Industry Questions and Answers CFS APS Mission Planner FINAL.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
CALL FOR SOLUTIONS ARMY PREPOSITIONED STOCKS (APS) MISSION PLANNER: DECISION-SUPPORT CAPABILITY
Solicitation number
ASC_FY27_APS-MP-01
Issued by

About this file

This file is a Questions and Answers (Q&A) document that addresses industry inquiries regarding the Army Prepositioned Stocks (APS) Mission Planner Call for Solutions. The Q&A document serves as a supplementary reference to clarify the requirements, evaluation criteria, and submission procedures outlined in the primary Call for Solutions solicitation. The document does not establish new requirements or modify existing terms but rather provides official responses to questions submitted by potential offerors during the pre-solicitation phase. These responses help ensure all interested parties have consistent understanding of the Army's needs for a Native Decision-Support Module to enhance the APS Mission Planner capability.

The specific questions and answers contained in this file address various technical, programmatic, and administrative aspects of the solicitation. While the exact content of individual Q&A entries is not detailed here, such documents typically cover topics including: clarification of statement of objectives or problem statements; technical requirements and interface specifications; submission format and documentation requirements; evaluation methodologies and scoring criteria; contract type and vehicle information; intellectual property and data ownership expectations; and timelines for proposal submission and award. Potential offerors should review this Q&A document in conjunction with the Call for Solutions document, the Army Open Solicitation (AOS) posting on sam.gov, and all associated attachments to develop compliant and competitive responses to this pre-solicitation opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Questions

#ReferenceQuestion/Clarification RequestedResponse
1Attachment 2For Past Performance, the Limit is noted as "5" in the table cell; the column header notes "Page Limit"; is Past Performance volume limited to 5 pages or 5 Examples of Past Performance?
2Attachment 0006Management Staffing Plan guidance (is not included); General questions on the format of the response for Subfactor 1 without a sample of what is being requested.
3Technical Subfactor 1 - Management Staffing PlanKey Personnel: is there a requirement laid out in the response to address staffing of Key Personnel? Attachment 0004 shows the LOE and LCATS and the PWS has Key Personnel in sections; however, it is not clear how the offeror is going to illustrate to the GVT that these are met/exceeded at time of proposal/award.
4DRAFT Solicitation, 2. Evaluation of the Past Performance FactorAs noted in prior Corporate Experience section of DRAFT solicitation, the Entity (Prime + all subcontractors) is considered for Experience. Is this rubric the same criteria for Past Performance?
5Draft Solicitation; Section L.3.b; Page 61

Attmt 0002 Solicitation Tables; Pages 1-2 Reference: Section L.3.b states “Filenames MUST be labeled as indicated in Table 1 - Requirements for Submission of Proposal Materials”, which references the table in Attachment 2 (IAW L.2.f). The table in Attachment 2 shows that each Technical Subfactor has a different filename.

Question: Will the Government please allow offerors to submit the response to Subfactors 1, 2, and 3 as one file (xxxxTECHxxxx.docx (or PDF)) and the required BOE Estimate (xxxxxBOESANITIZEDxxxx.docx (or PDF)) as a separate file?

6 Draft Solicitation; Section L.3.c; Page 60 Reference: Section L.3.c states “Volumes I, II, III and IV of the proposal shall consist of a table of contents, glossary of abbreviations and acronyms, summary section, and the narrative discussion”; however, in Attachment 0002 some volumes have multiple files.

Question: In instances where a Volume has multiple files IAW Attachment 0002, should the required “table of contents, glossary of abbreviations and acronyms, summary section” be located only in the beginning of the first sequential electronic file of each volume (i.e. the CostNarrative file, the TECH1, etc.)?

7 Draft Solicitation; Section L.3.b; Page 61

Attmt 0002 Solicitation Tables; Pages 1-2 Reference: Section L.3.b states “Proposal file names shall include the volume number proceeding the identified filename stated in Table 1 -Requirements for Submission of Proposal Materials”. There are two documents (Data Rights Assertion List and SAM Report) that are identified in Attachment 0002, but are not mentioned in a specific Volume in Section L.

Question: Since each file name must have the Volume number proceeding it, should the Data Rights Assertion List and SAM Report be included in Volume I? If not, which Volume should that be provided in?

8 Draft Solicitation ;Section M.A; Page 64

Draft Solicitation, Section A.4; Page 2 Reference: Section M.A (Basis for Award) first lists Technical, Past Performance, and Cost/Price as the evaluation factors; however, the following sentence mentions a Small Business Participation Plan (“Technical Factor is significantly more important than the Small Business participation plan Factor. The Small Business Participation …”) and do not mention Past Performance. Additionally, Section A.4 states competitive small business 8(a) set aside; therefore, a Small Business Participation Plan is unnecessary.

Question: Since this effort is a 8(a) set aside and there is no mention of a Small Business Participation Plan in Section L or the list of evaluation factors in Section M, will the Government please confirm that all Small Business Participation Plan references in Section M are meant to be references to the Past Performance Volume?

9 Draft Solicitation; Section M.B Factor 2; Page 64 Reference: In Section M.B (Factors and Subfactors to be Evaluated), Factor 2 states “Factor 2 - Past Performance: Each Offerors Small Business Participation Plan will be reviewed to determine whether this factor is ACCEPTABLE and UNACCEPTABLE”. The title for Factor 2 is Past Performance; however, the description mentions Small Business Participation Plan. There are also no references to a Small Business Participation Plan in Section L.

Question: Will the Government please update the Section M language for Factor 2 to detail the evaluation criteria for Past Performance?

10 Draft Solicitation; Section L.3.c.iii; Page 62

Attmt 0002 Solicitation Tables; Pages 1-2 Reference: Section L.3.c.iii (Volume III Past Performance) states “Offerors shall provide up to three (3) examples of recent and relevant Past Performance for the Prime contractor and up to two (2) examples for each major subcontractor.”; however, Attachment 0002 states “Limit 5” in the notes column.

Question: Will the Government please confirm that Attachment 0002’s “Limit 5” note indicates that Offerors are only allowed 5 references for the Past Performance Volume, which is what Section L.3.c.iii appears to indicate?

11 Draft Solicitation; Section L.3.b; Page 61

Attmt 0002 Solicitation Tables; Pages 1-2 Reference: Section L.3.b states “Proposal file names shall include the volume number proceeding the identified filename stated in Table 1 -Requirements for Submission of Proposal Materials”. Volume I Executive Summary is not listed anywhere in Attachment 0002.

Question: Will the Government please update Attachment 0002 to include Volume I Executive Summary information and file name?

12 Draft Solicitation; Section L.3.b; Page 61

Attmt 0002 Solicitation Tables; Pages 1 Reference: Attachment 2 indicates that “Cover page, Table of Contents, glossary and Letter of Intent not included in page count”; however, Section L.3.b also states that a “Summary Section” is required for each volume (“Volumes I, II, III and IV of the proposal shall consist of a table of contents, glossary of abbreviations and acronyms, summary section, and the narrative discussion.”).

Question: Will the Government please exclude the Summary Section from Volume page count?

13 Draft Solicitation; Section L.3.b; Page 61

Draft Solicitation; Section L.3.c.i.2; Page 61 Reference: Section L.3.b states “Volumes I, II, III and IV of the proposal shall consist of a table of contents, glossary of abbreviations and acronyms, summary section, and the narrative discussion.”. However, Section L.3.c.i.2 states “The Executive Summary shall contain a glossary of all abbreviations and acronyms used, with an explanation for each”.

Question: Is the glossary of all abbreviations and acronyms that is required by Section L.3.c.i.2 supposed to include all acronyms and abbreviations used in Volume I – IV? If so, will the Government remove the requirement to include a separate glossary of acronyms and abbreviations in each Volume?

14 Draft Solicitation; Section L.3.c.ii.2.viii; Page 62-63 Reference: Section L.3.c.ii.2, Bullet viii states “Describe any other aspects of the contract/order to demonstrate its similarity in scope and complexity to PWS Section PWS paragraphs 3.1.3 and 3.2.5 and its associated sub-paragraphs”; however, there are no PWS paragraphs 3.1.3. and 3.2.5. Additionally, earlier in Section L.3.c.ii.2, it states that offerors “… shall demonstrate experience and their approach to meeting PWS paragraphs 4.1, 4.2, 4.3 and 4.4 with similar size and scope…”.

Question: Should the reference to “PWS paragraphs 3.1.3 and 3.2.5” be changed to “PWS paragraphs 4.1, 4.2, 4.3, and 4.4”?

15 Draft Solicitation; Section L.3.c.ii.1 Page 61

Draft Solicitation; Section L.3.c.ii.3 Page 61 Reference: Both Section L.3.c.ii.1 (Management Staffing Plan) and L.3.c.ii.3 (Phase-In Plan) require for the following three items:

• “The Offeror shall describe their plan to meet staffing levels that maintains sufficient numbers of personnel with requisite skill sets and required security clearances to successfully perform the requirements.”

• “The Offeror shall demonstrate their ability to backfill vacant positions within forty five (45) days without creating a break in service.”

• “The Offeror shall demonstrate their approach, inclusive of techniques and controls, for work distribution between the Offeror and their Subcontractors that ensures successful contract performance.”

Question: Since we have such short page limits and to reduce duplication within the Technical Volume, will the Government please allow offers to provide the referenced information in response to the Management Staffing Plan Subfactor 1 only? If so, will the Government please remove those requirements from the Phase-In Plan Subfactor 3?

16 Attmt 0002 Solicitation Tables; Pages 1 Reference: DRFP Attachment 0002 has a row for a Basis of Estimate as part of the Technical Volume; however, a Basis of Estimate is not mentioned anywhere in Section L or M.

Question: Will the Government please clarify and provide Section L instructions and Section M evaluation criteria regarding what is required for the Basis of Estimate?

17 Draft Solicitation; Section L. 2.c. Page 60 Reference: SAM.GOV registration and (active) System for Award Management (SAM) account is required to submit proposal.

Question: Should Offerors complete the Reps & Certs included in the draft model contract? Or will SAM.gov information be sufficient?

18 Draft Solicitation; L.3.C.iv; Page 62-63

Attachment 0004 DRAFT Level of Effort and Labor Descriptions Reference: Attachment 0004 provides an IGCE for Travel Costs. However, there are no instruction on how to incorporate ODCs and Travel into an evaluated price.

Question: As it is very difficult for competitors to estimate travel and ODC costs without detailed spending history, would the Government please consider making Travel, Materials and ODC costs a plug number for purposes of an evaluated cost?

19 L.3.C.iv Cost/Price Reference: The DRFP L.3.C.iv states that “Phase-In cost shall be separately priced in accordance with the Offeror’s Phase In Plan and are not included in the Government provided Level of Effort” and that “the Government provided Level of Effort shall not be modified for the Base and each option period”.

Question: Can the Government please clarify the following:

1) Are these costs limited to costs above and beyond the government provided LOE during Phase-In?

2) Are these costs intended to be proposed as CPFF?

20 Attachment 0004 DRAFT Level of Effort and Labor Descriptions Reference: Attachment 0004 shows ½ the LOE for the Base Period compared to Option Years 1 and 2. The Base Period is a full 12 months. This results in a number of staff including the Contract Project Manager as half-time.

Question: Would the Government please consider amending to support full time staff and/or provide an explanation of the reduced man-hours for the Base Period?

21 Draft Solicitation; Section M.C.3; Page 66

Draft Solicitation; Section L.3.c.1; Page 61 Reference: Section M.C.3 states “The total evaluated cost/price to be used in the award determination will be the total identified in the Offerors Executive Summary file (which includes all options) subject to a most probable cost adjustment in accordance with paragraph one (1) below”; however, while Section L states that Cost/Price information is allowed in Volume I, Section L.3.c.1 (Volume I Executive Summary) does not provide any specific details regarding what Cost/Price information is required in Volume I (Executive Summary).

Question: Will the Government please clarify what Cost/Price information is required in Volume I Executive Summary?

22Attachment 0002, BOECurrently the BOE (Attachment 0002) is not mentioned in Section L. Can the Government provide instructions on what they would like with regards to the BOE (provide in Attachment 0002 only or also write to it in our technical volume, provide it as part of the price volume)?
23Attachment 0002, Key PersonnelAttachment 0002 references Key Personnel (letters of intent). Should this be removed from the requirements or can the Government add in this requirement to Section L and M?
24Draft Solicitation, Key PersonnelDoes the Government expect to add a requirement for Key Personnel Resumes to be submitted? If so can the Government update Section L and M with the specific requirement?
25Draft Solicitation, Page 62 of 66, Volume I Technical, Corporate Experienceunder the corporate experience section the instructions under Narrative description (vii) reference PWS Sections 3.1.2 and 3.2.5 these two sections do not appear in the PWS. Can the Government confirm that this should be referencing PWS 4.1, 4.2, 4.3, and 4.4?
26Draft Solicitation, Page 62 of 66 | Attachment 0002Section L states each Past Performance (PP) is limited to 3 pages each yet Attachment 0002 states 5 page. Can the Government please clarify how many pages each of our PP write ups are allowed?
27Draft Solicitation, Page 65 of 66, Evaluation for Technical"In order to determine the realism of meeting the phase-in plan, salaries proposed will be compared against Bureau of Labor Statistics (BLS) Data in Washington, Arlington, Annapolis, DC, VA, MD, WV location. Proposal of materially low Labor costs in comparison to the BLS data will demonstrate alack of understanding of the effort. If materially low salaries are identified during the cost evaluation, this will result in an UNACCEPTABLE rating. The Technical rating for Subfactor 3 will be expressed as ACCEPTABLE or UNACCEPTABLE." Does this mean salaries must be included in the technical volume in addition to the cost volume for the Government to determine acceptability?
28Draft Solicitation, Page 64 of 66, Evaluation for Volume III Past PerformanceSection states "Factor 2 - Past Performance: Each Offerors Small Business Participation Plan will be reviewed to determine whether this factor is

ACCEPTABLE and UNACCEPTABLE." However, in Section L there is no requirement for the Small Business Participation Plan can the Government provide details on what you would like to see for this requirement in Section L?

29Attachment 0002For Past Performance, the Limit is noted as "5" in the table cell; the column header notes "Page Limit"; is Past Performance volume limited to 5 pages or 5 Examples of Past Performance?
30Attachment 0006Management Staffing Plan guidance (is not included); General questions on the format of the response for Subfactor 1 without a sample of what is being requested. Attachment 0006 will be able to see the Attachment prior to the final RFP?
31Draft Solicitation, Page xx of 66, Technical Subfactor 1 - Management Staffing PlanKey Personnel: is there a requirement laid out in the response to address staffing of Key Personnel? Attachment 0004 shows the LOE and LCATS and the PWS has Key Personnel in sections; however, it is not clear how the offeror is going to illustrate to the GVT that these are met/exceeded at time of proposal/award.
32Draft Solicitation, Page x of 66, Evaluation of the Past Performance FactorAs noted in prior Corporate Experience section of DRAFT solicitation, the Entity (Prime + all subcontractors) is considered for Experience. Is this rubric the same criteria for Past Performance?
33n/aWhat is the current level of effort being provided to the Government in terms of FTE and LCAT?
34n/aWould the government rate higher to vendors who can bring CMMC and FedRAMP, and cyber security expertise?
35n/aCan we provide a demo?
36n/aWould the Government sponsor FCL or a sub-contractor that has secret level facility clearance can sponsor the offeror a facility clearance?
37Draft Solicitation, Page 62 of 66Volume I Technical, Corporate Experience: 2. Technical Subfactor 2 Corporate Experience. In addressing the Corporate Experience Factor, the Offeror shall describe its qualifications and detail its specific experience conducting work of the same and/or similar size (at a minimum 30 Full-Time Equivalent (FTE) employees), and same and/or similar complexity and scope to that described in the PWS. Offerors as an entity (prime contractor and all proposed subcontractors) shall demonstrate experience and their approach to meeting PWS paragraphs 4.1, 4.2, 4.3 and 4.4 with similar size and scope, and with performance within the last five (5) years. The Government will only consider the corporate experience of each entity and will not consider the corporate experience of individual employees. All major subcontractors identified in the Offerors proposal are considered as part of the entity. In order for a contract effort to be considered under this subfactor, the proposal must confirm that the prime or subcontractor that has experience in the competency areas identified will support the same competency areas if the Offeror receives the resultant award.

Volume I and III have the same requirements for expeirence text in red under Citation column. Should the Technical Volume I - Corporate Expereince be from the Prime Offeror only? And the Past Performance in Volume III is for both the Prime Offeror and Major Subcontracts?

&F &P

Formal Questions

#Question/Clarification RequestedFinal Response
1Under Section 5.2 General Notes, it states to “Accurately represent .. small business size and status as required.” Is this a set aside for SB participation only or is this full and open competition?This solicitation is not a small business set-aside. The acquisition is conducted as a Commercial Solutions Opening (CSO) under the authority of DFARS 212.70 and 10 U.S.C. § 4022, utilizing FAR Part 12 procedures. It employs competitive procedures open to all categories of commercial and defense entities, including large businesses, small businesses, non-traditional defense contractors (NTDCs), commercial startups, and academic/consortium participants.
2Given the aggressive delivery timeline (Foundation complete at Day 30), does the clock start AFTER the development team have been issued CACs, GFE and access to the databases (which can be a very time consuming process)?Contractually, the performance clock and the 120-day timeline start immediately upon contract award (or the effective date specified in the award document), NOT after CACs, GFE, and database access are granted. However, the Government is committed to expedited provisioning of developer accounts and environment access immediately upon award to mitigate schedule risk.
3Existing Vantage Data Ingestion vs. Net-New ERP Connectors (Day 60 Gate): Are authoritative feeds from GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, and DST/FMSWeb already ingested and accessible as raw/backing datasets inside the Army Vantage NIPRNet (IL4/IL5) enclave—making the Day 60 milestone an ontology-modeling and pipeline-harmonization effort—or will the performer be required to establish net-new external ERP interfaces and Interconnectivity Security Agreements (ISAs)?Authoritative feeds from GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, and DST/FMSWeb are already ingested, active, and available within the Army Vantage (Palantir Foundry) IL4/IL5 enclave. Offerors should assume that no new source-system integrations are required. Once the Government grants your team workspace access and provisions user permissions, these preexisting feeds will be immediately accessible and ready for use. The contractors technical boundary begins inside the platform.
4Government Furnished Access & Milestone Clock Start: Will the Government provision Army Vantage developer accounts, Foundry workspace sandboxes (Pipeline Builder, Ontology Manager, Workshop/Slate), and role-based data permissions upon award, and will the 120-day milestone clock (Days 30/60/90/120) be indexed to the date developer environment access is granted rather than the contract award date?No, the Government will not automatically have accounts active on Day 1. While the Government is responsible for initiating the provisioning process immediately after award, the 120-day milestone clock is indexed to the contract award date. The awardee is responsible for navigating the standard Army Vantage onboarding pipeline. The Government will prioritize and expedite approvals where possible.
5Accredited LLM & Multi-Agent Tooling inside Army Vantage (Day 90 Gate): Which specific Large Language Models (LLMs) and agentic orchestration modules (e.g., Palantir AIP Logic/Agent Studio, accredited commercial models via IL4/IL5 cloud endpoints) are currently authorized under the existing Army Vantage ATO for deploying the Day 90 Comptroller, G-3, and G-4 personas?The existing Army Vantage environment utilizes Palantir AIP (including AIP Logic, AIP Assist/Agent Studio) and accredited commercial models (such as GPT-4o, Claude, or other LLMs approved under the Army Vantage IL4/IL5 ATO). Awardees will deploy the Comptroller, G-3, and G-4 personas using these native capabilities.
6Historical APS Activation Baselines for ±5% Cost Engine Validation: To satisfy the Section 9 Acceptable Quality Level (AQL) requiring deterministic cost calculations within ±5% of historical Army baselines by Day 60/120, will the Government provide historical APS activation actuals, COSIS execution records, and SDDC rate tables as Government Furnished Information (GFI) at project kickoff?Yes, the Government will provide historical baseline datasets and ASC-approved planning factors as GFI. For transportation rates, SDDC Rates are updated annually by ARTRANS, and ASC TRD updates these rates directly in Vantage when ARTRANS makes them available. Cost engine validation will be benchmarked against these Vantage-resident rate structures and approved historical baselines.
7Phase 1 Prototype APS Set Scope vs. Enterprise Production: Should the 120-day Phase 1 prototype ingest and model all global configurations (APS-1 through APS-7/PES) simultaneously, or will Phase 1 validate against a designated representative theater/APS set prior to enterprise-wide scaling under Section 10 Follow-On Production?No, the Phase 1 prototype will not model all global configurations simultaneously; it will validate strictly against a designated land-based representative theater in the Pacific, focusing on the Pacific Equipment Set (PES) first, then expanding to APS-4. Enterprise-wide scaling across the remaining global footprint (APS-1 through APS-7) will occur post-prototype under Section 10 Follow-On Production.
8Phase 1 Prototype Target Funding / ROM Ceiling: Does the Government have an anticipated funding range or Not-to-Exceed (NTE) ceiling for the 120-day Phase 1 prototype to ensure offerors right-size parallel engineering sprints and Phase 1 ROM estimates?The Government does not disclose a target funding range or NTE ceiling for Phase 1. Offerors should propose a realistic, competitive ROM based on their technical solution and resource estimates. The Phase 1 ROM will be evaluated for compliance only.
9Identification of Non-Government Technical Advisors (Section 11): Pursuant to Section 11, can the Government identify which non-Government contractor organizations will serve as technical advisors during Phase 1 evaluations so offerors may screen for Organizational Conflicts of Interest (OCIs) and execute bilateral NDAs prior to December 1?The Government will provide formal notification identifying non-Government contractor organizations serving as technical advisors as soon as practicable to enable offerors to perform OCI screenings and execute bilateral NDAs.
10Will the Government provision Army Vantage (Palantir Foundry) NIPRNet IL4/IL5 developer access, connections to the named feeder systems (GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, and DST/FMSWeb), and role-based access for the awardee's engineers at or immediately after award? If not, what is the required path and typical timeline for a vendor that does not currently have Army Vantage access?No, the Government will not automatically have accounts active on Day 1. While the Government is responsible for initiating the provisioning process "immediately after award," the awardee is responsible for navigating the standard Army Vantage onboarding pipeline.

Because technical scope is strictly limited to utilizing preexisting, already-connected data feeds, contractors do not need to establish connection pipelines to the named feeder systems (GCSS-Army, LMP, GFEBS, etc.). Once the contractor is granted access to the platform, those data sources are immediately visible in the catalog.

11What personnel security, facility clearance, citizenship, or sponsorship requirements apply to vendor engineers who would build in the accredited IL4/IL5 environment? The Call does not state a facility clearance level.All contractor personnel accessing the accredited IL4/IL5 environment must be U.S. Citizens. Personnel must possess a favorable background investigation meeting minimum DoD IL4/IL5 access criteria (minimum Tier 3 / Secret eligibility or a favorably adjudicated T1/NACI with active DoD Public Trust, in accordance with Army CUI/IL5 cybersecurity policies). A Facility Security Clearance (FCL) at the Secret level is not strictly required if work is conducted entirely on unclassified systems/networks (CUI/IL5); however, individual personnel must hold active, verifiable clearances/investigations in DISS prior to platform access provisioning.
12Will the Government furnish the historical baselines, SDDC rate tables, and APS cost records needed to perform the +/-5% validation, and in what environment and format will those data be provided?Yes, the Government will provide historical baseline datasets as GFI post-award within the Vantage enclave. For transportation rates, SDDC Rates are updated annually by ARTRANS, and ASC TRD updates these rates in Vantage when ARTRANS makes them available.
13May a vendor whose SAM.gov entity validation is complete, but whose UEI and CAGE code are still pending, submit a Phase 1 Solution Brief and remain eligible if the UEI is issued before award?Yes, an offeror with pending CAGE/UEI codes may submit a Phase 1 Solution Brief, but they must have a fully active SAM.gov registration with an active UEI and CAGE code prior to contract award.
14What file format and email subject line should be used for the Phase 1 Solution Brief and for industry questions? Should questions be sent to both points of contact listed on the cover page?Solution Briefs may be in PDF, Word, or PowerPoint (max 5 pages or 15 slides). Submissions must be emailed to both Karen Loss (karen.m.loss.civ@army.mil) and Harrison Slagle (harrison.p.slagle.civ@army.mil) with the subject line: ASC_FY27_APS-MP-01 - Solution Brief - [Company Name].
15Is any existing Army Vantage ontology, data pipeline, or user interface component available for reuse on this prototype, or must the awardee build the APS Core Ontology and pipelines in a clean environment?While there are indeed existing products, data pipelines, and elements of an Army Prepositioned Stocks (APS) ontology residing in the broader Army Vantage platform, the awardee must plan to build the APS Core Ontology and associated pipelines in a clean workspace environment.

Although reuse is technically possible, the burden is on the awardee to obtain explicit administrative and intellectual property (IP) permissions from the original developer and data owner prior to utilizing any existing component. Because these permissions are not guaranteed at award and can take significant time to clear, offerors should assume a "clean environment build" as their baseline technical approach, while treating reuse as an active, post-award optimization risk.

16Will the Government consider a Phase 1 (White Paper and ROM) submission due date of December 7, 2026?No, the submission due date remains December 1, 2026, at 12:00 PM CST to support the planned evaluation and award timeline.
17The solicitation establishes a 120-day performance period and associated milestone gates. Are offerors permitted to propose alternative phasing or milestone schedules if they can demonstrate reduced technical risk and improved probability of successful mission outcomes?Offerors must deliver the milestones as defined for each progress gate (Days 30 or earlier, 60 or earlier, 90 or earlier, 120 or earlier) to ensure compliance with evaluation criteria. Internal development sprint timelines may be proposed, but overall milestone alignment is required.
18Will the Government provide existing APS, logistics readiness, maintenance, and force-structure ontologies, object models, and business definitions for reuse?The Government is responsible for delivering platform access, signed Data-Sharing Agreements (DSAs), and technical contacts by Day 30. Because the required data feeds are already integrated into the platform, they are immediately accessible to your team the moment your Vantage accounts are active. You do not need to set up, build, or configure any data feeds; your only task upon receiving access is to log in and verify that the preexisting feeds are visible in your workspace.
19What historical data period will be available for validating predictive models and the ±5% cost-engine accuracy requirement?The Government expects to make available 3 to 5 years of historical data in the development environment to perform validation of predictive models and the ±5% cost-engine accuracy.
20Are contractors expected to establish new source-system integrations, or should offerors assume all required data sources are already available within the Vantage environment?Offerors should explicitly assume that no new source-system integrations are required. All necessary data sources are already ingested, active, and available within the Vantage environment.

The contractor’s technical boundary begins inside the platform. Once the Government grants your team workspace access and provisions the necessary user permissions, these preexisting data feeds will be immediately accessible and ready for use.

21Will the Government provide official business rules, formulas, and cost calculation methodologies for readiness and activation planning?Yes, the Government will provide official business rules, formulas, and cost calculation methodologies (such as AR 750-1 and DA PAM 750-8) at kickoff, and ASC/AMC SMEs will validate model outputs prior to official use.
22How should the brief be submitted: email to both the Contracting Officer and Contract Specialist? Are there required file format, file size limits, or subject-line conventions?Solution Briefs must be submitted via email to both Contracting Officer Karen Loss (karen.m.loss.civ@army.mil) and Contract Specialist Harrison Slagle (harrison.p.slagle.civ@army.mil). Under Section 6.1.1, acceptable formats include PDF, MS Word, or PowerPoint (max 5 pages or 15 slides). The recommended subject line is: 'ASC_FY27_APS-MP-01 - Solution Brief - [Company Name]'.
23Appendix A says 'White Paper and ROM Price' while Sec 6 says 'Solution Brief'. Is the ROM part of the 5-page / 15-slide brief or a separate attachment?The high-level Rough Order of Magnitude (ROM) cost estimate and project schedule should be included as part of the 5-page written brief or 15-slide presentation (see Section 6.1.1.c.vii). A separate price attachment is not required for Phase 1.
24Do the executive summary and ROM count toward the 5-page limit? For slides, do the title slide and exec summary count within the 15?For written briefs, the Title Page does not count, but the Executive Summary and ROM count towards the 5-page limit. For briefing slides, the total count (including title, executive summary, and ROM slides) must not exceed 15 slides.
25Are there margin, line spacing, or minimum font-size requirements for tables and figures in the written brief?Written briefs must be in 12-point Times New Roman font. While standard 1-inch margins and single/1.5 line spacing are recommended, there are no rigid formal formatting restrictions for tables, figures, or diagrams, provided they remain readable.
26Sec 7.1 says no cost/price evaluation in Phase 1, but Sec 7.2 cites 'reasonable pricing' for selection. How will the ROM be used?The ROM will not undergo a formal cost-realism or fair-and-reasonable price evaluation in Phase 1. Instead, the Government will evaluate the ROM for compliance with instructions and verify that the proposed pricing is realistic and within general government planning tolerances for selection.
27Sec 3.1 requires 'real-time' readiness rates but also 24-hour pipeline refreshes. Is 24-hour data acceptable for the readiness computation?In military enterprise platforms like Vantage, "real-time readiness rates" refers to the analytical computation and user-interface layer (real-time filtering, dynamic rollup, instant querying, and zero UI latency), whereas the underlying ERP feeds (GCSS-Army, LMP, GFEBS) naturally operate on scheduled batch sync cycles (typically 12- to 24-hour intervals).
28Does the 120-day clock start at agreement award, Phase 3 completion, an agreed-upon start date, or a formal kickoff event?The 120-day performance period officially begins at contract award. A formal kickoff event is expected to occur within the first week following award.
29What IP and data-rights terms are expected for an OT versus a FAR-based vehicle, and is there a required format for the IP disclosures?For a FAR-based contract (DFARS 212.70), standard commercial data and software rights apply. Under an OT agreement, IP rights are negotiable to foster commercial participation. Offerors must list any proprietary technologies and proposed rights in their IP disclosure, which does not count against the page/slide limits.
30For systems not providing streaming data, will the government provide prioritization to the source system owners to transition their data feeds from 24 hours batch processing to streaming in order to fulfill this requirement (will include any adjustments to Data Agreements)?No. In Phase 1, intra-day event streaming is a 'Desired Attribute' rather than a mandatory requirement. The Government will not prioritize transitioning source systems to streaming or adjusting existing Data Agreements in Phase 1, as the 24-hour batch refresh is sufficient.
31If not, can this be delayed until follow-on work is approved?Yes. Transition to near-real-time event streaming may be deferred and addressed during follow-on production and scaling activities (Section 10).
32To assist in the predictive cost & ROM engine tool, will the Government supply that data and SDDC rate tables prior to day 30? If it is not in Vantage already, is the team required to ingest the data into Vantage?Yes, the Government plans to provide the SDDC rate tables and historical cost baselines as GFI shortly after award. If any tables are not already resident within Vantage, the performer will be responsible for ingesting them using standard Vantage tools to support the cost engine by the Day 60 milestone. SDDC Rates are updated annually by ARTRANS, and ASC TRD updates these rates directly in Vantage when ARTRANS makes them available.
33Will the government prioritize data-sharing agreements and external team support to accomplish ingestion?Yes, the Government will prioritize internal support to ensure access to existing connections. However, because Phase 1 relies strictly on existing data feeds and connections, no new external data-sharing agreements should be required.
34Will the government provide templates for EXORDs and Decision Memorandums?Yes, the Government will provide standardized formats and templates for EXORDs and Decision Memorandums as GFI during the initial requirements validation phase.
35Can the Government clarify whether the identified data sources are mandatory integration requirements or representative of the data needed to support the capability? Additionally, will the Government permit the successful offeror to leverage successor systems or alternative authoritative data sources to meet the intended functional requirements and operational outcomes?Offerors are permitted to leverage successor systems or alternative authoritative data sources (such as modernized ERP modules, consolidated enterprise data lakes, or authoritative master data stores), provided that the data feeds are preexisting within the Vantage environment and do not require creating new external source-system integrations.
36Is the tool meant to produce evidence for the FY 2027–2028 audits, or decision support only?The primary purpose of the Phase 1 prototype is to provide decision support and rapid planning capability for ASC. However, to ensure data reliability and defensibility, the data pipelines must support strict FIAR/FISCAM-compliant audit traceability (Section 3.1 Enterprise ERP Integration & Ontology) so that decisions and outputs are fully auditable and defensible.
37When GCSS-Army, LMP and GFEBS disagree, which source wins, and does “zero unresolved reconciliations” mean flag or resolve?Which source wins? Neither wins across the board. The System of Record (SoR) wins strictly for its statutory domain:

GCSS-Army wins for tactical/field property book, retail inventory, and unit-level maintenance.

LMP wins for wholesale/depot inventory, national maintenance, and working capital fund manufacturing.

GFEBS wins for financial general ledger, commitments, obligations, and disbursements.

Where they intersect, inventory/asset quantities default to GCSS-Army/LMP, while financial transaction values and ledger balances default to GFEBS.

Does "zero unresolved reconciliations" mean flag or resolve? In the context of an analytical or Vantage-based contract, it means programmatically resolve the reconciliation logic and automate discrepancy flags for human action. A contractor cannot administratively "write off," post adjustment journals, or unilaterally force-balance army ledgers; your role is to deliver a pipeline that reconciles all traceable delta records down to zero unclassified mismatches, with root-cause categorization for any remaining breaks.

38 Will the Government provide IL4/IL5 Vantage accounts and RMF inheritance, and is on-site work expected for UAT or the Day 120 demo? Vantage Accounts & RMF: Yes, the Government will provide the IL4/IL5 Vantage accounts and you will inherit the platform's existing Risk Management Framework (RMF) security controls. Since you are only using preexisting feeds inside an approved environment, you do not need to obtain a new Authority to Operate (ATO).

On-Site Work: You should plan for on-site work/travel only for the Day 120 Demonstration and User Acceptance Testing (UAT) if explicitly required by the customer's security protocols (e.g., if held in a secure facility/SCIF). Otherwise, standard sprint work and development can be performed remotely via your secure IL5 Vantage connections.

39 Will the Government provide the existing Vantage feeds, data-sharing agreements and source-system contacts by Day 30, or must we set them up? The Government is responsible for delivering platform access, signed Data-Sharing Agreements (DSAs), and technical contacts by Day 30. Because the required data feeds are already integrated into the platform, they are immediately accessible to your team the moment your Vantage accounts are active. You do not need to set up, build, or configure any data feeds; your only task upon receiving access is to log in and verify that the preexisting feeds are visible in your workspace.

&F &P

Intend to Respond

CompanyPOC
J.A. Green & CompanyRoss Guckert <ross@jagreenco.com>< retired from PEO EIS. Patrick Colleran reached out separately
DIUJaime Fitzgibbon CTR <jfitzgibbon.ctr@diu.mil>
DoD WHS Acquisition DirectorateMorrow, D Jeffrey CIV WHS AD (USA) <dwight.j.morrow2.civ@mail.mil>
BCG Federal (Boston Consulting Group)Lee, Ji Won (US SCA) <Lee.JiWon@bcgfed.com>
Genesix ConsultingFaith Edo-Osagie <admin@genesixconsulting.ca>
GovSignalsDerek Hoyt <derek@govsignals.ai>
Data Systems Analysts, Inc. (DSA)Ji Sun Yang <Ji.Sun.Yang@DSAINC.COM>
DatabricksMike Robinson <mike.robinson@databricks.com>
Begini Howard Private Equity (BHPE LLC)BHPE LLC <ss@bh.pe>
Jonahten, LLCJohn L. Spruill <jlspruill@jonahten.com>
Unison GlobalUnison Contracts <Contract@unisonglobal.com>
Data Systems Analysts, Inc.Ji Sun Yang <Ji.Sun.Yang@DSAINC.COM>
Synkriom Inc.faraheem.saifi@synkriom.com
Codaemon LLCRonita Kundu <ronita.kundu@codaemon.com>
Optimal Solutions GroupMark Turner <mturner@optimalsolutionsgroup.com>
OM Group IncJamison Glover <j.glover@omgroupinc.us>
365AI LLCShaun Meyers <shaun.meyers@365aiconsulting.com>
SalesforceAllie Colesanti <acolesanti@salesforce.com>
Hazel AIElton Lossner <elton@hazelai.com>
PARSONS AI LLCParsons AI <hello@parsons.ai>
Ernst & Young LLPAmanda L Abraham Chilcoat <Amanda.L.Abraham.Chilcoat@ey.com>
FAR WizardFAR Wizard Support <support@farwizard.com>
Alchem TechnologiesBob Daigle <Bob@alchemtechnologies.com>
Seekr TechnologiesMark Fedeli <mfedeli@seekr.com>
Deloitte Services LPLupton, Stephen <slupton@deloitte.com>
Innovo LLCSharon Capra <sharon.capra@innovonow.com>