Attachment 1 to RFQ No. FA520921Q0074 SOW, Page 1 of 5

STATEMENT OF WORK (SOW)

FOR

OPERATION AND MAINTENANCE (O&M)

OF

RADAR APPROACH CONTROL (RAPCON)

UNINTERRUPTIBLE POWER SYSTEMS (UPS)

AND

STATION BATTERY SYSTEMS

AT

YOKOTA AIR BASE JAPAN

14 May 2021

SOW, Page 2 of 5

STATEMENT OF WORK (SOW)

FOR OPERATION AND MAINTENANCE (O&M)

OF RADAR APPROACH CONTROL (RAPCON)

UNINTERRUPTIBLE POWER SYSTEMS (UPS)

AND STATION BATTERY SYSTEMS

1. DESCRIPTION OF SERVICES.

1.1. GENERAL. The contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary except that specifically identified as Government furnished in Section 3, Government Furnished Property and Services, to operate, maintain, and repair the uninterrupted power supply systems (UPS) at Yokota Air Base, Japan – Radar Approach Control (RAPCON Bldg 1371) facility.

1.2. BASIC SERVICES. The contractor shall perform operation and maintenance of the UPS (2) and Station Battery Systems (2). Preventive maintenance is required monthly. The contractor shall comply with all environmental and occupational standards to include, but not limited to the safety laws, rules and regulations listed in Appendix B. Sample reports are in Appendix C.

1.2.1. UPS AND STATION BATTERY SYSTEMS OPERATION PROCEDURES. The contractor shall comply with manufacturer instructions and or available technical data.

1.2.1.1. DEGRADATION OF SYSTEM CAPABILITY. Except in case of imminent personnel hazards or equipment damage, the contractor shall not degrade system capability without the specific approval of the Government’s Inspector/Acceptor specified in Appendix A Degradation of system capability is defined as any changes that would adversely affect the system’s capacity, performance or ability to provide full system capability. This includes a major functional limitation in system capability caused by a Preventive Maintenance Inspection (PMI), or any other maintenance actions. At least fifteen minutes prior to the degradation start time, the contractor shall notify the Inspector/Acceptor to include, but not limited to, the following:

a. Purpose of the degradation

b. Equipment involved

c. Period of degradation

d. Estimated recovery time

e. Other information that is required by Inspector/Acceptor

1.2.1.2. HAZARDOUS MATERIAL (HAZMAT)/WASTE. The contractor shall properly dispose at Yokota Hazardous Wastes (HAZWASTE) Management all HAZWASTE including Petroleum, Oil, Lubrication (POL) products associated with this O&M contract. The contractor shall transport HAZWASTE from applicable sites to the HAZWASTE Management Facility In Accordance With (IAW) Japan Environmental Governing Standard (JEGS) Para 5-3.4. The contractor shall establish a HAZMAT/HAZWASTE Control Program and ensure the following:

a. HAZMAT Storage Area is maintained IAW Air Force Joint Manual (AFJMAN) 23-209, Chapter 4

b. HAZMAT inventory listing including MSDS is maintained

c. Non-Physical Accumulation Point is established.

1.2.2. PMI PROGRAM. The contractor shall develop and maintain a PMI program to prevent and correct deficiencies on equipment items, thus minimizing breakdowns and service interruptions, extending component service life, and maximizing operating efficiency. The contractor’s PMI program shall include a plan consisting of inspections and services of lubrication, minor adjustment, and minor repair of components. A completed PMI plan shall be submitted to the Inspector/Acceptor within 30 calendar days after contract award. The contractor’s PMI program shall include all equipment identified in Appendix A. Upon completion of these PMIs, the contractor shall submit a completion report including the results of the PMI.

1.2.2.1. PMI SCHEDULE. The contractor shall perform monthly PMIs according to the approved schedule unless unexpected failures occur. Proposed PMI schedule changes shall be submitted to the Inspector/Acceptor for approval.

All materials and supplies, filters, indicator light bulbs and fasteners except regulated HAZMAT items (i.e. antifreeze and POL products) shall be made available on hand by the contractor as part of PMI. The contractor shall submit a

SOW, Page 3 of 5 request to the Government for all required regulated HAZMAT items.

1.2.2.2. CORROSION CONTROL. The contractor shall perform corrosion control activities on UPS to include but not limited to cable ladders, junction boxes, fuse panels, etc. The contractor is not required to perform corrosion control activities at heights exceeding those attainable from wooden stepladders provided on site (approximately three meters).

Surfaces requiring corrosion control treatment shall be corrected by removing all corrosion to the bare metal. A Government approved primer shall be applied followed by a finish coat that matches the existing paint. When extensive corrosion exists, the contractor shall clean and repaint the entire piece of equipment.

1.2.3. CORRECTIVE MAINTENANCE AND REPAIR. Corrective maintenance shall be required on a routine basis (operator maintenance), as a result of PMI, or as a result of service calls. When the contractor’s maintenance technician is on site, the contractor shall respond to equipment malfunctions when they occur and immediately begin fault isolation and restoration actions unless the Inspector/Acceptor directs otherwise. Efforts to correct malfunctions shall continue until the malfunction is corrected.

1.2.4. SERVICE CALLS. Service calls are defined as the contractor’s onsite support requirements that are called in by Inspector/Acceptor. The contractor shall not exceed five (5) hours travel time for responding to any service calls made by Inspector/Acceptor. Inspector/Acceptor will make service calls on 24 hours a day basis. Travel time is defined as the time from notification of a problem by Inspector/Acceptor to the time of arrival on-site by contractor personnel.

The contract manager will provide the government with a 24-hour contact number.

1.2.5. RECORDS AND OPERATING REPORTS. In addition to the above-mentioned correspondence, the contractor shall also prepare and submit to the Inspector/Acceptor all required operating records and reports. These reports shall be prepared and submitted to the Inspector/Acceptor monthly to arrive by the 5th duty day of the month following the reporting period. All record, reports and logs shall be in English. All records and reports covered under this SOW will become property of the Government. These records and reports shall not be removed from the site without prior approval of the Inspector/Acceptor.

1.2.5.1. REPORTS. The contractor shall submit to Inspector/Acceptor the following reports:

1.2.5.1.1. MONTHLY REPORT. The report shall contain the following elements:

a. On-call Dispatch Log, if any on call(s) is/are made during a previous month. On-call Dispatch Log shall include but not limited to the followings:

i. WHEN (date and time) Contractor receives on-call from the Inspector/Acceptor.

ii. WHY Contractor receives on-call from the Inspector/Acceptor.

iii. WHEN (date and time) Contractor arrives at on-site.

iv. WHAT was completed by Contractor as on-call service and maintenance action

b. Completed maintenance actions of equipment identified in Appendix A

c. Description of any corrective maintenance requirements noted but not accomplished, including an estimated date when the corrective maintenance will be accomplished.

d. Calibration deficiency listings and condition reports based upon PMI findings

e. Description of problem(s) that requires assistance from the Inspector/Acceptor

f. Parts consumption, listing of all parts used

g. Significant historical data

h. Recommendations for improving system efficiency and life-cycle expectancy

1.2.5.1.2. OTHER REPORTS. Upon request, the contractor shall provide the Government with specific data. The data may pertain to scheduled or unscheduled maintenance actions, resources expended in specific maintenance actions or administrative information.

1.2.5.2. RECORDS. Contractor shall maintain records for each item of equipment included within this contract, and of all PMI’s accomplished and dates performed. Entries for records shall include readings taken before and after adjustments, explanations of corrective actions for both scheduled and unscheduled maintenance required to correct a malfunction, degradation, outage, or other actions taken to prevent a disruption in service.

1.2.6. TEMPORARY AND SPECIAL MAINTENANCE SERVICES. Temporary, and special power generating

SOW, Page 4 of 5 services may be necessary to accomplish certain maintenance, repair, and new service connections.

1.2.6.1. TEMPORARY SERVICES. If equipment is to be removed from service or replaced temporarily for any reason, the contractor shall make temporary connections to maintain continued electrical power.

1.2.6.2. SPECIAL MAINTENANCE. The Contractor shall coordinate with the Inspector/Acceptor for repairs exceeding 8 hrs labor or 55,000 yen in materials. Repairs not exceeding 8 hrs labor or 55,000 yen in materials for each quarterly period are included in this contract amount and shall be completed with no additional charge to the Government. The Government has a right to select which limit, 8 hrs labor or 55,000 yen in materials, is applied to each case. When questions arise concerning the labor hours and materials required for a particular job, the CO and Contractor shall negotiate the requirements.

1.2.7. MANAGEMENT OF APPLICABLE DIRECTIVES, PUBLICATIONS, AND DOCUMENTS. The contractor shall maintain the Government provided publications including commercial manuals. All publications, manuals, charts, etc., furnished to the contractor by the Government will remain Government property and shall be retained on sites. The contractor shall download necessary electronic directives, documents, publications and forms.

It is the contractor’s responsibility to distribute copies of the downloaded electronic media or paper copies to each requiring site.

1.2.8. SAFETY REQUIREMENT. The contractor shall identify, control, and eliminate potential safety hazards, and shall initiate an immediate action to correct any deficiencies. The contractor shall inform the Inspector/Acceptor immediately of any accidents involving injury to contractor personnel or damage to the Government equipment or property that are a direct result of executing this O&M program.

2. SERVICE DELIVERY SUMMARY:

Performance Objective SOW Para

Performance Threshold Method of Assessment

Provide Preventive and Corrective Maintenance and Repair.

Preventive maintenance is within recommended intervals. All system and equipment components are free of defects, debris, errors, and problems. All equipment is properly calibrated. Service calls are handled appropriately. The Government is satisfied with service call performance.

1.2.2.

through 1.2.4.

95% of all scheduled PMIs are properly and timely completed. Responses to service calls are on time 100% of the time.

Periodic Surveillance

Reports and Records.

All reports are submitted on time. All reports are accurate and contain all applicable data. Records are accurate and current. Drawings are accurate and current.

1.2.5.

through 1.2.5.2.

100% of all reports are accurate.

90% of all reports are submitted on time. Approval of deviations from written procedures is obtained 100% of the time.

Periodic Surveillance

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. PUBLICATIONS AND FORMS. The Government will provide the contractor with all required Government forms prescribed in this SOW and the directives listed in Appendix B, only when those forms and directives are not available for the contractor to download electronically. The contractor shall provide any forms that may be devised for internal use.

3.2. UTILITIES. The Government will furnish the contractor all utilities necessary for completion of the work specified in this SOW.

4. GENERAL INFORMATION.

SOW, Page 5 of 5

4.1. QUALITY CONTROL. The contractor shall develop and maintain a quality control program to ensure O&M of electric power plant, UPS and station battery system. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's program shall include, but not be limited to, maintenance, troubleshooting, corrosion control techniques, safety procedures, security procedures and good housekeeping standards.

4.2. QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance. The contractor shall ensure that required test equipment is available for contractor Surveillance/Quality Assurance Evaluations.

4.3. HOURS OF OPERATION. The contractor shall respond to service calls twenty-four (24) hours a day, seven

(7) days a week, including all United States (US) and Japanese holidays.

4.4. SECURITY REQUIREMENTS. The contractor shall not make available or disclose technical or administrative information relative to or concerning, the sites, systems, publications, records, reports and any other data, to persons who are not certified by the Inspector/Acceptor.

4.5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND

AUTHORITY OR OVERSEAS COMBATANT COMMANDER. In the event of crisis or emergency as defined by the Inspector/Acceptor the contractor shall perform normal maintenance as long as the situation does not present imminent direct personal hazards to the employee.

4.6. CONTRACTOR PERSONNEL. The contractor shall submit a manning plan for maintenance requirements specified in this SOW to the Inspector/Acceptor. This plan shall identify the points of contact for service calls, inquiries and requests made by the Government.

4.6.1. PROJECT MANAGER. The contractor shall appoint a project manager who shall have the overall responsibility for directing and managing the contract. His duties shall include keeping the Inspector/Acceptor advised on system O&M difficulties and other conditions that may affect equipment and system reliability. The manager shall have authorization to act on all contractual matters relating to daily operation of this contract.

4.6.2. ENGLISH CAPABILITY. The contractor shall ensure that at least one technician possesses good English communication skills. The contract manager must be able to communicate effectively in both oral and written English. The contract manager must be able to effectively respond on all technical matters during inspections, contingency training deployment, or other approved visits by the government.

4.7. REMOVED PARTS AND MATERIALS. The contractor shall obtain approval from the Inspector/Acceptor prior to final disposition of any replacement item removed from equipment or facilities.

5. APPENDICES. The following Appendices are a part of this SOW.

APPENDIX A: MAJOR EQUIPMENT

APPENDIX B: DIRECTIVES, DOCUMENTS, PUBLICATIONS AND FORMS

APPENDIX C: UPS MAINTENANCE

APPENDIX D: FURUKAWA BATTERY MAINTENANCE

APPENDIX E: YUASA BATTERY MAINTENANCE

APPENDIX F: SAMPLE BATTERY CELL INSPECTION REPORT

APPENDIX A

MAJOR EQUIPMENT

LOCATION: RAPCON Bldg 1371, YOKOTA AIR BASE Site POC: MSgt Benjamin Nason 374OSS/OSAM, or his duly authorized personnel

1. UPS A

QTY EQUIPMENT MAKE MODEL RATING Manufacture Year

1 UPS A DENSEI-

LAMBDA

DL9360-104JL 100kVA 2008

180 BATTERY

(180 Cells)

FURUKAWA

BATTERY

MSE-200 200Ah/360V 2015

2. UPS B

QTY EQUIPMENT MAKE MODEL RATING Manufacture Year

1 UPS B DENSEI-

LAMBDA

DL9360-503JL 50kVA 2008

60 BATTERY

(360 Cells)

GS YUASA REH40-12 80Ah/360V 2015

Note: Output Distribution Panels and Maintenance Bypass Panel are included as the part of the UPS.

Appendix A, Page 1 of 1

Appendix B, page 1 of 1

APPENDIX B

DIRECTIVES, DOCUMENTS, PUBLICATIONS AND FORMS

The following publications and forms are applicable and form a part of this SOW. All publications are subject to change. Current editions and supplements shall apply.

AIR FORCE PUBLICATIONS

Directive Title Referenced In Date

AFPAM 32-1186 Value-Regulated Lead-Acid Batteries for Stationary Applications

1 AUG 99

AFMAN 91-203 Air Force Occupational Safety Fire, and Health Standards SOW, Para 1.2. 8 SEP 20

AFM 32-7002 Environmental Compliance and Pollution Prevention SOW, Para 1.2. 4 FEB 20

UNITED STATES FORCE JAPAN (USFJ) PUBLICATIONS

JEGS Japan Environmental Governing Standards SOW, Para 1.2.1.2.

DEC 20

u

Chapter 14 Maintenance

We recommend periodic Inspection of UPS and battery to use the unit safely.

14.1 Temperature condition in use

Temperature condition at the installation location Is designed to be from -10°C to +40°C. We recommend using the unit at the vicinity of 20°C for stable operation of UPS and battery llfe.

14.2 Inspection of UPS

(1) Inspection executed once a week

Only an expert should be allowed to Inspect UPS.

A sheet for maintenance Inspection report Is shown at the end of this chapter.

We recommend you to write Into the form In every week and save them In a file.

(2) Inspection executed once a year

Prohibited

• Except professional agency, no one shall execute internal Inspection of UPS.

• There is a high voltage section In UPS. Therefore you may get electric shock.

Annual precision inspection including battery as well as weekly inspection Is required.

In precision inspection, our technical engineer who has detalled knowledge of UPS will carry out the works that are not described In the Instruction manual such as fastening, Inspection of cable terminals and adjustment according to the electric specification.

Precision inspection shall be done by stopping UPS.

With respect to precision inspection, please contact our sales office or covenanted maintenance service provider.

14.3 Maintenance of battery equipment

(1) Inspection of battery

Prohibited

• Except professional agency, no one shall execute maintenance, Inspection and replacement of battery. You may get electric shock.

We recommend to use battery that we specified.

Battery Is very important component devise as the backup at the power failure. As the lifetime of battery is much Influenced by the ambient temperature in use, we conduct precision Inspection once a year.

Between the early stage and the stable stage of battery, there is no problem to conduct annual Inspection. But when battery comes to the end-of-life stage (after 4.5 years at temperature of 25°C or after 3.5 years at temperature of 30°C), we recommend Inspection per 6 month.

With respect to Inspection of battery, please contact to our sales office or to covenanted maintenance service provider.

pM020-04-021

Attachment 1 to RFQ No. FA520921Q0074 APPENDIX C, Page 1 of 4

1391723075U Typewritten Text

APPENDIX C

1391723075U Typewritten Text

UPS MAINTENANCE

(2) Replacement of battery Battery has lifetime. If it is in its end-of-life stage or an alarm message that shows NG of battery test is displayed, Please ask us to replace the battery as soon as possible. If you use the battery as It is, It may not function as the backup and may stop discharging at the moment when power failure occurs, and load equipment may be stopped.

The recommended replacement time of battery is written on the backside of the front door of the battery panel. However a lifetime of battery Is more shortened than expected due to the ambient temperature In use. Please refer "Chapter 16 Replacement of parts" and replace It.

14.4 Cleaning of air filter

If air filter gets dusty, airflow decreases and cooling capacity for UPS and battery panel is lowered.

Finally It may cause errors. Therefore periodic cleaning Is required.

Please clean air filter in the following procedure.

1. Indication of cleaning

(1) Check more than once a month. If air filter Is dusty, It should be cleaned.

(2) Clean It more than once per 6 months.

Note) Quantity of dust varies depending to dust of the room where UPS is installed.

Clean air filter in ahead of time if placed in the room thick with dust.

2. How to remove air filter Unfix 2 screws that fix air filter cover and pull it out. You will find air filter inside the cover.

1111111111111

Fig.14-2 Detaching of air filter cover

PM020-04-021

APPENDIX C, age 2 of 4 u

3. How to clean air filter

This type of filter Is reusable. Clean it in any of the ways shown below.

(1) Washing by pushing In the water butte.

(2) Water washing with running water.

(3) Suctioning with cleaner.

(4) Blowing off dust using compressed air.

Note) When cleaning air filter, stream of air or water shall flow In the direction reverse to the air flow In operation.

I In case of thick oily dust I DIiute neutral detergent 20 times thinner with hot water and put air filter in It all day and night. Then wash by pushing, and rinse with fresh water. Dry naturally after cleaning.

4. Replacement of air filter

If it Is difficult to reuse the air filter due to long use, it should be replaced.

If you issue an order to our company, please let us know "the production number" and

"the type" of UPS written on the rating faceplate.

PM020-04-021 ·1

APPENDIX C, Page 3 of 4

Inspection report

Date {Year, Month. Day):

Person in charge:

The production number:

The state of the equipment

1. The fan is rotating normally.

2. The side and the bottom of the panel are not well ventilated.

Paper or dust filled In the blowhole.

3. You have burnt odor.

4. The UPS panel Is heated or burnt.

5. The air filter is covered with dust.

6. Abnormal noise occurs.

The state of the environment

7. It's dusty in the room.

8. The room temperature Is kept from +18"C to +27"C.

9. The room humidity Is kept from 30% to 90%.

10. Nothing Is put within 1m around the UPS and the space is kept clean.

11. Something Is attached to the UPS or is put on the UPS.

12. Water droplets are found on the floor or on the wall of the room.

The state of the operation

13. All the alarm displays are turned off.

14. The voltage/current of each part is as follows.

Rated value

Output frequency Hz u-v Hz

Output voltage V u-v V

AC Input voltage V U-V V

AC input Hz U-V Hz frequency

DC voltage V V

Output current A u A

Ambient 5 to 25°C "C temperature recommended

If something is wrong, make a memo:

Measured value v-w V

V-W V

V A

Yes or No w-u V

W-U V w A p M020-04-021

APPENDIX C, Page 4 of 4

Combustion Danger

Explosion Danger

Storage batteries should be inspected on a periodic basis, following the periods stipulated in the Fire Defense Law and other regulations. When inspection results indicate deviations from standard range recorded in the instruction manual, proper measures should be taken on the basis of the instruction manual. All measures taken should be accurately recorded. Continued use in deviation of the standards can result in battery breakage, fire damage or performance degradation.

Storage battery inspections should be performed by “certified storage battery equipment maintenance engineers” or other experts. Having such inspections performed exclusively by unskilled workers can result in errors.

HSE and MSE type stationary lead acid batteries incorporate the control valve under the vent plug.

Neither the vent plug nor the control valve should ever be removed, because this can result in performance degradation, shortened service life, damage and other problems in the storage battery.

Before inspecting, stand a distance away from the storage battery, and touching a metal part or take other action to remove the static electricity charge in your body. Touching a storage battery with an electric charge in the body can cause sparks, and possibly trigger an explosion.

(1) One-Month Inspection Item Details Standard Measures

Total voltage in floating charge

Check voltage indication value on panel surface voltmeter

Floating charge voltage (2.23V/cell) × number of cells.

When deviating from standard, adjust by floating charge voltage (2.23V/cell) × number of cells.

Caution: Measuring equipment used to take these measurements should be calibrated on a regular basis, with use made only of items that fall within the allowable margin of error.

Caution

Attachment 1 to RFQ No. FA520921Q0074 APPENDIX D, Page 1 of 3

1391723075U Typewritten Text

APPENDIX D

1391723075U

FURUKAWA BATTERY MAINTENANCE

(2) Six-Month Inspection Item Details Standard Measures

①Total voltage during floating charge

(1) Measure total voltage with voltmeter of 0.5-class or above.

(2) Check voltage indication value on panel voltmeter.

(1) Value of floating charge voltage (2.23V/cell) × number of cells.

(2) Allowable margin for panel mounted gauges as stated in JIS C 1102-2 (direct-acting indicator electric gauges).

(1) When voltage value deviates from standard, adjust by floating charge voltage (2.23V/cell) × number of cells.

(2) Repair or replace gauges deviating over the allowable degree.

② Voltage in each battery during floating charge

Measure voltage of each battery.

Voltage is within the following range.

2 V type

2.10V~2.40V 6 V type

6.30V~7.20V 12 V type

12.60V~14.40V

There is no problem if there are 2.10V to 2.55V though the float voltage might come off from the standard value when the energizing period and charging time are short.When the voltage value deviates from the standard value, observe for 1 to 2 months, and contact The Furukawa Battery when no correction occurs.

Check for presence of breaking or deformation damage in container, lid, etc., as well as electrolyte leakage.

Absence of cracking, deformation and other damage or electrolyte leakage.

In cases of damage or electrolyte leakage, investigate the cause, and replace the battery containing any damaged items or found to have electrolyte leakage.

Check for presence of dirt or stains from dust, etc.

Absence of dirt, stains or corrosion.

Clean any dirt or stains with a damp cloth.

③ Visual appearance of storage battery, etc.

Check for evidence of rust formation in cubicles, platforms, connecting plates, connecting wires, terminals, etc.

Absence of stains or corrosion.

Clean, treat for rust prevention, coat or otherwise repair.

When there is damage or electrolyte leakage in the battery, investigate the cause, and replace the batteries on which any items are damaged.

APPENDIX D, Page 2 of 3

Electrolyte Leakage Danger

Explosion Danger

④ Temperature in vicinity of storage battery

Measure temperature in vicinity of storage battery.

40℃ or below When temperature is high and exceeds the standard value, investigate the cause and carry out cooling measures (temporarily halt charging, improve ventilation, etc.).

(3) One-Year Inspection For one-year inspections, perform the sequence of the six-month inspections plus the following item.

Item Details Standard Measures Connecting part Further tighten the bolts and nuts.

There are no loose parts after tightening to the clamping torque shown in Table 1.

When loose, tighten to the torque in Table 1.

Caution: Measuring devices used in the measurement should be calibrated regularly, and used within the allowable margin of error.

6. Measures at Abnormalities When abnormal conditions occur in a storage battery, adopt the proper measures based on the following cautions.

When electrolyte leakage occurs in a storage battery, halt use and contact the manufacturer. Damage or electrolyte leakage in the equipment can be the cause of fires.

When there is visible abnormal deformation (swelling) in a storage battery, halt use and contact the manufacturer.

Storage battery breakage or electrolyte leakage can be the cause of smoking or combustion.

When there is heating in a storage battery, halt use and contact the manufacturer. Such heating can be the cause of storage battery breakage or fire damage.

When there is breakage in a storage battery container or lid, halt use and contact the manufacturer. Such conditions can result in combustion or smoking caused by ignited explosion or electrolyte leakage.

When electrolyte is spilled on the floor, use soda or another neutralizer to neutralize the solution, then wash the area with large amounts of water and thoroughly dry. Such spillage can cause corrosion in the floor, parts or machinery.

Never use water to extinguish fires in storage batteries – instead using a powder type (ABC) fire extinguisher. Water can cause the fire to spread, becoming the cause of electric shocks.

Caution

APPENDIX D, Page 3 of 3

MANUAL No.BMSU21-0001

7. Maintenance and servicing

Be sure to observe the following handling and maintenance instructions on the battery.

Unless otherwise stated, the measuring instruments used for measurement should be of the accuracy specified in JIS C 8702-1

7.1 Important points for daily maintenance and handling

* Maintain the float charging voltage always at the specified value.

* Ensure that the battery temperature does not exceed 40˚C. (Failure to do so may result in significantly shortening the battery life.)

* Do not leave the battery in a discharged condition.

* Keep a fire away from the battery.

* Always keep the battery in a clean and dry condition.

7.2 Recommendations for periodic inspection

CAUTION

* Periodically inspect the storage battery for the period specified in the Fire Service Law. If the inspection reveals any deviation from the standard described in the instruction manual, take action according to the instruction manual. If you continue to use the battery while it is out of the standard, it may cause the battery to be damaged or burned out.

7.3 Operating instructions

CAUTION

* Make sure that the battery is serviced for proper maintenance under the direction of such skilled personnel (experts) as are qualified for battery equipment maintenance, for instance. Handling by inexperienced personnel alone may cause battery trouble.

* Keep the set charge voltage in the specified range. Failure to do so may cause battery damage or a reduction in capacity and/or life performance.

Attachment 1 to RFQ No. FA520921Q0074 APPENDIX E, Page 1 of 4

1391723075U Typewritten Text

APPENDIX E

1391723075U

YUASA BATTERY MAINTENANCE

7.4 Restriction or prohibition of the scope of product inspection

CAUTION

* Do not open the exhaust vent cover on the top of the lid. If this is opened, it may cause the storage battery's performance to degrade, its life to deteriorate, or even explode.

7.5 Checking and cleaning precautions

DANGER

* Do not clean the battery with a dry cloth or by dusting off. Doing so may generate static electricity, causing an explosion. Therefore, for this purpose, use a water-moistened cloth.

WARNING

* Be sure to use protective equipment such as rubber gloves and rubber-soled shoes when cleaning and inspecting. Direct contact of the body with conductive parts may result in electric shock.

CAUTION

* Clean the battery terminals. Soiled terminals may cause poor contact with the battery, or may even disconnect the power, failing to charge the battery.

* Before battery cleaning or checking, touch a metallic section in a place away from the battery to remove the static electricity accumulated on your body. Failure to do so may cause sparks, leading to an ignition or even an explosion.

* Do not allow the following materials to contact the battery container and the lid. Doing so may cause cracks to the battery container or lid, resulting in an electrolyte leakage.

Organic solvents (acetone, toluene, xylene, methyl ethyl ketone, ethyl acetate, ethyl alcohol, methyl alcohol, thinner, etc.)

Acetic acid and fuels (gasoline, benzine, etc.)

Oils, rust-preventive agent, detergents, and paints (lacquer, paint, etc.)

Cleaning means (wet tissue, chemical dustcloth, dust mop, floor wax, floor cleaner, etc.), Soft PVC Chemicals, and Other items similar to those all stated above.

APPENDIX E, Page 2 of 4

7.6 Periodic checks

In order to prevent battery trouble from occurring, perform the following checks on a regular basis:

(1) Monthly checks

Perform monthly checks in accordance with Table 5 below.

Table 5: Monthly Checks Check Item Method Acceptance Criteria Corrective Action

Total battery voltage during floating charge

Measure total battery voltage using a voltmeter.

Floating charge voltage (13.65 V/ battery) x number of batteries

Correct any difference to the specified value.

(2) Six-month checks

Perform checks every six months in accordance with Table 6 below.

Table 6: Six-month checks

Check Item Method Acceptance Criteria Corrective Action

Total battery voltage during floating charge

(1) Measure total battery voltage using a voltmeter class 0.5 or higher.

(1) Total battery voltage shall be:

Floating charge voltage × number of batteries

(1) If deviated from the specified value, readjust the voltage to be as specified.

(2) Read the voltmeter on the panel.

(2) Tolerances of measuring instruments on the panel shall be as per JIS C1102 - 1 to 9 (indicating electric equipment).

(2) For those with an error exceeding the allowable value, make repairs or replace with new ones.

Voltage of each battery

(1) Measure each battery voltage using a voltmeter class 0.5 or higher.

(when measuring is made with a voltmeter of below class 0.5, the reading thus obtained should be handled as an approximation)

Voltage shall be in the following range:

Tenure of use

Less than 1 year

More than 1 year

Stand ard

12.9 to 14.8V

13.65

0.3V Allowa ble voltage

12.9 to 14.8V

When the voltage value deviates from the allowable voltage, observe the situation for 1 to 2 months. If it remains deviated, then contact us at GS-Yuasa Corporation.

APPENDIX E, Page 3 of 4

Check Item Method Acceptance Criteria Corrective Action

Outer appearance of battery

Check battery containers, lids, and other items for deformation, damage and leakage.

No deformation such as visually perceptible swelling.

No damage or electrolyte leakage.

If any deformation, damage or leakage is found, determine the cause(s) and replace those deformed or damaged batteries with new ones.

Check for soiling with dust and other foreign matter.

No soiling. If soiled, clean with water-moistened cloth.

Check cubicle and battery stand for rusting.

No rusting. Perform cleaning and rust preventive treatment. Or touch up by painting.

Check connecting wires and terminals for rusting.

No rusting. Perform cleaning and mending. Or replace.

Temperature of the storage battery during floating charge

Measure the temperature near the storage battery.

40°C or below. If the temperature exceeds the standard value, investigate the cause, replace the thermal reed switch, and implement cooling (temporarily stop charging, change the ventilation method, etc.).

APPENDIX E, Page 4 of 4

APPENDIX F

Sample BATTERY CELL INSPECTION REPORT

Location: (RAPCON) B1F CVCF Room Battery Panel 2 Inspector:

Type Manufacturer Model Capacity Cell Q'ty Production Number

Lead Battery Control Valve

GS YUASA REH40 - 12 80Ah 30 AWFHWG

Battery Cell No.

Voltage

(V)

Temp

Test Result

Battery Cell No.

Voltage

(V)

Temp

Test Result

CN210 - 1

CN210 - 2

CN210 - 3

CN210 - 4

CN210 - 5

CN210 - 6

CN220 - 1

CN220 - 2

CN220 - 3

CN220 - 4

CN220 - 5

CN220 - 6

CN230 - 1

CN230 - 2

CN230 - 3

CN230 - 4

CN230 - 5

CN230 - 6

CN240 - 1

CN240 - 2

CN240 - 3

CN240 - 4

CN240 - 5

CN240 - 6

CN250 - 1

CN250 - 2

CN250 - 3

CN250 - 4

CN250 - 5

CN250 - 6

Total Voltage Remarks:

○ :Good

– :N/A (Not Applicable) N/G: Not Good

Appendix F, Page 1 of 1