Atch_1_to_Amd_1-QandAs_0001.pdf

PDF 50 KB Posted

Attached to
Picnic Shelter-FOFR
Solicitation number
140P5422R0022
Issued by

View the file

Other files

File Type Posted
Sol_140P5422R0022_Amd_0001.pdf PDF
Atch_3-Site_Visit_Info.pdf PDF
Atch_4_Photos.pdf PDF
Sol_140P5422R0022.pdf PDF
Atch_2-DBA_WD-Glynn_County.pdf PDF
Atch_1_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5422R0022 Amendment 1 Attachment 1

Question #1: At the site visit it was noted there is significant damage to the existing slab and it does not appear that it would be suitable to act as a base/foundation for the new slab. Is it acceptable to remove the existing slab before installing the new?

Answer: No, the existing slab is to remain.

Question #2: Will any temporary utilities be provided? (Electricity, Water) Answer: No

Question #3: Due to limited access to the designated area, will tree trimming of the path to the work area be permitted?

Answer: Yes, but the COR or a person designated by the COR has to be present and approve of the trimming.

Question #4: Are there any drawings for the existing slab Answer: No

Question # 5: Is permitting required Answer: No

Question #6: What testing is required Answer: 7 day and 28 day compression strength and slump test according to industry standards.

Question #7: Do drawings need to be stamped by engineer Answer: Yes

Question #8: Is there water hook-up available near site for pressure washing existing slab?

Answer: No

Question #9: What desired treatment for pressure treated pine Answer: Ground Contact Pressure Treated Lumber

Question # 10: Can fill dirt be added to level new slab over existing slab?

Answer: No

Question #11: Is termite treatment required Answer: No

Question # 12: Is there a preferred spacing for the rafters Answer: No, the engineered drawings should have the spacing, depending on the design.