2010 UTES Energy Upgrade Phase 2 Record Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- RFP-785-2600000069-1
- Issued by
- Metcalfe County, Kentucky
About this file
These documents are design and construction drawings for the Wendell H. Ford Regional Training Center's UTES Building Energy Upgrade - Phase II project, prepared by the Commonwealth of Kentucky's Finance and Administration Cabinet, Department of Facilities and Support Services, and Division of Engineering and Contract Administration. The project, dated January 2010, involves a comprehensive mechanical, electrical, and control systems upgrade for the facility located in Frankfort, Kentucky. The documents include detailed mechanical plans for first and second floors, mechanical schedules, electrical demolition and installation plans, HVAC control schematics, and mechanical details. The engineering firm Paladin, Inc. prepared the drawings, which underwent multiple revision phases from January through April 2010.
The design documents cover a complete systems overhaul, including mechanical equipment replacement, electrical system modifications, and installation of new control systems. Key components include VRV heat pump systems, exhaust fan replacements, make-up air units, cabinet unit heaters, and comprehensive building air balance modifications. The plans indicate a thorough approach to energy efficiency, with detailed specifications for equipment like heat recovery coils, gas-fired make-up air units, and precise control mechanisms for temperature and airflow management. The project appears to be funded by the Commonwealth of Kentucky, with the Department of Military Affairs as the primary stakeholder, and aims to upgrade the energy performance and mechanical infrastructure of the Wendell H. Ford Regional Training Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WENDELL H. FORD
REGIONAL TRAINING CENTER
WE STAND
DETINU
W E FALL
DEDIVI
D
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF MILITARY AFFAIRS
FRANKFORT, KENTUCKY
MECHANICAL ABBREVIATIONS
MECHANICAL SYMBOLS ELECTRICAL POWER SYMBOLS
REVISIONS DATE
RECORD DATE
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
G1.1RDM
SYMBOLS & ABBREVIATIONS
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
REVISIONS DATE
RECORD DATE
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
MD1.1RDM
FIRST FLOOR MECHANICAL DEMO PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
INFORMATION IS
ACCURATE.
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
MD1.2RDM
SECOND FLOOR MECHANICAL DEMO PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
M1.1RDM
FIRST FLOOR MECHANICAL PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
M1.2RDM
SECOND FLOOR MECHANICAL PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
EXHAUST FAN SCHEDULE
MARK MANUFACTURER MODEL CONFIGURATION CFM ESP (IN WC) HP FLA / MCA V / ɸ / Hz NOTES
HEAT RECOVERY COIL SCHEDULE
MARK MANUFACTURER MODEL CFM MBH EAT (°F DB / °F WB) LAT (°F DB / °F WB) GPM EWT LWT APD WPD NOTES
GAS FIRED MAKE-UP AIR UNIT SCHEDULE
MARK MANUFACTURER MODEL
ELECTRICAL GAS HEATING SECTION PREHEAT COIL SECTION COOLING SECTION FAN
NOTES
MCA / MOCP V/Ø/Hz CAPACITY INPUT/OUTPUT FUEL EAT LAT ROWS/FPI EAT LAT EWT LWT GPM CAPACITY TOTAL
CAPACITY
SENSIBLE
CAPACITY EAT DB/WB LAT DB/WB CFM ESP FAN HP
CABINET UNIT HEATER SCHEDULE
MARK MANUFACTURER MODEL KW V / ɸ / Hz FLA NOTES
PUMP SCHEDULE
MARK MANUFACTURER MODEL CONFIGURATION IMPELLER GPM HEAD (FT WC) HP V / ɸ / Hz MOTOR RPM NOTES
BUILDING AIR BALANCE SCHEDULE
AREA SUPPLY AIR (CFM) RETURN AIR (CFM) MAKE-UP AIR (CFM) EXHAUST AIR (CFM) RESULTING PRESSURE
CFM (+) (-) NOTES
GRILLE REGISTER & DIFFUSER SCHEDULE
MARK MANUFACTURER MODEL CONFIGURATION CONNECTION SIZE CFM RANGE BALANCING DAMPER THROW MAX NC NOTES
VRV HEAT PUMP OUTDOOR UNIT SCHEDULE
MARK MANUFACTURER MODEL NOMINAL CAPACITY COOLING CAPACITY HEATING CAPACITY V / Ø / Hz RLA MSC MOCP NOTES
EXPANSION TANK SCHEDULE
MARK MANUFACTURER MODEL CONFIGURATION ACCEPT. VOLUME (GAL.) APPLICATION NOTES
VRV HEAT PUMP INDOOR UNIT SCHEDULE
MARK MANUFACTURER MODEL STYLE
COOLING CAPACITY HEATING CAPACITY
(BTUH) CFM V / Ø / Hz MCA MOCP NOTES
TOTAL (BTUH) SENSIBLE (BTUH)
BASIS OF DESIGN
ITEM DESCRIPTION VALUE
REVISIONS DATE
RECORD DATE
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
M5.1RDM
MECHANICAL SCHEDULES & DETAILS
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
M6.1RDM
MECHANICAL DETAILS
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
OA SA
M
Starter
CT BI - Supply Fan Status
BO - Supply Fan Start/Stop
T
AI - Supply Air Temp
N.C.
S
BO - Outside Air Damper
BI - Outside Air Damper Status
DXGas
BO - Heating Enable
AO - Capacity Control
SF
T
EA
T
MCT
M
AI - Run-Around Loop Temp
AO - Run-Around Loop Mixing Valve
AI - Run-Around Loop Coil Discharge Air Temp
BO - Run-Around Loop Pump Start/Stop
EA
BI - Run-Around Loop Pump Status
RH
AI - Run-Around Loop Coil Discharge Air Relative Humidity
BO - Cooling Enable
AO - Capacity Control
HGRH AO - Reheat Control
AI - Suction Gas Pressure
DA
T AI - Zone Temp
M
Gas BO - Heat Enable / Disable
One Per Zone
T Unit MTD T-Stat
Typ.Of Each Unit Heater
DA
Elec
M
BO - Heat Enable / Disable
T Unit MTD T-Stat
EA
BO - Fan Start/Stop
M
CTBI - Fan Status
REVISIONS DATE
RECORD DATE
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
M7.1RDM
MECHANICAL CONTROL SCHEMATICS
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
C1.1RDM
HVAC CONTROLS PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
PHASE A 1/11/10
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
1-27-2010
JWB
ED1.1HG
FIRST FLOOR ELECTRICAL DEMO PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
1/22/10
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/8" = 1'-0"
DEMOLITION GENERAL NOTES:
ELECTRICAL TAGGED NOTES:
EXISTING AIR HANDLER AND DUCT HEATER
NOT TO SCALE
EXISTING CONDENSING UNIT
NOT TO SCALE
EXISTING CONDENSING UNITS AND A/C UNIT
NOT TO SCALE
EXISTING SMOKE DETECTOR
NOT TO SCALE
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
1-27-2010
JWB
ED1.2HG
SECOND FLOOR ELECTRICAL DEMO PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
1/22/10
DEMOLITION GENERAL NOTES: ELECTRICAL TAGGED NOTES:
SECOND FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/8" = 1'-0"
ROOF FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/16" = 1'-0"
EXISTING PANELS IN ELECTRICAL ROOM 201
NOT TO SCALE
EXISTING FURNACE
NOT TO SCALE
EXISTING TEMPERATURE CONTROL PANEL
NOT TO SCALE
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
E1.1RDM
FIRST FLOOR ELECTRICAL PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
DRAWN BY
CHECKED BY
A & E FILE NO
DATE
REVIEWED
DIV. OF ENGR.
ENGR. FILE NO
DRAWING NO
AGENCY
AUTHORIZED AGENT
DIVISION OF
ENGINEERING
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
CKYWMI2
Jan. 2010
MRB
E1.2RDM
SECOND FLOOR & ROOF ELECTRICAL PLAN
W. H. Ford Regional Training Center
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
DEPARTMENT OF FACILITIES AND SUPPORT SERVICES
FRANKFORT, KENTUCKY
OFFICE OF FACILITY DEVELOPMENT AND EFFICIENCY
1/22/10PHASE C
2/5/10BID DOCUMENT
4/18/11
THE REVISIONS TO THESE
CONTRACT DOCUMENTS
ARE BASED ON
INFORMATION FURNISHED
TO PALADIN, INC. BY THE
CONTRACTOR. PALADIN,
INC. DOES NOT WARRANT
OR REPRESENT THAT SUCH
File details come from the government source that posted it. Updated .