SOW Tents 2025.docx

DOCX document 31 KB Posted

Attached to
2025 Air Show Table, Tents and Chairs
Solicitation number
AS0001
Issued by

About this file

This Statement of Work outlines requirements for tent and rental item services supporting the Tinker Air Show at Tinker AFB, OK on June 27-29, 2025. The contractor must provide, deliver, set up, and remove multiple tents including: one 40'x100' framed tent with green carpet flooring, one 40'x60' tent, two 10'x20' tents, nine 5'x15' tents, and five 10'x10' hurricane strength pop-up tents. Additional requirements include 88 eight-foot tables, 300 metal folding chairs, and 300 white wedding chairs, all in pristine condition.

The period of performance runs June 26-July 2, 2025, with all items to be fully set up by June 30 at 1200 hours. The contractor must provide staff information by April 18, maintain 24/7 emergency contacts reachable within 30 minutes, and follow strict safety protocols including OSHA requirements and Air Force safety standards. Set-up locations include Building 3102 flight line runway area, Building 9001, Building 469, and the DV parking area near Building 2121. The contractor is responsible for all labor, materials, transportation, and must maintain clean work areas with proper debris removal.

View the file

Other files

File Type Posted
SOW Tents 2025Alpha.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TINKER AIR SHOW

Statement of Work

TENTS AND RENTAL ITEMS

1.0 INTRODUCTION

1.1 Organization. Tinker Air Show, Tinker AFB (TAFB) OK.

1.2 Background and Objective the 72 FSS Squadron requires tents, tables, and chairs in support for the Tinker Air Show on 27, 28 and 29 June 2025.

Scope.

1.1 Description of Services: The contractor shall provide all labor, tools, parts, material, equipment, transportation, and incidentals necessary to deliver/set up/take down chairs, tables, tents and water barrels. See paragraph 6 for a complete list of items that contractor will deliver, set up, take down and pick up.

1.2 Services: The contractor shall provide all that is required to perform the tasks This Statement of Work (SOW).

1.3 Materials: The contractor shall furnish all parts required for the performance of this SOW.

2. SERVICE DELIVERY SUMMARY

2.1 The contractor will provide a list of names, driver’s license number, state of insurance, date of birth, and social security number of all staff who will be delivering, setting up and tearing down the equipment to Cathy Clark-Fleck by noon on 18 April 2019. The contractor shall schedule all set up take down and delivery with:

PHILIP J. GIOVANNIELLO, MSGT, 72 SFS/ philip.giovanniello@us.af.mil

COMM: (405) 734-6316 CELL: (845) 978-8735

3. SPECIFIC TASKS

3.1 Contractor shall deliver and set up all items in this contract at the areas located on a map that will be provided to them. Contractor shall install all items in this contract and ensure it is in good working condition before leaving Tinker AFB. All tent tops will be clean and free of dirt, holes, rips, or tears. All poles will be straight and not bent. All chairs will be free of dirt, marks, and stickers. Tabletops will be clean and free of any food material, tape, and dirt. In addition, tables cannot be chipped cracked or in frail condition. Any wooden tables cannot have splinters or metal framing that bent, protruding or missing. Edges will be smooth and free of any hazards. The Period of performance will be 26 June before the air show and all items shall be removed by NLT 2330 2 July 2023. Contractor shall deliver and set up all items starting on 26 June and must be completely set up by 30 June 2023 by 1200 hours, all tents must be operational by 1200 hours on 30 June. Tables and chairs will be set up in the tents, with remaining placed in hanger, which includes unfolding all tables and chairs and placed and unfolded placed under tables in the appropriate areas. The Contractor shall tear down and pick up all items on 2 July beginning at 1700 hours. Contractor shall always proceed with caution when operating vehicles and equipment around all personnel.

3.1.2 The contractor will provide an adequate number of skilled workmen who can speak and understand English to complete work. At the completion of the work the contractor will ensure that all tools and debris is removed.

3.1.3 Contractor shall keep work area clean and in an orderly manner.

3.1.4 Contractor shall remove and dispose of any trash or related debris daily.

Contractor will not smoke on the flight line.

3.1.5 Place of Performance: Building 3102 flight line runway area, Bldg. 9001, Bldg. 469 and DV parking area near Bldg. 2121.

3.2 Hours of Operation. The Contractor shall provide services from Monday through Sunday. The contractor shall schedule work through Cathy Clark-Fleck, Jerry Wright and MSgt Betz. Contractor will provide two points of contact will cell numbers who can be reached by telephone 24 hours a day in case of emergency. The Contractor will be made available within 30 minutes if the wind or act(s) of God to ensure tents and equipment are in working condition.

3.4 Period of Performance: Work will be completed after coordinating with COLLINS, CHRISTOPHER C 1st Lt USAF AFMC AFSC/PZIOB

4. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

4.1 The Government shall provide access to the work area and the existing utilities in the immediate work area. There will be no other government furnished material or equipment for this contract. The contractor shall provide all materials and equipment required for installation.

4.2 Conservation of Utilities: The contractor shall instruct employees on utility conservation practices. The contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include the following:

a. Government phones shall be used for Official Government Business Only.

5. QUALITY ASSURANCE

5.1 According to the inspection of Services Clause, the Government will evaluate the Contractors performance under this contract. When an observation indicates defective performance, the contract monitor will notify the CO and the Contractor. Any action taken by the CO as a result of surveillance will be according to the terms of this contract. Any manner concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO and not to the Contract Monitor. The services to be performed by the contractor during the period of this contract are subject to review by the CO or authorized representatives. Other Government personnel may from time to time observe contract operations. These personnel will not interfere Contractor performance.

6. CONTRACTED ITEMS

The contractor shall deliver, set up, take down and pick up the following items.

1. Tents

a. One 40’x 100’ framed tent (white top) *Must be very neat in appearance/staked and green outdoor carpet (see paragraph 2 below). This tent will be on grass surface area. This tent must be the first tent erected. (all stakes will have protective covers (example: cut tennis balls) and all tie downs will have a brightly colored ribbon installed halfway between stake and tent.) Tent poles will be placed on plywood or other flat means to prevent poles from sinking into the soil. (DV tent) POC: April McDonald, (405) 582-1123.

b. One 40’ x 60’ tent on concrete surface: requires tie down by weighted means. (brightly colored ribbons is required on all tie downs) (3001 SFS entry tent)

c. Two 10 X 20 tents top, concrete surface: requires tie down by weighted means, (brightly colored ribbons is required on all tie downs)

d. Nine 5 X 15 Tents on concrete surface. (all tie downs will have a brightly colored ribbon installed halfway between stake and tent) (6 @ Bldg. 9001, 2 @ Bldg. 469 SFS, 1 DV Park area)

e. Five 10 x 10 Hurricane strength Pop Up/Eazy Up tents.

2. The 40 x 100 Tent interior shall have secured floor and be completely carpeted with clean green outdoor carpet. Inside the tent shall be 300 white wedding chairs and 20 each 8’ – all matching tables – all of which must be in pristine condition – clean, free of any gouges, tape, dirt etc. Placement: Location of the tents and foundation surface (grass/concrete): This tent is on the grass on the south side of the flightline. There is typically a green carpet that the DVs will walk on instead of the grass.

3. 88 each 8’ tables – Surface will not be chipped, cracked or frail – tables will not “bow” and must be usable, neat and clean in appearance. Any wood tables cannot have any protruding wood or steel/aluminum. To include setting up.

4. 300 Regular metal folding chairs without padding to include setting up.

APPENDIX "C"

SAFETY SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

FOR

TENTS, TABLES AND CHAIRS INSTALLATION,

SET UP AND REMOVAL

FOR TINKER AIR SHOW

PRE FILE NO: SEG-08-034

PREPARED BY: OC-ALC/SEG

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap notification/reporting as defined in paragraph I.B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.

B. Mishap Notification.

1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.

2. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time, and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

E. Slow Moving Vehicles.

1. Any contractor personnel operating Slow Moving Vehicles shall be trained by the contractor. The training shall contain, as a minimum the following information:

a. Proper prior use inspection procedures, to include serviceability & maintenance

b. Proper driving techniques for use in crowded areas

c. Proper driving techniques to use while around aircraft

d. Proper driving techniques to use while on the flight line

e. Any applicable Tinker Instructions regarding Slow Moving Vehicles

f. All manufacturer’s cautionary/warning items contained within the original equipment manufacturer’s user/owner’s manual

g. Other pertinent information

2. Any contractor or contractor employee observed endangering the public, government personnel or government property is subject to having their driving privileges revoked and/or be escorted off base until after the completion of the air show.

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor shall adhere to all OSHA requirements during setup and tear down. The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements

Element/Requirement Referenced Benchmark

Occupational Safety and Health Administration 29 CFR Series

Vehicle Operations AFI 91-207

Foreign Object Damage (FOD) TAFI 21-100

Tobacco Free Living AFI 48-104

SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES

These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.

29 CFR Series OSHA Regulations

TAFI 21-100Feb 19Foreign Object Damage (FOD)
AFI 31-218Sep 06Motor Vehicle Traffic Supervision
TAFBI13-213Mar 21Airfield Driving
AFI 48-104Jun 19Tobacco Free Living