.

3. 6 SANITATION

Adequat e sani t ar y conveni ences of a t ype appr oved f or use by per sons empl oyed on t he wor k shal l be pr ovi ded. Sani t ar y conveni ences shal l be pr oper l y secl uded f r om publ i c obser vat i on and mai nt ai ned by t he Cont r act or i n such a manner as r equi r ed or appr oved by t he Cont r act i ng Of f i cer .

Mai nt ai n t hese conveni ences at al l t i mes wi t hout nui sance. Upon compl et i on of t he wor k, t he Cont r act or shal l r emove t he conveni ences f r om t he pr emi ses, l eavi ng t he pr emi ses c l ean and f r ee f r om nui sance.

3. 7 UTILITIES

Al l r easonabl e quant i t i es of Gover nment - pr ovi ded ut i l i t i es shal l be made avai l abl e t o t he Cont r act or wi t hout char ge. Any t empor ar y t el ephone or power ser vi ce shal l be r equest ed by t he Cont r act or f r om t he l ocal t el ephone or power company pr ovi di ng ser vi ce t o Dobbi ns ARB. The Cont r act or shal l not t amper wi t h, connect or access any Gover nment communi cat i on f aci l i t y , equi pment or cabl e wi t hout expr ess wr i t t en consent f r om t he Cont r act i ng Of f i cer . Any t empor ar y connect i ons or l i nes t hat may be r equi r ed shal l be i nst al l ed, mai nt ai ned, and r emoved by t he Cont r act or at hi s expense and i n a manner sat i sf act or y t o t he Cont r act i ng Of f i cer . Cont r act or shal l r emove al l t empor ar y connect i ons and l i nes pr i or t o f i nal accept ance of t he construction.

3. 8 UTI LI TY SERVI CE I NTERRUPTI ON

The Gover nment shal l not be hel d r esponsi bl e f or i nt er r upt i ons of ut i l i t y ser vi ces and shal l not be l i abl e f or Cont r act or del ays, damages, or i ncr eased cost s occasi oned by any such i nt er r upt i on of ser vi ces.

3. 9 OPTI ONAL REQUI REMENTS

Wher e a choi ce of mat er i al s or met hods, or bot h, i s per mi t t ed i n t hi s Cont r act , t he Cont r act or wi l l be gi ven t he r i ght t o exer ci se t he opt i on unl ess ot her wi se r equi r ed by t he speci f i cat i on or pl ans.

3. 10 MATERI AL APPROVAL SUBMI TTAL PREPARATI ON

" Mat er i al and Wor kmanshi p" shal l be accompl i shed on and i n accor dance wi t h t he i nst r uct i ons t o AF For m 3000, Mat er i al Appr oval Submi t t al . Mat er i al Appr oval Submi t t al s shal l cont ai n compl et e i nf or mat i on f or t he pr oduct pr oposed. The i nf or mat i on shal l be i n enough det ai l t o al l ow t he Gover nment t o det er mi ne accept abi l i t y . I nf or mat i on t o be pr ovi ded i ncl udes, but i s not l i mi t ed t o: a descr i pt i on of al l sal i ent f eat ur es of t he pr oduct , descr i pt i ve l i t er at ur e and manuf act ur er ' s cut sheet ( i f avai l abl e) , pl us an expl anat i on as t o pr eci sel y why and how t he mat er i al or i t em submi t t ed meet s or exceeds al l r equi r ed f unct i ons, per f or mance and qual i t y speci f i cat i ons.

SECTI ON 01 01 00 Page 10

3. 11 MATERI AL DI SPOSI TI ON

3. 11. 1 Mat er i al / Equi pment Ti t l e

Ti t l e t o mat er i al s and equi pment t o be demol i shed, except Gover nment sal vage and hi st or i cal i t ems, i s vest ed i n t he Cont r act or upon r ecei pt of not i ce t o pr oceed. The Gover nment wi l l not be r esponsi bl e f or t he condi t i on, l oss or damage t o such pr oper t y af t er not i ce t o pr oceed.

3. 11. 2 Cont r act or Sal vage

Cont r act or shal l sal vage i t ems and mat er i al s t o t he maxi mum ext ent possi bl e. Mat er i al sal vaged f or t he Cont r act or shal l be st or ed as appr oved by t he Cont r act i ng Of f i cer and r emoved f r om Gover nment pr oper t y bef or e compl et i on of t he Cont r act . The Cont r act or shal l not sel l sal vaged mat er i al on t he s i t e.

3. 12 CLEAN-UP

Remove and t r anspor t debr i s i n a manner t hat pr event s spi l l age on st r eet s or adj acent ar eas. Local r egul at i ons r egar di ng haul i ng and di sposal shal l appl y. The Cont r act or shal l mai nt ai n a c l ean and or der l y wor k s i t e.

3. 13 SAFETY REQUI REMENTS

The Cont r act or shal l i ni t i at e and mai nt ai n pr ogr ams t hat compl y wi t h t he pr ovi s i ons of 29 CFR par t s 1926 and 1910 of t he Occupat i onal Saf et y and Heal t h St andar ds. These pr ogr ams shal l i ncl ude t he educat i on and t r ai ni ng of empl oyees and subcont r act or s ' per sonnel i n t he r ecogni t i on, avoi dance, and pr event i on of unsaf e condi t i ons and pr act i ces.

3. 14 FI RE PROTECTI ON

The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng adequat e and pr oper f i r e pr ot ect i on dur i ng al l phases of wor k on s i t e. Cont act t he Base Fi r e Depar t ment i n t he event of emer gency.

3. 15 FACI LI TI ES AND SERVI CES

The Cont r act or i s r esponsi bl e f or st or age of al l mat er i al s. St or age ar eas shal l be shown on t he s i t e pl an and appr oved by t he Cont r act i ng Of f i cer .

3. 16 RESTRICTIONS

3. 16. 1 Radi o Tr ansmi t t er Rest r i ct i ons

The Cont r act or shal l conf or m t o t he r est r i c t i ons and pr ocedur es f or t he use of r adi o t r ansmi t t i ng equi pment , as di r ect ed. Two ( 2) t r ansmi t t er s shal l be pr ovi ded by t he Gover nment t o t he Cont r act or f or use dur i ng const r uct i on.

3. 16. 2 Mat er i al s Bur ni ng

Bur ni ng of t r ash, t i mber and any ot her debr i s on Gover nment pr oper t y i s not permitted.

SECTI ON 01 01 00 Page 11

3. 17 REQUI RED CONTRACTOR ACTI ONS

3. 17. 1 Base Per mi t s

Obt ai n t hese pur suant t o par agr aph 3. 1 of t hi s speci f i cat i on. Per mi t s ar e r equi r ed f or , but ar e not necessar i l y l i mi t ed t o, wel di ng, and di ggi ng.

3. 17. 1. 1 Gover nment Di ggi ng Per mi t s

The r equi r ement f or di ggi ng or excavat i on per mi t s ( AF For m 103) shal l be appl i cabl e f or Gover nment - owned ut i l i t i es such as wat er , gas, el ect r i cal , sewer , f i ber opt i cs, t el ephone cabl e and communi cat i on cabl es f or r adar , weat her and navi gat i onal ai ds cabl e.

3. 17. 1. 1. 1 Pr ocedur es f or Gover nment Di ggi ng Per mi t s

Cont r act or shal l not di g anywher e on Dobbi ns ARB wi t hout a val i d di ggi ng permit.

Cont r act or shal l not i f y t he Cont r act i ng Of f i cer i n wr i t i ng t o r equest a di ggi ng per mi t .

Cont r act or shal l mar k t he ar ea on s i t e wher e di ggi ng i s t o occur . Thi s shal l be done t he same day t he di g per mi t i s r equest ed. Gover nment has f our t een ( 14) days t o i ssue an i ni t i al di ggi ng per mi t .

Cont r act or shal l mar k t he ar ea on s i t e wher e di ggi ng i s t o occur . Thi s shal l be done t he same day t he di g per mi t i s r equest ed. Gover nment has f our t een ( 14) days t o i ssue an i ni t i al di ggi ng per mi t .

Cont r act or shal l mai nt ai n al l mar ki ngs dur i ng const r uct i on per f or mance period.

Cont r act or wi l l pr ovi de AFM compl et ed and si gned copy of AF For m 103, Di g Per mi t , pr i or t o di ggi ng.

Once a di ggi ng per mi t i s i ssued, t he Cont r act or must hand di g and l ocat e al l mar ked ut i l i t i es wi t hi n f i ve ( 5) f eet of t he ar ea t o be wor ked on.

Cont r act or shal l f i l l al l hol es pr i or t o pr oj ect compl et i on.

I f , dur i ng t he l i f e of t he di ggi ng per mi t , ut i l i t y mar ki ngs ar e r emoved by t he Cont r act or or hi s subcont r act or ( s) t he Cont r act or shal l be r esponsi bl e f or r epl aci ng al l mar ki ngs.

3. 17. 1. 2 UPC Di ggi ng Per mi t s

The pr ocedur es set f or t h f or Gover nment - owned ut i l i t i es shal l not appl y t o ut i l i t i es whi ch ar e gover ned by t he Ut i l i t i es Pr ot ect i on Cent er ( UPC) under t he auspi ces of t he St at e of Geor gi a. UPC ut i l i t i es on Dobbi ns ARB i ncl ude t el evi s i on cabl e, t el ephone cabl es, dat a cabl es, et c. Pr ocedur es f or ut i l i t i es gover ned by t he UPC shal l be f ol l owed i n accor dance wi t h Geor gi a Ut i l i t y Faci l i t y Pr ot ect i on Act ( GUFPA) . The Cont r act or i s r equi r ed t o obt ai n a UPC di ggi ng per mi t pr i or t o di ggi ng on Dobbi ns ARB. The Gover nment i s not r esponsi bl e f or i ssui ng or moni t or i ng UPC di ggi ng per mi t s.

3. 17. 1. 3 Ut i l i t y Damage

The Cont r act or must i mmedi at el y not i f y t he Gover nment t echni cal r epr esent at i ve and UPC i n t he event t hat ut i l i t y damage occur s. I f damage

SECTI ON 01 01 00 Page 12 t o ut i l i t i es i s due t o Cont r act or non- compl i ance wi t h per mi t i nst r uct i ons or Cont r act r equi r ement s, r epai r s r equi r ed shal l be at t he Cont r act or ' s expense. Fi ber opt i c cabl es, whi ch cannot be r epai r ed t o meet t he mi ni mum al l owabl e deci bel s, wi l l be r epl aced at t he Cont r act or ' s expense.

3. 17. 1. 4 Wel di ng Per mi t s

Obt ai n wel di ng per mi t s on a dai l y basi s f r om t he Base Fi r e Depar t ment .

3. 17. 2 Sever e Weat her Pr ot ect i on

I n t he event of sever e weat her , t he Cont r act or shal l t ake pr ecaut i ons t o mi ni mi ze any danger t o per sons, and pr ot ect t he wor k and any near by Gover nment pr oper t y. Pr ecaut i ons shal l i ncl ude, but ar e not l i mi t ed t o, c l osi ng openi ngs; r emovi ng l oose mat er i al s, t ool s and equi pment f r om exposed l ocat i ons; and r emovi ng or secur i ng scaf f ol di ng and ot her t empor ar y work.

3. 17. 3 Cl ean Ti r e Pol i cy

Dobbi ns ARB has a c l ean t i r e pol i cy at wor k s i t es. The pur pose of t hi s pol i cy i s t o r educe or el i mi nat e t he t r anspor t of mud f r om t he wor k ar ea ont o publ i c r i ght s- of - way by mot or vehi c l es l eavi ng t he s i t e or by r unof f f r om t he s i t e. Cl ean and r emove mud f r om t he wheel s of vehi c l es pr i or t o ent r ance t o publ i c r i ght s- of - way. The si t e exi t shal l be mai nt ai ned i n or der t o pr event t r acki ng or f l ow of mud ont o publ i c r i ght s- of - way.

I mmedi at el y r emove al l mat er i al s spi l l ed, dr opped, washed or t r acked f r om any vehi c l e or s i t e ont o any r oadway or i nt o any st or m dr ai n. Compl i ance wi t h t he c l ean t i r e pol i cy, by Cont r act or and subcont r act or per sonnel , shal l be t he sol e r esponsi bi l i t y of t he Cont r act or .

3. 17. 4 Er osi on and Sedi ment Cont r ol

Take posi t i ve st eps t o mi ni mi ze s i l t at i on and er osi on dur i ng t he wor k.

Compl y wi t h t he r equi r ement s of Sect i on 01 56 00 DOBBI NS ARB ENVI RONMENTAL REQUI REMENTS, dr awi ngs and al l ot her r el at ed speci f i cat i on sect i ons.

3. 17. 5 Envi r onment al Requi r ement s

The Cont r act or and al l wor k t o be per f or med on Dobbi ns ARB shal l compl y wi t h t he r equi r ement s of Sect i on 01 56 00 DOBBI NS ARB ENVI RONMENTAL

REQUIREMENTS.

3. 17. 6 Qual i t y Cont r ol Pl an

The Cont r act or shal l be r equi r ed t o i nst i t ut e a compr ehensi ve Qual i t y Cont r ol Pr ogr am i n or der t o assur e hi msel f and t he Gover nment t hat al l mat er i al s and wor kmanshi p ar e i n st r i c t accor dance wi t h t he pr ovi s i ons of t he speci f i cat i ons. Wi t hi n t en ( 10) cal endar days af t er r ecei pt of Not i ce t o Pr oceed, t he cont r act or shal l submi t hi s Qual i t y Cont r ol Pr ogr am Pl an t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval . The pl an shal l cont ai n, at a mi ni mum, i dent i f i cat i on of pr ocedur es f or qual i t y cont r ol , t he t ype and model of maj or pi eces of equi pment t o be used on- t he- j ob, or der i ng pr ocedur es f or mat er i al s, and pr ocedur es t o ensur e adequat e pr ogr ess.

3. 17. 7 Hazar dous Spi l l Repor t i ng

The Cont r act or shal l r epor t any spi l l of oi l or hazar dous subst ances t o t he Fi r e Depar t ment ser vi ce desk at Ext . 911 f r om a Gover nment phone, or ( 678)

SECTI ON 01 01 00 Page 13

655- 4840 f r om a commer ci al phone ( 24 hour s per day, 7 days per week) . The Cont r act or shal l t ake ever y r easonabl e pr ecaut i on t o pr event t he spi l l age of oi l or ot her hazar dous subst ances.

3. 18 DD FORM 1354

Compl et i on of a DD1354 Package i s r equi r ed f or t hi s pr oj ect . Copi es of t he DD1354 f or m and i t s i nst r uct i ons ar e i ncl uded i n t he pr oj ect manual .

El ect r oni c copi es wi l l be avai l abl e f r om t he COR. Fol l ow t he i nst r uct i ons gi ven f or execut i ng t he DD1354 and coor di nat e i t ' s submi ssi on wi t h t he COR.

- - End of Sect i on - -

SECTI ON 01 01 00 Page 14

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

1. 2. 2 Locat i on

1. 3 OCCUPANCY OF PREMI SES

1. 4 EXI STI NG WORK

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

1. 6 SALVAGE MATERI AL AND EQUI PMENT

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 11 00 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s Sal vage Pl an; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes t he r emoval and r epl acement of about 55, 000 SY of concr et e ai r cr af t par ki ng r amp and i nci dent al r el at ed wor k. Thi s i ncl udes t he r emoval of exi st i ng concr et e pavement and base cour se, subgr ade pr epar at i on and compact i on, const r uct i on of new PCC pavement , const r uct i on of asphal t pavement shoul der s, i nst al l at i on of gr oundi ng poi nt s, pl acement of a new under dr ai n syst em, and new pavement mar ki ngs.

1. 2. 2 Location

The wor k i s l ocat ed at t he Dobbi ns Ai r Reser ve Base i n Cobb Count y, Mar i et t a, Geor gi a. See pl an set f or addi t i onal i nf or mat i on.

1. 3 OCCUPANCY OF PREMI SES

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of st agi ng ar eas and haul r out es.

1. 4 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Submi t f or m AF For m 103 and cont act l ocal ut i l i t y l ocat i ng ser vi ce a

SECTI ON 01 11 00 Page 2 mi ni mum of 3 wor ki ng days pr i or t o excavat i ng t o mar k ut i l i t i es. Al l ow addi t i onal t i me i f s t ar t of wor k occur s on a Monday or af t er a Hol i day.

Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound, or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 10 days pr i or t o st ar t i ng excavat i on wor k.

1. 6 SALVAGE MATERI AL AND EQUI PMENT

Al l demol i shed mat er i al s shal l be r emoved f r om gover nment pr oper t y and di sposed of i n accor dance wi t h appl i cabl e speci f i cat i ons.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

SECTI ON 01 11 00 Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/11

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 SPECI AL SCHEDULI NG REQUI REMENTS

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Act i v i t y Regul at i ons

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

1. 3. 1. 2 No Smoki ng Pol i cy

1. 3. 2 Wor ki ng Hour s

1. 3. 3 Wor k Out si de Regul ar Hour s

1. 3. 4 Occupi ed Bui l di ngs

1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons

1. 4 SECURI TY REQUI REMENTS

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 14 00 Page 1

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/11

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel ; G

1. 2 SPECI AL SCHEDULI NG REQUI REMENTS

a. The ai r f i el d t r af f i c cont r ol and saf et y equi pment ( bar r i cades and cl osur es must be i n pl ace, r eady f or oper at i on, and appr oved by Cont r act i ng Of f i cer bef or e wor k i s st ar t ed on t he const r uct i on phases i ndi cat ed wi t hi n t he pl an set whi ch woul d i nt er f er e wi t h nor mal ai r f i el d oper at i on.

b. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k. See pl an set f or r equi r ement s of Phases 1 t hr ough 3 of t he pr oj ect .

c. Taxi way B wi l l r emai n i n oper at i on dur i ng t he ent i r e const r uct i on per i od. The Cont r act or must conduct hi s oper at i ons so as t o cause t he l east possi bl e i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y.

d. Taxi ways A and G wi l l r emai n c l osed dur i ng t he ent i r e const r uct i on per i od. Cont r act or may not st or e mat er i al s or equi pment on t hese pavement s f or an ext ended per i or d of t i me or i n any ot her way bl ock access. Mat er i al s and equi pment may be st aged br i ef l y on Taxi ways A and G but must be moni t or ed and have t he abi l i t y t o c l ear t he t axi way i mmedi at el y t o al l ow f or ai r cr af t t uggi ng. Thi s al so r equi r es i mmedi at e c l eani ng of t he pavement ar eas t o r emove FOD.

e. Per mi ssi on t o i nt er r upt any Act i v i t y r oads, r ai l r oads, or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Act i v i t y Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.

SECTI ON 01 14 00 Page 2

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 3. 1. 2 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

1. 3. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s must occur dur i ng t he per i od bet ween 0600 and 1700 Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.

1. 3. 3 Wor k Out si de Regul ar Hour s

Wor k out s i de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out s i de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .

1. 3. 4 Occupi ed Bui l di ngs

The Cont r act or shal l be wor ki ng ar ound exi st i ng bui l di ngs whi ch ar e occupi ed. Do not ent er t he bui l di ngs wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer . 1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser v i ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, and ai r f i el d NAVAI Ds ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.

1. 4 SECURI TY REQUI REMENTS

Cont r act Cl ause FAR 52. 204- 2 Secur i t y Requi r ement s and Al t er nat e I I appl y.

SECTI ON 01 14 00 Page 3

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

08/15

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 VI EW LOCATI ON MAP

1. 4 PROGRESS AND COMPLETI ON PI CTURES

1. 5 MI NI MUM I NSURANCE REQUI REMENTS

1. 6 SUPERVI SI ON

1. 6. 1 Mi ni mum Communi cat i on Requi r ement s

1. 6. 2 Super i nt endent Qual i f i cat i ons

1. 6. 2. 1 Dut i es

1. 6. 3 Non- Compl i ance Act i ons

1. 7 PRECONSTRUCTI ON CONFERENCE

1. 8 PARTNERI NG

1. 8. 1 I nf or mal Par t ner i ng

1. 9 ELECTRONI C MAI L ( E- MAI L) ADDRESS

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 30 00 Page 1

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

08/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Vi ew Locat i on Map; G

Pr ogr ess and Compl et i on Pi ct ur es; G

1. 3 VI EW LOCATI ON MAP

Submi t , pr i or t o or wi t h t he f i r s t di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.

1. 4 PROGRESS AND COMPLETI ON PI CTURES

Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each mont h t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e. I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .

Pr i or t o any phot ogr aphy document at i on f or t he Pr oj ect , t he Cont r act or shal l coor di nat e wi t h t he COR on Base- speci f i c r equi r ement s such as

SECTI ON 01 30 00 Page 2 compl et i ng f or ms and obt ai ni ng appr oval s.

1. 5 MI NI MUM I NSURANCE REQUI REMENTS

Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.

1. 6 SUPERVISION

1. 6. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

1. 6. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on ai r f i el d pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

The Pr oj ect Super i nt endent and desi gnat ed al t er nat e shal l have f ul l aut hor i t y t o act f or t he Pr i me Cont r act or on al l cont r act mat t er s r el at i ng t o dai l y oper at i on of t hi s cont r act wi t h no dol l ar amount r est r i c t i ons.

The Pr oj ect Super i nt endent shal l be avai l abl e by cel l ul ar t el ephone dur i ng nor mal dut y hour s.

Dur i ng nor mal dut y hour s, t he Pr oj ect Super i nt endent or desi gnat ed al t er nat e shal l be avai l abl e t o meet on t he i nst al l at i on wi t h gover nment per sonnel wi t hi n one hour . Af t er nor mal dut y hour s, t he Pr oj ect Super i nt endent shal l be avai l abl e on t he i nst al l at i on wi t hi n t wo hour s of not i f i cat i on f or emer gency or ur gent s i t uat i ons.

1. 6. 2. 1 Duties

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .

The super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

1. 6. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, SECTI ON 01 30 00 Page 3 t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

1. 7 PRECONSTRUCTI ON CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 8 PARTNERING

To most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment , t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Suppor t ed Command, t he End User ( who wi l l occupy t he f aci l i t y) , t he Gover nment Desi gn and Const r uct i on t eam and Subj ect Mat t er Exper t s, t he I nst al l at i on, t he Cont r act or and Subcont r act or s, and t he Desi gner of Recor d wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e.

The Cont r act i ng Of f i cer wi l l pr ovi de I nf or mat i on on t he Par t ner i ng Pr ocess and a l i s t of key and opt i onal per sonnel who shoul d at t end t he Par t ner i ng meeting.

1. 8. 1 I nf or mal Par t ner i ng

The Cont r act i ng Of f i cer wi l l or gani ze t he Par t ner i ng Sessi ons wi t h key per sonnel of t he pr oj ect t eam, i ncl udi ng Cont r act or per sonnel and Gover nment per sonnel .

The I ni t i al Par t ner i ng sessi on shoul d be a par t of t he Pr e- Const r uct i on Meet i ng. Par t ner i ng sessi ons wi l l be hel d at a l ocat i on agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or ( t ypi cal l y a conf er ence r oom pr ovi ded by t he of f i ce or t he Cont r act or ) . The I ni t i al I nf or mal Par t ner i ng Sessi on wi l l be conduct ed and f aci l i t at ed usi ng el ect r oni c medi a ( a v i deo and accompanyi ng f or ms) pr ovi ded by t he Cont r act i ng Of f i cer . The Par t ner s wi l l det er mi ne t he f r equency of t he f ol l ow- on sessi ons, at no mor e t han 3 t o s i x mont h i nt er val s.

1. 9 ELECTRONI C MAI L ( E- MAI L) ADDRESS

Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er cont r act awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s cont r act i ncl udi ng, but not l i mi t ed t o cont r act document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s.

SECTI ON 01 30 00 Page 4

Mul t i pl e emai l addr esses ar e not al l owed.

I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng f i el d of f i ce( s) . Pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s emai l addr ess.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 30 00 Page 5

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 32 01. 00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

PART 2 PRODUCTS

2. 1 SOFTWARE

2. 1. 1 Gover nment Def aul t Sof t war e

2. 1. 2 Cont r act or Sof t war e

2. 1. 2. 1 Pr i maver a

2. 1. 2. 2 Ot her Than Pr i maver a

PART 3…

This is the start of the file's text. The full file is on GovTribe.