Summary of As-Needed Fencing and Gate Installation, Maintenance and Repair RFB
This Request for Bid (RFB) document is issued by the City of St. Pete Beach, Florida, seeking a qualified contractor to provide fencing and gate installation, maintenance, inspection, and repair services on an as-needed, task-order basis at City-owned or managed facilities throughout the city. The scope of work encompasses furnishing all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals for each authorized assignment, including installation of new fence systems and gates, removal and disposal of existing materials, preventive maintenance and inspection, repair services, and emergency response capabilities. The contractor must be experienced with multiple fencing systems including chain-link, ornamental metal, aluminum, vinyl, wood, and welded-wire fencing, as well as manual, mechanical, and automated gate systems. A non-mandatory pre-bid meeting is scheduled for November 4, 2026, at 1:45 PM EST via Microsoft Teams. The deadline for written questions is November 25, 2026, at 10:00 AM EST. Bid packages must be submitted electronically via Bonfire by December 2, 2026, at 9:00 AM EST, with bid opening scheduled for 9:30 AM the same day. The contract does not guarantee minimum quantity of work or expenditure, with assignments issued only when services are required and funding is available.
The cost sheet must include regular-time, overtime, after-hours, and emergency labor rates; minimum service-call, mobilization, trip, equipment, and diagnostic charges; unit prices for commonly used fence and gate materials and installation; and proposed material and subcontractor markups. All pricing must include overhead, supervision, tools, consumables, travel, and incidentals unless separately identified and authorized. Standard work hours are 7:30 AM to 6:00 PM, Monday through Saturday, with no Sunday or holiday work without prior City Manager approval. The contractor must maintain Commercial General Liability Insurance of $1,000,000 per occurrence, Comprehensive General Liability Insurance of $1,000,000 per occurrence, Personal Injury coverage of $1,000,000 per occurrence, Automobile Liability of $1,000,000, and Workers Compensation Insurance as required by Florida law. The City reserves the right to purchase certain materials directly to avoid sales tax. Contractors must register with the City's Procurement Manager in writing at least five business days before bid submission and must comply with Florida Statute 448.095 regarding E-Verify employment eligibility verification. Liquidated damages of $500 per calendar day apply for work not completed by the scheduled completion date. Payment will be made monthly as work progresses, with 5 percent retained until final completion and acceptance. The contractor warrants labor and workmanship for a minimum of one year from City acceptance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of St Pete Beach
Request for Bid
Bids due on or before 12/2/2026 at 9:00 AM EST(Deadline)
City Hall, St. Pete Beach, FL
As-Needed Fencing and Gate Installation, Maintenance and
Repair v020222
I. CONTENTS
I. CONTENTS
II. CONTRACTOR’S BID SUBMITTAL
III. COST SHEET
IV. GENERAL CONTRACT TERMS
V. REFERENCES & MINIMUM QUALIFICATIONS
VI. PUBLIC ENTITY CRIMINAL AFFIDAVIT
VII. NON-COLLUSION AFFADAVIT
VIII. SPECIFICATIONS
IX. SAMPLE AGREEMENT
Event Date Time Publication of Bid 10/28/2026 8:00 AM Pre-Bid Meeting (Non-MANDATORY) 11/04/2026 1:45 PM Deadline for Question Submission 11/25/2026 10:00 AM Bid Receiving Deadline 12/02/2026 9:00 AM Bid Opening 12/02/2026 9:30 AM
II. CONTRACTOR’S BID SUBMITTAL
The company that is submitting a bid declares that it has extensive experience in As-Needed Fencing and Gate Installation, Maintenance and Repair.
The undersigned, as Bidder, hereby declares that the only person or persons interested in the Bid as principal or principals are named herein, and that no person other than herein mentioned has any interest in the Bid or in the Agreement to be entered into; that this Bid or Agreement is made without connection with any other person, company, or parties making a Bid; and that it is in all respects fair and in good faith without collusion or fraud.
The Bidder further declares that they have examined the site of the work and informed themselves fully in regard to all conditions pertaining to the place where the work is to be done; that they have examined the Plans and Specifications for the work and Contract Documents relative thereto, and have read all special provisions furnished prior to the opening of bids; and that they have satisfied themselves relative to the materials to be supplied and work to be performed.
The Bidder proposes and agrees, if the Bid is accepted, to contract with the City of St. Pete Beach, Florida, in the form of an Agreement specified for “As-Needed Fencing and Gate Installation, Maintenance and Repair” in St. Pete Beach, Florida, in full and complete accordance with the shown, noted, described, and reasonably intended requirements of the Plans, Specifications, and Contract Documents, to the full and entire satisfaction of the City of St. Pete Beach, Florida.
The successful bidder shall be required to utilize the template Agreement in this Request for Bids (RFB) and any questions regarding the Agreement must be addressed during the RFB process before submittal.
The City reserves the right to respond or not respond to questions in the form of an addendum.
The Bidder proposes to furnish all materials, equipment, labor, and perform the work submitted in their bid schedule for the City of St. Pete Beach “As-Needed Fencing and Gate Installation, Maintenance and Repair”.
COMPANY: DATE:
ADDRESS: PHONE:
BIDDER: ____________________________ NAME:
(SIGNATURE) (PRINT NAME & TITLE)
STATE OF FLORIDA
COUNTY OF ____________________
The foregoing instrument was sworn to (or affirmed), subscribed, and acknowledged before me by means of ☐ physical presence or ☐ online notarization, this ____ day of ___________________________, 2026, by _____________________, who is personally known to me or has produced ________________________________ as identification.
(SEAL) ______________________________
Notary Public – State of Florida (Print, Type, Stamp, or Commissioned Name of Notary Public)
SUBMIT BID TO:
Electronically only via Bonfire
III. COST SHEET
Regular Time Rate
Overtime Rate
After Hours Rates
Emergency Labor Rates
Minimum service-Call
Mobilization Cost
Trip Cost (fee)
Equipment Fee
Disposal Fee Diagnostic Charge
Please provide Unit Prices for Commonly used Fence and gate materials and installation
State Proposed Material and Subcontractor Markup and Identify and Exclusions
Cost of rental Fencing for City events or other activities per linear ft
All Pricing shall include overhead, supervision, tools, consumables, travel, and incidentals unless separately identified and authorized.
V020922
IV. GENERAL CONTRACT TERMS
REQUEST FOR BID
The City of St. Pete Beach, FL seeks a qualified contractor to provide fencing and gate installation, maintenance, inspection, and repair services on an as-needed, task-order basis at City-owned or managed facilities. The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals required for each authorized assignment. Work shall be complete, safe, weather-resistant, and suitable for the applicable site conditions. The resulting agreement does not guarantee a minimum quantity of work or expenditure, and the City may issue assignments only when services are required and funding is available..
LOCATIONS
Throughout the City of St. Pete Beach As-Needed.
BID SUBMITTALS
Bid documents must include a signed/notarized Contractor’s Bid Submittal (Page 3), Fee Schedule, References, Contractor’s license and insurance certificates, and Public Entity Criminal Affidavit. The Contractor shall submit one electronic bid via Bonfire only.
BIDDER INFORMATION
All Contractors must contact the City’s Procurement Manager, in writing via e-mail (jtaylor@stpetebeach.org), with their intention to bid, along with their company name and contact information at least five (5) business days before the bid package is due. The City is not responsible for any Addendums or other supplementary information that is not received due to non-submittal of the aforementioned information. Please refer back to the city website (http://www.stpetebeach.org/news-and-links/city-projects.html) for additional project information as it becomes available. The City reserves the right to decide whether to answer addendums or not. The City is not required to provide any additional information.
MANDATORY PRE-BID MEETING
A NON-MANDATORY pre-bid meeting will be held on 11/4/2026 at 1:45 PM EST via Microsoft Teams Meeting. https://teams.microsoft.com/meet/245827573514203?p=O3vVzOSWuawYULDclK
WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS
No oral interpretations will be made to any firms as to the meaning of the scope of work or any other contract documents included in this RFB. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager and shall be received no later than 10:00 EST on 11/25/2026 Responses to questions may be handled as an Addendum if the response would provide clarification to the requirements of the RFB. All such Addenda shall become a part of the contract documents. The City will not be responsible for any other explanation or interpretation of the proposed RFB made or given prior to the award of the contract. The City will not respond to questions received after the specified deadline. The City reserves the right to respond to any and all questions but is not required to do so.
http://www.stpetebeach.org/news-and-links/city-projects.html http://www.stpetebeach.org/news-and-links/city-projects.html https://teams.microsoft.com/meet/245827573514203?p=O3vVzOSWuawYULDclK
BID PACKAGES
Sealed bids will be accepted Via Bonfire until 12/2/2026 at 9:00 AM EST (Deadline). No bids shall be accepted by the City after this deadline – NO EXCEPTIONS. Bid Packages must be electronic submitted via Bonfire. All Bidders are invited to attend this bid opening.
Clearly marked as: “As-Needed Fence and Gate Installation, Maintenance and Repair”
CONTACT INFORMATION
John Taylor – Procurement Manager Mailing Address - 155 Corey Avenue, St. Pete Beach, Florida 33706 Office Phone - (727) 363-9279 E-mail - purchasing@stpetebeach.org
SCOPE OF WORK
The City of St. Pete Beach, FL seeks a qualified contractor to provide fencing and gate installation, maintenance, inspection, and repair services on an as-needed, task-order basis at City-owned or managed facilities. The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals required for each authorized assignment. Work shall be complete, safe, weather-resistant, and suitable for the applicable site conditions. The resulting agreement does not guarantee a minimum quantity of work or expenditure, and the City may issue assignments only when services are required and funding is available..
1. General Requirements
• Coordinate each assignment with the City’s designated representative before mobilization.
• Verify field dimensions, access, underground and overhead conflicts, site conditions, and operational requirements before beginning work.
• Protect existing buildings, utilities, pavement, landscaping, and adjacent property. Repair damage caused by the Contractor at no additional cost to the City.
• Maintain secure sites throughout the work. Provide temporary barriers, barricades, signage, and access controls when fencing or gates are removed or openings are created.
• Keep work areas orderly and remove debris, demolished materials, packaging, and surplus materials upon completion.
• Perform work in compliance with applicable federal, state, and local laws, codes, permit requirements, manufacturer instructions, and recognized industry practices.
• Do not subcontract work without prior written City approval. The Contractor remains responsible for all approved subcontractors.
2. Contractor Qualifications
• Maintain all licenses, registrations, insurance, and certifications required for the work.
• Provide trained personnel experienced with chain-link, ornamental metal, aluminum, vinyl, wood, welded-wire, security, and other commonly used fencing systems.
• Provide technicians qualified to service manual, mechanical, and automated gate systems, including operators, controls, safety devices, access-control interfaces, and related hardware.
• Designate a project manager authorized to schedule work, receive direction, and resolve field issues.
mailto:purchasing@stpetebeach.org
3. Installation Services
• Furnish and install new fence systems, gates, posts, rails, fabric or panels, braces, tension components, fasteners, fittings, hinges, latches, locks, stops, bollards, and accessories identified in an authorized work order.
• Remove and legally dispose of existing fencing, gates, footings, and related materials when directed.
• Lay out fence lines and gate locations; confirm final alignment, grades, clearances, swing or slide paths, and access before excavation.
• Set post plumb, true, and properly spaced in concrete foundations sized for the fence type, gate loading, soil, wind exposure, and manufacturer requirements.
• Install fencing level and uniform, following site grades without unintended gaps, sharp projections, loose components, or misaligned sections.
• Provide corrosion-resistant hardware and compatible materials suitable for exterior and coastal exposure where applicable.
• Install pedestrian, swing, slide, cantilever, rolling, and specialty gates as ordered. Gates shall operate smoothly, align correctly, latch securely, and remain stable through the full range of travel.
• For automated gates, install operators, controls, photo eyes, monitored entrapment-protection devices, loops, edges, warning signage, emergency release provisions, and access-control connections specified in the work order.
• Restore disturbed pavement, concrete, turf, irrigation, landscaping, and finish to a condition equal to or better than the pre-work condition.
• Provide temporary fencing and removal for City events/projects.
4. Preventive Maintenance and Inspection
• Inspect fence fabric or panels, posts, rails, braces, footings, fasteners, coatings, grounding or bonding components where present, and perimeter security conditions.
• Inspect gates for alignment, sag, wear, corrosion, binding, clearances, hardware condition, stops, guides, rollers, tracks, hinges, latches, locks, and emergency release operation.
• For powered gates, inspect and test the operator, controls, batteries, drive components, limit settings, safety edges, photo eyes, monitored safety devices, loops, warning devices, and manual-release function.
• Tighten hardware; lubricate moving components; clean tracks and sensors; adjust hinges, rollers, guides, chains, belts, limits, and closing or opening forces as appropriate.
• Identify hazardous, nonfunctional, deteriorated, or noncompliant conditions and provide a written repair recommendation with photographs and itemized pricing before performing work that exceeds authorized maintenance.
• Submit an inspection report for each serviced location, including date, asset or location, observed condition, work completed, parts used, test results, and recommended follow-up.
5. Repair Services
• Repair or replace damaged, missing, bent, corroded, loose, or failed fence and gate components.
• Correct leaning posts, damaged foundations, broken welds, torn fabric, displaced panels, failed tensioning, gaps, sharp edges, and security breaches.
• Repair or replace gate hinges, pivots, rollers, wheels, tracks, guides, chains, belts, locks, latches, closers, stops, operators, motors, gearboxes, circuit boards, controls, safety devices, and related components as authorized.
• Match existing material, dimensions, profile, coating, finish, color, and appearance where reasonably available. Obtain approval before using a substitute.
• Diagnose the cause of failure and complete repairs that restore safe, reliable operation rather than providing a temporary correction unless the City expressly authorizes a temporary measure.
• Notify the City immediately when a condition cannot be made safe during the initial visit; secure the area and provide recommended corrective action.
6. Service Calls and Emergency Response
• Provide a single point of contact for routine and emergency service requests.
• Routine work shall be scheduled within the timeframe stated in the applicable work order.
• Emergency conditions may include an unsecured facility, inoperable critical gate, vehicle or storm damage, exposed sharp materials, or other immediate safety or security risk.
• Respond to emergency requests within the response time established by the City’s solicitation, contract, or work order and provide temporary site security when permanent repair cannot be completed during the initial response.
• Obtain authorization before incurring overtime, after-hours, or premium charges unless immediate action is necessary to protect life or property.
7. Work Orders, Estimates, and Documentation
• Perform work only after receiving an authorized purchase order, work order, or written notice to proceed, except for expressly authorized emergency stabilization.
• Provide a written estimate identifying labor hours and rates, materials and quantities, equipment, permits, subcontracted work, mobilization, disposal, and anticipated schedule.
• Do not exceed the authorized amount or materially change the scope without prior written approval.
• Provide manufacturer product data, color or finish samples, shop drawings, gate-operator details, and safety-device information when requested.
• Upon completion, submit a service ticket or invoice that references the authorization number and location and itemizes labor, materials, equipment, approved markups, and work completed.
• Provide before-and-after photographs for repairs, emergency work, concealed conditions, and other work when requested.
8. Safety and Site Control
• Comply with applicable occupational safety requirements and maintain a site-specific approach appropriate to excavation, cutting, welding, electrical work, traffic, and public access.
• Locate utilities before excavation and use safe digging practices.
• Provide required personal protective equipment and maintain tools and equipment in safe operating condition.
• Secure work zones from pedestrians, vehicles, staff, and unauthorized persons. Maintain accessible routes and emergency access unless otherwise approved.
• Coordinate hot work, utility shutdowns, access interruptions, and noisy or disruptive activities in advance.
• Immediately report accidents, property damage, utility strikes, security incidents, and unsafe conditions to the City.
9. Quality, Testing, and Acceptance
• Use new, first-quality materials unless the City expressly authorizes reuse.
• Ensure completed work is straight, plumb, secure, free of defects, and consistent in appearance.
• Demonstrate manual and powered gate operation through multiple full cycles. Verify locks, latches, stops, emergency release, access controls, and safety devices.
• Correct punch-list items and defective work promptly and at no additional cost.
• Final acceptance occurs after the City verifies completion, receives required documentation, and confirms satisfactory operation. Payment does not waive latent defects or warranty obligations.
10. Warranty Warrant labor and workmanship for a minimum of one year from City acceptance, or for the longer period stated in the contract. Transfer applicable manufacturer warranties to the City. Correct covered defects promptly and at no additional cost, including labor, materials, equipment, transportation, and restoration.
11. Pricing Schedule
• Provide regular-time, overtime, after-hours, and emergency labor rates by classification.
• State any minimum service-call, mobilization, trip, equipment, disposal, or diagnostic charges.
• Provide unit prices for commonly used fence and gate materials and installation work, where requested.
• State the proposed material and subcontractor markup and identify any exclusions.
• All pricing shall include overhead, supervision, tools, consumables, travel, and incidentals unless separately identified and authorized.
DETAILED SPECIFICATIONS
I. LOCATIONS
As-Needed City Wide
Standard work hours shall be from 7:30 AM until 6:00 PM, Monday through Saturday. No work shall take place on Sundays or on official City holidays without prior approval by the City Manager or designee at least 1 week prior to the scheduled work. A list of current official City holidays can be found on the City’s Human Resources website at http://www.stpetebeach.org/hr/holidays.html. Contractor will coordinate scheduling of work with the City’s Project Manager and City’s Inspector.
ADDITIONAL WORK DETAILS
Contractors or persons wishing to bid on this project are licensed, bondable and insured in accordance to the City's requirements. The Contractor will furnish all necessary labor, materials, tools, equipment and supplies to complete the scope of work. Bid must also include all costs for licenses, permits, and any material disposal fees.
Bidders shall bring questions, discrepancies, omissions, conflicts or doubt as to meaning of any part of Contract Documents to the attention of the City of St Pete Beach Procurement Manager at least ten (10) business days before bid submittal deadline. Clarification of intent of Contract Documents, if necessary, shall be made available to bidders in the form of an Addendum. Failure to request clarification of interpretation of Contract Documents shall not relieve bidders of their responsibilities to perform the work.
The City of St. Pete Beach reserves the right to reject any or all bids or parts of bids, or accept any bid or part thereof deemed to be in the best interests to the City of St. Pete Beach.
http://www.stpetebeach.org/hr/holidays.html
STATEMENT OF WORK
The Contractor shall furnish and pay the cost, including sales tax and all other applicable taxes, licenses, permits and fees, of all the necessary materials not furnished by the City and shall furnish and pay for all the superintendence, labor, tools, equipment, transportation, and perform all the work required for the execution of all services listed in the Bidder's Proposal and Bid Form attached hereto and in strict accordance with the Plans, Specifications, and requirements of the City of St. Pete Beach which are attached hereto and made a part hereof, and any amendments thereto and such supplemental Plans and Specifications which may hereafter be approved.
BEGINNING DATE
The Contractor shall, within ten (10) business days after receipt of the Notice of Award and before commencement of any operations hereunder, execute the Agreement. Additionally, the Contractor shall, within twenty (20) business days after receipt of the Notice of Award, provide all required documentation to the City. The Contractor must commence construction activities within thirty (30) business days of NTP to prepare and procure materials. Any change to the start date or the work schedule included with this bid must be submitted in writing to and approved by the City Manager or designee.
COMPLETION DATE
The work will be completed and ready for final inspection within the Time Frame needed and agreed upon from start of the project. The project shall be considered eligible for final acceptance by the City when all required work to be performed as outlined in this Agreement is complete and accepted by the City.
EXAMINATION OF SITE
Bidders may visit specific areas with advanced notice.
ASSURANCES
The responding Contractor shall provide a statement of assurance that the Contractor is not presently in violation of any statutes or regulatory rules that might have an impact on the firm’s operations. All applicable laws and regulations of the State of Florida, and ordinances and regulations of the City of St. Pete Beach will apply.
TRAFFIC CONTROL AND STAGING AREA
Contractor shall include all costs associated with vehicular and pedestrian traffic control and maintenance during the project. Contractor shall be responsible for providing a staging area. The location of this area must be approved by the City Manager or designee. The Contractor will be required to control the area including any additional fencing or barricades and Contractor will be responsible for the restoration of this and all other staging areas provided by the City.
ASSIGNMENT AND TRANSFER OF CONTRACT
The Contractor shall not assign or transfer this Agreement or any part thereof or any interest therein without consent in writing of the City and the Contractor’s Surety, and any such assignment or transfer without such written consent shall be null and void.
SUBCONTRACTS
The Contractor shall not subcontract this Agreement or any part thereof or any interest therein without consent in writing of the City and the Contractor’s Surety. Any Subcontractor approved by the City will be subject to the same standards and qualifications as stated in this Contract.
BID AND PERFORMANCE PAYMENT BOND
LIQUIDATED DAMAGES
If the work embraced by this Contract is not completed on or before the date set for completion or any extension thereof, the actual damages for the delay will be impossible to determine and in lieu thereof, the Contractor shall pay to the City fixed, agreed, and liquidated damages in the amount of either Five-Hundred Dollars ($500) per day for each calendar day of delay until the work is satisfactorily completed.
PAYMENT
Payment shall be made to the Contractor for work performed under this Contract for the quantities of work as determined in accordance with Payments for Work Completed and Payments Withheld of this Contract.
Payment for extra work will be made in accordance with the Changes in Work, Contract Amount, and Contract Time sections below.
CHANGES IN THE WORK
Without invalidating the Contract, the City may, at any time or from time to time, order additions, deletions or revisions in the work authorized by written Change Orders or directives. Upon receipt of a Change Order, the Contractor will proceed with the work involved. All such work shall be executed under the applicable conditions of the Contract documents. If any Change Order causes an increase or decrease in the Contract Amount or any extension or shortening of the Contract Time, an equitable adjustment will be made.
Additional Work performed by the Contractor without authorization of a Change Order will not entitle them to an increase in the Contract Amount or any extension of the Contract Time, except in the case of an emergency (subject to approval by City Manager or designee).
It is the Contractor's responsibility to notify their Surety of any changes affecting the general scope of the Work or change of the Contract Amount and the amount of the applicable bonds shall be adjusted accordingly, and an amended bond document furnished to the City. In the event the City directs the Contractor to make a change in the Work, and if the City and the Contractor do not arrive at a mutually acceptable increase or decrease in the Contract Amount, the contractor shall not use any such lack of mutual acceptance as a basis or cause to stop or otherwise delay the progress or the execution and completion of any of the work ordered, directed or required pursuant to the Contract Documents.
If the Contractor believes an event or situation has occurred which justifies a change in the Contract Amount or Contract Time, he shall deliver a written notice to the City Manager or designee. Each such written notice shall be delivered promptly and no later than fifteen (15) business days after the Contractor first discovered the occurrence. The Contractor shall be deemed to have waived the right to collect any and all costs incurred more than fifteen (15) business days prior to the date of delivery of the written notice and shall be deemed to have waived the right to seek an extension of the Contract Time with respect to any delay in the Progress Schedule which accrued more than fifteen (15) business days prior to the date of delivery of the written notice.
Any such notice shall include sufficient detail to explain the basis of entitlement to a claim for an adjustment to the Contract Amount of Contract Time. When requested by the City Manager or designee, the Contractor shall furnish any additional information and details as may be required to determine the facts or allegations involved, which shall be provided within fifteen (15) business days of the request unless a longer time period is allowed by the City Manager or designee.
The Contractor shall prepare bids detailing proposed adjustments to Contract Amount and/or Contract Time and submit them to the City Manager or designee within fifteen (15) business days of the City’s issuance of a proposed Change Order or the Contractor’s submitting a written notice of a change or claim for an adjustment to the Contract Amount or Contract Time. Contractor’s bids shall be irrevocable for a period of at least sixty (60) business days after receipt by the City. Any delay in the submittal of a complete, adequate and acceptable bid will not justify an increase in Contract Amount or Contract Time. Contractor agrees that it shall give the City access to any and all of Contractor’s and Subcontractors’ books, records and other materials relating to proposed Change Orders and other claims for adjustment to Contract Amount or Contract Time.
CHANGE OF CONTRACT AMOUNT
The Contract Amount constitutes the total compensation payable to the Contractor for performing the Work.
All duties, responsibilities and obligations assigned to or undertaken by the Contractor shall be at his expense without change in the Contract Amount. The Contract Amount may only be changed by written Change Order issued by the City. Any claim for an increase in the Contract Amount shall be in writing and delivered to the City Manager or designee within fifteen (15) business days of the occurrence of the event giving rise to the claim.
All claims for adjustment in the Contract Amount shall be determined by the City Manager or designee.
However, no claim for an adjustment to the Contract Amount will be considered for unforeseeable causes that were beyond the fault or negligence of the Contractor or his Subcontractors or supplier such as acts of God, floods, riots, etc. This restriction does not restrict submission of claims for additional Contract Time due to events of this nature. Any change in the Contract Amount shall be incorporated in a Change Order.
Contractor bids or claims shall cover all aspects of the Work involved and shall be fully documented and itemized as to all costs, quantities and charges for overhead and profit. Amounts for Subcontractors or Suppliers at any tier shall be similarly supported. When determining Subcontractors’ costs, the methods to be used shall be those used for the Contractor’s costs, except that the term “Subcontractor” shall replace the term “Contractor,” context permitting.
Changes in Contract Amount for extensions in Contract Time shall exclude costs that are unaffected or do not relate to the extension in Contract Time, such as: (a) operating costs of construction equipment assigned to the Work on a continuing basis, (b) operating costs and owned/rental costs of construction equipment (crane used for specific lifts, concrete pump used for specific pours, etc.), and (c) fully paid site facilities, tools, etc.
The value of any Work covered by a Change Order or of any claim for an increase or decrease in the Contract Amount where the Work involved is covered by unit prices contained in the Contract Documents shall be determined by application of unit prices to the quantities of the items involved. If the quantities originally contemplated are so changed in a proposed Change Order, that application of the Unit Prices to the quantities proposed will cause substantial inequity to the City or the Contractor, the applicable unit price(s) shall be equitably adjusted by mutual agreement.
If the value of work covered by a Change Order cannot be established or mutually agreed to utilizing previously established unit rates, the value shall be determined by the City on the basis of an estimate of the out-of-pocket cost and percentages that are acceptable to the City for overhead and profit. The out-of-pocket cost shall only include those direct costs which are needed to perform the work such as labor (including payroll taxes, fringe benefits, labor burden and workers’ insurance), materials, equipment, and other incidental out-of-pocket construction costs directly involved in the work, including but not limited to small tools, expendables and material costs but shall not include project management or project supervisory costs unless the Change Order includes an increase in the Contract time.
In such case, the Contractor will submit in the form prescribed by the City an itemized cost breakdown together with supporting data.
The amount of credit to be allowed by the Contractor to the City for any such change which results in a net decrease in cost, will be the amount of the actual net decrease as determined by the City. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any.
To be eligible for consideration, the Contractor’s written claim for a change in the Contract price, including claim(s) from sub-contractors, shall include an itemized cost breakdown with supporting data as described below:
A. For labor: Provide written documentation from the Contractor and Subcontractors or others as appropriate in the form of a detailed breakdown by each labor classification involved indicating the number of hours of Work involved and the hourly payroll rate applicable to each to substantiate the basis and amount of the direct labor cost. The direct labor cost may be increased to provide an allowance for indirect payroll costs (labor burden), such as payroll taxes, fringe benefits, and workers insurance after all premium discounts, rebates and other appropriate reductions have been taken.
B. For material, supplies, equipment, furnishings, etc., to be installed or included in the Work: Provide written documentation from the Contractor and Subcontractors, suppliers, etc., to substantiate the basis and amount of the various cost items involved. Material costs shall reflect the Contractor’s reasonably anticipated net actual cost after consideration of trade discounts and volume rebates.
C. For construction equipment: Provide written documentation in the form of a detailed breakdown by each construction equipment category, indicating the applicable unit rates (i.e., dollar amount per hour, dollar amount per day etc.,) and the number of hours, days, etc. to substantiate the basis and amount of the construction equipment out-of-pocket costs.
CHANGE OF CONTRACT TIME
The Contract Time may only be changed by written Change Order. Any claim for an extension in the Contract Time shall be in writing and include an analysis of the Progress Schedule as further described in the Specifications and shall be delivered to the City Manager or designee within fifteen (15) business days of the occurrence of the event giving rise to the claim. All claims for adjustment in the Contract Time shall be determined by the City Manager or designee. Any change in the Contract Time resulting from any such claim shall be incorporated in a Change Order. The Contract Time may be extended for an amount equal to time lost due to unforeseeable causes beyond the control of the Contractor (and his Subcontractors and Suppliers) if he makes a claim therefrom. Such delays shall include, but not be restricted to, acts or neglect by any separate Contractor employed by the City; fires; floods; labor disputes; epidemics; or acts of God.
All time limits stated in the Contract Documents are of the essence to the Contract. The stated time limits are agreed to be adequate to complete the work, including the procurement, manufacture and delivery of all material and equipment required, and account for any and all potential impact, delays, disruptions and costs that may be expected.
CITY’S RIGHT TO DIRECT PURCHASE
The City has reserved the right to purchase certain items and materials for this project directly in an effort to save applicable sales tax in compliance with Florida Law.
The City will issue purchase orders directly to the vendors supplying the equipment being directly purchased by the City for this project. Each Purchase Order will be accompanied by the City's Certificate of Exemption and a Certificate of Entitlement. All direct purchase vendor invoices will be issued to the City of St. Pete Beach, and the City will issue payment to each direct purchase vendor from City funds. The City will take title to the equipment at time of delivery from the vendor and will issue a separate Certificate of Entitlement for each purchase order.
The Contractor shall assist the City with receipt of materials furnished by the City in accordance with these Special Provisions including, but not limited to, verifying correct quantities, verifying documents of orders in a timely manner, providing and obtaining all warranties and guarantees required by the Contract Documents, assist with inspection of the goods at the time of delivery and notify the City immediately of any deficiencies noted. It is understood that the owner assumes the risk of damage or loss during the time that the building materials are physically stored at the job site prior to their installation or incorporation into the project. The Contractor shall coordinate with the City regarding the delivery schedules, sequence of delivery, loading orientation, and other arrangements normally required by the Contractor for the particular material furnished.
As City Furnished Materials are delivered to the job site and accepted by the City, the City shall notify the Contractor who will assist the City to visually inspect all shipments from the suppliers. The City will approve the vendor's invoice for material delivered upon adequate inspection and recommendation of the Contractor. The City shall assure that each delivery of City Furnished Materials is accompanied by documentation adequate to identify the Purchase Order against which the purchase is made and Contract Documents including but not limited to Contract, Plans, Specifications, and approved Shop Drawings. This documentation may consist of a delivery ticket, bill of lading and an invoice from the supplier conforming to the Purchase Order together with such additional information as the City may deem necessary.
PAYMENTS FOR WORK COMPLETED
Partial payments will be made as the work progresses (if applicable) at the end of each calendar month, or as soon thereafter as practicable on estimates made by the City Manager or designee and as approved by the City, provided that the Contractor is performing the overall job in a diligent manner. In making partial payments, there shall be retained five percent (5%) on the amount of each estimate until final completion and acceptance of all work covered by the Contract. Upon completion and acceptance of the work, the City Manager or designee shall issue a certificate that the work has been completed and accepted by them under the conditions of the Contract and shall make and approve the final estimate of the work. The entire balance found to be due the Contractor, including that retained by the City, should be paid to the Contractor.
Such payment shall be conditioned, however, upon the submission by the Contractor of evidence satisfactory to the City that all claims for labor, material, and any other outstanding indebtedness in connection with the Contract have been paid. Such payment shall also be conditioned upon approval and acceptance of the construction and improvements by the City.
If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor and the City Manager or designee so certifies, the City shall upon the Certificate of the City Manager or designee, and without terminating the Contract make payment for the balance due for that portion of the work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claim. If such delay occurs and payment is made under this clause, the Contractor shall nevertheless be prepared to complete the work in a timely manner upon the remedy or removal of such delay, and shall be bound under this Contract for the completion of such work unless this Contract is otherwise terminated. All payments will be made in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes.
PAYMENTS WITHHELD
The City Manager or designee may withhold, or, on account of subsequently discovered evidence, nullify the whole or part of any estimate to such extent as may be necessary to protect the City from loss on account of:
a) Defective work not remedied
b) Claims and/or liens filed or reasonable evidence indicating probable filing of claims
c) Failure of the Contractor to make payments properly to Subcontractors or for material or labor
d) A reasonable doubt that the Contract can be completed for the balance then unpaid
e) Damage to another Contractor
f) Failure of the Contractor to keep their work progressing in accordance with their time schedule
FINAL PAYMENTS
Upon the completion and acceptance of the work, the City Manager or designee shall issue a certificate that designates that the whole work provided for in this Contract has been completed and accepted by him under the conditions and the terms thereof and shall make the final estimate of the work. After issuance of the certificate, the entire balance found to be due the Contractor, including said retained percentage by the City in accordance with existing state laws as may be retained lawfully by said City, shall pay excepting such sums to the Contractor.
Before the approval of the final payment, the Contractor shall submit evidence satisfactory to the City that states that all payrolls, materials, bills and outstanding indebtedness in connection with this Contract have been paid.
LIENS
If at any time there shall be evidence of any lien or claim for which the City might become liable and which is chargeable to the Contractor, the City shall have the right to retain out of any payment then due or thereafter to become due, an amount sufficient for complete indemnification against such lien or claim. In the event the City has already paid to the Contractor all sums due under this contract or the balance remaining unpaid is insufficient to protect the City, the Contractor and his Surety shall be liable to the City for any loss so sustained.
RESPONSIBILITY OF THE CITY MANAGER OR DESIGNEE
The term “City Manager or designee” wherever used in the Contract shall be the City of St. Pete Beach or its duly authorized representative. Notices of any change in the City Manager or designee shall be given in writing by the City to the Contractor. The City Manager or designee shall have full authority to interpret the Plans and Specifications and shall determine the amount, quality, and acceptance of the work and supplies to be paid for under the Contract and every question relative to the fulfillment of the terms and provisions therein. It shall be the duty of the City Manager or designee to enforce the Plans and Specifications in a fair and unbiased manner. If a variation from any requirements is allowed the City Manager or designee shall grant the same in writing with the reasons for his action outlined, and such action will not invalidate or change the Contract in any other manner.
INTENT OF PLANS AND SPECIFICATIONS
The Contractor shall keep on the job a copy of the Plans and Specifications and shall at any time give the City Manager or designee access thereto. Anything mentioned in the Specifications and not shown on the Plans or shown on the Plans and not mentioned in the Specifications, shall be of like effect as if shown or mentioned in both. The Contractor shall not take advantage of any errors, discrepancies or omissions that may exist in the Plans and Specifications but shall immediately call them to the attention of the City Manager or designee whose interpretation or correction thereof shall be conclusive. Should a conflict occur between the General Specifications and any Supplemental Specifications and/or Plans, the latter shall govern.
LICENSES AND PERMITS
The Contractor shall obtain and pay for all necessary City licenses and work permits and shall faithfully comply with all laws, ordinances and regulations, (Federal, State or local) which may be applicable to the operations to be conducted hereunder, except for those permits obtained by the City. Notwithstanding the provisions above, the contractor is responsible for non-compliance of all permit requirements, including all fines resulting from Contractor’s non-compliance of said requirements.
Chapter II, Section II-4, “Registration of Licenses Obtained From Other Municipalities:” “Persons, partnerships, corporations, or other business entities doing business with the City who are not required to obtain a City occupational license, but who must have either a State or County or Municipal occupational license from another municipality, shall register such occupational license with St. Pete Beach Community Development Department. The City may charge a fee for such registration.” The Contractor shall be responsible for obtaining all City, County, State and Federal permits required by those government agencies and must provide documentation of receipt of those permits prior to project commencement. This shall include a notice to commence work letter and the applicable fee, if required. Any sub-contractor hired by the contractor awarded the project, MUST also register their license with the City.
SUPERINTENDENCE
The Contractor shall constantly superintend all the work embraced in this Contract in person or by a responsible agent who shall have in writing, full authority to act for them and to carry out all the instructions given by the City Manager or designee.
LABOR PROVISIONS
The Contractor and his Subcontractors shall discharge, whenever ordered to do so by the City Manager or designee, any employee who is disorderly or whose conduct in the opinion of the City Manager or designee is detrimental to the prosecution of the work. No person whose age or physical condition is such as to make this employment dangerous to his/her health and safety or to the health and safety of others shall be employed on the work, and in no event shall any persons under the age of sixteen (16) years be employed.
INSURANCE
The Contractor shall procure and maintain at his/her own expense, during the life of the Contract, liability insurance as hereinafter specified. All such insurance shall be subject to the approval of the City for adequacy of protection and shall include a provision preventing cancellation without twenty (20) business days prior notice to the City in writing. The City shall be included as an additional insured on all liability insurance. The liability insurance required is as follows: Contractor’s General Public Liability and Property Damage Insurance issued to the Contractor and protecting the Contractor from all claims for personal injury, including death, and all claims for destruction of or damage to property, arising out of or in connection with any operations under this Contract, whether such operations be by the Contractor or by any Subcontractor hired by the Contractor or anyone directly or indirectly employed by the Contractor or hired by the Contractor.
The successful Contractor shall supply and maintain insurance which defends, indemnifies and holds harmless the City of St. Pete Beach, its officers, employees and agents from and against any and all liability, damage claims, demands, costs, judgments, fees, attorney’s fees or loss arising directly out of acts or omissions hereunder by the Contractor or third party under the direction or control of the Contractor. Such general and excess liability coverage shall be primary to any other coverage carried by the City of St Pete Beach. Contractor must furnish the City with Certificate of Insurance prior to commencement of work. An approved Certificate of Insurance furnished by the Contractor’s carrier to guarantee the Contractor being insured with the City of St Pete Beach must be named as a certificate holder for this contract. The following minimum coverage:
• Commercial General Liability Insurance $1,000,000.00.
• Comprehensive General Liability Insurance of $1,000,000.00 each occurrence.
• Personal Injury for $1,000,000.00 each occurrence.
• Automobile Liability $1,000,000.00.
• General Workers Compensation Insurance as required by Florida law.
• Longshore Harbor Workers Compensation Insurance
PROTECTION OF WORK AND PROPERTY
The Contractor shall continuously maintain adequate protection of all their work and materials from damage or theft and shall protect the City’s property and all adjacent property from injury or loss arising in connection with activities under their Contract. The Contractor shall make good any such damage, injury, or loss, except such as may be caused by agents or employees of the City.
The Contractor shall take, use, provide, and maintain all necessary precautions, safeguards, and protection to prevent accidents, or injury to persons or property on, about, or adjacent to the site of the work. Should the situation arise that physical security is needed the Contractor will provide security on off days and holidays. The Contractor shall be responsible for all charges incurred with such action.
The Contractor shall post danger signs warning against any hazards created by the work being done under their Contract. They shall designate a responsible member of their organization on the work, whose duty shall be the prevention of accidents, and the name of the person so designated shall be reported to the City Manager or designee and City in writing. In an emergency affecting the safety of life, or of the work or adjoining property, the Contractor, without special instruction or authorization from the City Manager or designee, or City, is hereby permitted to act, at their own discretion, to prevent such threatened loss or injury, and they must take such action if so instructed or authorized by the City Manager or designee. The Contractor shall also protect adjacent property as required by law.
PARKING
The Contractor shall arrange with City Manager or designee for temporary parking areas to accommodate construction personnel and construction equipment. Note that limited parking spaces are available in the City of St. Pete Beach. The Contractor will be asked to coordinate with the City’s representative on site on a regular basis to minimize the impact on residents and visitors.
TRANSPORTATION, HANDLING AND STORAGE
The Contractor shall transport, handle, protect and store products in accordance with manufacturer's instructions and all environmental regulatory agencies.
VEHICLES
Business vehicles shall be identified on both sides with the name of the company.
ENVIRONMENTAL PROTECTION
It shall be the Contractor’s responsibility to implement construction methods, best management practices, and erosion control methods that avoid water pollution as required by the State of Florida Department of Environmental Protection (FDEP), City of St. Pete Beach, and Pinellas County. Any Contractors in violation of the City of St. Pete Beach Regulations, Pinellas County Regulations, Florida Department of Environmental Protection Regulations, or any other regulatory agency regulations shall be the sole responsibility of the Contractor. The Contractor shall hold harmless the City of St. Pete Beach and the City Manager or designee from any fines and litigation resulting from the Contractor’s actions. The Contractor shall pay all attorneys’ fees, fines, penalties and any other such expenses resulting from the Contractor’s actions. The Contractor shall provide all necessary measures to prevent any materials whatsoever from entering the waterway except for those materials, which are shown, on the plans as completed structures.
The Contractor shall provide MSDS sheets to the City Manager or designee on all applicable materials before applying those materials.