Call_for_Solutions__APS_Mission_Planner_(Phase_1)17NOV26.pdf
PDF 275 KB Posted
- Attached to
- CALL FOR SOLUTIONS ARMY PREPOSITIONED STOCKS (APS) MISSION PLANNER: DECISION-SUPPORT CAPABILITY
- Solicitation number
- ASC_FY27_APS-MP-01
About this file
This is a Call for Solutions issued by the U.S. Army Contracting Command–Rock Island (ACC-RI) on behalf of the U.S. Army Sustainment Command (ASC) and U.S. Army Materiel Command (AMC) for the Army Prepositioned Stocks (APS) Mission Planner Decision-Support Capability project (Project Number ASC_FY27_APS-MP-01, AOS Number W9128Z-25-S-A002). The solicitation seeks commercial solutions to develop a native decision-support module within the Army Vantage (Palantir Foundry) IL4/IL5 environment to integrate fragmented data from multiple systems (GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, DST, and FMSWeb) into a persistent, queryable dashboard supporting rapid Courses of Action development for Army Prepositioned Stocks readiness, logistics, and fiscal planning. Solution briefs are due December 1, 2026, at 12:00 PM Central Standard Time, with questions due by November 23, 2026. The Government anticipates awarding an Other Transaction (OT) Prototype Agreement under 10 U.S.C. § 4022 or a commercial FAR-based contract under DFARS 212.70, with an anticipated award date of December 23, 2026. Submissions will proceed through three phases: Phase 1 (Solution Brief evaluation by December 4, 2026), Phase 2 (oral presentations beginning December 7, 2026), and Phase 3 (formal proposals due December 14, 2026).
Required deliverables must achieve completion within 120 days or less through phased milestone gates: Day 30 (Technical Design Document and data inventory mapping), Day 60 (live automated data pipelines and APS Core Ontology publication), Day 90 (multi-agent AI orchestration and three-click dashboard interface), and Day 120 (production-ready system with zero Severity 1/2 defects and successful executive demonstration). Mandatory solution attributes include a three-click Vantage user interface with multi-axis filtering, enterprise ERP integration with 24-hour pipeline refreshes and FIAR/FISCAM audit compliance, AR 750-1-compliant readiness analytics, a location-aware cost engine validating within ±5% of historical baselines, role-based LLM personas (Comptroller, G-3, G-4) for automated military document generation, and performance standards including sub-5-second view load times and Federal Section 508 accessibility. Desired attributes encompass extensible modular architecture supporting federation with emerging DoD systems, intra-day event streaming capability, predictive supply chain risk modeling, and side-by-side Courses of Action comparative simulation. Offerors must register in SAM.gov with a Unique Entity ID (UEI) and Commercial and Government Entity (CAGE) code, disclose any Organizational Conflicts of Interest with mitigation plans per FAR 9.5, and submit a Rough Order of Magnitude cost estimate (not evaluated for Phase 1). The Government reserves the right to make multiple awards, single award, or no award, and upon successful prototype completion, may award non-competitive follow-on production contracts for enterprise-wide deployment across all global APS configurations and integration with additional defense systems. Contracting Officer is Karen Loss (karen.m.loss.civ@army.mil) and Contract Specialist is Harrison Slagle (harrison.p.slagle.civ@army.mil).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALL FOR SOLUTIONS
ARMY PREPOSITIONED STOCKS (APS) MISSION PLANNER: DECISION-
SUPPORT CAPABILITY
Project Number ASC_FY27_APS-MP-01
Army Open Solicitation (AOS) Number
W9128Z-25-S-A002
Call for Solution Title Army Prepositioned Stocks (APS) Mission Planner – Native Decision- Support Module
Issued By U.S. Army Contracting Command – Rock Island (ACC-RI) on behalf of U.S. Army Sustainment Command (ASC) / U.S. Army Materiel Command (AMC), utilizing the ACC-Aberdeen Proving Ground (APG) AOS.
Submission Instructions To respond to this Call for Solution, please refer to Section 6 and Section 7 of this Call for Solution
Solution Briefs Due Date/Time (Suspense)
01 December 2026 at 12:00 PM Central Standard Time.
Questions Due Date/Time 23 November 2026 at 12:00 PM Central Standard Time.
Points of Contact (POCs) for Solution Brief Submission
Contracting Officer: Karen Loss karen.m.loss.civ@army.mil Contract Specialist: Harrison Slagle harrison.p.slagle.civ@army.mil
NOTE: Any submissions received after the suspense date/time listed above will be deemed late and will not be evaluated. It is the sole responsibility of the company to ensure that its submission is received in the designated email inboxes prior to the deadline.
This Call for Solution is issued under the authority of Defense Federal Acquisition Regulation Supplement (DFARS) 212.70 – Commercial Solutions Opening and 10 U.S.C. § 4022 (Authority to carry out certain prototype projects) and may result in the award of Federal Acquisition Regulation (FAR)-based contracts or non-FAR Other Transaction (OT) prototype agreements.
1. BACKGROUND
Strategic logistics planners and commanders currently face critical operational latency and diminished data fidelity when assessing Army Prepositioned Stocks (APS-1 through APS-7/PES) due to fragmented data silos across disparate systems (GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, DST, and FMSWeb).
This reliance on manual, labor-intensive data extraction severely impairs the U.S.
Army Sustainment Command's (ASC) ability to formulate defensible, audit-traceable Courses of Action (COAs) under compressed operational timelines for urgent Combatant Command Requests for Information (RFIs). To bridge this operational seam and enable rapid, data-driven contingency response, the Army requires a specialized, native decision-support module—the APS Mission Planner—built directly within the enterprise Army Vantage (Palantir Foundry) IL4/IL5 environment to synthesize these disparate feeds into a persistent, authoritative, and rapidly queryable single source of answers for global APS readiness, logistics, and fiscal planning.
2. PROBLEM STATEMENT
Strategic and operational logisticians currently lack an integrated, automated capability to rapidly evaluate cost-to-readiness trade-offs and forecast the time, resources, and funding required to activate and deploy Army Prepositioned Stocks (APS). This capability gap stems from critical data fragmentation across GCSS-Army, LMP, and GFEBS, which drives days or weeks of manual reconciliation, alongside an absence of unified cost-to-readiness modeling for dynamic fiscal burn rates, second-destination transportation, and Care of Supplies in Storage (COSIS) requirements. Furthermore, complex legacy interfaces prevent non-technical planners from swiftly resolving high-stakes RFIs, while manual document generation delays the creation of critical operational directives and EXORDs. To bridge this operational seam, the Army requires a three-click interactive analytical dashboard hosted in Army Vantage that synthesizes authoritative ERP data, executes deterministic cost/readiness algorithms, leverages multi-agent AI assistants, and automatically generates decision-quality military documentation within minutes.
3. REQUIRED AND DESIRED SOLUTION ATTRIBUTES
Proposed solutions must articulate both mandatory (required) attributes essential for success and preferred (desired) capabilities that enhance overall mission utility.
3.1 Required Attributes (Mandatory)
Offerors must satisfy all the following requirements within a bounded 120-day or less implementation period:
• Three-Click Vantage UI: Deploy a persistent, web-accessible dashboard within Army Vantage (Palantir Foundry) that aggregates critical KPIs with a strict three-click information architecture (Click 1: Select Strategic Scope; Click 2: Isolate Functional Domain; Click 3: Resolve RFI with Granular Data) supporting multi-axis filtering by UIC, APS set, fleet/commodity, and storage node.
• Enterprise ERP Integration & Ontology: Ingest and harmonize live data feeds from GCSS-Army, LMP, GFEBS/GFEBS-SA, ERMS, and DST/FMSWeb into a published Vantage Foundry APS Core Ontology by Day 60 or less, supporting 24-hour pipeline refreshes, automated exception handling, and strict FIAR/FISCAM-compliant audit traceability.
• Readiness & Stockage Analytics: Compute real-time, AR 750-1-compliant equipment readiness rates (FMC/NMCM/NMCS), perform gap analyses against FMSWeb authorizations to isolate pacing item shortfalls, and track Class IX repair parts stockage (ASL, UBL, SSL) against AWCF revolving capital obligations.
• Predictive Cost & ROM Engine: Deliver a location-aware, parametric cost engine validating within ±5% of historical baselines to model inductions, Class IX/II requisitions, COSIS operations, maintenance tiers, degradation-based equipment wake-up curves, and Second Destination Transportation (SDT) via SDDC rate tables, with dynamic scenario levers for instant recalculation.
• Multi-Agent AI Orchestration: Integrate role-based, secure LLM personas (Comptroller, G-3, and G-4) within Army Vantage by Day 90 or less to resolve natural language queries and automatically generate editable, exportable, and human-in-the-loop validated military decision products (EXORDs and Decision Memorandums) in standardized Army formats.
• Security & Performance Standards: Native implementation within the accredited Palantir Foundry NIPRNet (IL4/IL5) environment in a strictly read-only architecture compliant with DoD RMF, utilizing existing Vantage RBAC, ensuring primary view load times under 5 seconds, and maintaining Federal Section 508 accessibility compliance.
Desired Attributes
• Extensible Modular Architecture: Design ontology schemas and pipeline modularity using open data standards to support seamless federation with emerging DoD systems (e.g., Maven Smart System, Weapons360, ParaLine) without refactoring the Phase 1 core.
• Intra-Day Event Streaming: Capability to transition critical GCSS-Army work order and requisition tables from 24-hour batch processing to near-real-time streaming updates.
• Predictive Supply Chain Risk Modeling: Advanced modeling that projects supply chain lead-time spikes or obsolescence risks based on broader defense industrial base trends.
• Side-by-Side COA Comparative Simulation: Multi-scenario visualization enabling simultaneous comparison of cost, time-to-readiness, and transport feasibility across alternative APS staging sites.
4. AWARDING INSTRUMENT
The Call will be awarded in accordance with the Army Open Solicitation procedures detailed within Solicitation W9128Z-25-S-A002, accessible via https://sam.gov/workspace/contract/opp/5b9770243f6c49aab9fc51e97b2f8046/vi
ew. This Call provides instructions to companies and outlines how the Government will evaluate submissions. The Government contemplates the award of an Other Transaction (OT) Prototype Agreement pursuant to 10 U.S.C. § 4022, or a commercial FAR-based contract under DFARS 212.70, based on the solution selected and the business status of the successful vendor.
5. CALL INSTRUCTIONS AND NOTES
5.1 Overview of Submission Phases
The response and selection process under this Call consists of the following phases:
Phase 1: Solution Brief Offerors will submit a high-level summary of their proposed solution, addressing the government’s objectives and requirements.
Phase 2: Pitch (unless bypassed) Selected offerors may be invited to present and discuss their solution in a live or virtual setting.
Phase 3: Offerors advancing to this phase will be invited to submit a detailed solution for final evaluation and potential award.
Detailed submission requirements for Phase 1/Solution Briefs are provided in Section 6. Evaluation criteria for Phase 1/Solutions Briefs are outlined in Section
7. Phase 2 and/or Phase 3 submission requirements and evaluation criteria will be provided via subsequent invitation letters.
5.2 General Notes
Offerors are reminded that all awards are subject to the availability of funds and the Government reserves the right to make multiple awards, a single award, or no award as a result of this Call.
Only a Contracting or Agreements Officer has the authority to enter into, modify, or execute a binding instrument on behalf of the United States https://sam.gov/workspace/contract/opp/5b9770243f6c49aab9fc51e97b2f8046/view https://sam.gov/workspace/contract/opp/5b9770243f6c49aab9fc51e97b2f8046/view
Government. All payment obligations are subject to Congressional appropriations.
In order to be eligible for award, offerors must:
o Possess a Unique Entity ID (UEI) and be registered in the System for Award Management (SAM) prior to award and maintain active registration throughout the period of performance.
o Register in the prescribed government invoicing system (e.g., Wide Area Workflow).
o Accurately represent their small business size and status as required.
o Be determined responsible by the Contracting/Agreements Officer and not be suspended, debarred, or otherwise prohibited from receiving an award.
o Disclose any actual or potential Organizational Conflicts of Interest (OCIs) to the Contracting/Agreements Officer prior to award.
Offerors are responsible for monitoring SAM.gov for any amendments or updates to this Call.
Notice to Offeror(s): The Government reserves the right to cancel this open Call, either before or after the closing date. If the Government cancels this open Call, the Government has no obligation to reimburse an offeror for any costs.
Additionally, the government reserves the right to award all, some, or none of the items or services proposed.
6. SOLUTION SUBMISSION REQUIREMENTS
6.1 Phase 1 – Solution Brief
6.1.1 Phase 1 – Solution Brief Content
Solution Briefs shall not exceed five (5) written pages using 12-point Times New Roman font or, alternatively, may take the form of briefing slides not exceeding fifteen (15) slides. The Government will not consider inserted textboxes/pop-ups or internet links to additional information as part of the Solution Brief and will not consider such information in its evaluation. Solution Briefs are intended to be clear and concise.
Solution Briefs shall include the following:
a. Title Page (does not count against page limit)
i. Company Name, Title, Date, Point of Contact Name, E-Mail Address, Phone, Address, and Call reference number. If registered in SAM.gov, include the Commercial and Government Entity (CAGE) code and Unique Entity Identification (UEI) code.
ii. Specifically identify the Call for which the Solution Brief is submitted.
b. Executive Summary (one page)
i. Provide an executive summary of the technology.
c. High-Level Technology Solution/Concept
i. Describe the unique aspects of your solution/concept and its relevance to the respective Call/Topic.
ii. Explain whether the solution/concept is innovative and/or a potential capability.
iii. Describe how your proposed solution/concept solves a capability gap/problem and/or provides innovative technological advancements.
iv. Outline the capabilities and scalability of the solution/concept.
v. Describe the benefits of your solution/concept as it applies to the respective Call/Topic.
vi. Explain how the proposed technical approach is feasible, achievable, and supported by a technical team with the expertise and experience to accomplish the proposed solution/concept.
vii. Provide a proposed project schedule and a proposed, high-level Rough Order of Magnitude (ROM) cost estimate, and describe how the proposed schedule is achievable for the proposed solution/concept.
d. Intellectual Property Statement/Agreement/Disclosures (does not count against page limit)
i. As needed, include a separate disclosure for each company that would be a participant in the solution/concept.
The Government may be unable to evaluate the Solution Brief if a Company fails to provide the information requested above.
7. EVALUATION CRITERIA
7.1 Basis of Evaluation
The Government will evaluate Solution Briefs to identify solutions that best meet Army requirements using a three-factor evaluation methodology. Submissions will be evaluated against the following criteria in descending order of importance:
Technical Merit:
Feasibility and Architectural Soundness: Demonstrated capability to engineer live data pipelines and publish the APS Core Ontology natively inside Army Vantage within the required timelines.
Functional Completeness: Comprehensiveness in addressing the three-click navigation model, readiness tracking (AR 750-1), Class IX visibility, ±5% accurate deterministic cost modeling, and multi-agent AI workflow generation.
Data Lineage and Governance: Approach to preserving audit drill-back lineage (FIAR/Yellow Book compliant) and data exception handling.
Innovation & Usability: Quality and maturity of the proposed user interfaces and role-based persona workflows.
Schedule Realism & Milestone Feasibility:
Feasibility, clarity, and logical sequencing of the proposed 120-day or less execution schedule, specifically addressing the Day 30, 60, 90, and 120 progress gates.
Cost/Price:
The Government will evaluate the ROM for compliance with the Call’s instructions only. Cost and/or Price evaluation, and Fair and Reasonable Price determination, will not be performed on the ROM for Phase 1 evaluation.7.2 Selection Process
Following evaluation, the Government will categorize Solution Briefs as either:
Selected for Further Consideration: The Solution Brief demonstrates acceptable technical merit, an achievable 120-day or less schedule, and reasonable pricing. The offeror will be invited to participate in Phase 2 (Pitch/Demonstration) or proceed directly to Phase 3 (Formal Solution/Award Negotiation).
Not Selected for Further Consideration: The submission fails to meet the technical requirements, presents unmanageable schedule risk, lacks platform viability within Army Vantage, or funds are not available.
8. ITERATIVE PROTOTYPING
In accordance with AOS Section F, the APS Mission Planner project will be executed as a phased, iterative prototype over a 120-day period. Vendors are advised that the Government welcomes solutions utilizing either pre-existing, commercially available solutions or new custom prototype developments. For commercial off-the-shelf (COTS) or existing software-as-a-service (SaaS) platforms, the 120-day phased milestone schedule detailed below will be adapted to focus on integration, configuration, data mapping, and security accreditation rather than net-new software development. Both pathways are valued equally, provided they meet the operational requirements and the final Acceptable Quality Levels (AQLs) defined in Section 9
Progress will be measured and reviewed against predefined milestone gates:
Day 30 Gate (Foundation Complete): Delivery of the Technical Design Document (TDD), comprehensive data inventory of existing Vantage feeds (GCSS-Army, LMP, GFEBS, ERMS, DST/FMSWeb), validated operational workflow requirements with ASC SMEs, and initial data pipeline mappings.
Day 60 Gate (Pipelines and Models Live): Operational deployment of automated data pipelines; publication of the baseline Vantage Foundry APS Core Ontology (Units, Fleets, LINs, NIINs, Storage Nodes); demonstration of the deterministic cost engine validated against historical records.
Day 90 Gate (AI and Integrated Interfaces Ready): Deployment of the multi-agent AI orchestration module featuring Comptroller, G-3, and G-4 personas;
implementation of the unified three-click dashboard interface and automated EXORD/memo document generator; initiation of formal User Acceptance Testing
(UAT).
Day 120 Gate (Production Delivery and Demonstration): Full remediation of UAT defects; formal delivery of the production-ready APS Mission Planner module and complete hand-off package; successful execution of an executive demonstration showcasing end-to-end scenario simulation and automated directive output.
At the conclusion of each iteration, ASC and ACC-APG stakeholders will review deliverables. Iterative adjustments may be made by mutual agreement to refine user workflows or adapt the prototype to evolving operational demands.
9. SUCCESSFUL COMPLETION OF PROTOTYPE
In accordance with AOS Section G, successful completion of the APS Mission Planner prototype will be established via written determination by the Agreements Officer / Approving Official based upon fulfillment of the following Acceptable Quality Levels (AQLs):
Day 30: Foundation Gate Day 60: Pipelines & Ontology Day 90: AI Orchestration Day 120: Final Demonstration
Technical Design Doc Live Automated Pipelines Multi-Agent Personas Final Operational Module
Data Inventory Mapping Core Ontology Published 3-Click UI & Doc Generator User Feedback Remediated
Workflow Validation Deterministic Cost Engine ASC Planners UAT Exec COA Simulation
Performance Dimension Acceptance Standard
System Navigation Standard 100% of defined operational RFIs solvable within three mouse clicks from the root dashboard.
Data Integrity & Lineage Zero unresolved reconciliations between displayed metrics and underlying ERP source timestamps;
full FIAR/Yellow Book drill-back auditability.
Cost Engine Accuracy Deterministic cost calculations must validate within ±5% of historical Army cost baselines for comparable historical APS activations.
Software Quality Standard Zero Severity 1 (Mission Critical) or Severity 2 (Urgent) defects remaining upon entry into the Day 120 Final Operational Demonstration.
Accessibility Compliance Full compliance with Federal Section 508 accessibility standards across all dashboard interfaces.
Deliverables Acceptance Formal Government acceptance of all six project deliverables: DEL-01 (TDD & Architecture), DEL-02 (Live Pipelines & Ontology Mappings), DEL- 03 (Cost-to-Readiness Engine & Test Report), DEL-04 (AI Orchestration Module), DEL-05 (UAT Assessment Report), and DEL-06 (Final Production Solution & SOP Package).
10. FOLLOW-ON PRODUCTION
In accordance with AOS Section H and pursuant to 10 U.S.C. § 4022(f), offerors are advised that upon successful completion of the prototype project as determined in writing by the Government, the Government may award a follow-on production contract or Other Transaction agreement without the use of competitive procedures.
Follow-on production activities may encompass enterprise-wide deployment across all global Army Prepositioned Stock configurations (APS-1 Continental United States, APS-2 Europe, APS-3 Afloat, APS-4 Pacific/Northeast Asia, APS- 5 Southwest Asia, APS-6/7/PES), integration with additional defense systems (e.g., Maven, Weapons360), real-time bidirectional write-back to tactical ERPs, and long-term sustainment across the enterprise. The scope and dollar magnitude of any follow-on production effort may be significantly larger than that of this Phase 1 prototype.
11. NON-GOVERNMENT ADVISORS
Non-Government personnel may serve as technical advisors during the evaluation of Solution Briefs. Any participating contractor advisors will be bound by formal Non-Disclosure Agreements (NDAs) and organizational conflict-of-interest prohibitions.
If non-Government advisors are utilized, the Government will provide notice to offerors identifying the specific contractor entities, allowing offerors the opportunity to execute bilateral corporate NDAs prior to evaluation.
12. ORGANIZATIONAL CONFLICT OF INTEREST (OCI)
The Offeror shall perform an OCI analysis and submit the results of that analysis in addition to the Solution Brief submission. Specifically, the Offeror shall analyze the details of the Call and the implementation of their proposed Solution for actual or potential OCI situations associated with the performance of the Offeror, or any of the Offeror’s proposed teammates or subcontractors, under any contract or agreement the Offeror or the Offeror’s teammates or subcontractors have been or may be awarded by any federal agency or other entity. The Offeror shall describe in detail the methodology used to identify actual or potential OCI issues. The level of detail for OCI analysis may not be the same for all vendors.
FAR 9.5 may be used as guidance for OCI analysis. If no conflicts are identified, a risk mitigation plan is not required; however a description of the analysis methodology, and an affirming statement that no conflicts are identified shall be included. This section will not count against submission page limits.
If the Offeror identifies any actual or potential OCIs with respect to the performance of the Offeror or the Offeror’s subcontractors or teammates, the contractor shall provide an OCI Mitigation Plan to be incorporated as an attachment to any resulting contract or agreement. Any proposed avoidance or mitigation techniques shall be consistent with FAR 9.5 and the most recent decisions of the Government Accountability Office (GAO) and the U.S. Court of Federal Claims.”
13. APPENDICES & REFERENCED AUTHORITIES
Offerors should reference the following governing authorities, directives, and technical standards in formulating their technical architecture and execution plans:
Statutory and Regulatory Acquisition Authorities:
10 U.S.C. § 4022 – Authority of the Department of Defense to carry out certain prototype projects
DFARS Subpart 212.70 – Defense Commercial Solutions Opening (CSO)
DoDI 5000.75 – Business Systems Requirements and Acquisition
Financial Improvement and Audit Remediation (FIAR) Guidance, FISCAM, and Yellow Book Standards
Federal Section 508 Accessibility Standards (29 U.S.C. § 794d)
Army Logistical, Maintenance, and Accountability Policies:
AR 700-141 – Army Prepositioned Stocks (APS)
AR 750-1 – Army Materiel Maintenance Policy
DA PAM 750-8 – The Army Maintenance Management System (TAMMS) User Manual
AR 710-2 – Supply Policy Below the National Level
AR 735-5 – Property Accountability Policies
AR 700-138 – Army Logistics Readiness and Sustainability
Data Architecture and Cybersecurity Frameworks:
DoDI 8510.01 / AR 25-2 – Risk Management Framework (RMF) for DoD Information Technology
Office of the Army Chief Data and Analytics Officer (CDAO) – Army Vantage Governance Guidelines
Palantir Foundry Data Ontology, Archetype, and Data Lineage Protocols
Operational Authoritative Feeder Systems:
Global Combat Support System–Army (GCSS-Army)
Logistics Modernization Program (LMP)
General Fund Enterprise Business System (GFEBS / GFEBS-SA)
Decision Support Tool (DST) and Force Management System Web Site (FMSWeb)
Enterprise Requirements Management System (ERMS)
Appendix A: Tentative Schedule of Events
Event Estimated Due Dates
Call for Solution Released 17 NOV 2026
Call Closes-Industry Q&A Deadline 23 NOV 2026
Phase 1: White Paper and ROM Price Due 01 DEC 2026
First Down-Select 04 DEC 2026
Phase 2: Oral Presentations Begin 07 DEC 2026
Second Down-Select 11 DEC 2026
Phase 3: Formal Proposals 14 DEC 2026
Negotiations 16 DEC 2026
Anticipated Award Date 23 DEC 2026
5.2 General Notes
File details come from the government source that posted it. Updated .