Exhibit 1
Building Information Sheets
[[[This template is provided to assist the Contractor in developing his O&M mechanical cost. Spec writers are encouraged to expand on these items]]]
The following are building statistics for informational purposes only. The CO will complete a Building Information Sheet for every building. The figures below are estimates only. When necessary, the CO or their designee will provide access to assignment drawings and blueprints.
1. BUILDING DATA:
Property Manager Contact information: _____________________
Contract Specialist Contact Information: _____________________
O&M Contractor contact information: _____________________
Name of Building: _____________________
Location: _____________________
Quantity of floors: _____________________
Square footage (Building total) _____________________
Quantity of elevators:
Judges: _____________________
Passenger’s: _____________________
Sally Port/Prisoner
Freight: _____________________
Age of Building: _____________________
Normal Building Operating Hours: ___________ (Opening and Closing of Building)
Building Operating Plan (BOP) (yes or no): _____________ NOTE: If no BOP exists it is the responsibility of the government to develop and provide for the contractor’s use and revise as needed.
Quantity of Agencies: _____
List Agencies (Of special note are law enforcement and agencies with 24 hour operations)
2. CHILD CARE CENTERS
Interior: special equipment (identify) Yes or No
Playground: Yes or No
3. ENVIRONMENTAL (quantity)
Fuel Tanks (GSA Owned) ______
Underground/Above ground/Capacity ______
Generators: (GSA Owned) ______
Firing Range ______
Asbestos: Yes or No ______
Lead Based Paint: Yes or No ______
PCB’s: Yes or No ______
Copy of all environmental permits (Air, UST, etc.) ______
NOTE TO CONTRACTOR: Asbestos, Lead, or any other hazardous material may be in the building (particularly older ones) and has not been discovered yet so all suspicious material found should be treated assuming it is.
4. MAJOR ALTERATION PROJECTS
Build-outs/Prospectus/Agencies moving In/Out (possible impact)
5. BUILDING AUTOMATION SYSTEMS and OTHER CRITICAL EQUIPMENT (Include # of equipment, manufacturer names, model #s, serial #s, tonnage KW, etc.
EMS/BAS/SMART Technologies: ___________
Type of System and Frontend ____________
For BAS not on GSA network, when was the last software update? ___________ What is the current version?
CHILLERS: ____________
UPS SYSTEMS: ____________
GENERATORS: ____________
BOILERS (Steam or Hot water): ____________
WATER TREATMENT ____________
Open Loop (coupon racks) ____________
Closed Loop (coupon racks) ____________
Glycol Loops (type ethylene or propylene) ____________
Chemical Free Systems (type/which loops) ____________
Roof Anchorage Points and Systems (Quantity): ____________
Roof Anchorage Point and System Certification (Weight Test Date) ____________
6. HISTORICAL REPAIR AND SERVICE REQUEST INFORMATION
Quantity of Service Request Monthly: ____________
Quantity and amount of Repairs over threshold for the past 2 years: ____________
7. ANNIVERSARY DATES OF THE LAST TESTING OF MAJOR
MAINTENANCE ITEMS:
Eddy Current: ____________
Evaporator: ____________
Condenser: ____________
Infrared testing: ____________
Switchgear: ____________
Boiler: ____________
Pressure vessels: ____________
Steam traps: ____________
8. HISTORICAL AND AESTHETIC ATTRIBUTES
Care should be taken to protect historical elements and artwork when performing work and maintenance around those items.
Yes or No
Artwork: ________
Statues: ________
Artifacts: ________
9. CAFETERIAS/CONCESSIONS
Yes or No _____________
Grease Traps (Yes or No): _____________
Grease Trap Capacity: _____________
10. FIRE ALARM SYSTEM
Is Central Station monitoring phone lines currently being handled by GSA or the O&M Contractor? _____________
Historically has the Fire Alarm, Sprinkler testing been performed during normal or after hours? _____________
Device count for each building for the fire alarm system:
Smoke Detector (Quantity): _____________
Heat Detector (Quantity): _____________
Duct Detector (Quantity): _____________
Pull Stations (Quantity): _____________
Water Flows (Quantity): _____________
Tampers (Quantity): _____________
Dry Pipe Systems (low air): _____________
Strobes (Quantity): _____________
Speakers (Quantity): _____________
Combination Speaker/Strobe (Quantity): _____________
Quantity Batteries (Quantity): _____________
Fire Extinguishers (Quantity by type): _____________
How many require 12-year Hydrostatic test per calendar year?
FY-2017 _____________
FY-2018 _____________
FY-2019 _____________
FY-2020 _____________
FY-2021 _____________
How may require 6-year test are due per calendar year? _____________
FY-2017 _____________
FY-2018 _____________
FY-2019 _____________
FY-2020 _____________
FY-2021 _____________
When was the last generator load bank test performed? _____________ What is the building load on the generator(s)? _____________
Natural Gas or Diesel? _____________
How many battery operated emergency lights (exit, stairwell, or other) _____________
11. FILTERS (Size/MERV Rating/Type) _____________
12. SECURITY SYSTEMS
Quantity of card readers for perimeter access and types (readers or key pads): _____________
Pop-up bollards/Wedges/Plates: _____________
Sally Port garage doors: _____________
Judges garage doors/gates: _____________
13. PLUMBING
Quantity of automatic soap dispensers (quantity and type of batteries per dispenser) ___________
Quantity of automatic towel dispenser (quantity and type of batteries per dispenser) ___________
Quantity of automatic flush valves (quantity and type of batteries per valve) ___________
Quantity of automatic faucets (quantity and type of batteries per unit) ___________
Quantity of waterless urinals requiring cartridge replacement (i.e. Sloan, Falcon, etc.): ___________
Quantity Back Flow Prevention Devices ___________
14. MISCELLANEOUS
Is any equipment currently under warranty? If so, when do they expire? ____________ What are the ages of the building roofs? ____________