Atachment A_Demolition Plans.pdf
PDF 5 MB Posted
- Solicitation number
- PE-66276-NONST-2024-000000010
- Issued by
- Ware County, Georgia
About this file
This document contains the demolition plans for the 120 & 124 S. Cherokee Road and 136 S. Cherokee Road buildings in Social Circle, Georgia. The plans outline the general demolition requirements, including the removal of existing millwork, plumbing fixtures, ceilings, and interior lighting. The existing wood floors and ceiling decks are to remain and be protected. The contractor is responsible for field verifying all existing conditions and dimensions prior to commencing demolition work. The owner will provide the testing results for asbestos-containing materials and has the right to salvage any fixtures or millwork within the demolition areas prior to the contractor starting work.
The plans also specify that the contractor must coordinate any power, communication, fire protection, and medical gas shutdowns with the owner and general contractor to ensure that portions of the building(s) that need to remain in use are not affected. The contractor is responsible for repairing any damage to existing finishes and equipment not removed under the scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB _ Lead_Asbestos_Mold mitigation and Demo .pdf | ||
| Atachment B_Bid Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
A.
B.
C.
17.
18.
19.
20.
21.
ALL ITEMS SHOWN IN A DASHED RED LINE SHALL BE REMOVED AND DISPOSED OF,
UNLESS NOTED OTHERWISE.
ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLTION WORK.
ALL EXTERIOR DOORS AND WINDOWS TO REMAIN.
CONSULT MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEER FOR DEMOLITON OF
EXISTING UTILITIES, EXISTING PLUMBING FIXTURES, WATER HEATER, MECHANICAL
DUCTING, AND EXISTING SERVICES.
VERIFY WITH OWNER EXTENT OF EXISTING MECHANICAL DUCTWORK AND HVAC
EQUIPMENT TO BE REMOVED. CONSULT MECHANICAL ENGINEER FOR ASSOCIATED
HEATING AND COOLING REQUIREMENTS.
REMOVE ALL EXISTING INTERIOR LIGHTING THROUGHOUT. CONSULT ELECTRICAL
ENGINEER FOR NEW ELECTRICAL EMERGENCY LIGHTING REQUIREMENTS.
CONSULT STRUCTURAL ENGINEER TO VERIFY NO WALLS BEING REMOVED ARE LOAD
BEARING.
ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLTION AREA, WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITON WORK.
REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE
NEW WORK. REMOVE EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE
FOR NEW FINISH. EXISTING WOOD FLOORS TO REMAIN.
THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
POWER, COMMUNICATION, FIRE PROTECTION & MEDICAL GAS SHUT DOWNS SHALL
NOT EFFECT PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR
TO REROUTE OR PROVIDE TEMPORARY POWER, COMMUNICATION, FIRE PROTECTION
AND MEDICAL GAS. COORDINATE SHUT DOWNS WITH OWNER AND GENERAL
CONTRACTOR.
REMOVE ALL EXISTING CEILINGS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
EXISTING WOOD CEILING DECK TO REMAIN AND BE PROTECTED. THE EXISTING
CEILING SHALL BE REMOVED AND REPLACED IN A MANNER TO AVOID DAMAGE TO
THE WALL SYSTEM.
NOTIFY ARCHITECT AND OWNER OF EXISTING DUCTWORK, PIPE, AND CONDUIT
PENETRATIONS EXPOSED AFTER DEMOLITION THAT ARE NOT FIRESTOPPED THROUGH
EXISTING FLOORS AND WALLS IDENTIFIED AS FIRE AND/OR SMOKE RATED ON LIFE
SAFETY PLANS. EXISTING NON-COMPLIANT PENETRATIONS ARE TO BE FIRESTOPPED.
WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
IN ALL LOCATIONS THAT A DOOR IS ILLUSTRATED TO BE DEMOLISHED, REMOVE AND
DISPOSE OF DOOR, FRAME, HARDWARE AND ALL ASSOCIATED ITEMS, UNLESS NOTED
OTHERWISE.
TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
FIREPROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO
BE SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO
DEMOLITION. THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS
A RESULT OF PREVIOUS CONSTRUCTION OR ADDITIONS.
THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
OWNER HAS THE RIGHT TO SALVAGE ANY FIXTURES AND/OR MILLWORK WITHIN AN
AREA OF DEMOLITION PRIOR TO CONTRACTOR STARTING WORK IN THAT ZONE.
COORDINATE TIMING OF SUCH REMOVALS WITH OWNER.
RECONSTRUCT EXISTING FIREPROOFING DUE TO WALL, CEILING OR EQUIPMENT
DEMOLITION.
THE OWNER WILL PROVIDE THE TESTING RESULTS OF ASBESTOS CONTAINING MATERIALS
(ACM) IN THE PROJECT AREA. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE
UNCOVERED OR QUESTIONED, LEAVE THE PREMISES AND NOTIFY THE OWNER &
ABATEMENT CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DESIGNER NOTE: VERIFY ABATEMENT SCOPE.
IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
120 S. Cherokee Road - 3960 SF 124 S. Cherokee Road - 3220 SF
OVERALL SPACE AREA
DEMOLITION KEYED NOTES
1 REMOVE ALL EXISTING MILLWORK AND ASSOCIATED PLUMBING.
F1 EXISTING WOOD FLOOR TO REMAIN.
F2 EXISTING CONCRETE FLOOR TO REMAIN.
2 REMOVE AND CAP ALL EXISTING PLUMBING FIXTURES. VERIFY DEMOLITION
REQUIREMENTS WITH PLUMBING ENGINEER.
3 EXISTING SKYLIGHTS AND ASSOCIATED WOOD CEILINGS TO REMAIN.
A
DEMISING WALL TO REMAIN
F1 F1
F2
F1
DEMOLITION FLOOR PLAN LEGEND
DEMOLISH ALL CARPET AND TILE
FLOORING. ALL EXISTING WOOD
AND CONCRETE FLOOR TO REMAIN.
DEMOLISH ALL INTERIOR WALLS
THROUGHOUT. VERIFY NONE ARE
LOADED WITH STRUCTURAL ENGINEER.
EXISTING
1/8" = 1'-0"A101
1 FIRST FLOOR DEMOLITION PLAN
400 Bellemeade Street Suite 401, Greensboro, NC 27401
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
8/
/2
:4 0:
P
M
As indicated
PR
O
JE
C
T F
ILE
S O N
AC
C
City of Social Circle
120 & 124 S. Cherokee Road Social Circle, GA 30025
Social Circle Downtown Building Demolition
R23.01470.00 Phase 00002
DEMOLTION PLAN
CPL CPL
08/27/2024
DESIGN
A101
PROJECT ISSUE & REVISION SCHEDULE
# Date Description 08/27/2024 Architectural Demoiltion Package#1 Demolition
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
A.
B.
C.
17.
18.
19.
20.
21.
ALL ITEMS SHOWN IN A DASHED RED LINE SHALL BE REMOVED AND DISPOSED OF,
UNLESS NOTED OTHERWISE.
ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLTION WORK.
ALL EXTERIOR DOORS AND WINDOWS TO REMAIN.
CONSULT MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEER FOR DEMOLITON OF
EXISTING UTILITIES, EXISTING PLUMBING FIXTURES, WATER HEATER, MECHANICAL
DUCTING, AND EXISTING SERVICES.
VERIFY WITH OWNER EXTENT OF EXISTING MECHANICAL DUCTWORK AND HVAC
EQUIPMENT TO BE REMOVED. CONSULT MECHANICAL ENGINEER FOR ASSOCIATED
HEATING AND COOLING REQUIREMENTS.
REMOVE ALL EXISTING INTERIOR LIGHTING THROUGHOUT. CONSULT ELECTRICAL
ENGINEER FOR NEW ELECTRICAL EMERGENCY LIGHTING REQUIREMENTS.
CONSULT STRUCTURAL ENGINEER TO VERIFY NO WALLS BEING REMOVED ARE LOAD
BEARING.
ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLTION AREA, WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITON WORK.
REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE
NEW WORK. REMOVE EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE
FOR NEW FINISH. EXISTING WOOD FLOORS TO REMAIN.
THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
POWER, COMMUNICATION, FIRE PROTECTION & MEDICAL GAS SHUT DOWNS SHALL
NOT EFFECT PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR
TO REROUTE OR PROVIDE TEMPORARY POWER, COMMUNICATION, FIRE PROTECTION
AND MEDICAL GAS. COORDINATE SHUT DOWNS WITH OWNER AND GENERAL
CONTRACTOR.
REMOVE ALL EXISTING CEILINGS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
EXISTING WOOD CEILING DECK TO REMAIN AND BE PROTECTED. THE EXISTING
CEILING SHALL BE REMOVED AND REPLACED IN A MANNER TO AVOID DAMAGE TO
THE WALL SYSTEM.
NOTIFY ARCHITECT AND OWNER OF EXISTING DUCTWORK, PIPE, AND CONDUIT
PENETRATIONS EXPOSED AFTER DEMOLITION THAT ARE NOT FIRESTOPPED THROUGH
EXISTING FLOORS AND WALLS IDENTIFIED AS FIRE AND/OR SMOKE RATED ON LIFE
SAFETY PLANS. EXISTING NON-COMPLIANT PENETRATIONS ARE TO BE FIRESTOPPED.
WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
IN ALL LOCATIONS THAT A DOOR IS ILLUSTRATED TO BE DEMOLISHED, REMOVE AND
DISPOSE OF DOOR, FRAME, HARDWARE AND ALL ASSOCIATED ITEMS, UNLESS NOTED
OTHERWISE.
TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
FIREPROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO
BE SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO
DEMOLITION. THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS
A RESULT OF PREVIOUS CONSTRUCTION OR ADDITIONS.
THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
OWNER HAS THE RIGHT TO SALVAGE ANY FIXTURES AND/OR MILLWORK WITHIN AN
AREA OF DEMOLITION PRIOR TO CONTRACTOR STARTING WORK IN THAT ZONE.
COORDINATE TIMING OF SUCH REMOVALS WITH OWNER.
RECONSTRUCT EXISTING FIREPROOFING DUE TO WALL, CEILING OR EQUIPMENT
DEMOLITION.
THE OWNER WILL PROVIDE THE TESTING RESULTS OF ASBESTOS CONTAINING MATERIALS
(ACM) IN THE PROJECT AREA. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE
UNCOVERED OR QUESTIONED, LEAVE THE PREMISES AND NOTIFY THE OWNER &
ABATEMENT CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DESIGNER NOTE: VERIFY ABATEMENT SCOPE.
IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
120 S. Cherokee Road - 3960 SF 124 S. Cherokee Road - 3220 SF
OVERALL SPACE AREA
DEMOLITION KEYED NOTES
1 REMOVE ALL EXISTING MILLWORK AND ASSOCIATED PLUMBING.
F1 EXISTING WOOD FLOOR TO REMAIN.
F2 EXISTING CONCRETE FLOOR TO REMAIN.
2 REMOVE AND CAP ALL EXISTING PLUMBING FIXTURES. VERIFY DEMOLITION
REQUIREMENTS WITH PLUMBING ENGINEER.
3 EXISTING SKYLIGHTS AND ASSOCIATED WOOD CEILINGS TO REMAIN.
A
C2
DEMOLITION CEILING LEGEND
DEMOLISH LAY-IN CEILING AND
ASSOCIATED LIGHTS, VENTS AND
CEILING FANS
DEMOLISH DRYWALL CEILING AND
ASSOCIATED LIGHTS, VENTS AND
CEILING FANS
*UNO. REMOVE ALL EXISTING CEILING.
PRESERVE AND PROTECT ALL EXISTING
WOOD CEILING DECK THROUGHOUT.
EXISTING
400 Bellemeade Street Suite 401, Greensboro, NC 27401
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
8/
/2
:4 0:
P
M
As indicated
PR
O
JE
C
T F
ILE
S O N
AC
C
City of Social Circle
120 & 124 S. Cherokee Road Social Circle, GA 30025
Social Circle Downtown Building Demolition
R23.01470.00 Phase 00002
DEMOLTION REFLECTED CEILING
PLAN
CPL CPL
08/27/2024
DESIGN
A102
1/8" = 1'-0"A102
1 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
# Date Description 08/27/2024 Architectural Demolition Package#1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
A.
B.
C.
17.
18.
19.
20.
21.
ALL ITEMS SHOWN IN A DASHED RED LINE SHALL BE REMOVED AND DISPOSED OF,
UNLESS NOTED OTHERWISE.
ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLTION WORK.
ALL EXTERIOR DOORS AND WINDOWS TO REMAIN.
CONSULT MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEER FOR DEMOLITON OF
EXISTING UTILITIES, EXISTING PLUMBING FIXTURES, WATER HEATER, MECHANICAL
DUCTING, AND EXISTING SERVICES.
VERIFY WITH OWNER EXTENT OF EXISTING MECHANICAL DUCTWORK AND HVAC
EQUIPMENT TO BE REMOVED. CONSULT MECHANICAL ENGINEER FOR ASSOCIATED
HEATING AND COOLING REQUIREMENTS.
REMOVE ALL EXISTING INTERIOR LIGHTING THROUGHOUT. CONSULT ELECTRICAL
ENGINEER FOR NEW ELECTRICAL EMERGENCY LIGHTING REQUIREMENTS.
CONSULT STRUCTURAL ENGINEER TO VERIFY NO WALLS BEING REMOVED ARE LOAD
BEARING.
ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLTION AREA, WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITON WORK.
REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE
NEW WORK. REMOVE EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE
FOR NEW FINISH. EXISTING WOOD FLOORS TO REMAIN.
THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
POWER, COMMUNICATION, FIRE PROTECTION & MEDICAL GAS SHUT DOWNS SHALL
NOT EFFECT PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR
TO REROUTE OR PROVIDE TEMPORARY POWER, COMMUNICATION, FIRE PROTECTION
AND MEDICAL GAS. COORDINATE SHUT DOWNS WITH OWNER AND GENERAL
CONTRACTOR.
REMOVE ALL EXISTING CEILINGS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
EXISTING WOOD CEILING DECK TO REMAIN AND BE PROTECTED. THE EXISTING
CEILING SHALL BE REMOVED AND REPLACED IN A MANNER TO AVOID DAMAGE TO
THE WALL SYSTEM.
NOTIFY ARCHITECT AND OWNER OF EXISTING DUCTWORK, PIPE, AND CONDUIT
PENETRATIONS EXPOSED AFTER DEMOLITION THAT ARE NOT FIRESTOPPED THROUGH
EXISTING FLOORS AND WALLS IDENTIFIED AS FIRE AND/OR SMOKE RATED ON LIFE
SAFETY PLANS. EXISTING NON-COMPLIANT PENETRATIONS ARE TO BE FIRESTOPPED.
WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
IN ALL LOCATIONS THAT A DOOR IS ILLUSTRATED TO BE DEMOLISHED, REMOVE AND
DISPOSE OF DOOR, FRAME, HARDWARE AND ALL ASSOCIATED ITEMS, UNLESS NOTED
OTHERWISE.
TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
FIREPROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO
BE SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO
DEMOLITION. THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS
A RESULT OF PREVIOUS CONSTRUCTION OR ADDITIONS.
THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
OWNER HAS THE RIGHT TO SALVAGE ANY FIXTURES AND/OR MILLWORK WITHIN AN
AREA OF DEMOLITION PRIOR TO CONTRACTOR STARTING WORK IN THAT ZONE.
COORDINATE TIMING OF SUCH REMOVALS WITH OWNER.
RECONSTRUCT EXISTING FIREPROOFING DUE TO WALL, CEILING OR EQUIPMENT
DEMOLITION.
THE OWNER WILL PROVIDE THE TESTING RESULTS OF ASBESTOS CONTAINING MATERIALS
(ACM) IN THE PROJECT AREA. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE
UNCOVERED OR QUESTIONED, LEAVE THE PREMISES AND NOTIFY THE OWNER &
ABATEMENT CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DESIGNER NOTE: VERIFY ABATEMENT SCOPE.
IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
136 S Cherokee Road - 2222 SF
OVERALL SPACE AREA
DEMOLITION KEYED NOTES
1 REMOVE AND CAP EXISTING PLUMBING FIXTURES. REMOVE EXISTING WATER
HEATER ON MEZZANINE. VERIFY DEMOLITION REQUIREMENTS WITH PLUMBING
ENGINEER.
C1 REMOVE EXISTING CEILING.
C2 REMOVE ALL INTERIOR LIGHTING. CONSULT ELECTRICAL ENGINEER AND
OWNER FOR NEW EMERGENCY LIGHTING.
2 REMOVE AND REPLACE EXISTING CANOPY FABRIC. EXISTING CANOPY
STRUCTURE TO REMAIN.
3 KEEP AND PROTECT EXISTING STAINED GLASS ABOVE ENTRY IN INTERIOR.
F1 REMOVE EXISTING FLOOR AND INCLUDE NEW 4" GRAVEL INFILL FLOORING
THROUGHOUT FOR FUTURE CONCRETE FLOOR UPFIT.
A
F1
DEMOLITION LEGEND
DEMOLISHED
EXISTING TO REMAIN
1/8" = 1'-0"A101
1 FIRST FLOOR DEMOLITION PLAN
400 Bellemeade Street Suite 401, Greensboro, NC 27401
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
8/
/2
:4 0:
P
M
As indicated
PR
O
JE
C
T F
ILE
S O N
AC
C
City of Social Circle
136 S. Cherokee Road Social Circle, GA 30025
Social Circle Downtown Building Demolition
R23.01470.00 Phase 00002
DEMOLITION PLAN
CPL CPL
08/27/2024
DESIGN
A101
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
A.
B.
C.
17.
18.
19.
20.
21.
ALL ITEMS SHOWN IN A DASHED RED LINE SHALL BE REMOVED AND DISPOSED OF,
UNLESS NOTED OTHERWISE.
ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLTION WORK.
ALL EXTERIOR DOORS AND WINDOWS TO REMAIN.
CONSULT MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEER FOR DEMOLITON OF
EXISTING UTILITIES, EXISTING PLUMBING FIXTURES, WATER HEATER, MECHANICAL
DUCTING, AND EXISTING SERVICES.
VERIFY WITH OWNER EXTENT OF EXISTING MECHANICAL DUCTWORK AND HVAC
EQUIPMENT TO BE REMOVED. CONSULT MECHANICAL ENGINEER FOR ASSOCIATED
HEATING AND COOLING REQUIREMENTS.
REMOVE ALL EXISTING INTERIOR LIGHTING THROUGHOUT. CONSULT ELECTRICAL
ENGINEER FOR NEW ELECTRICAL EMERGENCY LIGHTING REQUIREMENTS.
CONSULT STRUCTURAL ENGINEER TO VERIFY NO WALLS BEING REMOVED ARE LOAD
BEARING.
ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLTION AREA, WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITON WORK.
REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE
NEW WORK. REMOVE EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE
FOR NEW FINISH. EXISTING WOOD FLOORS TO REMAIN.
THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
POWER, COMMUNICATION, FIRE PROTECTION & MEDICAL GAS SHUT DOWNS SHALL
NOT EFFECT PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR
TO REROUTE OR PROVIDE TEMPORARY POWER, COMMUNICATION, FIRE PROTECTION
AND MEDICAL GAS. COORDINATE SHUT DOWNS WITH OWNER AND GENERAL
CONTRACTOR.
REMOVE ALL EXISTING CEILINGS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
EXISTING WOOD CEILING DECK TO REMAIN AND BE PROTECTED. THE EXISTING
CEILING SHALL BE REMOVED AND REPLACED IN A MANNER TO AVOID DAMAGE TO
THE WALL SYSTEM.
NOTIFY ARCHITECT AND OWNER OF EXISTING DUCTWORK, PIPE, AND CONDUIT
PENETRATIONS EXPOSED AFTER DEMOLITION THAT ARE NOT FIRESTOPPED THROUGH
EXISTING FLOORS AND WALLS IDENTIFIED AS FIRE AND/OR SMOKE RATED ON LIFE
SAFETY PLANS. EXISTING NON-COMPLIANT PENETRATIONS ARE TO BE FIRESTOPPED.
WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
IN ALL LOCATIONS THAT A DOOR IS ILLUSTRATED TO BE DEMOLISHED, REMOVE AND
DISPOSE OF DOOR, FRAME, HARDWARE AND ALL ASSOCIATED ITEMS, UNLESS NOTED
OTHERWISE.
TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
FIREPROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO
BE SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO
DEMOLITION. THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS
A RESULT OF PREVIOUS CONSTRUCTION OR ADDITIONS.
THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
OWNER HAS THE RIGHT TO SALVAGE ANY FIXTURES AND/OR MILLWORK WITHIN AN
AREA OF DEMOLITION PRIOR TO CONTRACTOR STARTING WORK IN THAT ZONE.
COORDINATE TIMING OF SUCH REMOVALS WITH OWNER.
RECONSTRUCT EXISTING FIREPROOFING DUE TO WALL, CEILING OR EQUIPMENT
DEMOLITION.
THE OWNER WILL PROVIDE THE TESTING RESULTS OF ASBESTOS CONTAINING MATERIALS
(ACM) IN THE PROJECT AREA. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE
UNCOVERED OR QUESTIONED, LEAVE THE PREMISES AND NOTIFY THE OWNER &
ABATEMENT CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DESIGNER NOTE: VERIFY ABATEMENT SCOPE.
IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
136 S Cherokee Road - 2222 SF
OVERALL SPACE AREA
DEMOLITION KEYED NOTES
1 REMOVE AND CAP EXISTING PLUMBING FIXTURES. REMOVE EXISTING WATER
HEATER ON MEZZANINE. VERIFY DEMOLITION REQUIREMENTS WITH PLUMBING
ENGINEER.
C1 REMOVE EXISTING CEILING.
C2 REMOVE ALL INTERIOR LIGHTING. CONSULT ELECTRICAL ENGINEER AND
OWNER FOR NEW EMERGENCY LIGHTING.
2 REMOVE AND REPLACE EXISTING CANOPY FABRIC. EXISTING CANOPY
STRUCTURE TO REMAIN.
3 KEEP AND PROTECT EXISTING STAINED GLASS ABOVE ENTRY IN INTERIOR.
F1 REMOVE EXISTING FLOOR AND INCLUDE NEW 4" GRAVEL INFILL FLOORING
THROUGHOUT FOR FUTURE CONCRETE FLOOR UPFIT.
DEMOLITION LEGEND
DEMOLISHED
EXISTING TO REMAIN
A
C1
C1
C2
C2 C2
C2 C2
C2
C2
C2
400 Bellemeade Street Suite 401, Greensboro, NC 27401
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
8/
/2
:4 0:
P
M
As indicated
PR
O
JE
C
T F
ILE
S O N
AC
C
City of Social Circle
136 S. Cherokee Road Social Circle, GA 30025
Social Circle Downtown Building Demolition
R23.01470.00 Phase 00002
DEMOLITION REFLECTED CEILING
PLAN
CPL CPL
08/27/2024
DESIGN
A102
1/8" = 1'-0"A102
1 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
| 2024-08-27_Social Circle_120 Cherokee_Demolition Plans.pdf |
| A101 - DEMOLTION PLAN |
| A102 - DEMOLTION REFLECTED CEILING PLAN |
| 2024-08-27_Social Circle_136 Cherokee_Demolition Plans.pdf |
| A101 - DEMOLITION PLAN |
| A102 - DEMOLITION REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .