ASHE171038 - Fac. 1467 AFN _ TECH-SPECS.pdf
PDF 2 MB Posted
- Solicitation number
- FA568224R0002
About this file
This pre-solicitation notice provides details for a planned federal contract opportunity for demolition and renovation work at Fac. 1467 for AFN Aviano Air Base in Italy. Key information includes the estimated value of construction between $1,000,000 to $5,000,000, work to be performed in Italy in accordance with DFARS 225.1103(3) and 252.225-7042, site visits scheduled upon solicitation release, a tentative solicitation issuance date of January 2024, required SOA certification in category OG01, and compliance with Italian laws and regulations including D.Lgs. 81/2008 on worker safety. Interested vendors should monitor the website for solicitation updates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE171038 - Fac. 1467 AFN_DRAWINGS.pdf | ||
| ASHE171038 - Fac. 1467 AFN _CCEB FY24.xlsx | XLSX spreadsheet | |
| ASHE171038 - Fac. 1467 AFN _POS.pdf | ||
| ASHE171038 - Fac. 1467 AFN _ DD 1354 DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Prepared and Submitted by:
Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)
Tel. +39 0434 1602158; Fax +39 0434 1602158 Email: info@engtools.eu
PROJECT ASHE 17-1038
A/E CONTRACT No. FA5682-17-D-0006;
D.O. FA568220F0042
DESIGN FOR REPAIR FAC.1467 FOR AFN AVIANO,
AREA F – AVIANO AB, ITALY
TECHNICAL SPECIFICATIONS
SUBMITTAL: FINAL (100% design)
Date: June the 3rd, 2021
DESIGN FOR REPAIR FAC.1467 FOR AFN AVIANO PROJECT: ASHE 17-1038
FINAL (100% design) TECHNICAL SPECIFICATIONS Page 2 of 69
THIS PAGE LEFT INTENTIONALLY BLANK
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Prepared and Submitted by:
Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)
Tel. +39 0434 1602158; Fax +39 0434 1602158 Email: info@engtools.eu
PROJECT ASHE 17-1038
A/E CONTRACT No. FA5682-17-D-0006;
D.O. FA568220F0042
DESIGN FOR REPAIR FAC.1467 FOR AFN AVIANO,
AREA F – AVIANO AB, ITALY
TECHNICAL SPECIFICATIONS
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT NO. ASHE 17-1038, PERTAINING TO THE
REPAIR ACTIONS OF FAC.1467, AREA F, AVIANO AB,
I DECLARE THAT I HAVE ASCERTAINED THAT THE TECHNOLOGICAL SYSTEMS INCLUDED THERIN
COMPLY WITH THE APPLICABLE ITALIAN NORMS.
Date: June the 3rd, 2021
Design Coordination and Review
Ing. Stefano Bellinger Ordine degli Ingegneri della Provincia di Pordenone No.739 Sez.A
Architectural
Arch. Davide Raffin Ordine degli Architetti della Provincia di Pordenone No.385
Mechanical
Ing. Francesco Terpin Ordine degli Ingegneri della Provincia di Pordenone No.16 Sez.B
Structural
Ing. Pia Wendel Ordine degli Ingegneri della Provincia d Pordenone
no. 730 Sez.A
Electrical
Ing. Giorgio Paron Ordine degli Ingegneri della Provincia di Udine No.
FINAL (100% design) TECHNICAL SPECIFICATIONS Page 4 of 69
FINAL (100% design) TECHNICAL SPECIFICATIONS Page 5 of 69
TABLE OF CONTENTS
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 6
SCHEDULE OF MATERIAL SUBMITTALS 19
REVISED MASTER SPECIFICATIONS 25
SCHEDULE OF WORK ITEMS 33
FINAL (100% design) AC1 Page 6 of 69
AC1 - 1. SCOPE OF PROJECT
The purpose of this project is to design the space reconfiguration and the repair works needed to adapt the old Base Theatre in Fac. 1467 for hosting AFN Aviano, which will be relocated from Area E to Area F.
The existing interior structure supporting the false ceiling needs to be demolished and replaced with a new mezzanine able to support new functional offices, served by power and lighting system, fire alarm system, COM/DATA system and HVAC system.
The renewed building will host two recording studios for radio, social network and video/TV, one storage, a cooling room for the server, workspace for 16 personnel, single offices for 3 of them, and conference room.
Civil The civil works included in the design consist on:
• the construction of preparatory works for the installation of the emergency electric generator;
• the reconstruction of the side entrance ramp;
• the construction of a system dedicated to the disposal of radon gas;
• the restoration of green areas in the vicinity of the areas being worked on by levelling the ground and grass seeding
Architectural The project stems from the need to transform this space into the headquarters of the Aviano Air Base AFN radio.
To this end, the net height of the building is considered ideal for dividing the space into two levels of equal height.
Considering that the narrow existing stairs are unsuitable, they will be demolished and a transversely placed staircase will be construct.
The precise geometry of the building with its unique perimeter structures, allows the construction within the perimeter of an independent steel structure, with a central spine and constant pitch. One of the 10 resulting bays, approximately 6x4.50 meters, contains the new staircase body and a view over the double-height space, which gives additional light to the conference room.
In order to insert this structure inside the perimeter walls, it is necessary to demolish the slab that supported the projection chamber. In this way, with the new horizontal structure, it is possible to approach the two old angular staircases, covering the current bathrooms with the new floor, which maintain their function.
Architectural works include, among others:
• Removal and disposal of suspended ceiling;
• Removal and disposal of existing external doors and windows;
• Removal and disposal of existing internal doors;
• Removal and disposal of existing internal gypsum board partitions;
• Construction of new floor at ground floor;
• Construction of new gypsum board partitions;
• Installation of new mineral fiber suspended ceiling;
• Installation of new doors and windows,
• Construction of new restrooms;
• Installation of new downspout, gutters and flashing;
• Replacement of roof insulating membrane
• Installation of new safety system on the roof.
Structural The design anticipates the construction of a mezzanine placed inside the old Base Theatre in Fac. 1467 were the available volume, about 11.80mx24.30m per 7.80m height is confined by the masonry structure of the existing construction disposed on its perimeter.
The existing foundation consists of a simple enlargement of the wall thickness, also made of brick elements.
The proposed mezzanine system employs a set of standard steel columns and beams, floor decks, railings and
FINAL (100% design) AC1 Page 7 of 69 stairs. In detail, transversally the structure con be considered an ordinary moment frame structure of two bay portals. Longitudinally the structural system to resist horizontal seismic actions is offered by concentrically braced frames placed in perimeter position at opposite ends.
The floor level consists of secondary beams and a concrete filled steel deck. HEA, IPE, UPN standard sections are foreseen for columns, beams and secondary beams respectively. A concrete beam foundation system will support the mezzanine columns. To avoid seismic interference with the existing structure, the new mezzanine is separated from the adjacent structure to accommodate movement in both directions.
Structural works include, among others:
• Demolition of existing internal stairs;
• Demolition of existing floor slab;
• Foundation excavations inside the building;
• Construction of new reinforced concrete foundation for mezzanine;
• Installation of new mezzanine made of steel structure;
Mechanical Scope of the design is to provide a new independent HVAC system, to not overload existing one, taking into account activity and number of people that will be present in each room.
The design, as explained, will:
• provides a new HVAC system, including a new electric heat pump, VRV type with fan coils and compact heat recovery and ventilation units;
• Provide a dedicated plumbing system.
Mechanical Demolitions include:
• removal of the existing HVAC system
• demolition of wall and/or pavement of existing bathroom and removal of existing plumbing system
• all other items of work as indicated on drawings and Schedule of Work Items.
Mechanical Works include:
HVAC system
• supply and installation of new HVAC and plumbing system in accordance with new internal distribution layout;
• provide all mechanical work needed to meet the requirements of the facility;
• all other items of work as indicated on drawings and Schedule of Work Items.
Plumbing system
• Supply and installation of new sewage system for restrooms.
Electrical Electrical works include the removal of the entire existing electrical system and the supply and installation of new electrical system, internal and external lighting and emergency lighting system, telecommunication distribution system and fire alarm system, in accordance with new internal distribution layout.
FINAL (100% design) AC1 Page 8 of 69
AC1 - 2. LEED CERTIFICATION
Not Required.
AC1 - 3. SUBMITTAL OF MATERIALS
In accordance with Paragraph 2.5 of the technical specification No. 01100, entitled “GENERAL CONDITIONS” of the Master Specifications (new edition, 2020), the materials listed in "MATERIAL SUBMITTAL SCHEDULE" shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative. The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
Number of copies will be as required on "MATERIAL SUBMITTAL SCHEDULE".
AC1 - 4. CONSTRUCTION AREA SCREENING
All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s (C.O.) Technical Representative. Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE).
Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by Contracting Officer (C.O.). Contractor shall submit photos or samples of the screening material for approval by C.O. The Contractor shall replace or repair in a timely manner, as determined by C.O., all fences and screening sections that have damage or develop unsightly rips or holes. It is strictly forbidden to install advertisement signs and/or logos including contractor’s along the construction site fence. At the end of the work or when exterior work requires it, temporary fencing shall be removed. Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1 - 5. PROJECT SIGN
The Contractor shall furnish a project sign on site in accordance with Section 01101. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to C.O. for approval.
AC1 - 6. JOB SITE MOBILIZATION
The Contractor shall submit a proposal to C.O. diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution cannot begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE. Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1 - 7. SAFETY
Contractor's activities shall be in compliance with the following: OSHA 29 CFR 1926 Construction Regulations, US Corps of Engineers Manual EM385-1-1 Nov. 2014, AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards, and Italian Legislative Decree 81/08 including subsequent amendments: in case of any differences, the more stringent applies.
FINAL (100% design) AC1 Page 9 of 69
An appointed professional shall develop a site-specific safety plan (PSC - Piano di Sicurezza e Coordinamento), in accordance with Legislative Decree 81/08). PSC is considered equivalent to the Accident prevention plan required by Manual USACE EM385-1-1.
Contractor shall consider in advance interference hazard through a preliminary assessment plan: the DUVRI - Documento Unico per la Valutazione Rischi da Interferenze shall be coordinated with 31 FW/CCPP Base employees safety representative (Phone 0434 30 5709), in accordance with Legislative Decree 81/08.
Contractor shall develop a site specific plan for operational safety (POS - Piano Operativo di Sicurezza) in accordance with Legislative Decree 81/08, prior to starting planned work activities. Employees training certificates shall be included in the POS documents.
Contractor’s design submittals may also include, as necessary, an Elaborato Tecnico della Copertura (Roof Fall Protection Operational Manual - ROM) in accordance with Friuli Venezia Giulia Regional Law 24, 16 OCT 2015, on mandatory directions for permanent fall protection measure on roofing systems. Mentioned submittal package is subjects to 31 CES/CEOER approval in coordination with 31 FW/SEG.
Contractor’s activities connected with maintenance of Base facilities and infrastructures shall be in compliance with OSHA 29 CFR 1910 General Industry regulations. For maintenance, surveys, repairs and plants installation requiring access to roof structures, activities shall be executed in accordance with OSHA 1910.28(b)(9)(i)(D) on fall arrest systems for fixed ladders, and Friuli Venezia Giulia Regional Law 24/2015 for mandatory directions on permanent fall protection measure on roofing systems.
Contractor’s activities connected with construction, installation, maintenance and repairs of systems, equipment, tools and machinery (including parts, accessories and appurtenances) covered by European Machinery Directive 2006/42/EC shall be performed so as to maintain current compliance with mentioned directive. Machinery control logs shall be duly signed after each repair or maintenance operation by a certified Contractor’s representative. Recertification processes, revamping or retrofitting of systems, equipment, tools and machinery (including parts, accessories and appurtenances) shall be performed in accordance with European Machinery Directive 2006/42/EC. Related compliance certificates shall be duly signed by a Contractor representative.
Contractor’s activities within confined spaces are covered by OSHA 29 CFR 19.26.1200 and OSHA 29 CFR 1910.146, respectively for Construction and General Industry. Mentioned regulations shall be coordinated with Italian presidential decree DPR 177, dated 14 SEP 2011. Mandatory prescriptions on confined space shall be taken into consideration at the design stage for new contracts as well as for maintenance and repair contracts.
Contractor's representatives shall receive a safety briefing during the pre-performance conference from Base 31 FW/SEG Occupational Safety Office. Electronic copy of POS will be provided to 31 FS/SEG (Phone 0434 30 4817).
AC1 - 8. CUSTODY OF HAZARDOUS WASTE AND HAZARDOUS MATERIALS
Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
• Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
• Safety Data Sheets: The Contractor shall furnish English language versions of the Safety Data Sheets (SDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEIE for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the SDS form to the Contractor.
• Hazardous Waste Management Plan: The Contractor shall provide a hazardous waste management plan.
• Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEIE office.
• Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEIE through the Director of Works.
• Asbestos Containing Materials: Asbestos containing materials could be encountered during
FINAL (100% design) AC1 Page 10 of 69 demolition work. It shall be the responsibility of the Contractor to handle and dispose asbestos containing materials in the appropriate manner, as prescribed by Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of asbestos containing materials shall be in compliance with Local Regulations.
AC1 - 9. PRESERVATION OF EXISTING CONDITIONS
The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by C.O.
to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1 - 10. WORK SITE CONDITIONS
The work areas shall be made available to the Contractor as follows:
a. Building interior area: Government personnel will remove movable furniture items prior commencement of the work.
b. Building Location: building1467 is located in a no restricted area. Contractor shall strictly comply with the Contracting Officer’s instructions. Delays may happen when the Contractor will enter the areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the USA Government.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by C.O., unless it is hidden by the opaque fencing material. Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition and painted a color which coordinates with the base architectural plan and is approved by C.O., if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by C.O.
e. Loading and Unloading of Construction Materials and Equipment: Unloading of materials will be allowed within the fenced work area. Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings. Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area; unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work. Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly
FINAL (100% design) AC1 Page 11 of 69 secured in waste receptacles so that it does not blow to another area or onto the airfield.
During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
AC1 - 11. AIRFIELD SAFETY TRAINING
Work site area is outside Airfield Area.
AC1 - 12. PARKING
Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or lay-down areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public. The Contractor shall not park outside the construction zone unless approved through C.O. The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1 - 13. ACCESS ROUTES
The Contractor shall provide a haul route plan for approval by C.O.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four (4) weeks prior to his scheduled starting of work.
AC1 - 14. TRUCKING AND ROADS
Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.
Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1 - 15. NOISE CONTROL
The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1 - 16. EXCAVATIONS
Not applicable
AC1 - 17. LAWN MAINTENANCE
Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE. Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty
(30) days or three mowings after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the Contractor.
AC1 - 18. LAWN ESTABLISHMENT
Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing
FINAL (100% design) AC1 Page 12 of 69 before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE. Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by C.O.
AC1 - 19. CONSTRUCTION SITE RESTORATION
All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five (5) days of Government acceptance of the project site.
AC1 - 20. PROCEDURES AND WORK PHASES
Prior to starting any work, the Contractor shall submit a Work Plan for approval by the Contracting Officer.
AC1 - 21. SALVAGEABLE MATERIALS
In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative. It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material.
Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1 - 22. CONSTRUCTION DRAWINGS
The following Construction Drawings complement this Technical Specification and are an integral part of the project documents.
1 G-001 COVER SHEET, PROJECT AREAS AND AVIANO AB KEY MAPS
COPERTINA, AREA DI PROGETTO E PIANTA CHIAVE BASE AVIANO
2 G-002 INDEX OF DRAWINGS
INDICE DEI DISEGNI
3 V-101 EXISTING CONTIDITIONS - GROUND AND FIRST FLOOR PLANS
STATO DI FATTO - PIANTA PIANO TERRA E PRIMO
4 V-102 EXISTING CONTIDITIONS - SECOND AND ROOF FLOOR PLANS
STATO DI FATTO - PIANTA PIANO SECONDO E COPERTURA
5 V-201 EXISTING CONTIDITIONS - ELEVATIONS
STATO DI FATTO - PROSPETTI
6 V-202 EXISTING CONTIDITIONS - ELEVATIONS
STATO DI FATTO - PROSPETTI
7 V-301 EXISTING CONDITIONS - SECTIONS
STATO DI FATTO - SEZIONI
8 V-302 EXISTING CONDITIONS - SECTIONS AND DETAILS
STATO DI FATTO - SEZIONI E DETTAGLI
9 AD101 DEMOLITIONS - GROUND AND FIRST FLOOR PLANS
DEMOLIZIONI - PIANTA PIANO TERRA E PRIMO
10 AD102 DEMOLITIONS - SECOND AND ROOF PLANS
DEMOLIZIONI - PIANTA PIANO SECONDO E COPERTURA
11 AD201 DEMOLITIONS - ELEVATIONS
DEMOLIZIONI - PROSPETTI
12 AD202 DEMOLITIONS - ELEVATIONS
FINAL (100% design) AC1 Page 13 of 69
DEMOLIZIONI - PROSPETTI
13 AD301 DEMOLITIONS - SECTIONS
DEMOLIZIONI - SEZIONI
14 AD302 DEMOLITIONS - SECTIONS
DEMOLIZIONI - SEZIONI
15 A-101 NEW CONDITIONS - GROUND AND FIRST FLOOR PLANS
PROGETTO - PIANTA PIANO TERRA E PRIMO
16 A-102 NEW CONDITIONS - SECOND AND ROOF PLANS
PROGETTO - PIANTA PIANO SECONDO E COPERTURA
17 A-201 NEW CONDITIONS - ELEVATIONS
PROGETTO - PROSPETTI
18 A-202 NEW CONDITIONS- ELEVATIONS
PROGETTO - PROSPETTI
19 A-301 NEW CONDITIONS - SECTIONS
PROGETTO - SEZIONI
20 A-302 NEW CONDITIONS - SECTIONS
PROGETTO - SEZIONI
21 A-401 NEW CONDITIONS - GROUND FLOOR REFLECTED CEILING PLAN
PROGETTO - PIANTA CONTROSOFFITTI PIANO TERRA
22 A-402 NEW CONDITIONS - FIRST FLOOR REFLECTED CEILING PLAN
PROGETTO - PIANTA CONTROSOFFITTI PIANO PRIMO
23 A-403 NEW CONDITIONS - GROUND FLOOR FLOOR FINISHES PLAN
PROGETTO - PIANTA FINITURE PAVIMENTI PIANO TERRA
24 A-404 NEW CONDITIONS - FIRST FLOOR FLOOR FINISHES PLAN
PROGETTO - PIANTA FINITURE PAVIMENTI PIANO PRIMO
25 A-601 NEW CONDITIONS - WINDOWS SCHWDULE
PROGETTO - ABACO FINESTRE
26 A-602 NEW CONDITIONS - DOORS SCHWDULE
PROGETTO - ABACO PORTE
27 A-603 NEW CONDITIONS - WALL SCHEDULE
PROGETTO - ABACO PARETI
28 S-001 STRUCTURAL DATA DESIGN
DATI PROGETTAZIONE STRUTTURALE
29 S-101 NEW CONDITIONS - FOUNDATION AND MEZZANINE STRUCTURE PLAN
PROGETTO - PIANTA FONDAZIONI E STRUTTURA MEZZANINO
30 S-301 NEW CONDITIONS - SECTIONS
PROGETTO - SEZIONI
31 S-501 NEW CONDITIONS - DETAILS - FOUNDATIONS
PROGETTO - DETTAGLI - FONDAZIONI
32 S-502 NEW CONDITIONS - DETAILS - CARPENTRY
PROGETTO - DETTAGLI - CARPENTERIA
33 S-503 NEW CONDITIONS - DETAILS - CARPENTRY
PROGETTO - DETTAGLI - CARPENTERIA
34 S-504 NEW CONDITIONS - DETAILS - CARPENTRY
PROGETTO - DETTAGLI - CARPENTERIA
35 M-101 NEW CONDITIONS - GROUND FLOOR PLAN - HVAC SYSTEM
PROGETTO - PIANTA PIANO TERRA - IMPIANTO HVAC
36 M-102 NEW CONDITIONS - FIRST FLOOR PLAN - HCVAC SYSTEM
PROGETTO - PIANTA PIANO PRIMO - IMPIANTO HCVAC
37 M-103 NEW CONDITIONS - GROUND FLOOR PLAN - VRF SYSTEM
PROGETTO - PIANTA PIANO TERRA - IMPIANTO GAS REFRIGERANTE
38 M-104 NEW CONDITIONS - FIRST FLOOR PLAN - VRF SYSTEM
PROGETTO - PIANTA PIANO PRIMO - IMPIANTO GAS REFRIGERANTE
39 M-301 NEW CONDITIONS - SECTIONS - HVAC SYSTEM
FINAL (100% design) AC1 Page 14 of 69
PROGETTO - SEZIONI - IMPIANTO HVAC
40 M-501 NEW CONDITIONS - DETAILS
PROGETTO - DETTAGLI
41 M-601 NEW CONDITIONS - EQUIPMENT SCHEDULE
PROGETTO - TABELLE APPARECCHIATURE
42 M-701 NEW CONDITIONS - SCHEMATIC DIAGRAM
PROGETTO - SCHEMA FUNZIONALE
43 P-101 NEW CONDITIONS - GROUND FLOOR PLAN - PLUMBING SYSTEM
PROGETTO - PIANTA PIANO TERRA - IMPIANTO SANITARIO
44 P-102 NEW CONDITIONS - FIRST FLOOR PLAN - PLUMBING SYSTEM
PROGETTO - PIANTA PIANO PRIMO - IMPIANTO SANITARIO
45 P-401 NEW CONDITIONS - RESTROOM ENLARGED PLAN - PLUMBING SYSTE
PROGETTO - PIANTA INGRANDITA BAGNI - IMPIANTO SANITARIO
46 E-001 NOTES, ABBREVATIONS AND SYMBOLS
NOTE, ABBREVIAZIONI E SIMBOLI
47 ED101 DEMOLITIONS - GENERAL AND GROUND FLOOR PLAN
DEMOLIZIONI - PIANTA PIANO TERRA E PLANIMETRIA
48 ED102 DEMOLITIONS - FIRST AND SECOND FLOOR PLAN
DEMOLIZIONI - PIANTA PIANO PRIMO E SECONDO
49 ED201 DEMOLITIONS - ELEVATIONS
DEMOLIZIONI - PROSPETTI
50 E-101 NEW CONDITIONS - GENERAL PLAN
PROGETTO - PLANIMETRIA GENERALE
51 E-102 NEW CONDITIONS - GROUND AND FIRST PLAN - DISTRIBUTION & COMM.
PROGETTO - PIANTA PIANO TERRA E PRIMO - DISTRIBUZIONE E DATI
52 E-103 NEW CONDITIONS - GROUND AND FIRST PLAN - DISTRIBUTION & COMM.
PROGETTO - PIANTA PIANO TERRA E PRIMO - DISTRIBUZIONE E DATI
53 E-104 NEW CONDITIONS - GROUND AND FIRST PLAN - LIGHTIN SYSTEM
PROGETTO - PIANTA PIANO TERRA E PRIMO - IMPIANTO ILLUMINAZIONE
54 E-201 NEW CONDITIONS - ELEVATIONS
PROGETTO - PROSPETTI
55 E-501 NEW CONDITIONS - DETAILS
PROGETTO - DETTAGLI
56 E-601 NEW CONDITIONS - LIGHTIN FIXTURE SCHEDULE
PROGETTO - ABACO CORPI ILLUMINANTI
57 E-602 NEW CONDITIONS - LIGHTIN FIXTURE SCHEDULE
PROGETTO - ABACO CORPI ILLUMINANTI
58 EP101 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
59 EP101 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
60 EP102 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
61 EP103 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
62 EP104 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
63 EP105 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
64 EP106 NEW CONDITIONS - WIRING DIAGRAMS
PROGETTO - DIAGRAMMI QUADRI ELETTRICI
65 EP701 NEW CONDITIONS - ELECTRICAL PANELS BLOCK DIAGRAM
FINAL (100% design) AC1 Page 15 of 69
PROGETTO - SCHEMA A BLOCCHI QUADRI ELETTRICI
66 T-101 NEW CONDITIONS - GENERAL PLAN
PROGETTO - PLANIMETRIA GENERALE
67 T-102 NEW CONDITIONS - GROUND AND FIRST PLAN - DISTRIBUTION & COMM.
PROGETTO - PIANTA PIANO TERRA E PRIMO - DISTRIBUZIONE E DATI
68 T-103 NEW CONDITIONS - GROUND AND FIRST PLAN - DISTRIBUTION & COMM.
PROGETTO - PIANTA PIANO TERRA E PRIMO - DISTRIBUZIONE E DATI
69 T-301 NEW CONDITIONS - SECTION
PROGETTO - SEZIONE
70 T-501 NEW CONDITIONS - DATA CABLING
71 FAD101 DEMOLITIONS - GROUND, FIRST AND SECOND FLOOR PLAN
DEMOLIZIONI - PIANTE PIANO TERRA, PRIMO E SECONDO
72 FA101 NEW CONDITIONS - GROUND AND FIRST PLAN - FIRE ALARM SYSTEM
PROGETTO - PIANTA PIANO TERRA E PRIMO - IMP.ALLARME INCENDIO
73 FA701 NEW CONDITIONS - FIRE ALARM SYSTEM - WIRING DETAILS
PROGETTO - IMP. ALLARME INCENDIO - COLLEGAMENTO IMPIANTO DI RIVELAZIONE
74 FA702 NEW CONDITIONS - FIRE ALARM SYSTEM - INPUT/OUTPUT
PROGETTO - IMP. ALLARME ANTINCENDIO - INPUT/OUTPUT
FINAL (100% design) AC1 Page 16 of 69
AC1 - 23. TECHNICAL SPECIFICATION
Specifications for construction projects of the Air Base in Aviano (PN), Italy, revision 2020, and applicable modification, shall be applicable to the present project, together with the List of Work Items to be performed:
- 01100 GENERAL CONDITIONS
- 02220 SITE DEMOLITION
- 02315 EXCAVATION AND FILL
- 03300 CAST-IN-PLACE CONCRETE
- 05120 STRUCTURAL STEEL
- 06100 ROUGH CARPENTRY
- 08110 STEEL DOORS AND STEEL FRAMES
- 08120 ALUMINUM DOORS AND FRAMES
- 08210 WOOD DOORS
- 09220 INTERIOR PLASTER
- 09250 GYPSUM AND CEMENT BOARD
- 09310 CERAMIC AND STONE COMPOSITE TILE
- 09510 ACOUSTICAL CEILING
- 09685 CARPET TILE
- 15050 BASIC MECHANICAL MATERIALS AND METHODS
- 15080 INSULATION FOR MECHANICAL SYSTEMS
- 15400 PLUMBING
- 15720 AIR HANDLING AND DISTRIBUTION EQUIPMENT
- 15810 DUCTWORK AND DUCTWORK ACCESSORIES
- 15950 HVAC TESTING ADJUSTING BALANCING
- 15960 DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
- 09900 PAINTS AND COATINGS
- 16050 BASIC ELECTRICAL MATERIALS AND METHODS
- 16402 INTERIOR DISTRIBUTION SYSTEM
- 16510 INTERIOR LIGHTING
- 16710 STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
See Paragraphs AC1-24 and AC1-25 and AC1-26 for the other applicable specifications.
AC1 - 24. ADDITIONAL SPECIFICATIONS
None.
AC1 - 25. REVISED MASTER SPECIFICATIONS
In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-23 of these Technical Specifications, the following Revised Master Specifications shall apply to this project
- 01101/R PROJECT SIGN
- 15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
AC1 - 26. ADDITIONAL NORMS AND STANDARDS
Furthermore, the works included in this project shall be in accordance, when applicable norms like Aviano Design Guide 2011 Revision, NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.
AC1 - 27. FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS
1. Once issued NTP, Contractor is required to contact CEAOR (0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (blank DD1354 and
FINAL (100% design) AC1 Page 17 of 69 category codes list CATCODE_LIST_2010 are available at 31CES/CENM office during duty hours).
Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
2. All installed mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to D.Lgs- 17/2010, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed. Furthermore, the electric equipment shall be in compliance with the Legislative Decree No. 81/2008 and subsequent modifications which apply the Directive 2014/35/EU (D.lgs. n.86 19/05/2016) and 2014/30/EU.
Electrical tests and installation shall comply with Low 37/08 and CEI 64/8 Norm.
3. Contractor is required to perform F/A systems testing in accordance with CEF close out check list;
4. At the end of the work, the Contractor shall provide the Government with three copies of the following documents:
- Certificate of Compliance with Law No. No. 37 dated 22 January 2008, for the installation of the electrical and mechanical systems in a workmanlike manner, signed by the Contractor.
- Final Acceptance Test Certifications for electrical and mechanical systems signed by a
Registered Engineer to be selected among three candidates proposed by the Contractor to the Contracting Officer in accordance with Law No. 37 dated 22 January 2008.
- For Warranty management and Preventive Maintenance purpose, the closeout documentation shall be delivered IAW the Master Spec 01100 latest rev.
- 3 set of AS BUILT drawings signed and stamped by qualified engineer and CD with Autocad and pdf electronic version of same drawings (AUTOCAD Release 2007 for drawings. Drawings shall be geospatially referenced using real world coordinates WGS-1984 UTM 33N.
31CEP/CEPT section (0434-305488) will provide an AutoCAD drawing that is geospatially referenced for the contractor to use as a background).
FINAL (100% design) AC1 Page 18 of 69
FINAL (100% design) MATERIAL SUBMITTAL SCHEDULE Page 19 of 65
SCHEDULE OF MATERIAL SUBMITTALS
LEGEND
E = Electronic Copy
(number) = number of paper copies, stamped and signed if required
E+# = Electronic Copy + number of paper copy, stamped and signed when required
FINAL (100% design) MATERIAL SUBMITTAL SCHEDULE Page 20 of 69
Schedule of Material Submittals
Work
Items
Item n.
Appro-ved
Disap-proved
1 FOUNDATION EXCAVATIONS E E 3
1 FALSE CEILING IN MINERAL FIBERS 2 E E E E E E
2 TILES 2 E E E E E
3 INTERNAL PARTITIONS IN GYPSUM BOARD 3 2 E
4 PAINTING OF STEEL STRUCTURE 3 3 E E E E
5 PAINTING OF INTERNAL WALLS 3 3 E E E E E E
6 INTERNAL DOORS WITH ALUMINUM FRAME E 2 E E E E E E
7 FOUNDATION CONCRETE 3 E E E
8 ELEVATIONS CONCRETE 3 E E E
9 STEEL STRUCTURE ELEMENTS 3 E E E
10 CONCRETE STEEL 3 E E E
11 STRUCTURAL GLASS 3 E E E
1 Pre-insulated HVAC ductwork 1 E E E E E E
2 Flexible ductwork 2 E E E
3 Suppy diffusers 3 E E E E
4 Return diffusers 4 E E E E
5 Exhaust valves 5 E E E E
6 Trasfer air grilles 6 E E E
PART II - Arch., Struct., Civil
Number of Copies Required
D a te
R e c e iv e d i n C o n tr a c ti n g
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn S u s p e n s e D a te
C o lo r S e le c ti o n
C a ta lo g D a ta Date
Contractor
Notified
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
S c h e d u le s
L is ti n g s
R e p o rt s
P la n s
Project Number:
ASHE 17-1038
Project Title:
REPAIR FAC.1467
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
R e q u ir e d S u b m is s io n D a te
D
AY
S
FR
O
M N
TP
Item or Description of Item, Contract Reference, Type of Submittal
C e rt if ic a te o f C o m p lia n c e
A. REPAIR WORKS
S h o p D ra w in g s
PART III - Mechanical
Part IIIa HVAC
M a te ri a l S a fe ty D a d a S h e e t (M
S D
S
T e c h n ic a l D a ta
T e s t R e p o rt s
PART I - Arch., Struct., Civil DEMOLITIONS and REMOVALS
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
Items
Item n.
Appro-ved
Disap-proved
Number of Copies Required
D a te
R e c e iv e d i n C o n tr a c ti n g
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn S u s p e n s e D a te
C o lo r S e le c ti o n
C a ta lo g D a ta Date
Contractor
Notified
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
S c h e d u le s
L is ti n g s
R e p o rt s
P la n s
Project Number:
ASHE 17-1038
Project Title:
REPAIR FAC.1467
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
Item or Description of Item, Contract Reference, Type of Submittal
C e rt if ic a te o f C o m p lia n c e
A. REPAIR WORKS
S h o p D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t (M
S D
S
T e c h n ic a l D a ta
T e s t R e p o rt s
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
7 Louvers 7 E E E
8 Condensing unit for VRV system, brand DAIKIN mod. RXYSQ8TY1 or similar 8 E E E E E E
9 BACNET GATEWAY INTERFACE 9 E E E E E E
10 Indoor units for VRV system at R410A 10 E E E E E E
11 Monosplit for server room 11 E E E E E E
12 Heat recovery ventilation units for VRV system at R410A 12 E E E E E E
16 Wall-mounted washbasin with battery electronic mixer with infrared sensor 17 E
17 Suspended w.c. with concealed cassette 17 E
18 Floor mounted shower plate 18 E
19 Electric water heater 19 E E E E E E
1 Electrical Panel 1 E E E E E E
2 Electrical Cables 3 E E E
3 Fiber Optic cable 5 E E
4 Comm Cables 6 E E
5 Fire Alarm loop cable 4 E E
6 Dali lighting cable 7 E E
7 Cable tray, conduits 8 E E
8 Galvanized steel pipes 9 E E
9 PVC conduits 10,11,12 E E
10 Concrete manholes 13 E E E
11 Power receptacles, disconnectors, power connections 18 E E E E
12 Recessed floor boxes 17 E E E
Part IIIb Plumbing
PART IV - Electrical
R e q u ir e d S u b m is s io n D
S
FR
O
M N
TP
Items
Item n.
Appro-ved
Disap-proved
Number of Copies Required
D a te
R e c e iv e d i n C o n tr a c ti n g
F ie ld R e p o rt s
O p e ra ti n g I n s tr u c ti o n s
S a m p le s
R e tu rn S u s p e n s e D a te
C o lo r S e le c ti o n
C a ta lo g D a ta Date
Contractor
Notified
(To be completed by Contract
Administrator)
S u b m it ta l N u m b e rs
C o n tr a c to r R e s u b m it ta l
F in a l A p p ro v a l
D a te t o C iv il
E n g in e e ri n g
S c h e d u le s
L is ti n g s
R e p o rt s
P la n s
Project Number:
ASHE 17-1038
Project Title:
REPAIR FAC.1467
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
L in e N u m b e r
Item or Description of Item, Contract Reference, Type of Submittal
C e rt if ic a te o f C o m p lia n c e
A. REPAIR WORKS
S h o p D ra w in g s
M a te ri a l S a fe ty D a d a S h e e t (M
S D
S
T e c h n ic a l D a ta
T e s t R e p o rt s
M a n u fa c tu re r' s R e c o m m e n d a ti o n
M a n u fa c tu re r' s W a rr a n ty
13 Lighting switches and sensors 19,20,21 E E
14 LPS lightning system 22 E E E
15 Ordinary and emergency Lighting fixtures 23-32 E E E E
16 Comm system 33-34 E E E E
17 Fire alarm system 35 E E E E E E E
18 Diesel Generator and Tank 14 E E E E E E
19 Intercon system 36 E E E E E E
20 Firestopping 16 E E
1 Certificate of Compliance of the installed VRV system 8,9, 10,12
3 3
2 Certificate of Compliance of the installed HP system 11 3 3
3 TAB report 13 3 3
4 Declaration of Conformity "DI.CO." issued as request by D.M. 37/2008.
Declarations shall be divided ias below:
- DI.CO. for the electrical sys
- DI.CO. for the fire alarm sys
5 Declaration of correct installation "DICH-PROD" of the firestopping materials, complete with all the mandatory annexes.
3 3
FINAL DOCUMENTATION (FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS)
R e q u ir e d S u b m is s io n D
S
FR
O
M N
TP
PRE-FINAL (60% design) MATERIAL SUBMITTAL SCHEDULE Page 24 of 69
FINAL (100% design) REVISED SPECIFICATIONS Page 25 of 69
REVISED AND ADDITIONAL SPECIFICATIONS
PRE-FINAL (60% design) REVISED SPECIFICATIONS Page 26 of 69
REVISED AND ADDITIONAL SPECIFICATIONS INDEX
SECTION 01101R PROJECT SIGN
SECTION 15601/R CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
PRE-FINAL (60% design) SECTION 01101/R
PROJECT SIGN
SECTION 01101/R
PROJECT SIGN
Delete sketch at the end of the Section and add:
EMERGENCY NUMBERS: 112 - 911
FINAL (100% design) REVISED SPECIFICATIONS Page 28 of 69
SECTION 15601/R
CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING
Paragraph 1.8:
Delete all paragraph.
Add:
0.1 SUBMITTALS
0.1.0 Manufacturer's Data
a. Direct Expansion Heat Pump
0.1.1 Shop Drawings:
a. Direct Expansion Heat Pump
0.1.2 Operation and Maintenance Manuals:
a. Direct Expansion Heat Pump
0.1.3 Posted Operating Instructions:
a. Direct Expansion Heat Pump
Paragraph 2.1.2:
Delete all paragraph.
Add:
0.1.4 Condensing unit for Variable Refrigerant Volume system
Condensing unit for Variable Refrigerant Volume system, controlled by inverter, R410A refrigerant, heat pump, modular structure for side-by-side installation of several units.
The system must provide for the possibility of interrupting the power supply of one or more indoor units ensuring the functionality of the rest of the system.
VRT technology: Load modulation is obtained by automatic and dynamic control not only of the flow rate but also of the evaporation / condensation temperature of the refrigerant with climatic compensation as required by the Ministerial Decree "minimum requirements of
26/06/15 annex1".
The Automatic, High Sensible and Standard modes allow to set the reaction speed of the system.
FINAL (100% design) REVISED SPECIFICATIONS Page 29 of 69
System configuration: the system is configured using a software with a simplified graphical interface, which manages the first start-up and customization of the system.
Compatibility of indoor units: The VRV IV system can be used in combination with the entire range of VRV indoor units, direct expansion air curtains, hydrobox modules for the production of cold and hot water at low temperature, with the units internal of the residential range, to ventilation and fresh air systems, such as enthalpic recuperators with and without direct expansion coil type VAM or VKM, air handling units with hydronic coil type AHU.
Maximum number of connectable indoor units in standard configuration: 46. The power of the connected indoor units must be between a minimum of 50 and can reach a maximum of
200% of that supplied by the heat pump.
Self-supporting steel structure, equipped with removable panels, with galvanization treatment with high corrosion resistance, protection grids on the intake and expulsion of condensing air with an optimized aerodynamic profile having dimensions not exceeding
1685x1240x765 mm (HxLxP) with weight maximum 275 kg. It does not require special bases for installation.
Exchange coil made up of internally grooved copper pipes W-HiX and pack of high efficiency shaped aluminum fins with anti-corrosive treatment, equipped with side protection grids with square mesh. The countercurrent geometry and the e-Pass system allow to obtain a high efficiency of subcooling even with long circuits and to reduce the quantity of refrigerant.
2 helical fans, controlled by inverter, silent operation, anti-turbulence protection grills placed on the vertical air delivery driven by a directly coupled Brushless DC electric motor, operating with digital control; air flow 223 m3 / min, electric motor power 0.75 kW.
Standard external static pressure of 78 Pa; characteristic curve optimized for partial load operation. Speed control by microprocessor to obtain a constant pressure flow in the exchanger.
2 scroll type orbiting spiral hermetic inverter compressors optimized for use with R410A equipped with a pressure regulation device that minimizes losses even in the presence of low loads. Reduced compression surface with digitally controlled brushless motor; capacity control from 3 to 100%; cooling with compressed gas which makes the use of a liquid separator unnecessary. Electric heating element of the oil sump with a power of 33 W.
i-Demand functionality for limiting the peak electric load and sequential start of the compressors. Microprocessor system controller for starting the automatic oil return cycle, which makes the installation of devices for lifting it unnecessary.
Operating range:
• in cooling from –5 ° CDB to 43 ° CDB.
• in heating from –20 ° CBU to 15.5 ° CBU.
Sound pressure level not higher than 60 dB (A). Possibility to reduce the sound pressure level up to 45 dB (A) by setting it on the PCB of the outdoor unit and / or with additional cards.
R410A refrigerant circuit with two-pipe fluid distribution, refrigerant control via electronic expansion valve, synthetic oil, with advanced equalization system; it includes the liquid receiver, the filter and the oil separator. Refrigerant charge not exceeding 10.3 kg.
Automatic function for charging the refrigerant autonomously provides for the calculation of the quantity of refrigerant necessary for correct operation and for its charging within the circuit.
Automatic function for checking the refrigerant: it is also able to automatically check the refrigerant content in the circuit periodically, highlighting any anomalies in the quantity of refrigerant gas.
FINAL (100% design) REVISED SPECIFICATIONS Page 30 of 69
Connections for refrigerant pipes located either under the machine or on the front panel;
diameter of liquid pipe 12.7 mm and gas 28.6 mm to be welded.
Safety and control devices: the system has control sensors for low and high pressure, refrigerant suction temperature, oil temperature, heat exchanger temperature and external temperature. There are also safety pressure switches for high and low pressure (equipped with manual reset via remote control). The unit is equipped with shut-off valves (Schrader valves) for suction, for liquid pipes and for service connections. The refrigerant circuit is cleaned with vacuum suction of humidity, dust and other residues. It is then pre-charged with the relative coolant. System microprocessor for the control and regulation of operating cycles both in heating and in cooling. Capable of managing all sensors, actuators, control and safety devices and electric drives, as well as automatically activating the defrosting function of the exchangers.
Power supply: 400 V, three-phase, 50 Hz.
Connection to the control system via non-polarized communication bus.
Self-diagnosis function for indoor and outdoor units via the data bus, accessible via local manual control and / or diagnostic device: Service-Checker - display and storage of all process parameters, to ensure effective system maintenance. Possibility of printing maintenance reports.
Possibility of controlling consumption through connection to a centralized touch screen control, which allows viewing of the entire system, with automatic recognition of the internal units, web access as standard, such as the Intelligent Touch Manager.
Possibility…