Atch 1 Draft PWS.docx
DOCX document 95 KB Posted
- Attached to
- Maintenance & Repair of Elevators, KMC
- Solicitation number
- FA561325ELEVATOR
About this file
This Performance Work Statement (PWS) details vertical transportation equipment (VTE) maintenance, repair, and inspection services for the Kaiserslautern Military Community (KMC) spanning multiple locations including Ramstein Air Base and surrounding facilities. The contract will be a firm-fixed price agreement covering a base period of 1 January 2026 - 31 December 2026 with four potential one-year option periods through 31 December 2030. Contractor responsibilities include comprehensive maintenance of freight and passenger elevators, escalators, and wheelchair/stairlifts, with requirements for 180 preventive maintenance services, 60 safety inspections, 95 routine service calls, and 15 emergency service calls annually.
Key performance objectives include maintaining equipment availability with no more than 2 defects per month, responding to routine service calls within 3 hours, emergency calls within 90 minutes, and submitting detailed maintenance reports. The contractor must be DIN EN ISO 9001:2015 and DIN EN 13015 certified, registered with German industry chambers, and capable of performing all maintenance in compliance with German and U.S. safety regulations. The estimated annual parts cost is €160,000, with the government reserving the right to adjust quantities up to 5% without contract modification. The solicitation is currently in a sources sought phase, with responses due by 4 April 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 2 MR Questionnaire.pdf | ||
| Atch 1 Draft Appendix B Equipment List.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE
WORK STATEMENT (PWS)
FOR
VERTICAL TRANSPORTATION EQUIPMENT
MAINTENANCE, REPAIR &
INSPECTION SERVICES
IN THE
KAISERSLAUTERN MILITARY COMMUNITY
(KMC)
26 November 2024
786 CES/CEOES
PERFORMANCE WORK STATEMENT (PWS) FOR
VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR & INSPECTION SERVICES
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) in the Kaiserslautern Military Community (KMC), Ramstein Air Base (TYFR), Ramstein Air Base-Construction & Training Squadron (MTMC), Kaiserslautern-Vogelweh (YANB), Kaiserslautern-Einsiedlerhof (TYFT), Kaiserslautern-Kapaun Air Station (TYFU) and Landstuhl-Kirchberg (MTMN) in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2. below). Services are to be performed in accordance with all applicable German local, state, and federal standards, codes, laws, manufacturer recommendations and all required safety regulations (see paragraph 8.14.). The most stringent of these shall apply. Manufacturer training certificates are not required to perform services under this contract. The VTE and their locations are listed in Appendix B, Equipment List: freight and passenger elevators, escalators and may include wheelchair/stairlifts.
1.1. This full maintenance contract signifies a VTE service provider (contractor) takes total service responsibility for the equipment identified in the contract. Except for the services covered in paragraph 2. below, the monthly fixed prices include all inspections, maintenance, repairs, replacements, and routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.
1.2. If grinding, cutting and welding work is required in the performance of this contract, the contractor must inform the COR by email at least 24 hours prior to the scheduled repair/maintenance to coordinate the deactivation of fire extinguishing systems. In case of emergency repairs, the contractor must inform the COR immediately upon determining that grinding, cutting or welding work is required that the fire extinguishing systems must be deactivated. No grinding, cutting or welding work shall be carried out without prior confirmation by the COR that fire extinguishing systems have been deactivated. Deactivation of fire extinguishing systems is possible 24/7.
1.3. Work conducted on VTE will be in accordance with, but not limited to, the references listed in paragraph 8.14., as well as any additional regulations that may apply, and shall be performed only by qualified personnel trained for the services required. Contractor technicians shall have knowledge of the current German Safety and Accident Prevention Regulations (Deutsche Gesetzliche Unfallversicherung – DGUV) and the usage of guidelines and generally recognized rules of engineering in accordance with commercial practices to be able to assess the condition of the equipment properly. The contractor shall be familiar with the different equipment used under this contract. The contractor shall be DIN EN ISO 9001:2015 and DIN EN 13015 certified and provide proof of certification with their quote. The contractor must continue to be certified throughout the life of the contract. The contractor, subcontractor, teaming/joint venture partner, etc. being intended to perform the services must be registered or a member of the German Chamber of Industry and Commerce (Industrie- und Handelskammer) or the German Chamber of Trade (Handwerkskammer). Membership must continue throughout contract performance.
2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services, and no work on any services listed in paragraph 2. will commence without advance approval by the CO:
2.1. Alterations (a.k.a. modernizations) are not covered in the full maintenance service arrangement. (See paragraph 3.2.)
2.2. Acts by parties other than the contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power, generator power spikes, and low quality, lightning-stroke), building subsidence, and modernizations are not included in the contract.
2.3. Routine cleaning and refinishing of the interior of cars and the exterior of the cars, doors and frames are not included in the full maintenance service.
2.4. In the event the contractor encounters an item of work included in paragraph 2.1. through 2.3., the contractor will report the situation to the COR. The report will include the work location, a detailed scope of the required work, justification for contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the contractor’s responsibility to obtain an engineered equivalent product from a commercial source, unless waived by the CO.
3. DEFINITIONS.
3.1 Maintenance, Repair and Replacement. Maintenance, repair and replacement on existing VTE are included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. All work carried out shall be in accordance with standard commercial practices using only Original Equipment Manufacturer (OEM) parts. Upon non-availability of OEM parts, items of equal or higher quality are permissible upon the COR’s concurrence. All services carried out by the contractor shall be in accordance with, but not limited to, the standard guidelines listed in paragraph 8.14. When required parts are not available, the contractor shall notify the COR the same business day this is being discovered. The contractor shall provide written documentation (for example, a letter from the parts manufacturer) to the COR explaining why the required repair time cannot be met. The contractor shall complete the repair within one (1) normal business day after receiving the required parts.
3.2. Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with the standard guidelines listed in paragraph 8.14., as well as any additional regulations that may apply.
4. MAINTENANCE AND INSPECTION SERVICES.
4.1. The contractor, with the CO/COR, shall determine the working order and condition of all VTE listed in Appendix B within thirty (30) calendar days of contract award. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the contractor to replace the missing items, accomplish the repair, and reimburse the contractor in accordance with the contract. Defects that existed before the start of the period of performance (PoP) fall under CLIN X004, “Over and Above Services”. The CO will give instructions for situations where a unit requires a level of repair potentially constituting an alteration as described in paragraph 3.2. The contractor and the CO shall certify their agreement as to the working order of the equipment.
4.2. The contractor shall develop and submit to the COR an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days of contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed and requires the contractor to coordinate with the respective Facility Manager/alternate prior to carrying out services. The contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements. The contractor shall submit schedule deviations to the COR as soon as possible, but no later than the day before service is scheduled.
The contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The MCP is required to specify appropriate intervals for specific maintenance items. Maintenance shall be carried out following the regulations/guidelines listed in paragraph 8.14. below, as well as any additional regulations that may apply, and shall include, but not be limited to, repair/substitution/replacement/renewal/changing of parts, hydraulic oil and hoses, lighting elements, automatic elevator shaft smoke extraction systems (Schachtentrauchungsanlagen), batteries including service and initial installing of Subscriber Identity Module (SIM-Cards) and operation of Global System for Mobile Communications (GSM) wireless data module transmitters to operate Emergency Call Systems (ECS) when needed for the assets listed in Appendix B.
4.3. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, as well as repairs is required.
4.4. The contractor shall perform necessary safety inspections and tests through accredited surveillance associations (for example TUEV – Technischer Ueberwachungsverein, DEKRA) on all elevators and escalators and as required by the Betriebssicherheitsverordnung (BetrSichVO) / Ordinance on Industrial Safety and Health. The contractor shall provide DGUV-V3 testings / electrical safety checks, which are to be carried out every four (4) years and apply to electrical components testing. The prices for the additional tests must be included in the offer. Load testing of electrical components must be carried out in the base year and fourth option year of this contract.
4.5. The contractor shall prepare and submit a written report no later than eight (8) business days of work accomplished. The report shall include, but not be limited to:
(a) Date and time of the service
(b) Location, equipment/serial number and type
(c) Full operational test
(d) Overall condition including discrepancies cited and repairs needed
(e) Name of the technician performing the service
(f) Amount of man hours
(g) Parts used
4.6. The Government may perform inspections of the VTE at no cost to the contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the contractor will be notified in writing of any determination and may be responsible for corrective actions.
4.7. The contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR upon request; however, no later than one (1) business day of a request for review.
5. REPAIR SERVICE CALLS. The contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional cost to the Government. All repair work shall be done in accordance with standard commercial practices as well as all applicable guidelines listed in paragraph 8.14. below and any additional regulations that may apply. The contractor shall repair and replace components of the VTE at no additional cost to the Government.
5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.
5.1.1. The contractor shall respond in person to the VTE and begin work on routine service calls at no additional cost to the Government no later than three (3) hours after receipt of the call on regular scheduled workdays/hours.
5.1.2. The contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs, when the repair is not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. Refer to Appendix D – Over & Above (O&A) Instructions.
5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.
5.2.1. The contractor shall respond in person to the VTE and begin work on emergency service calls no later than 90 minutes after receipt of the call.
5.2.2. The contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time to repair and cost of repairs when the repair is not covered in the basic full maintenance service contract, but necessary to bring the VTE back to operation. Refer to Appendix D – Over & Above (O&A) Instructions.
5.3. Reporting. The contractor shall prepare and submit to the CO/COR a written report no later than eight (8) business days after a routine/emergency repair has been completed. The reports shall include:
(a) Date, time and call number of the service
(b) Location, equipment/serial number and type
(c) Full functionality test
(d) Service performed (malfunction and description of work)
(e) Amount of man hours
(f) Parts used
(g) Name of the technician performing the service
5.3.1. The contractor shall submit a written monthly report listing all open calls no later than the first business day of the following month.
6. SERVICES SUMMARY. The Government will evaluate contractor performance in accordance with the following criteria. The Services Summary (SS) provides information on contract requirements and the expected level of contractor performance. The contract service requirements are summarized in performance objectives. The performance threshold briefly describes the acceptable levels of service required for each requirement. These thresholds are critical to mission success.
| Performance Objective |
| PWS Paragraph(s) |
| PerformanceThreshold |
| Remedy |
| SS-1. Inspection – MCP Adherence. |
| 4.2. |
| Meets maintenance and inspection intervals as stated in MCP. |
Inspection according to MCP Rating Thresholds:
Satisfactory – 90% within stated inspection or maintenance schedules.
Unsatisfactory – below 90% within stated inspection or maintenance schedules.
Reperformance within 3 business days after initially scheduled maintenance/in-spection date IAW MCP.
| SS-2. VTE Service Availability. |
| 4., 4.2., 4.3., |
| VTE Service Availability. |
| N/A |
4.4., 4.5.,
| 4.6., 4.7. |
| Performance Threshold: |
No more than 2 defects per month.
SS-3. Repair Service Call – Routine – Response Time.
Response to routine calls within time specified in paragraph 5.1.1.
| 5.1.1. |
| Response to routine service call thresholds (quarterly inspection basis). |
Performance Threshold:
No more than 2 defects per quarter.
Reperformance within 2 hours of notification.
SS-4. Repair Service Call – Emergency – Response Time.
Response to emergency calls within the time specified in paragraph 5.2.1.
| 5.2.1. |
| Response to emergency service call thresholds (quarterly inspection basis). |
Performance Threshold:
100% within stated response time.
N/A
| SS-5. Reporting. |
| 2., 2.1., 2.2., |
| Reports Submittal. |
| Reperformance |
2.3., 2.4., 4., no later than 24
| 4.1., 4.2., |
| Performance Threshold: |
| hours of |
4.3., 4.4., notification.
| 4.5., 4.6., |
| No more than 3 defects per |
| 4.7., 5., |
| quarter. |
5.1., 5.1.1., 5.1.2., 5.2., 5.2.1., 5.2.2., 5.3., 5.3.1., 7.1., 8.7., 8.8., Appendix
D & E
7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government does not anticipate providing any government furnished property (GFP).
7.1. Damage to Government Property. The contractor shall report all damages to U.S. Government property within one (1) hour after occurrence to the 786 CES/CEOES Service Contract section, phone: 06371-47-4879. The contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the contractor’s failure to use reasonable care causes damage to any of this property, the contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the contractor fails or refuses to make such repair or replacement, the contractor shall be liable for the cost, which may be deducted from the contract price.
8. GENERAL INFORMATION.
8.1. Quality Control. The contractor will identify to the CO the responsible quality control inspector (QCP) to be notified in case of customer complaints upon submission of quote. The contractor shall develop and maintain a quality control program to ensure maintenance and repair services are performed in accordance with standard guidelines and codes as listed in paragraph 8.14. of this PWS, as well as any additional regulations that may apply. The contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE, MCP, and the location of all inspection records and key control logs which will always be available to the Government upon request. The QCP will have the inspection forms and records which will be used for the service. The contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.
8.2. Quality Assurance. The Government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan. The contractor shall reperform at no additional cost to the Government when reperformance is required in accordance with paragraph 6., Services Summary. Any re-performance and/or unacceptable performance will be documented by the COR and may result in the Government seeking equitable price reduction or adequate consideration in accordance with FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial Services. To record validation results, the COR will use the contractor’s MCP, maintenance and repair reports to ensure all terms and conditions of applicable regulations and manufacturer instructions are met to ensure safe and continuous operation of installed equipment subject to this contract. Results of the validation then become the official Air Force record of the contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished as required, the COR will initiate and provide the CO with a Corrective Action Report (CAR) for issuance to the contractor. The contractor shall respond to the CAR in accordance with the instructions provided and return it to the CO within five (5) calendar days of receipt. The CO will forward the contractor’s response to the COR once received. The COR will perform re-inspection within one (1) business day of receipt of the contractor’s response.
8.3. Hours of Operation. The contractor shall coordinate all work to be accomplished in accordance with this PWS with the COR and Facility Manager/alternate for each piece of equipment to be maintained and repaired. Emergency repairs may be required 24 hours, Monday through Sunday including holidays. Business hours are 0700-1600, Monday through Friday. The time for maintenance and repairs to be performed shall be coordinated before any work is scheduled.
The contractor’s hours of operations shall be in accordance with the table below.
Hours of Operation
Preventive Maintenance, Maintenance Services and Safety Inspection
Repairs
Emergency Repairs
| Monday-Friday |
| 0700-1600 |
| 0700-1600 |
| 24 hours |
Saturdays, Sundays, & German and U.S. Federal Holidays
24 hours
U.S./German Federal Holidays.
| 1st January |
| New Year’s Day |
| Neujahr |
| U.S. and German |
| 3rd Monday in January |
| Martin Luther King Day |
U.S.
| 3rd Monday in February |
| Washington’s Birthday |
U.S.
| ** |
| Good Friday |
| Karfreitag |
| German |
| ** |
| Easter Monday |
| Ostermontag |
| German |
| 1st May |
| Labor Day |
| Tag der Arbeit |
| German |
| ** |
| Ascension Day |
| Christi Himmelfahrt |
| German |
| ** |
| Whit Monday |
| Pfingstmontag |
| German |
| Last Monday in May |
| Memorial Day |
U.S.
| ** |
| Corpus Christi Day |
| Fronleichnam |
| German |
| 19th June |
| Juneteenth Day |
U.S.
| 4th July |
| Independence Day |
U.S.
| 1st Monday in September |
| Labor Day |
U.S.
| 3rd October |
| German Unification |
| Tag der dt. Einheit |
| German |
| 2nd Monday in October |
| Columbus Day |
U.S.
| 1st November |
| All Saints’ Day |
| Allerheiligen |
| German |
| 11th November |
| Veteran’s Day |
U.S.
| 4th Thursday in November |
| Thanksgiving |
U.S.
| 25th December |
| Christmas |
| Weihnachten |
| U.S. and German |
| 26th December |
| 2nd Day of Christmas |
| 2. Weihnachtstag |
| German |
When a U.S. federal holiday is on a Saturday, the preceding Friday will be observed. When the holiday is on a Sunday, the following Monday will be observed.
** Indicates dates change each year – moveable holidays.
8.4. Security Requirements. Contractor personnel shall comply with all requirements and procedures as defined in AFFARS clause 5352.242-9000, Contractor Access to Air Force Installations. Contractor employees will be required to obtain and display identification badges. Please anticipate delays when accessing the base with commercial vehicles and allow time for commercial vehicles to reach their destination. Contractor employees shall drive only on designated routes and obey the speed limits posted throughout base. Procedures for commercial vehicle access to the base are subject to change without prior notice.
Citizens from certain countries are currently banned from entering U.S. installations; Security Forces maintains a list of these banned countries. This includes individual contractor employees, therefore any contractor employee who is a citizen of one of these countries will not be allowed to access the installation. The list of excluded countries is subject to change without modification or amendment of the PWS or contract.
8.4.1. Contractor/employee base pass and identification, special clearances. Contractor personnel shall obtain a Defense Biometric Identification Card (DBIDS) no later than fourteen
(14) days prior to the Period of Performance (PoP). In order to obtain the DBIDS, the contractor is required to submit to the COR the following:
· AE190-16A (Request for DBIDS)
· AE190-16K (Installation-Pass-Holder Acknowledgement)
· AE190-16E (Data Protection)
· Memo of DBIDS Request
· Military Installation Access List
· Copy of Passport / ID Card (Personalausweis)
· Security Questionnaire for Simple Security Check
· Police Good Conduct Certificate (Polizeiliches Fuehrungszeugnis)
AE190-16K, AE190-16A, AE190-16E Memo of DBIDS, Military Installation Access List request, and the Security Questionnaire will be provided by the COR, 786 CES/CEOES.
Contractor personnel shall present completed documentation to Security Forces personnel at bldg. #134, Ramstein Air Base, to obtain their DBIDS. Contractor personnel can only gain access to the KMC (Kaiserslautern Military Community) after the security check has been passed with a positive result. It is the responsibility of the contractor to collect and return the DBIDS within one (1) week from personnel that is no longer employed, in case the contract is terminated and/or after end of the PoP.
8.4.2. Access to Restricted Areas. Access to secure areas must be coordinated with the COR. Restricted areas require notification through the COR to the Facility Manager/alternate at least one (1) week prior to the date of service to allow ample time for coordination.
8.4.3. Escort. For any restricted/secure area access in conjunction with the scope of services, the COR will arrange for an escort and entry authorization at the designated place of performance.
8.4.4. Language Requirement. Contractor employees performing services shall be able to speak English sufficiently well to communicate on a basic level with on-site personnel.
8.5. Continuation of Essential Department of Defense Services During Crisis Declared By The National Command Authority Or Overseas Combatant Commander. In accordance with DODI 1100.22, Policy and Procedure for Determining Workforce Mix, paragraph 5b, it is determined that none of the services as stated in this PWS are mission essential.
8.6. Special Qualifications. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel must adhere to the qualification standards defined in DIN EN 13015. The contractor, subcontractor, teaming/joint venture partner, etc. being intended to perform the services must be registered or a member with the German Chamber of Industry Commerce (Industrie-und Handelskammer) or the German Chamber of Trade (Handswerkskammer). Membership must continue throughout contract performance.
8.7. Schedule Coordination. The contractor shall coordinate/schedule the dates and times services will be rendered with the Facility Manager (FM) and submit a written maintenance schedule to the COR no later than thirty (30) business days prior to the start date of the maintenance and safety inspection. The schedule shall include the estimated dates, times, building numbers and locations. Any schedule changes shall coordinated in writing with the contractor, FM and the COR at least eight (8) business days prior to the originally scheduled dates.
8.8. Schedule Information. The contractor shall be responsible to provide all Schedule Coordination Information of their operations with the appropriate base personnel to the CO/COR. The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility.
8.9. Special Equipment. Any special equipment required in the performance of services under this contract, such as lifting/working platforms etc. must be made available immediately at any time to make a repair. No prior coordination with the COR is required to determine that special equipment is needed and must be obtained. Any special equipment must be brought along for each operation and taken back. There is no temporary storage facility available on base.
8.10. Environmental Control. The contractor shall comply, and assure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in a company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals. A copy of all MSDS will be provided to the CO/COR. The MSDS data is subject to random checks by the Government. The contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought to the Government facility. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO/COR and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.
8.11. Conformance with Environmental Management Systems. The contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable to the contract. The contractor shall perform work in a manner that conserves water, energy, and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the contractor shall respond and take corrective action immediately. In the case of a nonconformance, the contractor shall respond and take corrective action based on the time schedule established by the EMS coordinator. In addition, the contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this contract. All on-site contractor personnel shall receive the installation EMS awareness level information.
8.12. Conformance with Environmental Requirements. The contractor shall perform all work in accordance with applicable German and U.S. Air Force environmental laws, regulations and operating standards, including but not limited to, the Final Governing Standards (FGS) for Germany. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract. The FGS for Germany and other important environmental laws and requirements applicable to all contractors working on base will be made available upon request.
8.13. Contract Manager. The contractor shall provide to the CO and COR the name of a contract manager (primary and alternate) who shall be responsible for the performance of work and have full authority to act on behalf of the contractor on all contract matters relating to the daily operations of this contract no later than five (5) business days after award. The contract manager shall be available during normal duty hours (0700-1600). The contractor shall be able to meet with the COR to resolve any contract-related issues. The contract manager and alternate shall be able to understand, read, speak, and write basic and technical English (to speak English with sufficient structural accuracy and vocabulary to participate in formal and informal conversations on practical, social, and professional topics). The contractor shall provide to the CO and COR, no later than five (5) business days after award, a list of all personnel performing under this contract to include names and contact information (valid (cell) phone numbers), as well as their individual function. Any required changes to this list shall be submitted in writing to the CO and COR, ten (10) business days prior to the change taking effect.
8.14. Applicable Guidance. The contractor shall comply with all applicable regulations and requirements. The below list may not be complete and all-inclusive. Systems shall be checked in accordance with:
· Manufacturer Specifications
· DIN EN 13015, Instandhaltung von Aufzuegen und Fahrtreppen – Regeln fuer Instandhaltungsanweisungen / Maintenance of Lifts and Escalators – Rules for Maintenance Instructions
· VDI 3810 Blatt 6/Part 6, Richtlinie zum Betreiben und Instandhalten von gebaeudetechnischen Anlagen, Aufzuege / Guideline for the Operation and Commissioning by the Association of German Engineers, Building Installations – Lifts
· TRBS Technische Regeln fuer Betriebssicherheit / Technical Rules for Operational Safety
· Technische Regeln für Arbeitsstaetten / Technical Rules for Workplaces “ASR A1.7”
· Berufsgenossenschaftliche Regeln (BGR) 232 (Richtlinien für Kraftbetriebene Fenster, Tueren und Tore / Trade Association Rules 232 “Guidelines for Power Driven Windows, Doors, and Gates”
· DGUV Deutsche Unfallverhuetungsvorschriften (UVV) / German Accident Prevention Regulations
· DGUV 209-070 (Sicherheit bei der Hydraulik bei der Instandhaltung / Safety in Hydraulic Maintenance)
· DGUC Regel 113-020 “BGR 237” (Hydraulik-Schlauchleitungen / Hydraulic Hose Lines)
· DGUV Regel 100-500 “BGR 500” (Betreiben von Hebebuehnen / Operation of Hydraulic Lifts)
· Betriebssicherheitsverordnung (BetrSichVO) / Ordinance on Industrial Safety and Health
· DGUV-V3 Pruefung Elektrischer Betriebsmittel / Testing of Electrical Systems
· DIN EN VDE 0100 (Daten und Fakten für das Errichten von Niederspannungen / Low- voltage Electrical Installations)
· EU-Maschinenrichtlinie 2006/42/EG / EU Directive 2006/42/EC on Machinery
· WHG (Wasserhaushaltsgesetz – German Water Act)
8.15. Waste Disposal. All trash and hazardous waste, generated as a result of services performed, shall be disposed off base in accordance with the German National Waste Disposal Act (Abfallbeseitigungsgesetz – AbfG) at no additional cost to the Government.
8.16. Performance and Services Performed During Military Exercises and Operations Work stoppages may occur during the execution of this contract due to military exercises or operations. During these times, access to areas supporting the exercise or operation may be curtailed or not allowed. During scheduled and unscheduled exercises or operations, the contractor should be prepared to move to other work locations or suspend operations. No additional cost shall be incurred to the Government for moving to other work locations and for the waiting time until the exercise or operation is over.
8.17. Base Closures. Work scheduled, but not accomplished because of base closures due to weather, exercises, or actual alert, will be accomplished as soon as possible after the installation is reopened.
APPENDICES.
A. Workload Estimate Data Per Year B. Equipment List C. Deliverables D. Over & Above Instructions E. Over & Above Work Request Form
Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair & Inspection Services
APPENDIX A – Workload Estimate Data Per Year
ITEM
DESCRIPTION OF SERVICE
ESTIMATED QUANTITY
| 1 |
| Preventive Maintenance and Maintenance Service* |
(In Accordance with the current Equipment List)
| 180 |
| Year |
| 2 |
| Safety Inspections* |
(In Accordance with the current Equipment List)
| 60 |
| Year |
| 3 |
| Routine Service Calls** (based on a 5-year average) |
| 95 |
| Year |
| 4 |
| Emergency Service Calls** (based on a 5-year average) |
| 15 |
| Year |
| 5 |
| Parts Cost** (based on a 5-year average) |
| EUR 160,000.00 Per Year |
This workload estimate does not bind the Government to these fixed quantities. A workload estimate is only a best guess estimate based on the current equipment list* and historical data** and its purpose is to provide the contractor with data needed to estimate probable workload and perform risk assessment needed to formulate a fair and reasonable FFP (Firm-Fixed Price).
As assets are replaced, upgraded, decommissioned, and lose warranty, the equipment list will be updated at least annually. For the scope of this contract, any upward or downward quantity change to Appendix A, Workload Estimate Data Per Year, of up to 5% is considered in- scope and will not require a modification.
APPENDIX B – Equipment List (see separate sheet)
APPENDIX C – Deliverables All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The contractor shall be responsible for delivering all end items. All required documents, reports and schedules shall be sent by email in Adobe PDF format to the organizational email address of the requiring activity: 786CES.ServiceContracts.OrgBox@us.af.mil
| DELIVERABLE |
| PARA REFERENCE |
| DUE DATE |
| DELIVER TO |
Maintenance Control Program (MCP) for each VTE
| 4.2. |
| Within 30 calendar days of |
contract award
CO/COR
| Quality Control Inspector |
| 8.1. |
| Submit with quote |
| CO |
| Contractor Qualification |
| 1.3., 8.6. |
| Submit with quote |
| CO |
| Maintenance and Inspection Reports |
| 4.5. |
| NLT 8 business days after maintenance completion date |
| COR |
| Response Time to Routine Repair Service Call |
| 5.1., 5.1.1. |
| NLT 3 hours after receipt of call |
| COR |
| Response Time to Emergency Repair Call |
| 5.2., 5.2.1. |
| NLT 90 minutes after receipt of call |
| COR |
| Routine Repair Reports |
| 5.3. |
| NLT 8 business days after repair completion date |
| COR |
| Emergency Repair Reports |
| 5.3. |
| NLT 8 business days after repair completion date |
| COR |
| Over & Above Work Justification and Quotation |
| 2., 2.4., Appendix D & E |
| NLT 5 business days after reporting to work location |
| COR |
APPENDIX D – Over & Above (O&A) Instructions
1. O&A Work Definition. O&A work means work discovered during the course of contract performance that is not covered in the full maintenance service arrangement covered by the line items for the basic work under the contract, and necessary in order to satisfactorily return the VTE to a safe and operational condition. The contractor shall identify needed repairs and recommend corrective action during contract performance. Using a contract modification permits the Government and the contractor to negotiate parts and labor which are necessary to make repairs or prevent malfunctions, but are not specifically identified and priced. Examples of O&A work include, but are not limited to: EXCLUDED SERVICES identified in paragraph 2.
NOTE: The Government reserves the right at any time to utilize other contract vehicles, perform work in house, or to outsource O&A work without any notice or further consultation for maintenance/repair or replacement of equipment or infrastructure system upgrades/modifications. If O&A work is performed under this contract, competing quotes from other sources will be requested by the Government to determine price fair and reasonableness in accordance with FAR 13.106-3(a)(1). If pricing obtained from other sources is found to be lower than the pricing submitted by the contract holder, the Government reserves the right at any time to award a contract to the lowest-priced offeror.
1.2. O&A Work Procedures.
1.2.1. The contractor shall submit to the Contracting Officer Representative (COR) an O&A request form describing the O&A work being proposed. The form, with all applicable fields completed, shall be submitted no later than five (5) business days after reporting to the work location. Should the five (5) business days be insufficient due to delays caused by establishing repair costs, the contractor shall provide written documentation (for example, a letter/email from the parts manufacturer) to the COR explaining any delays.
1.2.2. The COR will send the work request package to the Contracting Officer (CO) for review/approval.
1.2.3. The contractor and CO will negotiate a firm-fixed-price settlement for the work. The contractor shall not begin work until receipt of a signed/approved work request form or approval memo from the CO. The contractor shall commence work and complete work by the mutually agreed upon dates stipulated in the form/memo.
APPENDIX E – Over & Above (O&A) Work Request Form
Control Number
Work location, work to be performed & required parts:
Justification:
Price: The total O&A proposed pricing shall include all labor, parts, and delivery.
Total of Parts/Material Costs EUR
Labor Costs EUR
Total of all O&A Costs EUR
Schedule of Work: Start
Complete
Days & Hours
Warranty Period: Parts Labor
Other Conditions:
Contractor
Government COR