AsBuilts WHFRTC WF400 Solar Array.pdf

PDF 3 MB Posted

Attached to
RFP-67-26 DMA Install Solar Energy Photovoltaic Panels WHFRT
Solicitation number
RFP-785-2600000069-1
Issued by
Metcalfe County, Kentucky

About this file

These are engineering drawings for the Kentucky National Guard Wendell H. Ford Regional Training Center Solar Energy Project: Phase II, dated 02/21/2012, prepared by Earthwell Energy Management Inc. and Luckett & Farley. The project involves installing solar photovoltaic (PV) systems on multiple buildings at the training center, specifically Buildings 360/365, 361, 400, and UTES. The drawings include detailed roof plans, site maps, and single-line electrical diagrams for each building, showing the proposed solar array layouts and electrical interconnection strategies.

The solar installation utilizes Mage Solar Phi Series 230 modules with SMA inverter technology, including 36 kW and 42 kW Sunny Tower Inverters. Each building's system will connect to existing electrical infrastructure through new AC subpanels and revenue grade meters, allowing for grid interconnection. The one-line diagrams detail the electrical connections, including integrated DC disconnects, Sunny Web Box monitoring systems, and pathways to existing electrical distribution panels. The project appears to be a comprehensive renewable energy upgrade designed to reduce the facility's electrical consumption and leverage solar energy generation across multiple buildings at the training center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawings

File details come from the government source that posted it. Updated .