Atch_12_First_Article_Cylinder_Assembly_NSN_4776_GA.pdf

PDF 92 KB Posted

Attached to
Overhaul of UH-1N Dynamic Components Federal contract opportunity
Solicitation number
FA852424R0602
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a First Article Requirements form for a federal contract opportunity. It outlines the requirements for the first article cylinder assembly, NSN 1650-014214776GA, which is a critical component of the UH-1N helicopter.

The key details are:

  • The first article quantity is 1 unit, which will be part of the production quantity.
  • The first article must be manufactured at the facilities where the item will be produced under the contract.
  • The first article must meet material, dimensional, and environmental specifications as detailed in drawing 212-076-005.
  • The contractor must provide a test plan for government approval, and a test report for government review and approval/disapproval within 30 days.
  • Approved first articles will be forwarded to supply, while disapproved first articles will be returned to the contractor or retained pending disposition instructions.
  • First article testing will not be waived.
  • The cognizant engineering organization responsible for approving the test is AFLCMC/WIU, and the estimated cost of government testing/inspection is $1,730.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

08 FEB 2024(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

97499 / 212-076-005-109

4. NSN

1650014214776GA

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM x

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

MATERIAL, DIMENSIONAL AND FINISH (ENVIRONMENTAL) SPECIFICATIONS

B. The detailed technical requirements for First Article approval tests are contained in

Drawing 212-076-005

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 45 days.

D. Contractor's notification to ACO and traci.polk@us.af.mil

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

See Remarks in Note 1

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within calendar days from date contract.

(2) Notify calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 45 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,730.0000

Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 22 Feb 2024

08 FEB 2024(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Giddens, Coby FNAME: 21 FEB 2024DATE:

Note 1: Ship First Article Test Report to:

Attn: Traci Polk DLA Central Receiving/DDWG-ER Special Handling: FA UNIT-DO NOT POST 455 Byron St, Bldg 376 Robins AFB, GA 31098-1887 Note 2: First article test report should include:

1. Certifications for all purchased hardware/material.

2. Dimensional check worksheet.

3. A copy of the latest calibration certifications for all measuring instruments used to perform the dimensional checks.

4. Certifications for any work not performed by the contractor, if applicable.

5. Job travelers. Job travelers should include process from start to finish, even if the first article is requested without coatings.

6. Results of all testing requirements indicated on drawing.

Note 3: Waiver conditions apply only to production of same, and not similar, article.

Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 22 Feb 2024

08 FEB 2024(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Giddens, Coby F

AFLCMC / WI U E D

478-926-7255

468-7255

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 22 Feb 2024

File details come from the government source that posted it. Updated .