At12_Experience_ProjectDataSheet.docx
DOCX document 16 KB Posted
- Attached to
- RED ROCK ADMIN BUILDING PHASE 2 REPAIRS
- Solicitation number
- 140L0626R0015
About this file
This is an Experience Project Data Sheet form used to document a contractor's relevant construction and design project experience for qualification purposes in response to a federal solicitation.
The form is designed to capture comprehensive information about past projects that demonstrate a firm's capability to perform work similar to the Red Rock Admin Building Phase 2 Repairs project. The sheet requires documentation of the submitting firm's role (offeror, joint-venture partner, or other), work classification (prime contractor, sub-contractor, joint venture), and the percentage of project work performed. Key project details must be provided, including the contract number, award date, completion date, project location, owner information, and point of contact details. The form distinguishes between construction and design projects, requiring contractors to specify the type of work performed (new construction, renovation, repair, or alteration) and the contract vehicle used (firm-fixed price, cost/time and material, design-build, design-bid-build, or delivery/task order). For construction projects, contractors must report the award amount, final price, and identify any lead design firm if applicable. For design projects, the A/E design fee and total construction value must be documented. The form requires detailed descriptions of the project scope, relevancy to the current solicitation requirements, specific work self-performed by the firm, and any other pertinent information demonstrating experience and capability to execute similar federal construction or repair projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L0626R0015_Amd_0001.pdf | ||
| 140L0626R0015_SiteVisitSignInSheet_0001.pdf | ||
| At01_SOW_Jun2026.pdf | ||
| At10_PriceSchedule.xlsx | XLSX spreadsheet | |
| At14_RFI_Form.docx | DOCX document | |
| At13_PastPerformanceQuestionnaire.docx | DOCX document | |
| Sol_140L0626R0015.pdf | ||
| At02_WD_NV20260091_25Jun26_Building.pdf | ||
| At11_Lim_on_SubK_Breakout.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE PROJECT DATA SHEET (CONSTRUCTION AND DESIGN)
Project No. (check one):
|_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
UEI Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
Owner:
Point of Contact, Phone Number, & Email:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs
|_| Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: significant features, square footage, construction methods). If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .