This statement of work outlines requirements for pressure washing, repairing, priming and painting the exterior of two structures on Cumberland Island National Seashore. The contractor shall pressure wash, scrape and caulk approximately 6,000 square feet of wood siding, windows, doors, ceilings and decking on the Dairy Manager's House and Stafford Beach House. This includes washing, priming and painting 25 windows, 9 doors, and 500 square feet of porch surfaces on the Dairy Manager's House. For the Stafford Beach House, the contractor shall pressure wash and paint 8 doors, 6 windows, and all exterior surfaces of two structures totaling approximately 3,000 square feet. The contractor must provide their own transportation between the mainland and island docking areas as well as island transportation to work sites. All work must be completed in accordance with historic preservation standards and between 7am-5pm Monday through Friday by roller and brush only, with no spraying allowed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_1_to_Amd_1_QandAs_0001.pdf | ||
| Sol_140P5424R0001_Amd_0001.pdf | ||
| Sol_140P5424R0001.pdf | ||
| Entire_RFP_with_Atchs.pdf | ||
| Atch_3_Photos.pdf | ||
| Atch_4_Site_Visit_Info.pdf | ||
| Atch_2_DBA_DOL_WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5424R0001 Attachment 1
Page 1 of 3 Pages
National Park Service Cumberland Islands National Seashore
Statement of Work (SOW) Pressure Wash, Repair and Paint the Exterior of
Dairy Manager’s (DM’s) House and Stafford Beach House
Contractor shall provide all labor, supervision, materials, tools, equipment, supplies, transportation and incidentals necessary to pressure wash, repair, prime and paint approximately 6,000 square feet of wood, lap siding, rafter tails and overhang surface. Scrape, prime and paint windows, 11-34”x54”, 9- 34”x79”, 2-34”x69”, 7-39”x44”, 6-44”x75” double hung, 6 over 6 glass pane, double hung, wood windows and 4 (3) 61”x40” and (1) 68”x36” single hung, glass pane windows, replace approximately 40% of all window glazing. Wash, prime and paint 9 exterior wood doors, 1-32”x80”, 5-36”x80, 2-34”x80”, 1- 70”x80” French Door. 500 square feet of wood porch ceiling, decking, posts, beams, railings, steps. The project will also include minor repairs to wood siding, and decking, less than 10%. All surfaces to be painted shall be scraped and sanded as needed. The painting will consist of one coat of latex primer on bare spots and two (2) finish coats of a high gloss, latex paint. All work shall be done in accordance with generally accepted practices for the trade, all applicable standards and regulations and Secretary of the Interior Standards for Treatment of Historic Properties, and NPS 28: Cultural Management Guideline, which can be found at https://www.nps.gov/parkhistory/online_books/nps28/28contents.htm
Contractor Responsibilities on structures:
• Pressure wash entire buildings with an environmentally friendly, high quality, exterior siding cleaner concentrate (which must be approved before purchasing).
• Ensure water does not enter building while pressure washing.
• Inspect and immediately dry any water that does enter the building.
• Place painter’s tarp on ground prior to scraping walls and soffits, to catch paint chips from being scattered around the landscape.
• Apply one coat of latex primer to bare areas and two finish coats of high gloss, latex paint. Paint will be applied with a thick nap roller and brushed, spraying is not allowed.
• The exterior of the windows are to be painted.
• Paint both sides of doors and door screens.
• All glass panes are to be scraped of all paint and entire pane will be cleaned with glass cleaner.
Dairy Manager’s (DM’s) House
• Scrape loose, peeling, paint from walls, windows, doors, ceiling and decking.
• Pressure wash all exterior surfaces, approximately 3,000 square feet. Scrape and caulk as needed.
• Prime and paint wood surfaces with 1 coat of latex primer on bare spots and 2 coats of high quality, high gloss, latex paint. Approximately 2,500 square feet of wood lap siding and overhang.
• Wash, prime and paint the trim on 25 wood windows (11 double hung windows 34’’x 54’’, 9- 34”x79”, 2-34”x69”, 3-61”x40”) and 1”x 2” wood, window screens.
• Wash, prime and Paint 1- 32” x 80”, 1-36”x80” exterior, wood doors and screens, both sides.
The square footage for the doors is included with the wall total.
• Clean, prime and paint porch benches, supports, railings and posts, steps, and porch ceiling approximately 500 square feet.
https://www.nps.gov/parkhistory/online_books/nps28/28contents.htm
Page 2 of 3 Pages
Stafford Beach House (2 Structures)
• Scrape loose, peeling, paint from walls, windows, doors, ceiling and decking from 2 structures.
• Pressure wash approximately 3,000 square feet of wall, roof overhang, ceiling and decking. Scrape and caulk as needed.
• Prime and paint all surfaces with 1 coat of latex primer on bare spots and 2 coats of high quality, high gloss, latex paint.
• Paint 8 exterior, wood doors and trim, 4-36”x80”, 3- 34” x 80” and 1-French Door
70”x80”. The square footage for the doors is included with the wall total.
• Paint all windows and trim, 6-44”x75”, 1-68”x36”, 7-39”x44”. The square footage for the windows is included with the wall total.
Please see attached photos
Special Considerations:
• Project is located on Cumberland Island not the mainland. The distance from the mainland to the dock on the island is approximately 7 miles.
• The contractor is responsible for all transportation of equipment, materials and daily transport of personnel to and from the island. The park will provide one round trip transport for one vehicle to and from the island. The park will make the final determination as to whether the vehicle will fit on the landing craft.
• The contractor is responsible for island transportation from the floating dock to the work site. Driving is only permitted from the dock to the jobsite. No driving anywhere else on the island.
• The contractor will be provided docking space on the island and on the mainland for a maximum boat size of 25’. If no space is available on the mainland the contractor’s boat will have to be pulled from the water daily but can be stored at a designated park location.
• Approximate square footages for walls includes the doors, windows and trim.
• Painting is to be achieved by brush and roller. NO SPRAYING!!!!!
• A very low pressure from a water hose will be used to wash around all doors and windows.
• Replacement material will be like in kind.
• Paint colors are: Walls- Sherwin Williams, Super paint, Exterior Gloss Ultra, A84W1151
(Custom L4), Trim- Sherwin Williams, Super Paint, Exterior Gloss Ultra, A84T154 (Custom 34-63721). All comparables will be approved before purchasing.
• Lead testing has been completed for these structures and they have been painted several times since then.
• If more than 40% of window glazing is found to be needed, then the contractor is to report this to the COR immediately and it will be addressed with the CO for a possible modification. No work outside of the SOW is to be done without written authorization.
• Hinges and doorknobs are to be removed or taped to prevent painting.
• Contractor will comply with all OSHA, Federal, State, and local regulations.
Page 3 of 3 Pages
• Construction sites will be cleaned up at the end of each day.
• Disposal of all construction debris is the responsibility of the contractor.
• Work hours are Monday through Friday, 7am-5pm.
• No work on government holidays.
• Work on the weekend must be approved by the COR and must be requested at least 24 hours in advance.
• The area will remain open to visitors while the work of this contract is executed. Visitors are the park’s primary customers. Daily contact with visitors by the contractor is likely.