Atch_1_SOW.pdf

PDF 101 KB Posted

Attached to
Picnic Shelter-FOFR
Solicitation number
140P5422R0022
Issued by

View the file

Other files

File Type Posted
Atch_1_to_Amd_1-QandAs_0001.pdf PDF
Sol_140P5422R0022_Amd_0001.pdf PDF
Atch_3-Site_Visit_Info.pdf PDF
Atch_4_Photos.pdf PDF
Sol_140P5422R0022.pdf PDF
Atch_2-DBA_WD-Glynn_County.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5422R0022 Attachment 1

Page 1 of 2 Pages

Contractor shall provide all labor, supervision, material, tools, equipment, supplies, transportation and incidentals necessary to construct a picnic shelter within Fort Frederica National Monument located in Saint Simons Island, Georgia, 31522, Glynn County. The Park intends to rehabilitate the existing concrete slab and cover the location with a simple gable roofed structure to provide a shelter for visitors using the park dock. The goal of this project is to clear vegetation from on top of the existing concrete slab and in the immediate area, while minimizing impact to the natural and built environment. A new slab would be poured over the existing concrete slab and a roof shelter would be installed over the new concrete slab. The contractor shall grub, trim, cut and dispose of all debris and material associated with the project. The contractor will clean the existing concrete slab and pour a new concrete slab over the existing slab. The contractor will install a gable roof. The bottom of the header is to be 8 feet from the finished concrete slab and the roof will have a 5 twelve pitch. The roof material is to be a standing seam, galvalume.

Install two, ABA compliant sidewalks from two sides of the concrete slab.

1. TASKS:

a) Clearing and Grubbing

b) Grub, trim and cut approximately 60 cubic yards of brush, small trees and limbs.

c) Dispose of approximately 20 cubic yards of concrete rubble.

d) Cut, remove, and dispose of trees and stumps (one 18”x 50’ pine, one 3’x 25’

e) dead oak, ten 8”-16” x 40’ cedars, pines and oak trees).

2. Demolition: Flush cut, four galvanized pipes, that are extending from concrete slab.

Galvanized pipes are 2”x 12”, 1”x 6”, 3/4”x 18” and ½”x 6”.

3. Installation

a) Clean debris from existing slab and pressure wash entire 1300 square feet.

b) Place a layer of at least 4 MIL thick plastic sheeting over the existing, cleaned concrete slab.

c) Pour a 4” thick, 3000 psi, concrete slab over the existing concrete slab. The existing slab measures 30’x 40’. Slab is to have a fine, broom finish.

d) Place #4 steel rebar, in a 2’x 2’ grid, midway of the thickness of the new concrete slab and sidewalk.

e) Rebar is to be tied at each area where rebar crosses each, with at least 16-gauge, rebar wire.

f) Install two, ABA compliant sidewalks (one on the south side and one on the west side of the concrete slab. Each sidewalk is 5’ wide, approximately 30’ long and 4” thick.

g) Install an expansion joint at the points where each sidewalk meets the concrete slab and cut “Control” joints in both the slab and the sidewalk. The control joints in the sidewalk should be ½”- ¾” deep and every 10 feet. The control joints in the slab, should be placed in the middle of the 30’ length and two joints, evenly spaced within the 40-foot length.

140P5422R0022 Attachment 1

Page 2 of 2 Pages

h) Provide shop drawings for a roof cover similar to the roof pictures attached below.

Trusses to be secured with hurricane straps and rated for a minimum of hurricane force winds.

i) All lumber to be pressure treated, pine.

j) Install a roof covering over the new concrete slab. The header of the roof is to be 8 feet off the finished slab and have a 5/12 pitch.

k) Roof metal is to be a standing seam, Galvalume. Color to be brown and approved by

COR.

l) Level landscape area, approximately 30 feet around the perimeter of the concrete slab.

4. Products: Galvalume, Standing Seam Metal Roofing

5. SECURITY: Materials and equipment may be stored on site in a construction trailer. NPS is not liable for lost or stolen items stored on site.

See Attachment #4 for Photos