Asphalt Adjustment 2026.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Bridge Maintenance & Repair - State Projects D 1-8 & 10-11
Solicitation number
RFB 605 2700000074 2
Issued by
Kentucky

About this file

This is an asphalt adjustment calculation spreadsheet for Kentucky state transportation contracts, effective March 1, 2026, related to bridge maintenance and repair projects. The document serves as a tool for calculating price adjustments on asphalt materials used under master agreements. The spreadsheet is organized by delivery order, with monthly tracking from January through December, and records key variables including tons of material quantity (Q), asphalt content, the KAPI (Kentucky Asphalt Price Index) for the month the contract was bid (PL), and the KAPI for the month of pickup or delivery (PC). A threshold met indicator determines whether adjustments apply, with adjustment percentages calculated and tracked by delivery date.

The asphalt adjustment calculation formula multiplies the tons of material by 5.6, divides by 100, and multiplies the result by the difference between the current month's KAPI and the bid month's KAPI: Asphalt Adjustment Quantity = (Q x 5.6)/100 x (PC - PL). This mechanism allows contractors to receive price adjustments when asphalt costs fluctuate between the bid date and delivery date, protecting against material cost volatility. The total asphalt adjustment quantity is calculated and displayed as a dollar amount, with current totals shown as $0.00. The spreadsheet references the Kentucky Transportation Cabinet's Fuel and Asphalt Adjustments page for current KAPI values, enabling real-time price index lookups necessary for accurate adjustment calculations under these state master agreements.

View the file

Other files

File Type Posted
District Map.pdf PDF
Drawings and Notes -2026.pdf PDF
Bid Tab Sheet (STATE) (2).xlsx XLSX spreadsheet
Final_RFB_605_2700000074_2_SO_FORM.PDF PDF
How to Submit an Online Response - March 2023.pdf PDF
Final_RFB_605_2700000074_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In Place

For Master Agreements effective March 1, 2026Delivery Order Number
Type Delivery Order Here
Month PlacedItemTons (Q)Asphalt ContentPL
(Feb 2026)PC (KAPI)Threshold Met
(1=Yes, 0=No)AdjustmentpercentDate
5.6January
5.6February
5.6March
5.6April
5.6May
5.6June
5.6July
5.6August
5.6September
5.6October
5.6November
5.6December
Total Asphalt Adjustment Quantity$0.00

To get the PC (KAPI), click HERE

Contract Formula for Calculating Asphalt Adjustment:

Asphalt Adjustment Quantity = (Q x 5.6)/100 x (PC - PL)

Where:
Q = Tons of material or mixture used
PL = KAPI for the month that the contract is bid
PC = KAPI for the month of pick up or delivery

https://transportation.ky.gov/Construction/Pages/Fuel-and-Asphalt-Adjustments.aspx