ARRC_2025 ROWClearing_CE.pdf

PDF 218 KB Posted

Attached to
ITB 26-11-214020 ARRC MP186-195 ROW BRUSH CLEARING
Solicitation number
ITB 26-11-214020 ARRC MP186-195 ROW BRUSH CLEARING
Issued by
Anchorage Municipality, Alaska

About this file

This is a Categorical Exclusion (CE) confirmation letter from the Federal Transit Administration (FTA) to the Alaska Railroad Corporation (ARRC) regarding the 2025 Right-of-Way Clearing Project. The project involves clearing vegetation on the ARRC mainline track between mileposts 187-195 and 171-173 in the Matanuska-Susitna Borough, Alaska. Activities include removing above-ground vegetation within approximately 190 feet of the typical 200-foot right-of-way using hand tools and equipment, with a 5-foot vegetative buffer maintained for adjacent property owners and a 25-foot buffer from anadromous waterways. Cut vegetation within habitat buffer areas will be reduced to approximately 3 feet from the surface, with cut material mulched and left in place or removed as appropriate. The FTA has determined the project qualifies as a CE under the National Environmental Policy Act and will not result in significant environmental effects. A related Invitation to Bid (ITB 26-11-214020) for the brush clearing contract was posted September 29, 2026, with bids closing at 3:00 P.M. AKST on October 20, 2026. A mandatory site visit and project tour was scheduled for 10:00 A.M. on October 7, 2026, at the Willow Section House, with pre-registration required by October 5, 2026, limited to one authorized representative per bidding firm.

The project is subject to federal wage requirements as outlined in the Department of Labor's Pamphlet 600, Issue 52, effective April 1, 2026. All site visit attendees must provide their own transportation and comply with personal protective equipment requirements including hard hats, ANSI-compliant high-visibility safety vests, safety glasses, and sturdy closed-toe protective footwear. The FTA's CE determination is conditioned on implementation of specified mitigation measures, including obtaining necessary permits, adhering to USFWS clearing activity windows (July 15 through May 1 for forested areas and August 31 through March 1 for eagles), and maintaining vegetative habitat buffers of 25-50 feet for anadromous waterways. The determination applies only to the project as described and may be subject to re-evaluation if the project scope changes or new information regarding environmental effects emerges.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Transportation Federal Transit Administration

June 3, 2025

William O’Leary

CEO

Alaska Railroad Corporation PO Box 107500 Anchorage, AK 99510

Subject: Alaska Railroad Corporation 2025 Right-of-Way Clearing Project National Environmental Policy Act Categorical Exclusion Confirmation

Dear Mr. O’Leary:

The Federal Transit Administration (FTA) has reviewed the materials Alaska Railroad Corporation (ARRC) submitted by e-mail on March 27, 2025, and subsequently through May 29, 2025, including an FTA Categorical Exclusion (CE) worksheet and supporting documentation describing the proposed ARRC 2025 Right-of-Way Clearing Project (Project) on the ARRC system in Alaska. FTA understands that the Project activities consist of clearing vegetation on the ARRC mainline track between mileposts 187-195 and 171-173, within the Matanuska- Susitna Borough, Alaska. The Project activities would clear vegetation within the mainline ROW limits (approximately 190-feet out of the typical 200-foot ROW). Hand tools and equipment would be utilized to remove above-ground vegetation, the vegetative mat would not be impacted as a result of this project. Most of these areas have been previously cleared by our regularly scheduled vegetation management program. A contractor will utilize a vegetative buffer of 5-feet to adjacent property owners and a 25-foot buffer from anadromous waterways. Vegetation within the habitat buffer areas will be cut to approximately 3-feet from the surface. Cut material will be mulched and left in place or removed from the buffer zone; large timber may be removed and reused.

The Project would have no effect on any Endangered Species Act-listed species or designated critical habitat, or on any essential fish habitat as outlined in the Magnuson-Stevens Fishery Conservation and Management Act. There would be no impact to wetlands or waters of the US and no use of a Section 4(f) resource due to Project activities.

REGION X

Alaska, Idaho, Oregon, Washington

915 Second Avenue Federal Bldg. Suite 3192 Seattle, WA 98174-1002 206-220-7954 206-220-7959 (fax)

Project activities are exempt from compliance with Section 106 of the National Historic Preservation Act under Appendix A, Section II. Activity J. Landscaping, Access Roads, and Laydown Areas (2) of the Advisory Council on Historic Preservation’s Program Comment to Exempt Consideration of Effects to Rail Properties Within Rail Right-of-Way, approved on Aug.

17, 2018.

Based on a review of the submitted documentation, FTA has determined that the Project will not result in significant environmental effects, and qualifies as a CE under the National Environmental Policy Act (NEPA) pursuant to 23 CFR Part 771.118(c)8. This determination applies only to the proposed Project as described above and in documentation submitted to FTA on February 21, 2025, and is conditioned on the implementation of the attached mitigation measures. Should the Project scope change or new information on the Project or its potential environmental effects be provided, FTA may require a re-evaluation of the NEPA determination and may withdraw or suspend the CE confirmation or require additional environmental reviews.

This confirmation is not an expressed or implied promise that Federal financial assistance for the Project will be awarded. Please contact me at barney.remington@dot.gov if you have any questions.

Thank you for coordinating with FTA.

Sincerely, Barney Remington Environmental Protection Specialist cc: Jeanette Holt, Environmental Analyst II, Alaska Railroad Corporation

Attachment A Alaska Railroad Corporation

2025 Right of Way Clearing Project Mitigation Measures

Alaska Railroad Corporation (ARRC) shall follow all relevant federal, state, and local regulations related to construction and operation of the 2025 Right of Way Clearing Project (Project). ARRC shall implement the following measures to avoid or minimize impacts during both construction and operation:

General:

o ARRC or its designated contractor shall obtain necessary permits prior to beginning work.

Biological Resources:

o ARRC shall ensure that the USFWS allowable window for clearing activities within forested areas of July 15 through May 1 and for eagles August 31 through March 1 is followed.

o ARRC shall ensure that a 25-50-ft vegetative habitat buffer for anadromous waterways is followed.

2025-06-03T08:58:24-0700
BARNEY RYAN REMINGTON