Atch 2_Price List LZDZ Mx.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Landing Zone/Drop Zone Maintenance
Solicitation number
FA483025Q0058
Issued by

About this file

The file is a Price List for Landing Zone (LZ)/Drop Zone (DZ) Maintenance Services issued by the Department of the Air Force Air Combat Command. The solicitation (FA483025Q0058) is a 100% small business set-aside Blanket Purchase Agreement (BPA) for maintenance services on 11 parcels totaling 106.4 acres, with an ordering period from 19 June 2025 to 18 June 2030. Maintenance requirements include removing saplings, mowing grass to a maximum height of 6 inches, leveling ground, filling holes, and removing debris larger than 12 inches, with work to be performed no more than 4 times per calendar year.

The Request for Quote (RFQ) requires both price and technical submissions, with quotes due by 13 June 2025 at 12:00 PM EST. Vendors must email submissions to specific Air Force contacts, complete a base pass request form by 4 June 2025, and attend a mandatory site visit on 5 June 2025. The NAICS code is 561730 with a $9.5 million size standard. Interested companies must be registered in the System for Award Management (SAM) and provide company details including Unique Entity ID, CAGE Code, number of employees, and total yearly revenue. The pricing schedule includes four line items for cutting/clearing 107 acres, currently priced at $0.00 in the attached spreadsheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

CONTROLLED UNCLASSIFIED INFORMATION (Once Completed)
Price List

Landing Zone (LZ)/Drop Zone (DZ) Maintenance Services Ordering Period: 19 June 2025 - 18 June 2030 ***Price List Updated Annually***

CONTRACT LINE ITEM NO.(CLIN)SUPPLIES/SERVICE
NON-PERSONAL SERVICES:

Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform maintenance on 11 parcells totaling 106.4 acres. Maintenance shall consist of removing new saplings that may return after initial clearing. Mowing to return grass to a height of no more than 6 inches, leveling of ground or filling of holes in areas as needed, and removal of any debris located on the HLZ’s/DZ’s larger than 12 inches in length. If new holes or ruts are created while performing maintenance on the landing zones, they shall be filled and leveled. Maintenance will be performed on each parcel no more than 4 times per calendar year.

QTYUNITUNIT
PRICEAMOUNT
0001 First Cut/Clearing107Acres$0.00$0.00
0002 Second Cut/Clearing107Acres$0.00$0.00
0003 Third Cut/Clearing107Acres$0.00$0.00
0004 Fourth Cut/Clearing107Acres$0.00$0.00
TOTAL$0.00
Company Name:
Printed Name:
Title:
Signature:
Date:
CONTROLLED UNCLASSIFIED INFORMATION (Once Completed)

IGE Process & Notes

1) Use salary.com determine the proper classification (engineer 1,II etc)
and find the hourly rate for this area. Uplift by 29.4% for the final
salary which is the South Atlantic Region benefits (See the BLS attachment
showing cost of employees by region).
Network Engineer III - $44/hr
Network Engineer III - $91,520/yr + 29.4% = $118,427
OR
2) Use salary.com determine the proper classification (engineer 1,II etc)
and use the total compensation tab amount.
or
3) Use salary.com determine the proper classification (engineer 1,II etc)
and find the hourly rate for this area. Determine the GS grade that equals
that $ amount, then look up that GS rate on AFI 65-503 Table A26-1.
Civilian Standard Composite Pay Rates by Grade. (EPubs or AF Portal under
Finance Functional Area). The table is the loaded rate for that GS rate.
Network Engineer III - $44/hr $91,520 salary (44*8 x 260 working days) = GS-12
https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2020/RUS.pdf

File details come from the government source that posted it. Updated .