Atch_1_Drawings.pdf
PDF 1 MB Posted
- Attached to
- SERVICE 8 HVAC VAV BOXES - PAC Federal contract opportunity
- Solicitation number
- 140P5522R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_and_Answer_for_RFP_5522R0007_0001.pdf | ||
| Sol_140P5522R0007_Amd_0001.pdf | ||
| Sign_in_Sheet_from_Site_visit_July_20__2022_0001.pdf | ||
| Atch_2_Specifications.pdf | ||
| Sol_140P5522R0007.pdf | ||
| Atch_5_PP_Questionnaire.pdf | ||
| Atch_4_Wage_Determinations.pdf | ||
| Notice_to_Prospective_Offerors.pdf | ||
| Atch_3_VAV_UNIT_SELECTIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES - P15PC00467
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
/3
/2
:2
:3
P M
SERVICE 8 HVAC VAV BOXES
PRAIRIE ACADIAN CULTURAL BUILDING
JEAN LAFITTE NATIONAL HISTORIC PARK
SOUTHEAST ST. LANDRY LOUISIANA
1 2
XX
XXXXXX
246007B
JEAN LAFITTE NATIONAL PARK AND PRESERVE
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
GENERAL
1 G001 COVER SHEET
MECHANICAL
2 M101 MECHANICAL PLAN - NEW WORK
Grand total: 2
SITE
250 PARK AVE
EUNICE, LA 70535
S
T
A
T
E
O
F LO
U
I S
I A
N
A
P
R
O
F
E
S
S
I O
N A
L E
N
G
I N
E
E
R
AMY E. HADLOW
License No.31314
09-30-2021
AHU-1
(EXISTING)
CH-1
TU-2
TU-3
TU-4
TU-5
TU-6
TU-7
TU-8
TU-1
3" GAS
(EXISTING)
3" H W
R
(E
XISTIN
G
3" H W
S
(E
XISTIN
G
H W
S (E
X
IS
T
IN
G
H W
R (E
X
IS
T
IN
G
3" GAS
(EXISTING)
3" CWR 3" CWS
120 GPM CHW
12.2 GPM HW
CRAFTS
EXHIBITS
RECEPTION
PORCH
ENTRY
LOBBY
PRESENTATIONS
OFFICE MEN
WOMEN
KITCHEN
MULTI-
PURPOSE
INFORMATION
(EXISTING)
(EXISTING)
(EXISTING)
FC-1
(EXISTING)
FC-2
(EXISTING)
HP-1
(EXISTING)
REFRIGERANT LINESET
AIR VENT
HWR
HWS
BALANCING VALVE
THREE-WAY,
MODULATING
CONTROL VALVE
WITH ELECTRONIC
ACTUATOR
PIPE UNION - TYPICAL
PRESSURE/TEMPERATURE
TEST PLUG TYPICAL
VAV REHEAT COIL
STRAINER
BASE BID - ALL NEW
DEDUCT ALT #1
REPLACE REPAIR
ITEMSYMBOLITEMSYMBOL
UNION
REDUCER
AUTOMATIC AIR VENT
THERMOMETER
PRESSURE GAGE W/ GAGECOCK
STRAINER W/ BLOWDOWN VALVE
RELIEF VALVE
CHECK VALVE
CONTROL VALVE, 3-WAY
CONTROL VALVE, 2-WAY
PRESSURE REDUCING VALVE
BALANCING COCK
GLOBE VALVE
GATE VALVE
CALIBRATED BALANCING VALVE
BUTTERFLY VALVE
FLEXIBLE CONNECTION
MANUAL AIR VENT WITH CAP
GATE VALVE W/HOSE FITTING
BALL VALVE
THERMOMETER WELL
VALVED PRESSURE GAGE CONNECTION
HVAC LEGEND-SYMBOL
T THERMOSTAT OR ZONE SENSOR AS
INDICATED IN MECHANICAL SCHEDULE
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/3
/2
:2
:1
P M
MECHANICAL PLAN - NEW
WORKM101
P. GORDY
P. GORDY
A. HADLOW
2 2
PRAIRIE ACADIAN CULTURAL BUILDING XX
XXXXXX
246007B
JEAN LAFITTE NATIONAL HISTORIC PARK09/30/2021
8 0 8 16
SCALE OF FEET
B L D
G
M101
1 MECHANICAL PLAN - NEW WORK
DEDUCT ALTERNATE #1:
1. REUSE EXISTING VALVES SHOWN ON DETAIL 2/M101 TO BE
REPLACED
2. EXISTING TO REMAIN VALVES SHALL BE FLUSHED, CLEANED, AND 3-
WAY VALVES MUST BE CHECKED FOR PROPER OPERATION.
ADDITIVE ALTERNATE #1:
PROVIDE INDEPENDENT THIRD PARTY TEST AND BALANCE FOR ENTIRE
SYSTEM, AIR AND WATER. SEE SPECIFICATION SECTION 23 0593
TESTING AND BALANCING FOR HVAC FOR DETAILS. TESTING &
BALANCING COMPANY SHALL CONTRACT WITH GENERAL
CONTRACTOR.
TU-8 NEW CARRIER 35E 1,200 360 13 0.15 55 90 180 160 2.5
TU-7 NEW CARRIER 35E 400 120 8.6 0.22 55 90 180 160 1
TU-6 NEW CARRIER 35E 2,000 450 35.5 0.15 55 90 180 160 5
TU-5 NEW CARRIER 35E 2,000 600 35.5 0.15 55 90 180 160 5
TU-4 NEW CARRIER 35E 1,500 450 14.4 0.15 55 90 180 160 2.5
TU-3 NEW CARRIER 35E 2,000 600 35.5 0.15 55 90 180 160 5
TU-2 NEW CARRIER 35E 1,500 450 14.4 0.15 55 90 180 160 2.5
TU-1 NEW CARRIER 35E 1,500 450 14.4 0.15 55 90 180 160 2.5
IN OUT
TOTAL
MBH
S.P. DROP
(INCHES)
ENTERING AIR
(⁰F)
LEAVING AIR (⁰F) GPM
MARK CONDITION MFGR MODEL MAX CFM MIN CFM
REHEAT
TERMINAL UNIT SCHEDULE
M101
2 EXISTING TERMINAL UNIT PIPING CONNECTION (SHOWN FOR REFERENCE)
EXISTING EQUIPMENT CONDITIONS
CHILLER: 92 GPM, EWT 52 DEG F, LWT 42 DEG F, 6 FT H20 MAX PD
CHW PUMPS: 100 GPM, 60 FT HEAD,
HW PUMP: 40 GPM, 45 FT HEAD
1. REPLACE ALL TERMINAL UNITS, HOT WATER COILS, AND VALVES AS
SHOWN ON DETAIL 2/M101
2. EXISTING CEILING TILES SHALL BE REMOVED, STORED AND REUSED
AFTER TERMINAL UNITS ARE INSTALLED.
3. REPLACE ALL CEILING TILES REMOVED DURING CONSTRUCTION THAT
WERE DAMAGED.
BASE BID:
S
T
A
T
E
O
F LO
U
I S
I A
N
A
P
R
O
F
E
S
S
I O
N A
L E
N
G
I N
E
E
R
AMY E. HADLOW
License No.31314
09-30-2021
LJWood Cross-Out
LJWood Cross-Out
LJWood Cross-Out
| G001 - COVER SHEET |
| 2021-409 NPS JELA 246007B VAV BOXES M20_pgordyZ7BV6 |
| G001 - COVER SHEET |
| M101 - MECHANICAL PLAN - NEW WORK |
| 2021-409 NPS JELA 246007B VAV BOXES M20_pgordyZ7BV6 |
| M101 - MECHANICAL PLAN - NEW WORK |
File details come from the government source that posted it. Updated .