Asbestos 407 N Main St Bid Documents.pdf

PDF 3 MB Posted

Attached to
Asbestos Abatement
Solicitation number
2019-711
Issued by
Rusk County, Wisconsin

About this file

This is a Bid Documents file for asbestos abatement services issued by the City of Edgerton, Wisconsin for hazardous materials removal at 407 N Main Street, Edgerton, WI 53534. The project requires the removal and legal disposal of all asbestos-containing materials identified in the Asbestos and Lead Sampling Inspection and Bulk Sampling report dated June 11, 2019, conducted by Advanced Health and Safety. The scope of work includes removal of friable materials listed in Category A (including window caulking, glazing, pipe insulation, and mag block insulation totaling approximately 1,519 linear feet of pipe insulation and 14 roof drains in Area 1 alone), Category B non-friable materials (cement board and Bakelite panels), Category C non-friable materials (roofing materials and yellow mastic under carpet), and tile and mastic on concrete outlined in the sampling report. The contractor must also manage and dispose of all hazardous materials in accordance with local, state, and federal regulations, recycle all recyclable materials, and file all required notifications with the Wisconsin Department of Natural Resources. Site visitations are required prior to bid submission, with contractors instructed to examine existing conditions and notify the City of any ambiguities or inconsistencies within five working days prior to the bid date. The deadline for receipt of proposals is 4:00 p.m. on Thursday, July 11, 2019, with work completion required by October 1, 2019. Interested parties should contact Ramona Flanigan at the City of Edgerton (608-884-3341 or rflanigan@cityofedgerton.com).

Bids must be submitted as lump sum quotes on the provided Bid Form, with contractors required to provide a statement of understanding of project scope, description of methods and approach, and anticipated costs including estimated hours. The contractor must be a Wisconsin State Certified Asbestos Contractor and provide evidence of proper disposal of all materials. Minimum insurance requirements include Auto Liability of $1,000,000 combined single limit, Comprehensive coverage of $1,000,000 per occurrence, General Liability of $2,000,000 aggregate with $1,000,000 each occurrence, and Workers' Compensation of $100,000 per accident. Upon contract award, the contractor must execute an agreement substantially similar to the provided draft, with payment made upon completion and acceptance of work including evidence of proper disposal. The City reserves the right to contract with the bidder determined to be in its best interest after consideration of cost, schedule, and overall value, and reserves the right to reject any or all bids. Quotes remain subject to acceptance for 60 days after bid opening, and no bidder may withdraw their quote within 30 days after the opening date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

Asbestos Abatement

The City of Edgerton, Wisconsin is soliciting quotes from Contractors interested in providing asbestos abatement at 407 N Main Street, Edgerton, WI 53534.

Interested Contractors shall provide the city with written a quote on the fully executed Bid Form.

All proposals may either be provided in hard copy enclosed within a sealed envelope and clearly labeled

"Asbestos Abatement” or emailed to jsalvo@cityofedgerton.com by the deadline noted below:

Deadline for receipt of proposals is 4:00 p.m. Thursday, July 11, 2019.

Interested parties should contact:

City of Edgerton 12 Albion St Edgerton, WI 53534

Call 608-884-3341 or email jsalvo@cityofedgerton.com

The City of Edgerton reserves the right to contract with the Bidder that has been determined to be in the best interest of the City after full consideration of cost, schedule and overall value.

The City of Edgerton also reserves the right to reject any or all Bids.

mailto:jsalvo@cityofedgerton.com

City of Edgerton Hazardous Waste Removal

407 N Main St

INSTRUCTIONS TO BIDDERS

June 25, 2019

Description of Project

As a part of re-development of property located at 407 N. Main Street, Edgerton WI 53534 (“Property”), the City of Edgerton is seeking quotes to remove and legally dispose of all asbestos containing materials from the Property (“Project”).

Scope of Work

Contractor is to include the following items in the scope of work to be completed for the City of Edgerton.

1. The Contractor shall provide a statement of understanding of the scope of the Project.

2. The Contractor shall provide a description of the methods and approach that the Contractor intends to follow.

3. The Contractor shall provide anticipated cost of services and estimated hours. The total cost should be stated as an amount not to be exceeded, including expenses to be billed at cost, and reference an attached fee schedule for hourly or other unit rates of costs.

4. The quote is to be lump sum using the form provided.

5. The Contractor shall remove and properly dispose of all asbestos containing material from the building as described in List A, B and the tile and the mastic on the concrete outlined in List C. in the Asbestos and Lead Sampling Inspection and Bulk Sampling report by Advanced Health and Safety dated June 11, 2019. (See attached).

6. The Contractor is responsible for all coordination with the City and building owner.

7. The Contractor is responsible for the proper disposal of all materials including hazardous materials in accordance with local, state and federal waste disposal laws. Contractors must recycle all recyclable materials.

Contractor must file all Notifications for Demolition and reports with the WDNR and other agencies as required.

8. Upon the award of the Project, the Contractor shall enter into an agreement in substantially the same format and content as the attached draft “agreement”. (See attached Exhibit A)

9. Asbestos removal contractor must be Wisconsin State Certified Asbestos Contractor. Contractor must provide evidence of proper disposal of all materials.

Schedule The work at the 407 N Main Street must be completed by October 1, 2019.

Site Visitations and Contacts

1. The Contractor shall have examined the existing building so as to compare it with the bid documents and have satisfied itself as to the condition of the premises, any obstructions, etc., necessary for carrying out the work before the delivery of its quote.

2. Contractor shall promptly notify the City of any ambiguity, inconsistency or error, which they discover upon examination of the Bidding Documents, or of the site and local conditions. Contractor’s request for clarification or interpretation shall be made in writing to the City within five working days prior to the bid date.

3. Contact for City of Edgerton:

Ramona Flanigan 12 Albion Street Edgerton, WI 53534

(608) 884-3341 rflanigan@cityofedgerton.com

Submission of Quotes

1. Quotes shall be submitted on the attached form no later than 4:00 PM Thursday, July 11, 2019.

2. Quotes shall acknowledge the receipt of the Instructions to Bidders and any addendums.

3. Copies of the documents may be obtained at the City of Edgerton City Hall located 12 Albion Street, Edgerton, WI 53534 phone (608) 884- 3341.

4. The owner reserves the right to waive any informalities or to reject any or all quotes.

5. No bidder may withdraw his/her quote within 30 days after the actual day of the opening thereof.

6. Quote submission with scope exclusions may be rejected.

7. Cost saving alternatives or substitutes as proposed by the Contractor are acceptable and encouraged for submittal with your quote.

8. The City is an equal opportunity agency and encourages the participation of MBE and WBE.

Quote Form

Hazardous Waste Removal

407 N Main St

Quote Due Date 4:00 pm Thursday, July 11, 2019

Company Name: __________________________________________________

Address: ________________________________________________________

Contact Person: __________________________________________________

Email: __________________________________________________________

Phone Number: ___________________ Fax Number: _________________

ARTICLE 1 – QUOTE RECIPIENT

1.01 This Quote is submitted to:

City of Edgerton 12 Albion Street Edgerton, WI 53534

1.02 The undersigned Bidder proposes and agrees, if this Quote is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Quote and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Information for Bidders.

This Quote will remain subject to acceptance for 60 days after the bid opening, or for such longer period to time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Quote, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, Instructions to Bidders, other related data identified in the Bidding documents, and the following Addenda, receipt of which is hereby acknowledged:

Addendum No. Addendum Date

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site;

information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.

E. Based on the information and observations referred to in Paragraph 3.01.D above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Quote for performance of the Work at the price(s) quoted and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

F. Bidder has given the City written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by the City is acceptable to Bidder.

G. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Quote is submitted.

H. Bidder will submit written evidence of its authority to do business in the state where the project is located before the award of the Contract. Bidder is a Wisconsin State Certified Asbestos Contractor.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder Certifies that:

A. This Quote is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Quote.

C. Bidder has not solicited or induced any individual or entity to refrain from bidding;

and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph:

1. “Corrupt practice’ means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process.

2. “Fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.

3. “Collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish quote prices at artificial, non-competitive levels; and

4. “Coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

ARTICLE 5 – TIME OF COMPLETION

5.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with the Instructions to Bidders.

ARTICLE 6 – BASIS OF QUOTE

6.01 Bidder will complete the Work by October 1, 2019 and in accordance with the

Contract Documents for the following price(s)

A. Lump Sum Quote Price not to exceed for all work identified in the Base Bid Documents at 407 N Main St. $_____________

1. Anticipated hours ______________

2. Attach fee schedule for hourly and other unit rate costs

B. Cost saving alternatives or substitutes

(Attach description of alternative). $_____________

Signature of Bidder Date

EXHIBIT A

AGREEMENT

BETWEEN OWNER AND CONTRACTOR

FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

THIS AGREEMENT is by and between City of Edgerton ("Owner") and __________________________________. ("Contractor").

Owner and Contractor hereby agree as follows:

ARTICLE 1 - WORK

1.01 Contractor shall complete all Work as specified or indicated in the City of

Edgerton Request for Proposals, Hazardous Waste Removal at 407 N Main St Documents dated June 25, 2019 and bid form dated July 11, 2019 which include:

• Attachment A Instructions to Bidders

ARTICLE 2 -THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:

• Remove asbestos containing materials from 407 N Main St in accordance with the Instructions to Bidders and the findings of the Asbestos and Lead Sampling Inspection and Bulk Sampling report by Advanced Health and Safety dated June 11, 2019;

• Proper disposal of all materials including hazardous materials in accordance with local, state and federal waste disposal laws.

ARTICLE 3 -CONTRACT TIMES

3.01 Time of the Essence

The work at 407 N Main St must be completed by October 1, 2019.

ARTICLE 4 - CONTRACT PRICE

4.01 Owner shall pay Contractor for completion of the Work in a lump sum for services rendered not to exceed $______________.

ARTICLE 5 – PAYMENT PROCEDURES

5.01 Final Payment

A. Upon completion, including the providing of evidence of proper disposal of all materials, and acceptance of the Work, Owner shall pay to the Contractor the Contract Price.

ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS

6.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:

A. Contractor agrees to coordinate its Work with Owner and all other subcontractors of the project.

B. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.

C. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

D. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.

E. Bidder agrees to comply with completion dates identified in Agreement.

F. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site;

information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor’s safety precautions and programs.

G. Based on the information and observations referred to in Paragraph 6.01.D&E. above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

H. Contractor has given Owner written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Owner is acceptable to Contractor.

I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

J. Contractor is responsible to obtain all permits and inspections necessary to complete all Work.

K. Contractor has, and will provide prior to the commencement of the Work, evidence of authority to do business in the State of Wisconsin.

L. Contractor shall recycle as much of the removed equipment and construction waste as possible. All materials that cannot be recycled must be disposed in accordance with applicable laws. Contractor must provide evidence of proper disposal of all materials.

ARTICLE 7 - CONTRACT DOCUMENTS

7.01 Contents

A. Edgerton Hazardous Waste Removal at 407 N Main St Documents consist of the following:

1. Advertisement for Bids

2. This Agreement

3. Attachment A to this Agreement (Bid Form)

4. Attachment B to this Agreement (Instructions for Bidders)

ARTICLE 8 – INSURANCE

8.01 Minimum Contractor Insurance Coverages.

A. Auto Liability - $1,000,000 Combined Single Limit B. Comprehensive - $1,000,000 each occurrence Combined Single Limit C. General Liability - $2,000,000 aggregate, Premises Liability Combined Single

Limit $1,000,000 each occurrence Combined Single Limit $2,000,000 aggregate, Products & Completed Operation

Liability Combined Single Limit

1.02 Worker’s Compensation - $100,000 each accident

1.03 Statutory Employer’s - $500,000 disease, policy limit

1.04 Liability - $100,000 disease, each employee

IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.

Counterparts have been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner and Contractor or on their behalf. Signatures on this Agreement certify that the Contractor and its Subcontractors are eligible to work on federally funded contracts, have not been debarred or suspended, and are not listed on the “Consolidated Listing of Debarred Contractors”.

This Agreement will be effective on (which is the Effective Date of the Agreement).

OWNER: CONTRACTOR

By: By:

Title: Title:

(If Contractor is a corporation, a partnership, or a joint venture attach evidence of authority to sign.)

Attest: Attest:

Title: Title:

Address for giving notices: Address for giving notices:

License No.

(If Owner is a corporation, attach evidence of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.)

(Where applicable)

Agent for service of process:

4822-4005-3659, v. 1

ASBESTOS AND LEAD INSPECTION

AND BULK SAMPLING

LOCATION

407 N MAIN STREET

EDGERTON, WI

CLIENT

CITY OF EDGERTON

DATE OF INSPECTION

JUNE 11, 2019

Advanced Health and Safety 5940 Seminole Centre Court Ste 225A

Madison, WI 53711 www.madisonasbestos.com

ASBESTOS INSPECTION & BULK SAMPLING

407 N Main Street in Edgerton, Wisconsin Advanced Health & Safety LLC (AHS) was contacted to conduct an asbestos survey at the aforementioned property.

AHS inspected the property on June 11, 2019. The property was inspected for the presence of asbestos containing building materials. Bulk samples were taken for building materials found suspect to contain asbestos, as discussed with the client. All samples were shipped overnight via Fed Ex. and were submitted to Triangle Environmental Services for analysis by Polarized Light Microscopy (PLM).

Four separate categories of materials (if applicable) will be listed for the property:

The first list (List A) will be of materials found to contain asbestos, which are friable or may become friable during demolition. It is required that these materials be removed by a certified asbestos abatement contractor prior to a demolition. All asbestos materials in List A must be removed prior to a fire training burn.

The second list (List B) will contain materials found to contain asbestos but are described as Category II non-friable. If the building is to be demolished, it is required that these materials be removed by a certified asbestos abatement contractor prior to a demolition. All asbestos materials in List B must be removed prior to a fire training burn.

The third list (List C) will contain materials found to contain asbestos but are described as Category I non-friable. If the building is to be demolished, the materials may be able to remain in the building during demolition if proper steps are taken and they do not become friable. These proper steps include but are not limited to: notifying the demolition contractor of the presence of asbestos, utilizing wet methods during demolition, notifying the landfill accepting the waste that not-friable Category I asbestos materials are present, and manifesting the waste. Also, if any of the building materials are to be recycled (ie, crushing concrete) than the asbestos must be removed from this building material. NESHAPS (DNR) does not regulate materials found at < 1% asbestos, however OSHA does still regulate materials that contain < 1% asbestos. If materials in List C are likely to be disturbed, the contractor shall ensure compliance with all appropriate OSHA regulations. All asbestos materials in List C must be removed prior to a fire training burn.

The fourth list (List D) will include materials that were sampled and found not to contain asbestos. Removal is not required for these materials.

Note: while abatement may/may not “required” for a demolition of a single family residence, it is recommended for disposal as well as neighbor relations & liability purposes. If any suspect materials are found during demolition/burn that has not been sampled during this inspection, work should cease and Advanced Health & Safety should be contacted to assess the situation. Inaccessible areas may exist inside walls.

Building/Dwelling: 407 N Main St in Edgerton, Wisconsin Building Type: Commercial Inspector: Bob Stigsell Inspector Contact Info: 608-243-8466 bob@madisonasbestos.com Inspector Certification: AII-03628 Certification Expires: May 25, 2020 Inspection Date: June 11, 2019 Advanced Client Name: Ramona Flanigan Client email: rflanigan@cityofedgerton.com Client Contact Info: (608) 884-3341

List A Asbestos-Containing Friable/May Become Friable Materials

(Required to be Abated prior to Demolition or Burning)

Sample# Description 7 Red window caulking from the glass block windows on the north side of area number one. Three sets of windows. Each side of windows is 12 feet long by 3 feet high.

23 Interior window caulking around the east service door of area number three. The door is 8 feet high by 3 feet wide.

26 Interior window caulking from the square windows on the west and north walls of area number three. There are two sets of windows on the west wall. Each set of windows is 5 feet wide by 6 feet high. There are three sets of windows on the north wall. Each set of those windows is 7 feet wide by 6 feet high.

27 Window glazing from the two sets of middle metal clad windows in area number three. There are 40 windows total in these two sets. Each window is 12 inches wide by 18 inches high. There also 48 panes of windows on the south side of area number three that are positive.

29 Caulking between the cement board walls and the concrete block walls. 10 linear feet

33 Window glazing from the small set of Metal windows in the south west corner of area umber four. Also includes the two sets of windows on the south side of the same space. There are a total of 24 panes of glass in this room and each payne is 12 inches wide by 20 inches high.

38 Mag block from the outside of the boiler tank in area number seven.

Accessible from the outside loading dock area. 6‘x 6‘x 15‘.

40 Black caulking and mastic on the exterior east wall of area number nine. 3 feet off the ground. Three linear feet

41 Gray caulking and mastic on the exterior east wall of area number nine. 3 feet off the ground. 14 feet long by 3 feet high. Of wall of bricks will need to be removed and disposed of.

42 Somewhat flexible window glazing from the greenhouse windows of the exterior of area number nine. There are 10 windows in this set. Each window is 26 inches wide by 48 inches high.

44 Exterior window caulking around the three sets of metal clad windows on the north side and two sets on the west side of area number three. The windows on the north side of the building are 6 feet wide and 5 feet high.

The windows on the west side are 5 feet wide by 6 feet high.

45 Red exterior caulking around the outside of the five sets of windows on the north side of area number four. Each set of windows is 4 feet wide by 3 feet high. The bottom of the windows are about 8 feet off the ground top about 11 feet off the ground.

50 Exterior door caulking from south door of area number two. Hard caulking. The doorway is 6 feet wide by 10 feet high.

53 Exterior caulking between the kee wall cement panels that are painted white that are about 4 feet off the ground around the entire perimeter of the building.

54 Window glazing on the north set of the windows on top of the roof of Area one. Also included with this we will assume that the other three sets of windows to the south of the northside are also positive because they are the same windows. Therefore, four sets of windows. Each set of windows is 122 feet long by 5 feet high.

56A Exterior window mastic associated with the set of windows on top of the roof over area number two. There are six windows in this set. The window frame is 13 feet long by wide.

Assumed positive: there is a room that is inaccessible off of the northeast corner of area number three. We do not know what is in it and will not be able to know until the demolition is underway.

Assumed to contain asbestos pipe insulation (air-cell, mag block & felt). Please note:

in all areas where there is pipe insulation there is also pipe insulation that is broken and lying on the ground that will also need to be cleaned up:

• Area number 1: 14 roof drains + 645 linear feet of pipe insulation.

• Area number 2: 2 roof drains + 257 linear feet of pipe insulation mostly above suspended ceiling tiles and coming down into the registers inside the perimeter walls.

• Area number 3: 275 lineal feet of pipe insulation

• Area number 4: 54 linear feet of pipe insulation

• Pass-through room between area numbers three, four, five and seven: 158 linear feet of pipe insulation

• Area number 6: seven linear feet of pipe insulation plus one roof drain plus the pipe chase behind the toilets will need to be cleaned up of asbestos on the floor.

• Area number 7: five linear feet of pipe insulation coming through the roof on the exterior of the building. Warning: Hornet nest in the top part.

• Area number 8: one roof drain

List B

Asbestos Containing Category II Non-Friable Materials (will become friable) (Required to be Abated prior to Demolition or Burning)

Sample# Description 28 Cement board walls and ceiling from the bathroom in the northeast corner of area number three. 432 ft.².

Assumed positive: two breaker panels in area number three with asbestos Bakelite.

List C Asbestos Containing Category I Non-Friable Materials

(May Be Able To Remain In Building During Demo if Not Friable- Consult DNR) (These Materials Must Be Abated Prior To Burning)

Sample# Description 20B Yellow and black mastic under carpet in the computer/server room in the southwest corner of area number two. 120 ft.². Also possible flooring under walls. Floortile is negative, Mastic is positive

Assumed positive: all roofing materials on the entire building

List D Materials Found Not To Contain Asbestos At 1% Or Greater

(Both Tested or Known Not To Contain Asbestos) (No Abatement Required)

Sample# Description 1-2 Drywall/mud composite sample from area number eight 3-4 24 suspended ceiling tiles from area number eight 5-6 12-inch floor tiles plus yellow/clear mastic from area number eight 8 White window glazing from the wall of glass windows on the west side of area number one 9-10 Drywall from the wall on the southwest side of area number one 11 Possible coating on the wires inside the safety glass on the glass block wall on the west side of area number one 12 Brown/black interior caulking from the windows in area number two 13-14 Drywall from the walls in area number two 15–16 2‘x 4‘ceiling tiles in area number two 17–18 Yellow carpet mastic under the blue carpet in area number two north office 19 Black mastic under blue carpet and yellow mastic in the large west office

(22‘x 18‘) and 12‘x 14‘office just north of the large office in area number two. Total area is 466 ft.². Also, possible flooring under walls.

20A 12-inch floor tiles under carpet in the computer/server room in the southwest corner of area number two. 120 ft.². Also possible flooring under walls. Floor tile is negative, Mastic is positive

21 2‘x 4‘wormy with holes ceiling tiles in area number two offices 22 Interior window glazing inside the metal clad windows on the southside of area number three 24 Brick mortar from the walls of area number three 25 Window glazing from the squared windows on the west and north walls of area number three 30 Ceramic tile grout from the floor of area number four 31 Wax rings from area number four 32 Drywall from the walls in area number four 34 Window glazing from the metal clad windows on the north side of area number four 35–36 Plaster walls in area number six 37 Flexible caulking outside the windows on the exterior of area number four on the southside 39 Flexible white exterior caulking around the outside of the door of area number one 43 Black waterproofing between the brick wall envelope of area number nine on the exterior 46 Exterior window caulking on the outside of the door labeled “green – T” on the north side of area number four near the loading dock 47 Exterior grey caulking on the sides of the north receiving dock between the bricks on the building transitions 48 Exterior flexible brown window caulking from area number two 49 Exterior plaster from the overhang at the west entrance of area number two 51 Hard window caulking on the exterior of the door on the south side of area number two. This is the door covered by the trees and vines.

52 Shelving liners on the shelves from the fire hydrant shed on the southwest side of the building 55 Hard window glazing on the three sets of windows south of the north set of windows on top of the roof 56B Exterior window caulking associated with the set of windows on top of the

LICENSES/CERTIFICATION

BOB STIGSELL

LEAD INSPECTOR: LII-3628

ASBESTOS INSPECTOR: AII-3628

ASBESTOS SUPERVISOR: ACS-3628

ASBESTOS PROJECT DESIGNER: APD-3628

LEAD-SAFE RENOVATOR: LSR-3628

ASBESTOS MANAGEMENT PLANNER: AMP-3628

A COPY OF THE LICENSES WILL BE MADE AVAILABLE UPON REQUEST.

ASBESTOS SAMPLING RESULTS

Asbestos Bulk Sampling Analysis for: Analyzed by:

Advanced Health & Safety LLC TESC 5940 Seminole Centre Ct., Ste. 225A 13509 East Boundary Road, Ste B Madison, Wisconsin 53711 Midlothian, Virginia 23112 Ph: 608-243-8466 bob@madisonasbestos.com Phone: 804-739-1751

Advanced Client Name: City of Edgerton-Ramona Flanigan Client Contact Info: rflanigan@cityofedgerton.com Client Phone Number: (608) 884-3341 Project Site Location: 407 N Main St Edgerton, WI Sampling Date: June 11, 2019

1-2 Drywall/mud composite sample from area number eight 3-4 24 suspended ceiling tiles from area number eight 5-6 12-inch floor tiles plus yellow/clear mastic from area number eight 7 Red window caulking from the glass block windows on the north side of area number one. Three sets of windows. Each side of windows is 12 feet long by 3 feet high.

8 White window glazing from the wall of glass windows on the west side of area number one

9-10 Drywall from the wall on the southwest side of area number one 11 Possible coating on the wires inside the safety glass on the glass block wall on the west side of area number one 12 Brown/black interior caulking from the windows in area number two 13-14 Drywall from the walls in area number two 15–16 2‘x 4‘ceiling tiles in area number two 17–18 Yellow carpet mastic under the blue carpet in area number two north office 19 Black mastic under blue carpet and yellow mastic in the large west office

(22‘x 18‘) and 12‘ x 14‘ office just north of the large office in area number two. Total area is 466 ft.². Also, possible flooring under walls.

20 12 inch floor tiles plus yellow and black mastic under carpet in the computer/server room in the southwest corner of area number two. 120 ft.². Also possible flooring under walls. Floortile is negative, Mastic is positive

21 2‘x 4‘ wormy with holes ceiling tiles in area number two offices 22 Interior window glazing inside the metal clad windows on the southside of area number three 23 Interior window caulking around the east service door of area number three. The door is 8 feet high by 3 feet wide.

24 Brick mortar from the walls of area number three 25 Window glazing from the squared windows on the west and north walls of area number three 26 Interior window caulking from the square windows on the west and north walls of area number three. There are two sets of windows on the west wall. Each set of windows is 5 feet wide by 6 feet high. There are three sets of windows on the north wall. Each set of those windows is 7 feet wide by 6 feet high.

27 Window glazing from the two sets of middle metal clad windows in area number three. There are 40 windows total in these two sets. Each window is 12 inches wide by 18 inches high. There also 48 panes of windows on the south side of area number three that are positive.

28 Cement board walls and ceiling from the bathroom in the northeast corner of area number three. 432 ft.².

29 Caulking between the cement board walls and the concrete block walls. 10 linear feet

30 Ceramic tile grout from the floor of area number four 31 Wax rings from area number four 32 Drywall from the walls in area number four 33 Window glazing from the small set of Metal windows in the south west corner of area umber four. Also includes the two sets of windows on the south side of the same space. There are a total of 24 panes of glass in this room and each payne is 12 inches wide by 20 inches high.

34 Window glazing from the metal clad windows on the north side of area number four

35–36 Plaster walls in area number six 37 Flexible caulking outside the windows on the exterior of area number four on the southside 38 Mag block from the outside of the boiler tank in area number seven.

Accessible from the outside loading dock area. 6‘x 6‘x 15‘.

39 Flexible white exterior caulking around the outside of the door of area number one 40 Black caulking and mastic on the exterior east wall of area number nine. 3 feet off the ground. Three linear feet

41 Gray caulking and mastic on the exterior east wall of area number nine. 3 feet off the ground. 14 feet long by 3 feet high. Of wall of bricks will need to be removed and disposed of.

42 Somewhat flexible window glazing from the greenhouse windows of the exterior of area number nine. There are 10 windows in this set. Each window is 26 inches wide by 48 inches high.

43 Black waterproofing between the brick wall envelope of area number nine on the exterior

44 Exterior window caulking around the three sets of metal clad windows on the north side and two sets on the west side of area number three. The windows on the north side of the building are 6 feet wide and 5 feet high.

The windows on the west side are 5 feet wide by 6 feet high.

45 Red exterior caulking around the outside of the five sets of windows on the north side of area number four. Each set of windows is 4 feet wide by 3 feet high. The bottom of the windows are about 8 feet off the ground top about 11 feet off the ground.

46 Exterior window caulking on the outside of the door labeled “green – T“on the north side of area number four near the loading dock

47 Exterior grey caulking on the sides of the north receiving dock between the bricks on the building transitions

48 Exterior flexible brown window caulking from area number two 49 Exterior plaster from the overhang at the west entrance of area number two 50 Exterior door caulking from south door of area number two. Hard caulking. The doorway is 6 feet wide by 10 feet high.

51 Hard window caulking on the exterior of the door on the south side of area number two. This is the door covered by the trees and vines.

52 Shelving liners on the shelves from the fire hydrant shed on the southwest side of the building 53 Exterior caulking between the knee wall cement panels that are painted white that are about 4 feet off the ground around the entire perimeter of the building.

54 Soft window glazing on the north set of the windows on top of the roof.

Also included with this we will assume that the other three sets of windows to the south of the northside are also positive because they are the same windows. Therefore, four sets of windows. Each set of windows is 122 feet long by 5 feet high.

55 Hard window glazing on the three sets of windows south of the north set of windows on top of the roof

56 Exterior window caulking associated with the set of windows on top of the

Assumed positive: all roofing materials on the entire building Assumed positive: two breaker panels in area number three with Bakelite.

Assumed positive: there is a room that is in accessible off of the northeast corner of area number three. We do not know what is in it and will not be able to know until the demolition is underway.

Assumed to contain asbestos pipe insulation (air-cell, mag block & felt). Please note:

in all areas where there is pipe insulation there is also pipe insulation that is broken and lying on the ground that will also need to be cleaned up.

Area number eight: one roof drain Area number one: 14 roof drains + 645 linear feet of pipe insulation.

Area number 2: 2 roof drains + 257 linear feet of pipe insulation mostly above suspended ceiling tiles and coming down into the registers inside the perimeter walls.

Area number three: 275 lineal feet of pipe insulation Area number 4: 54 linear feet of pipe insulation Pass-through room between area number three, four, five and seven: 158 linear feet of pipe insulation Area number six: seven linear feet of pipe insulation plus one roof drain plus the pipe chase behind the toilets will need to be cleaned up of asbestos on the floor.

Area number seven: five linear feet of pipe insulation coming through the roof on the exterior of the building. Warning: Hornets nest in the top part.

TURNAROUND TIME: X Same day turnaround

Relinquished by: Bob Stigsell Date: June 11, 2019 Received by: ______________________ Date: ______________

Advanced Health & Safety, LLC

TRIANGLE ENVIRONMENTAL SERVICE CENTER, INC.

13509 East Boundary Road, Suite B, Midlothian, VA 23112

804-739-1751 • fax: 804-739-1753

BULK ASBESTOS SAMPLE ANALYSIS SUMMARY

5940 Seminole Centre Court, Suite 225A

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

CLIENT JOB/ #:

1 1 / White powder, brown fibers NAD 80%20% Cellulose

2 2 / White powder, brown fibers NAD 80%20% Cellulose

3 3 / White fibers, foil NAD 10%90% Fiberglass

4 4 / White fibers, foil NAD 10%90% Fiberglass

5A 5 - Tile / Gray vinyl NAD 100%

5B 5 - Mastic / Yellow adhesive NAD 100%

6A 6 - Tile / Gray vinyl NAD 100%

6B 6 - Mastic / Yellow adhesive NAD 100%

7 7 / Red adhesive 3% Chrysotile 97%

8 8 / Gray powder NAD 100%

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

Feng Jiang, MS Senior Geologist, Laboratory Director Yuedong Fang, Senior Geologist

13509 East Boundary Road, Suite B, Midlothian, VA 23112

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

9 9 / White powder, brown fibers NAD 80%20% Cellulose

10 10 / White powder, brown fibers NAD 80%20% Cellulose

11 11 / Clear glass NAD 100%

12 12 / Black, brown adhesive NAD 100%

13 13 / White powder, brown fibers NAD 80%20% Cellulose

14 14 / White powder, brown fibers NAD 80%20% Cellulose

15 15 / Gray powder, fibers NAD 50%40% Cellulose 10% Fiberglass

16 16 / Gray powder, fibers NAD 50%40% Cellulose 10% Fiberglass

17 17 / Yellow adhesive NAD 100%

18 18 / Yellow adhesive NAD 100%

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

13509 East Boundary Road, Suite B, Midlothian, VA 23112

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

19 19 / Black adhesive NAD 100%

20A 20 - Tile / Beige vinyl NAD 100%

20B 20 - Mastic / Black adhesive 2% Chrysotile 98%

21 21 / Gray fibers NAD 5%90% Cellulose 5% Fiberglass

22 22 / Gray powder NAD 100%

23 23 / Gray powder 2% Chrysotile 98%

24 24 / Gray granular NAD 100%

25 25 / Gray powder NAD 100%

26 26 / Dark gray powder 2% Chrysotile 98%

27 27 / Dark gray powder 3% Chrysotile 97%

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

13509 East Boundary Road, Suite B, Midlothian, VA 23112

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

28 28 / Gray cement 10% Chrysotile 90%

29 29 / Gray powder 3% Chrysotile 97%

30 30 / Gray granular NAD 100%

31 31 / Yellow adhesive NAD 100%

32 32 / White powder, brown fibers NAD 90%10% Cellulose

33 33 / Gray powder 3% Chrysotile 97%

34 34 / Gray powder NAD 100%

35 35 / Gray granular NAD 100%

36 36 / Gray granular NAD 100%

37 37 / Gray adhesive NAD 100%

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

13509 East Boundary Road, Suite B, Midlothian, VA 23112

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

38 38 / Gray powder, fibers 80% Chrysotile 20%

39 39 / White adhesive NAD 100%

40 40 / Dark gray powder 3% Chrysotile 97%

41 41 / Black powder 2% Chrysotile 98%

42 42 / Gray powder 2% Chrysotile 98%

43 43 / Black adhesive NAD 100%

44 44 / Gray powder 2% Chrysotile 98%

45 45 / Red adhesive 3% Chrysotile 97%

46 46 / Gray powder NAD 100%

47 47 / Gray adhesive NAD 100%

48 48 / Gray adhesive NAD 100%

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

13509 East Boundary Road, Suite B, Midlothian, VA 23112

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612L

06/12/2019 06/12/2019 06/12/2019

F. JiangJOB SITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT SAMPLE ID

& GROSS DESCRIPTION

ESTIMATED

% ASBESTOS

NON ASBESTOS

% FIBERS

NON FIBROUS

% MATERIALS

CLIENT:

49 49 / Gray granular NAD 100%

50 50 / Gray powder 2% Chrysotile 98%

51 51 / Gray powder NAD 100%

52 52 / Black adhesive NAD 90%10% Cellulose

53 53 / Gray adhesive 3% Chrysotile 97%

54 54 / Gray adhesive 3% Chrysotile 97%

55 55 / Gray powder NAD 100%

56A 56 - Mastic / Black adhesive 10% Chrysotile 90%

56B 56 - Caulk / Gray powder NAD 100%

Total Samples/Layers Analyzed: 60

Samples are analyzed in accordance with “Interim Method for the Determination of Asbestos in Bulk Insulation Samples”, EPA/600/R-93-116, July 1993 (EPA-600/M4-82-020, Dec 1982), or the current US EPA method for the analysis of asbestos in building material. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested.

NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [

Reviewed By Authorized Signatory:

LEAD SAMPLING RESULTS

Note: >0.5% lead concentration is considered lead by weight per Federal statute

Lead Bulk Sampling Analysis for: Analyzed by:

Advanced Health & Safety LLC TESC 5940 Seminole Centre Ct., Ste. 225A 13509 East Boundary Road, Ste B Madison, Wisconsin 53711 Midlothian, Virginia 23112 Ph: 608-243-8466 bob@madisonasbestos.com Phone: 804-739-1751

Advanced Client Name: City of Edgerton-Ramona Flanigan Client Contact Info: rflanigan@cityofedgerton.com Client Phone Number: (608) 884-3341 Project Site Location: 407 N Main St Edgerton, WI Sampling Date: June 11, 2019

Pb1 White paint on metal beams in area number one.

Pb2 White paint from the blocks on the 4-foot-high knee walls in area number one. Sample taken on the east wall.

Pb3 White paint painted on the glass block walls on the west side of. Number one Pb4 White paint from the floor to ceiling brick walls on the west side of area number one Pb5 White paint on the interior bricks in area number two Pb6 Gray paint and an older layer of paint on the floor from area number two Pb7 Gray and red floor paint from the sprinkler water main room in the south east portion of area number two Pb8 Gray paint from the floor in area number three Pb9 Brown wall paint from the used wall of area number four Pb10 Gray red floor paint from area number four Pb11 Green paint on the cement block walls of number four Pb12 Yellow for paint in the transition from the walk-through room two area number four Pb13 Yellow and green paint on the walls in area number six Pb14 White and green paint in the bathrooms on the walls area number six Pb15 White exterior paint on the trim on the outside of the building.

Pb16 White exterior foundation paint Pb17 Exterior white caulking on the window ledges on the outside of area number two

TURNAROUND TIME: X Same day turnaround

Relinquished by: Bob Stigsell Date: June 11, 2019 Received by: ______________________ Date: ______________

13509 East Boundary Road, Suite B, Midlothian, VA 23112 • 804-739-1751 • fax: 804-739-1753

(EPA METHOD 7000B / 3050B)

LEAD IN PAINT SAMPLE ANALYSIS SUMMARY

5940 Seminole Centre Court, Suite 225A Madison, WI 53711

City of Edgerton-Ramona Flanigan

407 N. Main St. Edgerton, WI

190612N

6/12/2019 6/12/2019 6/12/2019

MKSJOBSITE:

TESC LOGIN #:

DATE OF RECEIPT:

DATE OF ANALYSIS:

DATE OF REPORT:

ANALYST:

TESC

SAMPLE #

CLIENT

SAMPLE #

SAMPLE

WEIGHT (mg)

LEAD CONCENTRATION

PPM

CLIENT:

CLIEN…

This is the start of the file's text. The full file is on GovTribe.