Atch_1_SOW.pdf

PDF 139 KB Posted

Attached to
Replace Trash Compactor & Receivers-St Marys, GA Federal contract opportunity
Solicitation number
140P5424Q0026
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is a Statement of Work (SOW) for a federal contract solicitation to replace a trash compactor system at Cumberland Island National Seashore. The contractor shall provide all labor, materials, and equipment to remove and replace a 3-yard commercial trash compactor and two 40-yard compactor receivers. The government will provide transportation to and from the island. The performance period is anticipated to be no more than 90 days. This is a total small business set-aside solicitation under NAICS code 333310 with a response due date of June 24, 2024. Award is anticipated by the end of June 2024 to the firm providing the best value to the government, considering price, proposed equipment, experience, past performance, and estimated completion time. A site visit is scheduled for June 4, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Trash Compactor & Receivers-St Marys, GA, newest first.
File Type Posted
Sol_140P5424Q0026_Amd_0002.pdf PDF
Atch_1_to_Amd_2_SOW_0002.pdf PDF
Sol_140P5424Q0026_Amd_0001.pdf PDF
Atch_1_to_Amd_1_QandAs_0001.pdf PDF
Sol_140P5424Q0026.pdf PDF
Atch_3_Photos.pdf PDF
Atch_2_Required_Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5424Q0026 Attachment 1

Page 1 of 3 Pages

National Park Service Cumberland Island National Seashore

STATEMENT OF WORK (SOW)

Replace Trash Compactor System

Contractor shall provide all labor, supervision, material, tools, equipment, supplies, transportation and incidentals necessary to remove and replace (1) 3-yard commercial trash compactor and (2) 40-yard compactor receivers at Cumberland Island National Seashore.

Remove the existing 3-yard commercial “Cram-a-Lot” trash compactor, receivers, and any associated parts to be disposed of by the contractor. Contractor shall perform electrical disconnection and install wiring for approved 3-yard commercial compactor as described below and conduct performance test for proper operations. All equipment must be approved by the Contracting Officer Representative (COR) before ordering.

Submittals: After award, contractor must provide:

1. Manufacturer’s information for compactor and 3 YD Hoper.

2. Manufacturer’s information for proposed 40-yard receiver containers.

3. 1 pint touch up paint.

4. SDS Sheets as appropriate for chemicals and paint.

5. Provide original packaging and manufacturer’s warranty for all equipment information associated with equipment and contractor work performed.

Delivery & Storage: Delivery and storage of equipment, tools, and materials will be coordinated with the COR prior to mobilization. Staging and storage of tools and materials will be permitted in designated areas only. The government cannot be responsible for any tools or materials stored onsite

Transportation: The government will provide one round trip transport for one vehicle to and from the island. Contractor will confirm with COR if desired transportation will fit on the landing craft. The park will make the final determination as to whether the vehicle will fit on the landing craft.

Specifications for Trash Compactor & Dumpster System

1. Trash Compactor

a) Commercial grade – Stainless steel

b) 3 Yard compactor

c) 5' Angle Guides

d) Hinged Breaker Bar Teeth

e) 3-sided hopper with door

f) 5 hp

g) Multi-Cycle Operation Switch

h) 2 Stage Pump

i) (2) 40 YD Receiver Containers

j) Paint Color: Green

Page 2 of 3 Pages

2. Power Supply to Include

a) 230 – 240 volts

b) Weatherproof connections

c) Emergency Safety Shutdown Switch

3. Safety and Security

a) Hopper door closed safety switch

b) Emergency reversing devises – entrapment prevention

c) Safety decals, notifications, lights, etc (must meets commercial standards)

d) Audible tones

e) Outdoor – rated

f) Independent controls (if applicable) to be located and mounted per COR

g) Outdoor / UV-Resistant construction

Site Verification of Conditions: Contractor shall examine site conditions and notify COR of any concerns trash compactor removal and installation area and notify COR of any concerns that could affect quality and execution of work and cannot proceed with installation until unacceptable conditions are corrected. All work will be inspected by the COR and deviations from the scope of work shall be corrected.

Hours of Operation: All work is to be performed during normal business hours which are:

Monday thru Friday 7:00 A.M. to 5:00 P.M, excluding government holidays. Work must be scheduled around special events and programs; Contractor will be given a minimum of a 3 day notice. No work permitted outside of normal business hours without prior written consent.

Work on the weekend must be approved by the COR and must be requested at least 24 hours in advance.

Parking: Off Island parking is permitted in the visitor parking lot; boat parking in designated location only.

Radio use is prohibited.

The use of tobacco products are permitted in designated areas only.

Installation & Site Preparation: Contractor is responsible for surface preparation of existing and new unpainted surfaces. Contractor shall prime and apply 2 coats paint.

Quality Assurance Requirement:

1. Installation shall be in accordance with manufacturers installation instructions.

2. Contractor shall establish a safety barricade around work zone; contractor is responsible for ensuring the safety of visitors and employees surrounding the working environment.

3. Test all equipment functionality with government to ensure proper operation.

4. The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices.

Page 3 of 3 Pages

5. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

6. The government will periodically evaluate the contractor’s performance in accordance with the Statement of Work.

Waste Management: All debris and trash shall be removed from the building by the contractor after each workday and disposed of properly at the Contractors expense

Special Considerations:

1. Project is located on Cumberland Island not the mainland. The distance from the mainland to the dock on the island is approximately 7 miles

2. Contractor is responsible for all transportation including but not limited to: transporting all equipment, materials, tools, and personnel to and from the island

3. The contractor is responsible for island transportation (from the floating dock to the work site). Driving is only permitted from the dock to the jobsite. No driving anywhere else on the island

4. The contractor will be provided docking space on the island and on the mainland for a maximum boat size of 25’. If no space is available on the mainland, the contractor’s boat will have to be pulled from the water daily and stored at a designated park location.

5. Contractor will comply with all OSHA, Federal, State, and local regulations.

6. The area will remain open to visitors while the work of this contract is executed. Visitors are the park’s primary customers. Daily contact with visitors by the contractor is likely.

As all resources and operations of the NPS are ultimately paid for by the U.S taxpayer, any visitors that the contractor comes into contact with while accomplishing this work should be considered a customer and be accorded all reasonable courtesy.

File details come from the government source that posted it. Updated .