2010 UTES Energy Upgrade Phase 2 Record Drawings.pdf

PDF 5 MB Posted

Attached to
RFP-67-26 DMA Install Solar Energy Photovoltaic Panels WHFRT
Solicitation number
RFP-785-2600000069-1
Issued by
Metcalfe County, Kentucky

About this file

These documents are design and construction drawings for the Wendell H. Ford Regional Training Center's UTES Building Energy Upgrade - Phase II project, prepared by the Commonwealth of Kentucky's Finance and Administration Cabinet, Department of Facilities and Support Services, and Division of Engineering and Contract Administration. The project, dated January 2010, involves a comprehensive mechanical, electrical, and control systems upgrade for the facility located in Frankfort, Kentucky. The documents include detailed mechanical plans for first and second floors, mechanical schedules, electrical demolition and installation plans, HVAC control schematics, and mechanical details. The engineering firm Paladin, Inc. prepared the drawings, which underwent multiple revision phases from January through April 2010.

The design documents cover a complete systems overhaul, including mechanical equipment replacement, electrical system modifications, and installation of new control systems. Key components include VRV heat pump systems, exhaust fan replacements, make-up air units, cabinet unit heaters, and comprehensive building air balance modifications. The plans indicate a thorough approach to energy efficiency, with detailed specifications for equipment like heat recovery coils, gas-fired make-up air units, and precise control mechanisms for temperature and airflow management. The project appears to be funded by the Commonwealth of Kentucky, with the Department of Military Affairs as the primary stakeholder, and aims to upgrade the energy performance and mechanical infrastructure of the Wendell H. Ford Regional Training Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WENDELL H. FORD

REGIONAL TRAINING CENTER

WE STAND

DETINU

W E FALL

DEDIVI

D

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF MILITARY AFFAIRS

FRANKFORT, KENTUCKY

MECHANICAL ABBREVIATIONS

MECHANICAL SYMBOLS ELECTRICAL POWER SYMBOLS

REVISIONS DATE

RECORD DATE

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

G1.1RDM

SYMBOLS & ABBREVIATIONS

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

REVISIONS DATE

RECORD DATE

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

MD1.1RDM

FIRST FLOOR MECHANICAL DEMO PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

INFORMATION IS

ACCURATE.

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

MD1.2RDM

SECOND FLOOR MECHANICAL DEMO PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

M1.1RDM

FIRST FLOOR MECHANICAL PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

M1.2RDM

SECOND FLOOR MECHANICAL PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

EXHAUST FAN SCHEDULE

MARK MANUFACTURER MODEL CONFIGURATION CFM ESP (IN WC) HP FLA / MCA V / ɸ / Hz NOTES

HEAT RECOVERY COIL SCHEDULE

MARK MANUFACTURER MODEL CFM MBH EAT (°F DB / °F WB) LAT (°F DB / °F WB) GPM EWT LWT APD WPD NOTES

GAS FIRED MAKE-UP AIR UNIT SCHEDULE

MARK MANUFACTURER MODEL

ELECTRICAL GAS HEATING SECTION PREHEAT COIL SECTION COOLING SECTION FAN

NOTES

MCA / MOCP V/Ø/Hz CAPACITY INPUT/OUTPUT FUEL EAT LAT ROWS/FPI EAT LAT EWT LWT GPM CAPACITY TOTAL

CAPACITY

SENSIBLE

CAPACITY EAT DB/WB LAT DB/WB CFM ESP FAN HP

CABINET UNIT HEATER SCHEDULE

MARK MANUFACTURER MODEL KW V / ɸ / Hz FLA NOTES

PUMP SCHEDULE

MARK MANUFACTURER MODEL CONFIGURATION IMPELLER GPM HEAD (FT WC) HP V / ɸ / Hz MOTOR RPM NOTES

BUILDING AIR BALANCE SCHEDULE

AREA SUPPLY AIR (CFM) RETURN AIR (CFM) MAKE-UP AIR (CFM) EXHAUST AIR (CFM) RESULTING PRESSURE

CFM (+) (-) NOTES

GRILLE REGISTER & DIFFUSER SCHEDULE

MARK MANUFACTURER MODEL CONFIGURATION CONNECTION SIZE CFM RANGE BALANCING DAMPER THROW MAX NC NOTES

VRV HEAT PUMP OUTDOOR UNIT SCHEDULE

MARK MANUFACTURER MODEL NOMINAL CAPACITY COOLING CAPACITY HEATING CAPACITY V / Ø / Hz RLA MSC MOCP NOTES

EXPANSION TANK SCHEDULE

MARK MANUFACTURER MODEL CONFIGURATION ACCEPT. VOLUME (GAL.) APPLICATION NOTES

VRV HEAT PUMP INDOOR UNIT SCHEDULE

MARK MANUFACTURER MODEL STYLE

COOLING CAPACITY HEATING CAPACITY

(BTUH) CFM V / Ø / Hz MCA MOCP NOTES

TOTAL (BTUH) SENSIBLE (BTUH)

BASIS OF DESIGN

ITEM DESCRIPTION VALUE

REVISIONS DATE

RECORD DATE

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

M5.1RDM

MECHANICAL SCHEDULES & DETAILS

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

M6.1RDM

MECHANICAL DETAILS

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

OA SA

M

Starter

CT BI - Supply Fan Status

BO - Supply Fan Start/Stop

T

AI - Supply Air Temp

N.C.

S

BO - Outside Air Damper

BI - Outside Air Damper Status

DXGas

BO - Heating Enable

AO - Capacity Control

SF

T

EA

T

MCT

M

AI - Run-Around Loop Temp

AO - Run-Around Loop Mixing Valve

AI - Run-Around Loop Coil Discharge Air Temp

BO - Run-Around Loop Pump Start/Stop

EA

BI - Run-Around Loop Pump Status

RH

AI - Run-Around Loop Coil Discharge Air Relative Humidity

BO - Cooling Enable

AO - Capacity Control

HGRH AO - Reheat Control

AI - Suction Gas Pressure

DA

T AI - Zone Temp

M

Gas BO - Heat Enable / Disable

One Per Zone

T Unit MTD T-Stat

Typ.Of Each Unit Heater

DA

Elec

M

BO - Heat Enable / Disable

T Unit MTD T-Stat

EA

BO - Fan Start/Stop

M

CTBI - Fan Status

REVISIONS DATE

RECORD DATE

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

M7.1RDM

MECHANICAL CONTROL SCHEMATICS

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

C1.1RDM

HVAC CONTROLS PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

PHASE A 1/11/10

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

1-27-2010

JWB

ED1.1HG

FIRST FLOOR ELECTRICAL DEMO PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

1/22/10

FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"

DEMOLITION GENERAL NOTES:

ELECTRICAL TAGGED NOTES:

EXISTING AIR HANDLER AND DUCT HEATER

NOT TO SCALE

EXISTING CONDENSING UNIT

NOT TO SCALE

EXISTING CONDENSING UNITS AND A/C UNIT

NOT TO SCALE

EXISTING SMOKE DETECTOR

NOT TO SCALE

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

1-27-2010

JWB

ED1.2HG

SECOND FLOOR ELECTRICAL DEMO PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

1/22/10

DEMOLITION GENERAL NOTES: ELECTRICAL TAGGED NOTES:

SECOND FLOOR PLAN - ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"

ROOF FLOOR PLAN - ELECTRICAL DEMOLITION

SCALE: 1/16" = 1'-0"

EXISTING PANELS IN ELECTRICAL ROOM 201

NOT TO SCALE

EXISTING FURNACE

NOT TO SCALE

EXISTING TEMPERATURE CONTROL PANEL

NOT TO SCALE

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

E1.1RDM

FIRST FLOOR ELECTRICAL PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

DRAWN BY

CHECKED BY

A & E FILE NO

DATE

REVIEWED

DIV. OF ENGR.

ENGR. FILE NO

DRAWING NO

AGENCY

AUTHORIZED AGENT

DIVISION OF

ENGINEERING

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

CKYWMI2

Jan. 2010

MRB

E1.2RDM

SECOND FLOOR & ROOF ELECTRICAL PLAN

W. H. Ford Regional Training Center

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

DEPARTMENT OF FACILITIES AND SUPPORT SERVICES

FRANKFORT, KENTUCKY

OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY

1/22/10PHASE C

2/5/10BID DOCUMENT

4/18/11

THE REVISIONS TO THESE

CONTRACT DOCUMENTS

ARE BASED ON

INFORMATION FURNISHED

TO PALADIN, INC. BY THE

CONTRACTOR. PALADIN,

INC. DOES NOT WARRANT

OR REPRESENT THAT SUCH

File details come from the government source that posted it. Updated .