Atch_03_Schedule_Tioga_Campground_Vault_Toilets.pdf
PDF 103 KB Posted
- Attached to
- Vault Toilet Pumping at Yosemite NP
- Solicitation number
- 140P8523Q0048
About this file
This document provides an attachment schedule for vault toilet pumping services at Yosemite National Park. It outlines 31 vault toilet locations and 51 structures requiring pumping, with a total pumping volume of 17,200 gallons needed from July through September. Pumping frequencies vary from once per week to biweekly depending on the location. It also lists 3 septic tank locations requiring a total of 1,600 gallons of pumping, with frequencies of once per week or biweekly.
The related federal contract opportunity is solicitation number 140P8523Q0048 for vault toilet pumping services at Yosemite National Park issued by the Department of the Interior National Park Service. The solicitation seeks vault toilet and septic tank pumping and hauling services for locations within the park from July through September as outlined in the attachment schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_04_Price_Schedule.pdf | ||
| Atch_05_DOL_Wage_Determination.pdf | ||
| Sol_140P8523Q0048.pdf | ||
| Atch_01_Statement_of_Work.pdf | ||
| Atch_02_Map_Tioga_Rd_Vault_Toilet_Locations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 03 Schedule Tioga Campground Vault Toilets
Map Location Structures Vaults Maximum Gallons/Vault
Total Gallons by Location Frequency
July through Sept
VAULTS
1 Tioga Pass Entrance Station 1 2 600 1200 Once per week 8 Weeks 2 Mono Pass Parking 1 1 400 400 Once per week 8 Weeks 3 Lembert Dome 1 3 400 1200 Once per week 8 Weeks 4 Parsons Lodge 1 1 500 50 Bi‐Weekly 8 Weeks 5 Teneya Lake East 1 4 400 1600 Once per week 8 Weeks 6 Teneya Lake West 1 2 400 800 Once per week 8 Weeks 7 Murphy's Creek 1 1 400 400 Bi‐Weekly 8 Weeks 8 Sunrise Trail Head 1 1 400 400 Once per week 8 Weeks 9 Ten Lakes Parking Area 1 2 400 800 Once per week 8 Weeks 10 Yosemite Creek Picnic Area 1 1 400 400 Once per week 8 Weeks 11 May Lake 1 2 400 800 Bi‐Weekly 8 Weeks 12 Porcupine Creek Trail Head 1 1 400 400 Once per week 8 Weeks 13 Tuolumne Meadows Water Treatment Plant 1 1 50 50 Bi‐Weekly 8 Weeks 14 Yosemite Creek Campground 6 7 300 2100 Bi‐Weekly 8 Weeks 15 Porcupine Creek Campground 6 9 300 2700 Bi‐Weekly 8 Weeks 16 Tamarack Flat Campground 5 9 300 2700 Bi‐Weekly 8 Weeks 17 Tuolumne Grove Parking Area 1 4 300 1200 Once per week 8 Weeks
TOTAL 31 51 6,350 17,200
Location Structures Vaults Maximum Gallons/Septic
Total Gallons by Location Frequency
SEPTIC TANKS
18 Tuolumne Meadows Road Camp 1 1 50 50 Once per week 8 Weeks 18 Tuolumne Meadows Ranger Camp 1 1 50 50 Once per week 8 Weeks 19 Tuolumne Meadows Ranger Camp Septic 1 1 1500 1500 Bi‐Weekly 8 Weeks
TOTAL 5 5 1,600 1,600
File details come from the government source that posted it. Updated .