This is a comprehensive HCAI-approved construction plan set for the Arrowhead Regional Medical Center's Central Plant Medical Vacuum System Replacement project located at 400 North Pepper Avenue, Colton, California. The project involves the replacement of three existing Quincy 50 HP medical vacuum pumps with two new Amico Hexaplex stack-mounted vacuum systems, each containing six 15 HP pumps with a combined capacity of 1,290 SCFM compared to the existing 624 SCFM system. The work is executed in four sequential phases: Sequence 1 involves installation of the first Hexaplex system (MV-1) and bringing it online; Sequence 2 requires shutdown of the existing vacuum system and removal of the two 300-gallon receiver tanks; Sequence 3 entails installation of the second Hexaplex system (MV-2) and bringing it online; and Sequence 4 covers demolition and removal of the three existing Quincy pumps and associated infrastructure. The project area encompasses 850 square feet on the second floor of the Central Plant Building (BLD-00075), a two-story Type IA, fully sprinklered structure built in 1994 with 2-hour floor/slab construction.

The construction documents include detailed architectural, structural, electrical, and plumbing drawings prepared by SWA Architects, Spire Structural Engineering Inc., and PBS Engineers, and are designed to comply with 2022 California Building Code, Title 24, NFPA 99 Health Care Facilities Code, and all applicable state and local regulations. All electrical power for the new medical vacuum systems shall be supplied from the essential electrical distribution (emergency power) system, with new 250AF circuit breakers with adjustable trip settings required in the existing distribution boards CP-EEDH1 (600A, 480V) and CP-EEMDH1 (4000A, 480V). New equipment concrete pads, structural supports, seismic bracing, firestopping systems, and roof penetrations with flashing are required as detailed in the structural and architectural drawings. Coordination with all trades, verification of existing utilities and conditions, maintenance of fire protection systems and life safety devices, and compliance with infection control policies and procedures are essential contractor responsibilities. The project requires HCAI field review and approval of all deferred submittals, firestop systems, and penetration protection prior to installation, with as-built drawings and record documentation to be provided upon completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS LEGEND

WALL IDENTIFICATION

DOOR LETTER, SEE PLAN

ROOM NUMBER

DEPARTMENT LETTER

SHEET NO.

SECTION NO.

SHEET NO.

SECTION NO.

SHEET NO.

ELEVATION NO.

DETAIL NO.

SHEET NO.

EXISTING GRID LINE

NEW GRID LINE

EXISTING WALLS TO REMAIN

TO BE CONSTRUCTED

EXISTING WALLS TO

AREA/SCOPE OF WORK

/ENLARGED PLAN AREA

MATCH LINE

PROPOSED WALLS

CONCRETE

BE REMOVED

STEEL

PLYWOOD

INSULATION

GYPSUM BOARD

EXTERIOR WINDOW SYMBOL/TYPE

EQUIPMENT SYMBOL

WALL TYPE REFERENCE

REVISION REFERENCE

INTERIOR WINDOW SYMBOL/TYPE

WOOD MEMBER

DOOR SYMBOL

CLOUD AROUND REVISION

DETAIL REFERENCE

BUILDING SECTION

INTERIOR ELEVATION

EXTERIOR ELEVATION

WALL SECTION

REVISION

2 HR RATED FIRE PARTITION

1 HR RATED FIRE PARTITION

1 HR FIRE RATED SMOKE BARRIER

SECTION NO.

SHEET NO.

DEMO KEYNOTE

A-4.20

A-4.00

A-3.00

XX

XXXX

XX

E101A

B2

A

A-2.20 A-2.20

A-2.21 A-2.21

A-7.00

N

EW

S

A-2.40

PROPOSED KEYNOTE/ KEYED

NUMBERED NOTES

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

_T

TI

.D W

G

1/

/2

2:

P

M

ELECTRICAL ENGINEER

PBS ENGINEERS, INC.

279 E. ARROW HIGHWAY, SUITE 201

SAN DIMAS, CA 91773

CONTACT: REY ALVARADO

TEL: (626) 691-0379

FAX: (626) 650-0352

PLUMBING ENGINEER

PBS ENGINEERS, INC.

279 E. ARROW HIGHWAY, SUITE 201

SAN DIMAS, CA 91773

CONTACT: CORY NAKANISHI

TEL: (626) 691-0379

FAX: (626) 650-0352

N.T.S.

GENERAL NOTES

PROJECT NARRATIVE

APPLICABLE CODES

PROJECT DIRECTORY

VICINITY MAP

MEDICAL VACUUM PUMP REPLACEMENT

STRUCTURAL ENGINEER

SPIRE STRUCTURAL ENGINEERING INC.

26461 RANCHO PARKWAY SOUTH,

LAKE FOREST, CA 92630

CONTACT: JEREMY WELTON

TEL: (949) 916-3440

PROJECT SCOPE

THE TYPE OF APPROVAL TO BE ISSUED BY THE OSHPD FOR THIS PROJECT IS:

NON STRUCTURAL ALTERATION

INCIDENTAL STRUCTURAL ALTERATION

INCIDENTAL STRUCTURAL ADDITION

MINOR STRUCTURAL ALTERATION

MINOR STRUCTURAL ADDITION

MAJOR STRUCTURAL ALTERATION

MAJOR STRUCTURAL ADDITION

1. REPLACEMENT OF EXISTING MEDICAL VACUUM PUMPS EQUIPMENT WITH

NEW, LOCATED AT SECOND FLOOR OF CENTRAL PLANT BUILDING. THE

WORK WILL BE EXECUTED IN FOUR SEQUENCES.

BUILDING DATADEFERRED SUBMITTALS

INSTALLATION OF THE FOLLOWING ITEMS SHALL NOT BE STARTED UNTIL

DETAILED PLANS, SPECIFICATIONS AND ENGINEERING CALCULATIONS HAVE

BEEN SUBMITTED TO AND APPROVED BY THE ARCHITECT OR ENGINEER OF

RECORD AND OSHPD. THE ARCHITECT OR ENGINEER OF RECORD SHALL

REVIEW AND FORWARD SUBMITTAL DOCUMENTS FOR DEFERRED ITEMS TO

OSHPD WITH A NOTATION INDICATING THAT THE DOCUMENTS HAVE BEEN

REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF

THE PROJECT.

· NONE

HCAI FACILITY # 17282

BLD-00075- CENTRAL PLANT- BLDG 05

BUILDING TYPE: TYPE IA

OCCUPANCY: F-1 (H-3 GENERATOR ROOM ONLY)

STORIES: 2 STORY BUILDING 52'-6" FROM GROUND

FLOOR TO TOP OF ROOF PARAPET

FULLY SPRINKLERED: YES

YEAR OF CONSTRUCTION: 1994

EXISTING FLOOR/SLAB RATING: 2-HOUR

FLOOR/SLAB CONSTRUCTION: CONCRETE COMPOSITE DECK

EXISTING CORRIDOR CONSTRUCTION: 1-HOUR

AREA OF WORK: 850 SF

CAMPUS PLAN

GENERAL NOTES,

SHEET INDEX, VICINITY

MAP, LEGEND

T-1.00

SHEET INDEX

TITLE SHEETS

T-1.00 GENERAL NOTES, SHEET INDEX, VICINITY MAP, LEGEND

ARCHITECTURAL

A-1.00 OVERALL SITE PLAN

A-1.01 FIRST & SECOND FLOOR LIFE SAFETY & EGRESS PLANS

A-2.10 SECOND FLOOR OVERALL PLAN SEQUENCE ORDER

A-2.11 SECOND FLOOR DEMOLITION & PROPOSED PLANS - SEQUENCE 1

A-2.12 SECOND FLOOR DEMOLITION & PROPOSED PLANS - SEQUENCES 2 & 3

A-2.13 SECOND FLOOR DEMOLITION & PROPOSED PLANS - SEQUENCE 4

A-9.00 DETAILS

A-9.01 FIRESTOP SYSTEMS

A-10.00 MEDICAL VACUUM DRAWINGS (FOR REFERENCE)

STRUCTURAL

S-0.00 GENERAL NOTES

S-1.01 TYPICAL DETAILS

S-2.11 SECOND FLOOR PLAN & DETAILS PHASE 1

S-2.12 SECOND FLOOR PLAN & DETAILS PHASE 2 & 3

S-3.01 DETAILS

ELECTRICAL

E-0.00 GENERAL NOTES, SYMBOLS, ABBREVIATIONS AND SHEET INDEX

E-0.01A SINGLE LINE DIAGRAM - SEQUENCE 1& 2

E-0.01B SINGLE LINE DIAGRAM - SEQUENCE 3

E-0.01C SINGLE LINE DIAGRAM - SEQUENCE 4

E-2.00 SECOND FLOOR OVERALL PLAN

E-2.11 SECOND FLOOR DEMO AND REMODEL POWER PLANS - SEQUENCE 1

E-2.12 SECOND FLOOR DEMO AND REMODEL POWER PLANS - SEQUENCES 2 & 3

E-2.13 SECOND FLOOR DEMO AND REMODEL POWER PLANS - SEQUENCE 4

E-2.21 SECOND FLOOR DEMO AND REMODEL LIGHTING PLANS - SEQUENCE 1,2,3 & 4

E-2.31 SECOND FLOOR DEMO AND REMODEL FIRE ALARM PLANS - SEQUENCE 1,2,3 & 4

E-3.00 ELECTRICAL DETAILS

PLUMBING

P-0.00 GENERAL NOTES, LEGEND, ABBREVIATIONS, SHEET INDEX AND SCHEDULE

P-2.00 SECOND FLOOR OVERALL PLUMBING PLAN

P-2.11 SECOND FLOOR DEMOLITION & REMODEL PLUMBING PLAN - SEQUENCE 1

P-2.12 SECOND FLOOR DEMOLITION & REMODEL PLUMBING PLAN -

SEQUENCES 2 & 3

P-2.13 SECOND FLOOR DEMOLITION & REMODEL PLUMBING PLAN - SEQUENCE 4

P-2.14 ROOF PLUMBING PLAN

ARROWHEAD REGIONAL MEDICAL CENTER

400 N PEPPER AVE, COLTON, CA 92324

W VALLEY BLVD.

W OLIVE ST.

W CITRUS ST. E. RANDALL AVE.

W. SAN BERNARDINO AVE.

N PEPPER AVE

N EUCALYPTUS AVE

N MERIDIAN AVE

N RANCHO AVE

S SYCAMORE AVE

S RIVERSIDE AVE

S W

ILLOW

AVE

S LILAC AVE

PROJECT SITE

ARROWHEAD REGIONAL

MEDICAL CENTER

400 N Pepper Ave.

Colton, CA. 92324

W OLIVE ST.

W C ST.

GENERAL NOTES:

1. THE CONTRACTOR SHALL VISIT THE SITE INCLUDING ALL AREAS INDICATED ON

THE DRAWINGS TO THOROUGHLY FAMILIARIZE HIMSELF WITH THE EXISTING

CONDITIONS. CONTRACTOR SHALL VERIFY CONDITIONS AND DIMENSIONS AT JOB

SITE PRIOR TO BIDDING AND START OF CONSTRUCTION. PRIOR TO INSPECTION OF

THE EXISTING FACILITY, THE CONTRACTOR MUST RECEIVE PERMISSION FOR

ACCESS FROM THE OWNER OR THE DESIGNATED REPRESENTATIVE. IF

DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED FOR

CLARIFICATION. CONTACT THE ARCHITECT TO CLARIFY ALL UNCLEAR DRAWING

ITEMS PRIOR TO BIDDING. BY SUBMITTING A BID, THE CONTRACTOR ACCEPTS THE

CONDITIONS UNDER WHICH HE SHALL BE REQUIRED TO PERFORM THE WORK.

2. MECHANICAL, ELECTRICAL, AND STRUCTURAL DRAWINGS ARE SUPPLEMENTARY

TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE

GENERAL CONTRACTOR TO CHECK WITH THE ARCHITECTURAL DRAWINGS

BEFORE THE INSTALLATION OF MECHANICAL, ELECTRICAL, AND STRUCTURAL

WORK. ANY DISCREPANCY BETWEEN THE ARCHITECTURAL AND THE OTHER

DRAWINGS, SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR

CLARIFICATION. WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURAL

DRAWINGS SHALL BE CORRECTED BY THE GENERAL CONTRACTOR AT HIS OWN

EXPENSE, AND AT NO EXPENSE TO THE OWNER.

3. DO NOT SCALE DRAWINGS. LARGER SCALE DRAWINGS GOVERN OVER SMALLER

SCALE DRAWINGS.

4. ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE.

ARCHITECT SHALL DEFINE INTENT OF ANY IN QUESTION.

5. FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE, UNLESS OTHERWISE

NOTED.

6. CEILING HEIGHT DIMENSIONS ARE TO FINISHED SURFACE OF CEILING.

7. WALL DIMENSIONS ARE TO FACE OF FINISH UNLESS NOTED OTHERWISE.

CONSTRUCTION NOTES:

1. DUCTS PENETRATING STUD WALLS SHALL BE PROVIDED WITH NECESSARY

FRAMES AND BRACING AROUND THE OPENING.

2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP

PLATES, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL

CASEWORK, TOILET ACCESSORIES, AND FLOOR MOUNTED OR SUSPENDED

MECHANICAL AND ELECTRICAL EQUIPMENT.

3. CONTACT BETWEEN DISSIMILAR METALS SHALL BE PROPERLY SEPARATED BY THE

CONTRACTOR.

4. ALL DUST, NOISE AND ODORS SHALL BE CONTROLLED PER OWNER'S

REQUIREMENTS AND THOSE OF THE AHJ.

5. REQUIRED EXITS SHALL NOT BE BLOCKED AT ANY TIME.

6. THE CONTRACTOR SHALL PROTECT ALL FINISHED WORK AND SURFACES FROM

DAMAGE DURING THE COURSE OF WORK AND SHALL REPLACE AND/OR REPAIR

ALL DAMAGE CAUSED BY CONTRACTOR.

7. UPON COMPLETION OF WORK, ALL CONSTRUCTION AREAS SHALL BE LEFT BROOM

CLEAN AND FREE OF DEBRIS.

8. WHEN IT IS NECESSARY TO INTERRUPT ANY EXISTING UTILITY SERVICE, A

MINIMUM OF 1 WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER.

INTERRUPTIONS IN UTILITY SERVICES SHALL BE OF THE SHORTEST POSSIBLE

DURATION FOR THE WORK AT HAND AND SHALL BE APPROVED IN ADVANCE BY

THE OWNER.

9. IN THE EVENT THE UTILITY SERVICE IS INTERRUPTED WITHOUT THE REQUIRED

NOTICE THE CONTRACTOR SHALL BE FINANCIALLY LIABLE FOR ALL DAMAGES

SUFFERED BY THE OWNER DUE TO THE UNAUTHORIZED INTERRUPTION.

RECONNECTION SHALL BE MADE IMMEDIATELY.

10. OWNER'S INSPECTOR: AN INSPECTOR EMPLOYED BY THE OWNER IN ACCORDANCE

WITH TITLE 24, CCR, SHALL BE ASSIGNED TO INSPECT THE WORK. THE WORK OF

CONSTRUCTION IN ALL STAGES OF PROGRESS SHALL BE SUBJECT TO THE

PERSONAL CONTINUOUS OBSERVATION OF THE INSPECTOR. HE SHALL HAVE FREE

ACCESS TO ANY OR ALL PARTS OF THE WORK AT ANY TIME. THE CONTRACTOR

SHALL FURNISH THE INSPECTOR REASONABLE FACILITIES FOR OBTAINING SUCH

INFORMATION AS MAY BE NECESSARY TO KEEP HIM FULLY INFORMED WITH

RESPECT TO THE PROGRESS AND MANNER OF THE WORK AND THE CHARACTER

OF THE MATERIALS. INSPECTION OF THE WORK SHALL NOT RELIEVE THE

CONTRACTOR FROM ANY OBLIGATION TO FULFILL THIS CONTRACT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING HVAC

FILTERS WITHIN THE AREA OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR

THE PROTECTION OF AND, WHERE REQUIRED BY THE HCAI AND/OR CITY FIRE

MARSHALS, THE OPERATIONAL MAINTENANCE OF FIRE LIFE SAFETY DEVICES

WITHIN THE AREA OF WORK. ALL FIRE PROTECTION SYSTEMS (SPRINKLERS, PULL

BOXES, STAND PIPES, FIRE DAMPERS, EMERGENCY LIGHTS) SHALL BE KEPT IN

SERVICE AND ACCESSIBLE AT ALL TIMES.

12. ONLY NEW ITEMS OF RECENT MANUFACTURE, OF THE QUALITY SPECIFIED, FREE

FROM DEFECTS, SHALL BE PERMITTED IN THE WORK.

13. WHEN CONFLICTING INFORMATION IS FOUND IN THIS SET OF DRAWINGS AND

SPECIFICATIONS, THE MOST RESTRICTIVE/COSTLY REQUIREMENT SHALL PREVAIL.

AN RFI SHALL BE SENT TO THE ARCHITECT FOR CLARIFICATION, PRIOR TO

CONSTRUCTION. IF THE GENERAL CONTRACTOR CHOOSES TO PROCEED WITH

THE WORK WITHOUT CLARIFICATION FROM THE ARCHITECT, THE GENERAL

CONTRACTOR SHALL BEAR ALL OF THE COST WITHOUT ADDITIONAL COST TO THE

OWNER.

LIFE SAFETY:

1. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A

KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. PANIC HARDWARE SHALL BE

MOUNTED AT A HEIGHT OF NOT LESS THAN 34" OR MORE THAN 44" ABOVE THE

FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED

IN THE DIRECTION OF EXIT.

2. ALL EXIT LIGHTING AND SIGNS TO HAVE MINIMUM 6-INCH HIGH LETTERS IN

ACCORDANCE WITH CBC, SEC. 1011.6.1.

3. EMERGENCY LIGHTING SHALL BE PROVIDED GIVING A VALUE OF ONE FOOT

CANDLE AT FLOOR LEVEL IN ALL EXIT CORRIDORS.

4. MAINTAIN 44 INCHES MINIMUM CLEARANCE TO ALL REQUIRED EXITS.

DRAWING SET:

1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COMPLETE SET OF

CONTRACT DOCUMENTS, ADDENDA, DRAWINGS AND SPECIFICATIONS. THE

CONTRACTOR SHALL CHECK THE DRAWINGS OF THE OTHER TRADES AND SHALL

CAREFULLY READ THE ENTIRE SPECIFICATIONS AND DETERMINE HIS

RESPONSIBILITIES. FAILURE TO DO SO SHALL NOT RELEASE THE CONTRACTOR

FROM DOING THE WORK IN COMPLETE ACCORDANCE WITH THE DRAWINGS AND

SPECIFICATIONS.

2. THE PROJECT DRAWINGS AND SPECIFICATIONS COMPRISE A COMPLETE SET OF

CONSTRUCTION DOCUMENTS AND SHALL NOT BE SPLIT NOR SEPARATED BY THE

CONTRACTOR DURING BIDDING NOR CONSTRUCTION. PARTIAL DRAWING SETS

SHALL NOT BE PERMITTED TO BE USED ON THE JOB SITE.

AS-BUILT DRAWINGS:

1. THE CONTRACTOR SHALL PROVIDE AND KEEP UPDATED A COMPLETE RECORD

SET OF DRAWINGS. THE RECORD DRAWINGS SHALL BE CORRECTED DAILY AND

SHOW EVERY CHANGE FROM THE ORIGINAL DRAWINGS, NEATLY DELINATED WITH

CONTRASTING COLOR TO INCLUDE ACTUAL LOCATIONS OF CONCEALED WORK.

THIS SET OF DRAWINGS SHALL BE KEPT ON THE JOB SITE AND SHALL BE MADE

AVAILABLE BY THE CONTRACTOR FOR REVIEW BY THE OWNER, ARCHITECT OR

INSPECTOR OF RECORD UPON REQUEST.

2. CONTRACTOR'S RECORD SET DRAWINGS SHALL BE DELIVERED TO THE

ARCHITECT UPON FINAL COMPLETION OF THE WORK SO THAT ARCHITECT MAY

PREPARE RECORD SET PLANS FOR THE OWNER.

FIRE PROTECTION AND EQUIPMENT:

1. PRIOR TO SPRINKLER INSTALLATION, FIRE SPRINKLER CONTRACTOR SHALL

SUBMIT PLANS TO THE ARCHITECT FOR REVIEW PRIOR TO SUBMITTING TO THE

CALIFORNIA DEPARTMENT OF HEALTH CARE ACCESS AND INFORMATION (HCAI).

2. PROVIDE FIRE EXTINGUISHERS WHERE INDICATED AND AS REQUIRED BY FIRE

DEPARTMENT FIELD INSPECTOR.

3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING FIRE SPRINKLER SHOP

DRAWINGS AND HYDRAULIC CALCULATIONS.

FIRE STOPPING:

1. CONTRACTOR SHALL PROVIDE PROPER FIRE STOPPING AT FLOOR AND WALL

PENETRATIONS FOR PLUMBING, ELECTRICAL AND FIRE SPRINKLER LINES AS

REQUIRED PER THE APPROPRIATE UL DESIGN LISTING NUMBER.

2. WHERE PROVIDED, THROUGH-PENETRATION FIRESTOP SYSTEM AND MEMBRANE

PENETRATION DETAILS ARE FOR REFERENCE ONLY. THROUGH-PENETRATIONS

AND MEMBRANE PENETRATIONS SHALL BE PROTECTED BY AN APPROVED

PENETRATION FIRESTOP SYSTEM OR MEMBRANE PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479,

WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 Pa) OF

WATER OR AS OTHERWISE PERMITTED BY CBC, SECTION 714. LISTED

THROUGH-PENETRATION FIRESTOP SYSTEMS AND MEMBRANE PENETRATIONS

SHALL BE INSTALLED IN ACCORDANCE WITH THE INSTALLATION DETAILS FOR

LISTED SYSTEMS. LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS,

MEMBRANE PENETRATION PROTECTION AND OTHER PERMITTED MEANS AND

METHODS OF PENETRATION PROTECTION SHALL BE SUBMITTED FOR HCAI FIELD

REVIEW AND APPROVAL PRIOR TO INSTALLATION. CBC 714.1

INFECTION CONTROL:

1. THE CONTRACTOR SHALL COMPLY WITH ALL INFECTION CONTROL POLICIES AND

PROCEDURES ESTABLISHED BY THE HOSPITAL. INFECTION CONTROL

PROCEDURES MUST BE REVIEWED AND UNDERSTOOD BY THE CONTRACTOR

PRIOR TO BIDDING.

CALIFORNIA DEPARTMENT OF HEALTH CARE ACCESS AND INFORMATION (HCAI),

FORMERLY THE OFFICE OF STATEWIDE HEALTH PLANNING AND DEVELOPMENT

(OSHPD):

1. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO RECONSTRUCT THE

HOSPITAL BUILDING IN ACCORDANCE WITH CALIFORNIA BUILDING STANDARDS

CODE, TITLE 24, CALIFORNIA CODE OF REGULATIONS. SHOULD ANY CONDITION

DEVELOP NOT COVERED BY THE APPROVED PLANS AND SPECIFICATIONS

WHEREIN THE FINISHED WORK WOULD NOT COMPLY WITH TITLE 24, CALIFORNIA

CODE OF REGULATIONS, A CHANGE ORDER DETAILING AND SPECIFYING THE

REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY HCAI BEFORE

PROCEEDING WITH THE WORK.

2. SAMPLES AND SPECIFICATIONS OF INTERIOR WALL AND CEILING FINISH

MATERIALS SHALL COMPLY WITH CBC, SEC. 803 AND BE REVIEWED BY THE HCAI

FIELD INSPECTOR PRIOR TO INSTALLATION. TEST REPORTS FOR CARPETING

CONFIRMING COMPLIANCE TESTING IN ACCORDANCE WITH NFPA 253 SHALL BE

FURNISHED TO THE HCAI BUILDING OFFICIAL UPON REQUEST.

3. CHANGES TO APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE MADE BY

ADDENDA OR CHANGE ORDER APPROVED BY HCAI, AS REQUIRED BY PART 1, TITLE

24 CCR.

4. PRE-APPROVED DETAILS: A COPY OF THE HCAI PRE-APPROVED DOCUMENTS MUST

BE MADE AVAILABLE AT THE JOB SITE AT ALL TIMES. WORK MUST BE PERFORMED

IN STRICT ACCORDANCE WITH THE PRE-APPROVAL DOCUMENTS.

ANCHORAGE:

1. ANCHORAGE OF EQUIPMENT SHALL COMPLY WITH THE PROVISIONS OF TITLE 24,

PART 2, 2022 CBC SEC. 1617A AND ASCE 7, CHAPTER 13 - LATERAL FORCE ON

ELEMENTS OF STRUCTURES, NON-STRUCTURAL COMPONENTS & EQUIPMENT

SUPPORTED BY STRUCTURES.

2. PIPES, DUCTS AND CONDUITS SHALL BE SUPPORTED AND BRACED PER HCAI'S

OSHPD ANCHORAGE PRE-APPROVAL NO. OPM-0052-13, THE "B-LINE/TOLCO" OR

OTHER OSHPD PRE-APPROVED SYSTEM. SHOP DRAWINGS OF THE SUPPORT AND

BRACING SYSTEMS PER THE PRE-APPROVAL SHALL BE SUBMITTED TO THE

ARCHITECT FOR REVIEW TO VERIFY DETAILS ARE IN CONFORMANCE WITH CODE

REQUIREMENTS. SHOP DRAWINGS SHALL BE IN ACCORDANCE WITH ASCE 7,

CHAPTER 13 AS MODIFIED BY 2022 CBC, SEC. 1617A.

3. WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN

EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION

TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. WHEN

INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE (PRE- OR

POST-TENSIONED), LOCATE THE PRESTRESSED TENDONS BY USING A

NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION. EXERCISE EXTREME CARE

AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING

INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE

REINFORCEMENT AND THE DRILLED-IN ANCHOR AND/OR PIN.

ARCHITECT

SWA ARCHITECTS

48 EAST HOLLY STREET

PASADENA, CA 91103

CONTACT: TINA GO

TEL: 626-793-9805

FAX: 626-793-9807

BUILDING 02,

DIAGNOSTICS &

TREATMENT, BLD-00071

BUILDING 04

MENTAL HEALTH, BLD-00074

BUILDING 01

NURSING TOWER, BLD-00072

BUILDING 06,

MRI BUILDING, BLD-00076

BUILDING 05,

CENTRAL PLANT, BLD-00075

BUILDING 07, LOADING DOCK

BLD-00077

BUILDING 03, CLINICS BUILDING

BLD-00073

PROJECT LOCATION

SECOND FLOOR

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

11-13-2023

(CENTRAL PLANT BLDG)

APPLICABLE CODES CURRENT ADOPTED EDITIONS

1. 2022 CALIFORNIA ADMINISTRATIVE CODE (CAC)

PART 1, TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)

2. 2022 CALIFORNIA BUILDING CODE (CBC)

PART 2, TITLE 24, CCR

BASED ON THE 2021 INTERNATIONAL BUILDING CODE (IBC)

3. 2022 CALIFORNIA ELECTRICAL CODE (CEC)

PART 3, TITLE 24, CCR

BASED ON THE 2020 NATIONAL ELECTRICAL CODE (NEC)

4. 2022 CALIFORNIA MECHANICAL CODE (CMC)

PART 4, TITLE 24, CCR

BASED ON THE 2021 UNIFORM MECHANICAL CODE (UMC)

5. 2022 CALIFORNIA PLUMBING CODE (CPC)

PART 5, TITLE 24, CCR

BASED ON THE 2021 UNIFORM PLUMBING CODE (UPC)

6. 2022 CALIFORNIA FIRE CODE (CFC)

PART 9, TITLE 24, CCR

BASED ON THE 2021 INTERNATIONAL FIRE CODE (IFC)

7. 2022 CALIFORNIA EXISTING BUILDING CODE (CEBC)

PART 10, TITLE 24, CCR

BASED ON THE 2021 INTERNATIONAL BUILDING CODE

8. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN)

PART 11, TITLE 24, CCR

9. 2022 CALIFORNIA REFERENCED STANDARDS CODE (CRSC)

PART 12, TITLE 24, CCR

10. 2022 NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

11. 2021 NFPA 17 - STANDARD FOR DRY CHEMICAL EXTINGUISHER SYSTEMS

12. 2022 NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE

13. 2021 NFPA 99 - HEALTH CARE FACILITIES CODE

N

N

& And ∠ Angle ℄ Centerline # Pound or Number

(E) Existing

(N) New

A/C Air Conditioning ADDT'L Additional ABV. Above A.D. Area Drain ACT. Adjustable A.F.F. Above Finish Floor A.F.C. Above Finish Ceiling AHJ Authority Having Jurisdiction ALUM. Aluminum AN. Anodized APPROX. Approximate ASPH. Asphalt

BD. Board BLDG. Building BLK. Block BLKG. Blocking B.O. Bottom of B.O.C. Back of Curb BOT. Bottom

CAB. Cabinet C.B. Catch Basin CER. Ceramic C.I. Cast Iron CLG. Ceiling CLKG. Caulking CLR. Clear COL. Column CONC. Concrete CONN. Connection CONSTR. Construction CONT. Continuous CORR. Corridor CPT. Carpet CNTR. Counter CTR. Center C.F.C.I. Contractor Furnished Contractor

Installed

DBL. Double DEMO. Demolition DEPT. Department D.F. Drinking Fountain D.H. Double Hung DIAG. Diagonal DIM. Dimension DISP. Dispenser DN. Down D.O. Door Opening DR. Door DS. Downspout D.SP. Dry Standpipe DWG. Drawing DWR. Drawer

E. East EA. Each EL. Elevation ELEC. Electrical ELEV. Elevator/Elevation EMER. Emergency ENCL. Enclosure E.P.B. Electrical Panel Board EQ. Equal EQUIP. Equipment EST. Estimate E.W.C. Electric Water Cooler E.W.H. Electric Water Heater EXH. Exhaust EXIST. Existing EXP. Expansion EXT. Exterior

F.A. Fire Alarm F.D. Floor Drain FDN. Foundation F.A. Fire Extinguisher F.E.C. Fire Extinguisher Cabinet F.F. Finish Floor F.H.C. Fire Hose Cabinet FIN. Finish FL. Floor FLR. Floor FLASH. Flashing FLUOR. Fluorescent F.O.C. Face of Concrete

Face of Curb F.O.F. Face of Finish F.O.M. Face of Masonry F.O.S. Face of Stud F.P. Flat Point FPRF. Fireproof F.S. Floor Sink FT. Foot/Feet FTG. Footing FUT. Future F.V. Field Verify

GA. Gauge GALV. Galvanized G.B. Grab Bar GL. Glass GND. Ground GR. Grade GYP. Gypsum

H.C. Hollow Core HDWD. Hardwood HDW. Hardware H.M. Hollow Metal HORIZ. Horizontal HR. Hour HGT. Height HVAC. Heating/Ventilating/Air

Conditioning H.W.H. Hot Water Heater

I.D. Inside Diameter INSUL. Insulation INT. Interior INV. Invert

JAN. Janitor JT. Joint

KIT. Kitchen

LAM. Laminate LAV. Lavatory LAND'G Landing

L.B. Lag Bolt L.G. Lead Glass L.H. Left Hand LIN. Linen LKR. Locker LWC. Lightweight Concrete LVR. Louver

MAX. Maximum MECH. Mechanical MET. Metal MFR. Manufacturer MIN. Minimum MIR. Mirror MISC. Miscellaneous MTD. Mounted MTL. Metal MUL. Mullion

N. North N.I.C. Not In Contract N.C. Nurse Call No. or # Number NOM. Nominal N.T.S. Not To Scale

O Oxygen O.C. On Center O.D. Outside Diameter OFF. Office OH. Overhead OPNG. Opening OPP. Opposite O.H. Opposite hand O.F.C.I. Owner Furnished

Contractor Installed O.F.O.I. Owner Furnished

Owner Installed O.F.V.I. Owner Furnished

Vendor Installed

PAR. Parallel P.B. Panic Bar PRCST. Pre-cast PL. Plate P.G. Plate Glass P.LAM. Plastic Laminate PLAS. Plaster PLYWD. Plywood PR. Pair P.S.I. Pounds per Square Inch PT. Point P.T.D. Paper Towel Dispenser P.T.D/T. Paper Towel combination

Dispenser & Trash

Q.T. Quarry Tile

R. Riser RAD. Radius R.D. Roof Drain REF. Reference REFR. Refrigerator RF Radio Frequency RGTR. Register REINF. Reinforced REQ. Required RESIL. Resilient RFG. Roofing R.H. Right Hand RM. Room R.O. Rough Opening

S. South S.C. Solid Core S.C.D. Seat Cover Dispenser SCHED. Schedule SCN. Screen S.D. Soap Dispenser/

Storm drain SECT. Section SG. Semi Gloss SH. Shelf SHR. Shower SHT. Sheet SIM. Similar S.N.D. Sanitary Napkin Dispenser S.N.R. Sanitary Napkin Receptacle S.P. Starting Point SPEC. Specifications SQ. Square S.S. Stainless Steel STA. Station STD. Standard STG. Sheathing STL. Steel STOR. Storage STRL. Structural SUSP. Suspended SV Sheet Vinyl SYM. Symmetrical

TR. Tread TEL. Telephone T.G. Tempered Glass THK. Thick THR. Threshold T.O.J. Top of Joint T.O.P. Top of Pavement T.P.D. Toilet Paper Dispenser TV Television T.O.W. Top of Wall TYP. Typical

UNF. Unfinished U.N.O. Unless Noted Otherwise U.O.N. Unless Otherwise Noted

V.I.F. Verify In Field V. Vacuum V.B. Vinyl Base V.C.T. Vinyl Composite Tile VERT. Vertical VEST. Vestibule VIN. Vinyl V.T. Vinyl Tile

W. West W/ With W.C. Water Closet WD. Wood W/O Without W.G. Wire Glass W.H. Wall Hung WSCT. Wainscot WP. Waterproofing W.T.W. Wall to Wall

ABBREVIATIONS

CLIENT

ARROWHEAD REGIONAL MEDICAL CENTER

400 NORTH PEPPER AVE.

COLTON,, CA 92324

CONTACT: JAVIER RUIZ

TEL: (909) 580-1000

S250159-36-00

6/26/2025, 1:29:14 PM

S250159-36-00

Allen Cheng

4T H

S

TR

EE

T

4T H

S

TR

EE

T

7T H

S

TR

EE

T

5T H

S

TR

EE

T

EXISTING MEDICAL

OFFICE BUILDING

EXISTING DROP-OFF

EXISTING PARKING LOT

EXISTING PARKING LOT

EXISTING PARKING LOT

EXISTING PARKING LOT

EXISTING PARKING LOT

EXISTING PARKING LOT

MOTORCYCLE

PARKING

G R

E E N C

T R

1 S T. S T R E E T

N . P E P P E R

A V E .

C A P T A I N L U P E O L I V E R O S D R.

N . M

E R I D

I A N A V E N

U E

2 N D. S T R E E T

Y E L L O W

W A Y

B L U E D R.

HCAI BACKCHECK 1

ENLARGED FIRST FLOOR PLAN AT D&T BUILDING

W/ (E) MASTER ALARM PANEL LOCATION 1/8"=1'-0"

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

S250159-36-00

11-13-2023

(CENTRAL PLANT BLDG)

OVERALL SITE PLAN 1/64"=1'-0" 1

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

A1

.D W

G

3/

/2

:5

PM

OVERALL

SITE PLAN

A-1.00

KEYNOTES

# DESCRIPTION DETAIL

MAIN ENTRANCE TO PLANT BUILDING

(E) ACCESSIBLE STALLS, SEE SHEET A-1.01

ACCESSIBLE PATH OF TRAVEL FROM PUBLIC SIDEWALK

BUS STOPS

N

BLDG 06

MRI BLDG

BLD-00076

BUILDING 02

DIAGNOSTIC &

TREATMENT BLDG

BLD-00071

BUILDING 07

LOADING DOCK

BLD-00077

BUILDING 03

CLINICS BLDG

BLD-00073

BUILDING 01

NURSING TOWER

BLD-00072

BUILDING 05

CENTRAL PLANT

BLD-00075

PROJECT LOCATION

SECOND FLOOR

A-2.10

SECOND FLOOR OVERALL PLAN

PHASING ORDER

A-1.01

FIRST & SECOND FLOOR LIFE

SAFETY & EGRESS PLANS

BUILDING 04

MENTAL HEALTH BUILDING

BLD-00074

EXISTING

MASTER

ALARM PANEL.

N

FOR LOCATION

OF (E) MASTER

ALARM PANEL IN

FIRST FLOOR

03-21-2025

6/26/2025, 1:29:14 PM

25'-0"

25'-0"

BOILER ROOM

1E011

PLUMBING

ROOM

1E010

STAIR

1B09

CHILLER

ROOM

1E012

CORRIDOR

1E08

SWITCHGEAR

CORRIDOR

1E07

DISCHARGE

PLENUM

1E05

GENERATOR

ROOM

1E04

GENERATOR

ROOM

1E02

DISCHARGE

ROOM

1E01

GAS

FARM

1E03

CART

CHARGING

1F02

DF

A.D.

SLOPE

SLOPE

SLOPE DN SLOPE

DN

SLO

PE D

N

SLOPE DN

CHILLER

#4

CHILLER

#3

CHILLER

#2

CHILLER

#1

TYP.

OUTLINE OF

2ND FLOOR

MOTORCYCLE

PARKING

TYP.

EXIT

EXIT

8" T

O E

XI

T

0' F

T M

AX

TO

E

XI

T

0' F

T M

AX

(E)CWP (E)CWP (E)CWP

(E)CWP(E)CWP

(E) METAL

GRATING

CAT WALK

(E)MED.AIR

COMPRESSOR

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

OPEN TO

BELOW

OPEN TO

BELOW

UP DN

HEXAPLEX

MED. VACUUM

PUMP #1

MED.

VAC. PUMP

HEXAPLEX #1

MED.

VAC. PUMP

HEXAPLEX #2

PLUMBING

ROOM

2E06

CORRIDOR

2E01

LOCKER/

SHOWER

2E02

REST

ROOM

2E03

OFFICE

2E04

PUMP

ROOM

2E05

OPEN TO

BELOW

OPEN TO

BELOW

OUTLINE OF

2ND FLOOR

8" T

O E

XI

T

0' F

T M

AX

125'-6" TO EXIT(200' FT MAX.)

SQ. FT.

F-1 SUPPORT

# OF OCC.

EXISTING

MASTER ALARM

PANEL.

HCAI BACKCHECK 1

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

S250159-36-00

11-13-2023

(CENTRAL PLANT BLDG)

FIRST FLOOR LIFE SAFETY & EGRESS PLAN 3/32"=1'-0" 1SECOND FLOOR LIFE SAFETY & EGRESS PLAN 3/32"=1'-0" 2

AREA OF WORK

SEE 1/A-2.10

LEGEND

FIRST & SECOND FLOOR

LIFE SAFETY & EGRESS PLANS

A-1.01

KEYNOTES

# DESCRIPTION DETAIL

(E) CONCRETE WALKWAY TO REMAIN, PROTECT IN PLACE. -

(E) BOLLARD TO REMAIN, PROTECT IN PLACE. -

(E) HC PARKING STALLS WITH ACCESSIBLE ROUTE -

(E) ACCESSIBLE ENTRANCE TO CENTRAL PLANT, NO PUBLIC ACCESS -

(E) DRINKING FOUNTAIN TO REMAIN, PROTECT IN PLACE. -

(E) ACCESSIBLE STAFF RESTROOM TO REMAIN, PROTECT IN PLACE. -

(E) STAFF LOCKER/WASHROOM TO REMAIN, PROTECT IN PLACE. -

(E) EXIT PATH OF TRAVEL AND DISTANCE

(E) PATH OF TRAVEL TO AREA OF WORK

(E) EXIT DOOR

(E) 1HR. RATED FIRE PARTITION

(E) 2HR. RATED FIRE PARTITION

(E) 1HR. RATED SMOKE BARRIER

EXIT

XXX

XX

XX

SQ. FT.

XXXXXXX

# OF OCC.

AREA SQUARE FOOTAGE

OCCUPANT LOAD FACTOR

NUMBER OF OCCUPANT

FUNCTION OF SPACE

03-21-2025

6/26/2025, 1:29:14 PM

OFFICE

2E04

REST RM.

2E03

CORRIDOR

2E01

(E)CWP (E)CWP (E)CWP

(E)CWP(E)CWP

PUMP ROOM

2E05

LOCKER/SHOWER

2E02

(E) METAL

GRATING

CAT WALK

(E)MED.AIR

COMPRESSOR

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

OPEN TO

BELOW

OPEN TO

BELOW

UP DN

HEXAPLEX

MED. VACUUM

PUMP #1

MED.

VAC. PUMP

HEXAPLEX #1

MED.

VAC. PUMP

HEXAPLEX #2

(NOT PART OF WORK)

(NOT PART OF WORK)

(NOT PART OF WORK)(NOT PART OF WORK)

(NOT PART OF WORK)

(NOT PART

OF WORK)

PLUMBING

ROOM

2E06

(E) MVR-1

(E) MVR-2

1ST SEQUENCE

INSTALL (N) MEDICAL VACUUM PUMP

(HEXAPLEX #1) AND BRING ONLINE

SEE

2ND. SEQUENCE

SHUT DOWN (E) VACUUM SYSTEM.

REMOVE (E) TANK RECEIVERS

SEE

3RD SEQUENCE

INSTALL (N) MEDICAL VACUUM PUMP

(HEXAPLEX #2) AND BRING ONLINE

SEE

4TH SEQUENCE

REMOVE (E) QUINCY

MEDICAL VACUUM PUMPS

SEE

1 & 2 A-2.11

A-2.12

A-2.12

1 & 2 A-2.13

38'-0" 38'-0"

'-0

'-0

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

11-13-2023

(CENTRAL PLANT BLDG)

SECOND FLOOR OVERALL PLAN - SEQUENCE ORDER 1/4"=1'-0" 1

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

A2

.D W

G

1/

/2

2:

P

M

SECOND FLOOR OVERALL PLAN

SEQUENCE ORDER

A-2.10

N

EDC

AREA OF WORK

S250159-36-00

6/26/2025, 1:29:14 PM

(E)CWP (E)CWP (E)CWP

(E) METAL

GRATING

CAT WALK

(E) MED. AIR

COMPRESSOR

(E) MVR-1

(E) MVR-2

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

OPEN TO

BELOW

TYP.

TYP.

±13'-10"

±4 '-7

±2'-7"

EX

IS

TI

N

G C

AT

W

AL

K

(E)CWP (E)CWP (E)CWP

(E) METAL

GRATING

CAT WALK

(E) MED. AIR

COMPRESSOR

(E) MVR-1

(E) MVR-2

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

OPEN TO

BELOW

3'-0" MIN.

CLEAR±1

2' -9

±7'-2"

4 ALL

SIDES

4ALL

SIDES

M

IN

C

LR

±4 '-6

8'

-2

4' -7

±5'-6"

44" MIN. CLR.

MED.

VAC. PUMP

HEXAPLEX #1

PROPOSED KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, TIE INTO (E)

EQUIPMENT CONCRETE PAD, WHEN CONSTRUCTING MATCH

HEIGHT OF (E). SEE STRUCTURAL FOR ADDITIONAL INFORMATION

7/ S-2.12

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #1.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

INSTALL (N) CONTROL PANEL FOR HEXAPLEX SYSTEM #1, SHIPPED

LOOSE FOR FIELD INSTALLATION. 1/ S-3.01

ALL VERTICAL SIDES OF CONCRETE PAD SHALL RECEIVE

WARNING MARKINGS WITH SAFETY YELLOW PAINT. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE -

(E) WALL MOUNTED PANEL TO REMAIN, PROTECT IN PLACE. -

PROVIDE MINIMUM 36" CLEAR FOR WORKING SPACE IN FRONT OF

PANEL X 30" MINIMUM WIDE, OR THE WIDTH OF THE EQUIPMENT,

WHICHEVER IS GREATER.

REPAIR CONCRETE OR INFILL VOID AFTER REMOVAL OF POST &

PLATE. -

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, SEE STRUCTURAL

FOR ADDITIONAL INFORMATION

CORE -

2 & 6/ S-3.01

STEEL -

5/ S-1.01

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #2.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

(N) CONTROL PANEL FOR HEXAPLEX SYSTEM #2, SHIPPED LOOSE

FOR FIELD INSTALLATION. 1/ S-3.01

REPAIR EDGE OF EQUIPMENT CONCRETE PAD. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

NEW FLOOR SINK, SEE PLUMBING FOR ADDITIONAL INFORMATION 3/A-9.00

RELOCATED FIRE ALARM COMBINATION SPEAKER/STROBE LIGHT,

SEE E-2.31 FOR FURTHER INFORMATION. -

REFER TO PLUMBING DRAWINGS P-2.11, P-2.12, P-2.13 FOR

LOCATIONS OF PIPING WORK THROUGH ROOF. INSTALL PIPE

FLASHING AT ROOF.

4/A-9.00

1. IT'S THE GENERAL CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THAT

WORKING SPACE CLEARANCES FOR WALL EQUIPMENT TO REMAIN IS PROVIDED.

OTHERWISE RELOCATE WITHIN ORIGINAL LOCATION PROXIMITY OR AS AHJ ALLOW

IT REFER TO CONSULTANT DRAWINGS FOR OTHER DISCIPLINES WITH ADDITIONAL

INFORMATION.

2. ALL PENETRATIONS IN FIRE RATED WALLS AND/OR FLOOR MUST BE SEALED WITH

APPROPRIATE FIRE STOPPING SYSTEM.

3. FOR FIRE STOPPING SYSTEMS SEE SHEET A-9.01.

4. CONTRACTOR SHALL PROVIDE BACKING AND/OR ANCHORING AS NECESSARY FOR

EQUIPMENT TO BE RELOCATED.

5. PROTECT EXISTING FIREPROOFING FROM DAMAGE OR DETERIORATION AS

CONSTRUCTION PROCEEDS, INSPECT FIREPROOFING AND REPAIR DAMAGED

AREAS AND FIREPROOFING REMOVED DUE TO WORK OF OTHER TRADES.

6. REPAIR FIREPROOFING BY REAPPLYING IT USING SAME METHOD AS ORIGINAL

INSTALLATION OR USING MANUFACTURER'S RECOMMENDATION.

7. ANY AREAS WHERE THE EXISTING FINISH IS AFFECTED BY WORK, CONTRACTOR

TO FINISH, PATH, PAINT, AND ECT. TO MATCH THE ADJACENT AREA.

8. REFER TO STRUCTURAL FOR FLOOR OR WALL MOUNTED EQUIPMENT, PIPE,

CONDUITS, TAPEZE, HANGER, TOP & BOTTOM TRACK CONNECTIONS.

9. NEW ROOF REPAIRS SHALL NOT VOID EXISTING WARRANTIES. ALL NEW ROOF

WORK MUST BE APPROVED BY OWNER PRIOR TO CONSTRUCTION.

PROPOSED WORK NOTES

DEMOLITION KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION

OF (E) STORAGE CABINET AND NON-FIXED EQUIPMENT. -

DEMO & REMOVE (E) FLOOR SINK CAP AS NEEDED. CAP / PLUG AS

NEEDED PER PLUMBING DRAWINGS. SEE PLUMBING DRAWINGS

AND STRUCTURAL FOR ADDITIONAL INFORMATION.

5/ S-1.01

DEMO & REMOVE ABANDONED POST & PLATE SUPPORT, PATCH

SLAB PER STRUCTURAL. -

DEMO & REMOVE PORTION OF (E) EQUIPMENT CONCRETE PAD

UNTIL TOP OF (E) CONCRETE SLAB BELOW IS EXPOSED. -

(E) MEDICAL VACUUM RECEIVER TANK TO REMAIN, PROTECT IN

PLACE. -

PROTECT IN PLACE (E) +7-1/2" THICK CONCRETE METAL DECK, V.I.F.

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. -

(E) STORAGE CABINETS TO REMAIN, PROTECT IN PLACE. -

(E) FLOOR SINK TO REMAIN, PROTECT IN PLACE. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE. -

PROTECT IN PLACE (E) STEEL POST SUPPORTING ELEVATED AIR

SUPPLY LINE. ONE LEG BRACE SHALL BE REMOVED AND POSITION

INVERTED PER STRUCTURAL DWGS. REPAIR CONCRETE SLAB

UPON REMOVAL OF FLOOR BRACE.

1/A-9.00

(E) MEDICAL AIR COMPRESSOR AND ASSOCIATED PIPING TO

REMAIN, PROTECT IN PLACE. -

RELOCATE (E) FIRE ALARM HORN/STROBE LIGHT AFFECTED BY

POSITION OF (N) MED VAC PUMP, REFER TO ELECTRICAL FOR

EXTEND OF WORK.

(E) HAZARDOUS MATERIAL CABINET PER CLIENT'S DIRECTION. -

(E) WALL MOUNTED EQUIPMENT TO REMAIN, PROTECT IN PLACE. -

(E) MEDICAL VACUUM PUMP TO REMAIN, PROTECT IN PLACE. -

(E) WALL MOUNTED EQUIPMENT TO BE RELOCATED, SEE

ELECTRICAL FOR ADDITIONAL INFORMATION. -

DEMO & REMOVE (E) MED. VACUUM RECEIVER TANK. SEE

PLUMBING AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

(E) PLASTIC STRIP CURTAIN DOOR TO REMAIN -

DEMO & REMOVE (E) QUINCY MED. VACUUM PUMP. SEE PLUMBING

AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

(E) LOUVER WALLS TO REMAIN, PROTECT IN PLACE. -

CORE THROUGH (E) CONCRETE OVER METAL DECK FOR (N) FLOOR

SINK. REFER TO PLUMBING AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

2/A-9.00, 1 & 3/ S-1.01

1. PROTECT ALL ADJACENT AREAS AND ITEMS "TO REMAIN" DURING

DEMOLITION/CONSTRUCTION REPAIR/REPLACE ALL ITEMS DAMAGED DURING

CONSTRUCTION.

2. REFER TO CONSULTANT DRAWINGS FOR ADDITIONAL DEMOLITION OF OTHER

DISCIPLINES.

3. (E) WORK TO REMAIN SHALL BE PROTECTED FROM DEMOLITION OPERATIONS.

4. COORDINATE EXTENT OF DEMOLITION REQUIRED WITH NEW WORK.

5. COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION OF (E)

STORAGE CABINET AND NON-FIXED EQUIPMENT.

DEMOLITION GENERAL NOTES

SYMBOL LEGEND

INDICATES FLOOR DEPRESSION

ELEMENT TO BE REMOVED

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

11-13-2023

(CENTRAL PLANT BLDG)

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

A2

.D W

G

1/

/2

2:

P

M

SECOND FLOOR

DEMOLITION & PROPOSED PLANS

SEQUENCE 1

A-2.11

DC

N

N

DC

SECOND FLOOR DEMOLITION PLAN - SEQUENCE 1 1/4"=1'-0" 1

SECOND FLOOR PROPOSED PLAN - SEQUENCE 1 1/4"=1'-0" 2

AREA OF WORK

1ST SEQUENCE

INSTALL NEW HEXAPLEX #1 (STACK MOUNTED VACUUM

SYSTEM) ON NEW EQUIPMENT CONCRETE PAD AND BRING

ONLINE

SEQUENCE DESCRIPTION

AREA OF WORK

NOTE:

REFER TO E-2.21 FOR SECOND FLOOR DEMOLITION AND

REMODEL LIGHTING PLANS SEQUENCE 1

NOTE:

REFER TO E-2.21 FOR SECOND FLOOR DEMOLITION AND

REMODEL LIGHTING PLANS SEQUENCE 1

S250159-36-00

6/26/2025, 1:29:14 PM

GRATING

CAT WALK

OPEN TO

BELOW

(E)MED.AIR

COMPRESSOR

(E) MVR-1

(E) MVR-2

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

MED.

VAC. PUMP

HEXAPLEX #1

PLUMBING

ROOM

2E06

TYP.

EX

IS

TI

N

G C

AT

W

AL

K

(E) CONDENSATE LINE TO FLOOR

SINK TO BE RELOCATED TO (N) F.S.

PER PLUMBING DRAWINGS.

(E)CWP (E)CWP (E)CWP

(E) METAL

GRATING

CAT WALK

OPEN TO

BELOW

(E)MED.AIR

COMPRESSOR

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

MED.

VAC. PUMP

HEXAPLEX #1

PLUMBING

ROOM

2E06

3'-0" MIN.

CLEAR

±6'-6 7/8" ±7'-2"

ALL

SIDES

TYP.

±4'-3"

±1 2'

-9

3'- 0"

M

IN

CL

EA

R

TYP. MED.

VAC. PUMP

HEXAPLEX #2

4 9

7 7

6 16

DEMOLITION KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION

OF (E) STORAGE CABINET AND NON-FIXED EQUIPMENT. -

DEMO & REMOVE (E) FLOOR SINK CAP AS NEEDED. CAP / PLUG AS

NEEDED PER PLUMBING DRAWINGS. SEE PLUMBING DRAWINGS

AND STRUCTURAL FOR ADDITIONAL INFORMATION.

5/ S-1.01

DEMO & REMOVE ABANDONED POST & PLATE SUPPORT, PATCH

SLAB PER STRUCTURAL. -

DEMO & REMOVE PORTION OF (E) EQUIPMENT CONCRETE PAD

UNTIL TOP OF (E) CONCRETE SLAB BELOW IS EXPOSED. -

(E) MEDICAL VACUUM RECEIVER TANK TO REMAIN, PROTECT IN

PLACE. -

PROTECT IN PLACE (E) +7-1/2" THICK CONCRETE METAL DECK, V.I.F.

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. -

(E) STORAGE CABINETS TO REMAIN, PROTECT IN PLACE. -

(E) FLOOR SINK TO REMAIN, PROTECT IN PLACE. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE. -

PROTECT IN PLACE (E) STEEL POST SUPPORTING ELEVATED AIR

SUPPLY LINE. ONE LEG BRACE SHALL BE REMOVED AND POSITION

INVERTED PER STRUCTURAL DWGS. REPAIR CONCRETE SLAB

UPON REMOVAL OF FLOOR BRACE.

1/A-9.00

(E) MEDICAL AIR COMPRESSOR AND ASSOCIATED PIPING TO

REMAIN, PROTECT IN PLACE. -

RELOCATE (E) FIRE ALARM HORN/STROBE LIGHT AFFECTED BY

POSITION OF (N) MED VAC PUMP, REFER TO ELECTRICAL FOR

EXTEND OF WORK.

(E) HAZARDOUS MATERIAL CABINET PER CLIENT'S DIRECTION. -

(E) WALL MOUNTED EQUIPMENT TO REMAIN, PROTECT IN PLACE. -

(E) MEDICAL VACUUM PUMP TO REMAIN, PROTECT IN PLACE. -

(E) WALL MOUNTED EQUIPMENT TO BE RELOCATED, SEE

ELECTRICAL FOR ADDITIONAL INFORMATION. -

DEMO & REMOVE (E) MED. VACUUM RECEIVER TANK. SEE

PLUMBING AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

(E) PLASTIC STRIP CURTAIN DOOR TO REMAIN -

DEMO & REMOVE (E) QUINCY MED. VACUUM PUMP. SEE PLUMBING

AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

(E) LOUVER WALLS TO REMAIN, PROTECT IN PLACE. -

CORE THROUGH (E) CONCRETE OVER METAL DECK FOR (N) FLOOR

SINK. REFER TO PLUMBING AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

2/A-9.00, 1 & 3/ S-1.01

1. PROTECT ALL ADJACENT AREAS AND ITEMS "TO REMAIN" DURING

DEMOLITION/CONSTRUCTION REPAIR/REPLACE ALL ITEMS DAMAGED DURING

CONSTRUCTION.

2. REFER TO CONSULTANT DRAWINGS FOR ADDITIONAL DEMOLITION OF OTHER

DISCIPLINES.

3. (E) WORK TO REMAIN SHALL BE PROTECTED FROM DEMOLITION OPERATIONS.

4. COORDINATE EXTENT OF DEMOLITION REQUIRED WITH NEW WORK.

5. COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION OF (E)

STORAGE CABINET AND NON-FIXED EQUIPMENT.

DEMOLITION GENERAL NOTES

SYMBOL LEGEND

INDICATES FLOOR DEPRESSION

ELEMENT TO BE REMOVED

PROPOSED KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, TIE INTO (E)

EQUIPMENT CONCRETE PAD, WHEN CONSTRUCTING MATCH

HEIGHT OF (E). SEE STRUCTURAL FOR ADDITIONAL INFORMATION

7/ S-2.12

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #1.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

INSTALL (N) CONTROL PANEL FOR HEXAPLEX SYSTEM #1, SHIPPED

LOOSE FOR FIELD INSTALLATION. 1/ S-3.01

ALL VERTICAL SIDES OF CONCRETE PAD SHALL RECEIVE

WARNING MARKINGS WITH SAFETY YELLOW PAINT. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE -

(E) WALL MOUNTED PANEL TO REMAIN, PROTECT IN PLACE. -

PROVIDE MINIMUM 36" CLEAR FOR WORKING SPACE IN FRONT OF

PANEL X 30" MINIMUM WIDE, OR THE WIDTH OF THE EQUIPMENT,

WHICHEVER IS GREATER.

REPAIR CONCRETE OR INFILL VOID AFTER REMOVAL OF POST &

PLATE. -

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, SEE STRUCTURAL

FOR ADDITIONAL INFORMATION

CORE -

2 & 6/ S-3.01

STEEL -

5/ S-1.01

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #2.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

(N) CONTROL PANEL FOR HEXAPLEX SYSTEM #2, SHIPPED LOOSE

FOR FIELD INSTALLATION. 1/ S-3.01

REPAIR EDGE OF EQUIPMENT CONCRETE PAD. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

NEW FLOOR SINK, SEE PLUMBING FOR ADDITIONAL INFORMATION 3/A-9.00

RELOCATED FIRE ALARM COMBINATION SPEAKER/STROBE LIGHT,

SEE E-2.31 FOR FURTHER INFORMATION. -

REFER TO PLUMBING DRAWINGS P-2.11, P-2.12, P-2.13 FOR

LOCATIONS OF PIPING WORK THROUGH ROOF. INSTALL PIPE

FLASHING AT ROOF.

4/A-9.00

1. IT'S THE GENERAL CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THAT

WORKING SPACE CLEARANCES FOR WALL EQUIPMENT TO REMAIN IS PROVIDED.

OTHERWISE RELOCATE WITHIN ORIGINAL LOCATION PROXIMITY OR AS AHJ ALLOW

IT REFER TO CONSULTANT DRAWINGS FOR OTHER DISCIPLINES WITH ADDITIONAL

INFORMATION.

2. ALL PENETRATIONS IN FIRE RATED WALLS AND/OR FLOOR MUST BE SEALED WITH

APPROPRIATE FIRE STOPPING SYSTEM.

3. FOR FIRE STOPPING SYSTEMS SEE SHEET A-9.01.

4. CONTRACTOR SHALL PROVIDE BACKING AND/OR ANCHORING AS NECESSARY FOR

EQUIPMENT TO BE RELOCATED.

5. PROTECT EXISTING FIREPROOFING FROM DAMAGE OR DETERIORATION AS

CONSTRUCTION PROCEEDS, INSPECT FIREPROOFING AND REPAIR DAMAGED

AREAS AND FIREPROOFING REMOVED DUE TO WORK OF OTHER TRADES.

6. REPAIR FIREPROOFING BY REAPPLYING IT USING SAME METHOD AS ORIGINAL

INSTALLATION OR USING MANUFACTURER'S RECOMMENDATION.

7. ANY AREAS WHERE THE EXISTING FINISH IS AFFECTED BY WORK, CONTRACTOR

TO FINISH, PATH, PAINT, AND ECT. TO MATCH THE ADJACENT AREA.

8. REFER TO STRUCTURAL FOR FLOOR OR WALL MOUNTED EQUIPMENT, PIPE,

CONDUITS, TAPEZE, HANGER, TOP & BOTTOM TRACK CONNECTIONS.

9. NEW ROOF REPAIRS SHALL NOT VOID EXISTING WARRANTIES. ALL NEW ROOF

WORK MUST BE APPROVED BY OWNER PRIOR TO CONSTRUCTION.

PROPOSED WORK NOTES

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

A2

.D W

G

1/

/2

2:

P

M

SECOND FLOOR

DEMOLITION & PROPOSED PLANS

SEQUENCES 2 & 3

A-2.12

N

SECOND FLOOR DEMOLITION PLAN - SEQUENCES 2 & 3 1/4"=1'-0" 1

N

SECOND FLOOR PROPOSED PLAN - SEQUENCES 2 & 3 1/4"=1'-0" 2

DC

DC

AREA OF WORK

AREA OF WORK

2ND SEQUENCE

SHUT DOWN (E) VACUUM SYSTEM. DEMO AND REMOVE

EXISTING VACUUM RECEIVER TANKS MVR-1 AND MVR-2.

3RD SEQUENCE

INSTALL NEW HEXAPLEX #2 (STACK MOUNTED VACUUM

SYSTEM) ON NEW EQUIPMENT CONCRETE PAD AND BRING

ONLINE.

SEQUENCE DESCRIPTION

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

11-13-2023

(CENTRAL PLANT BLDG)

S250159-36-00

6/26/2025, 1:29:14 PM

GRATING

CAT WALK

(E)MED.AIR

COMPRESSOR

(E) MED.

VACUUM

PUMP MV-1

QSVI-50

(E) MED.

VACUUM

PUMP MV-2

QSVI-50

(E) MED.

VACUUM

PUMP MV-3

QSVI-50

OPEN TO

BELOW

HEXAPLEX

MED. VACUUM

PUMP #1

MED.

VAC. PUMP

HEXAPLEX #1

MED.

VAC. PUMP

HEXAPLEX #2

(NOT PART

OF WORK)

PLUMBING

ROOM

2E06

202020

TYP.

EX

IS

TI

N

G C

AT

W

AL

K

3'-0" MIN.

CLEAR

(E)CWP (E)CWP (E)CWP

(E) METAL

GRATING

CAT WALK

(E)MED.AIR

COMPRESSOR

OPEN TO

BELOW

HEXAPLEX

MED. VACUUM

PUMP #1

MED.

VAC. PUMP

HEXAPLEX #1

MED.

VAC. PUMP

HEXAPLEX #2

(NOT PART

OF WORK)

PLUMBING

ROOM

2E06

7 7

13 14

3'-0" MIN.

CLR. TYP.

TYPICAL

6 6

±4 '-6

C

LE

AR

±4 '-6

/2

C

LE

AR

3' -1

C

LE

AR

3'-7 1/2"

3' -5

/2

AT DECK

HCAI BACKCHECK 1

DEMOLITION KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION

OF (E) STORAGE CABINET AND NON-FIXED EQUIPMENT. -

DEMO & REMOVE (E) FLOOR SINK CAP AS NEEDED. CAP / PLUG AS

NEEDED PER PLUMBING DRAWINGS. SEE PLUMBING DRAWINGS

AND STRUCTURAL FOR ADDITIONAL INFORMATION.

5/ S-1.01

DEMO & REMOVE ABANDONED POST & PLATE SUPPORT, PATCH

SLAB PER STRUCTURAL. -

DEMO & REMOVE PORTION OF (E) EQUIPMENT CONCRETE PAD

UNTIL TOP OF (E) CONCRETE SLAB BELOW IS EXPOSED. -

(E) MEDICAL VACUUM RECEIVER TANK TO REMAIN, PROTECT IN

PLACE. -

PROTECT IN PLACE (E) +7-1/2" THICK CONCRETE METAL DECK, V.I.F.

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. -

(E) STORAGE CABINETS TO REMAIN, PROTECT IN PLACE. -

(E) FLOOR SINK TO REMAIN, PROTECT IN PLACE. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE. -

PROTECT IN PLACE (E) STEEL POST SUPPORTING ELEVATED AIR

SUPPLY LINE. ONE LEG BRACE SHALL BE REMOVED AND POSITION

INVERTED PER STRUCTURAL DWGS. REPAIR CONCRETE SLAB

UPON REMOVAL OF FLOOR BRACE.

1/A-9.00

(E) MEDICAL AIR COMPRESSOR AND ASSOCIATED PIPING TO

REMAIN, PROTECT IN PLACE. -

RELOCATE (E) FIRE ALARM HORN/STROBE LIGHT AFFECTED BY

POSITION OF (N) MED VAC PUMP, REFER TO ELECTRICAL FOR

EXTEND OF WORK.

(E) HAZARDOUS MATERIAL CABINET PER CLIENT'S DIRECTION. -

(E) WALL MOUNTED EQUIPMENT TO REMAIN, PROTECT IN PLACE. -

(E) MEDICAL VACUUM PUMP TO REMAIN, PROTECT IN PLACE. -

(E) WALL MOUNTED EQUIPMENT TO BE RELOCATED, SEE

ELECTRICAL FOR ADDITIONAL INFORMATION. -

DEMO & REMOVE (E) MED. VACUUM RECEIVER TANK. SEE

PLUMBING AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

(E) PLASTIC STRIP CURTAIN DOOR TO REMAIN -

DEMO & REMOVE (E) QUINCY MED. VACUUM PUMP. SEE PLUMBING

AND ELECTRICAL FOR ADDITIONAL INFORMATION. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

(E) LOUVER WALLS TO REMAIN, PROTECT IN PLACE. -

CORE THROUGH (E) CONCRETE OVER METAL DECK FOR (N) FLOOR

SINK. REFER TO PLUMBING AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

2/A-9.00, 1 & 3/ S-1.01

1. PROTECT ALL ADJACENT AREAS AND ITEMS "TO REMAIN" DURING

DEMOLITION/CONSTRUCTION REPAIR/REPLACE ALL ITEMS DAMAGED DURING

CONSTRUCTION.

2. REFER TO CONSULTANT DRAWINGS FOR ADDITIONAL DEMOLITION OF OTHER

DISCIPLINES.

3. (E) WORK TO REMAIN SHALL BE PROTECTED FROM DEMOLITION OPERATIONS.

4. COORDINATE EXTENT OF DEMOLITION REQUIRED WITH NEW WORK.

5. COORDINATE WITH FACILITIES FOR THE REMOVAL & RELOCATION OF (E)

STORAGE CABINET AND NON-FIXED EQUIPMENT.

DEMOLITION GENERAL NOTES

SYMBOL LEGEND

INDICATES FLOOR DEPRESSION

ELEMENT TO BE REMOVED

PROPOSED KEYNOTES

NOT ALL KEYNOTES APPLICABLE TO THIS SHEET

# DESCRIPTION DETAIL

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, TIE INTO (E)

EQUIPMENT CONCRETE PAD, WHEN CONSTRUCTING MATCH

HEIGHT OF (E). SEE STRUCTURAL FOR ADDITIONAL INFORMATION

7/ S-2.12

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #1.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

INSTALL (N) CONTROL PANEL FOR HEXAPLEX SYSTEM #1, SHIPPED

LOOSE FOR FIELD INSTALLATION. 1/ S-3.01

ALL VERTICAL SIDES OF CONCRETE PAD SHALL RECEIVE

WARNING MARKINGS WITH SAFETY YELLOW PAINT. -

(E) EQUIPMENT CONCRETE PAD TO REMAIN, PROTECT IN PLACE -

(E) WALL MOUNTED PANEL TO REMAIN, PROTECT IN PLACE. -

PROVIDE MINIMUM 36" CLEAR FOR WORKING SPACE IN FRONT OF

PANEL X 30" MINIMUM WIDE, OR THE WIDTH OF THE EQUIPMENT,

WHICHEVER IS GREATER.

REPAIR CONCRETE OR INFILL VOID AFTER REMOVAL OF POST &

PLATE. -

CONSTRUCT (N) EQUIPMENT CONCRETE PAD, SEE STRUCTURAL

FOR ADDITIONAL INFORMATION

CORE -

2 & 6/ S-3.01

STEEL -

5/ S-1.01

INSTALL (N) MEDICAL VACUUM PUMP, HEXAPLEX SYSTEM #2.

SEE PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

1/A-10.00, 7/ S-2.12

(N) CONTROL PANEL FOR HEXAPLEX SYSTEM #2, SHIPPED LOOSE

FOR FIELD INSTALLATION. 1/ S-3.01

REPAIR EDGE OF EQUIPMENT CONCRETE PAD. -

MEDICAL VACUUM PUMP HEXAPLEX #1 AND CONTROL PANEL

(PART OF SEQUENCE NO. 1) TO BE PROTECTED IN PLACE. -

MEDICAL VACUUM PUMP HEXAPLEX #2 AND CONTROL PANEL

(PART OF SEQUENCE NO. 3) TO BE PROTECTED IN PLACE. -

NEW FLOOR SINK, SEE PLUMBING FOR ADDITIONAL INFORMATION 3/A-9.00

RELOCATED FIRE ALARM COMBINATION SPEAKER/STROBE LIGHT,

SEE E-2.31 FOR FURTHER INFORMATION. -

REFER TO PLUMBING DRAWINGS P-2.11, P-2.12, P-2.13 FOR

LOCATIONS OF PIPING WORK THROUGH ROOF. INSTALL PIPE

FLASHING AT ROOF.

4/A-9.00

1. IT'S THE GENERAL CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THAT

WORKING SPACE CLEARANCES FOR WALL EQUIPMENT TO REMAIN IS PROVIDED.

OTHERWISE RELOCATE WITHIN ORIGINAL LOCATION PROXIMITY OR AS AHJ ALLOW

IT REFER TO CONSULTANT DRAWINGS FOR OTHER DISCIPLINES WITH ADDITIONAL

INFORMATION.

2. ALL PENETRATIONS IN FIRE RATED WALLS AND/OR FLOOR MUST BE SEALED WITH

APPROPRIATE FIRE STOPPING SYSTEM.

3. FOR FIRE STOPPING SYSTEMS SEE SHEET A-9.01.

4. CONTRACTOR SHALL PROVIDE BACKING AND/OR ANCHORING AS NECESSARY FOR

EQUIPMENT TO BE RELOCATED.

5. PROTECT EXISTING FIREPROOFING FROM DAMAGE OR DETERIORATION AS

CONSTRUCTION PROCEEDS, INSPECT FIREPROOFING AND REPAIR DAMAGED

AREAS AND FIREPROOFING REMOVED DUE TO WORK OF OTHER TRADES.

6. REPAIR FIREPROOFING BY REAPPLYING IT USING SAME METHOD AS ORIGINAL

INSTALLATION OR USING MANUFACTURER'S RECOMMENDATION.

7. ANY AREAS WHERE THE EXISTING FINISH IS AFFECTED BY WORK, CONTRACTOR

TO FINISH, PATH, PAINT, AND ECT. TO MATCH THE ADJACENT AREA.

8. REFER TO STRUCTURAL FOR FLOOR OR WALL MOUNTED EQUIPMENT, PIPE,

CONDUITS, TAPEZE, HANGER, TOP & BOTTOM TRACK CONNECTIONS.

9. NEW ROOF REPAIRS SHALL NOT VOID EXISTING WARRANTIES. ALL NEW ROOF

WORK MUST BE APPROVED BY OWNER PRIOR TO CONSTRUCTION.

PROPOSED WORK NOTES

SECOND FLOOR PROPOSED PLAN - SEQUENCE 4 1/4"=1'-0" 2

SECOND FLOOR DEMOLITION PLAN - SEQUENCE 4 1/4"=1'-0" 1

\\S W

A-

SE

R

VE

R \D

AT

A\

PR

O

J\

.0

A

R M

C M

ED

VA

C \D

W G

\2

7_

A2

.D W

G

3/

/2

:2

AM

SECOND FLOOR

DEMOLITION & PROPOSED PLANS

SEQUENCE 4

A-2.13

N

N

DC

DC

4TH SEQUENCE

DEMO & REMOVE EXISTING QUINCY MEDICAL VACUUM

PUMPS MV-1, MV-2, AND MV-3.

(END OF SEQUENCE)

SEQUENCE DESCRIPTION

AREA OF WORK

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

S250159-36-00

11-13-2023

(CENTRAL PLANT BLDG)

COMPLETION

DESCRIPTION OF EXISTING ROOF

BUILT-UP ROOFING OVER 4" (R-30) RIGID INSULATION

OVER CONCRETE DECK (VERIFY IN FIELD)

03-21-2025

6/26/2025, 1:29:14 PM

PRE-FORMED PIPE FLASHINGN.T.S.

MODIFICATION OF SINGLE

BRACE SUPPORT N.T.S.

(E) AIR SUPPLY PIPE

TO REMAIN,

PROTECT IN PLACE.

(E) STEEL POST TO

REMAIN, PROTECT

IN PLACE.

INVERTED POSITION

OF (N) BRACE

SUPPORT AND

ANCHOR TO (E)

CONC PAD PER

STRUCTURAL

DWGS. 15/S-2.11

WALKWAY

(E) STEEL ANGLE

SUPPORT TO REMAIN,

PROTECT IN PLACE.

REMOVE (E) STEEL

'L' FLOOR ANGLE &

BRACE SUPPORT,

INVERT POSITION

PER STRUCTURAL

DWGS.

TOP OF (E)

CONCRETE SLAB

(E) MED AIR

COMPRESSOR TO

REMAIN, PROTECT

IN PLACE.

SLAB SHALL BE

REPAIRED AFTER

REMOVAL OF FLOOR

ANGLE

NOTE: BRACE

SUPPORT SHALL

BE INVERTED TO

ENLARGED

WALKWAY

CLEARANCE.

(E) CONC PAD

FLOOR SINK AT N.T.S.

FLOOR SINK

SEALANT O/BACKER

ROD (TYPICAL)

(N) FLOOR DRAIN

ASSEMBLY, SEE PLUMBING

DWGS. FOR ADDITIONAL

INFORMATION

SLOPED MORTAR BED

(E) CONCRETE FILLED

METAL DECK

DRAIN PIPE, SEE

PLUMBING DWGS FOR

ADDITIONAL INFORMATION

ALIGN

NOTE: FLOOR DRAIN SHALL

NOT OBSTRUCT TRAFFIC

NOTE: SEE 3/S-1.01 FOR STENGTHING

OF OPENING & ADDL INFO.

SECOND FLOOR

TYP. NEW CORE HOLE N.T.S.

3"

MIN.

(E) STEEL BEAM

(E) FIRE PROOFING

WHERE OCCURS

(E) LIGHT WEIGHT

CONCRETE O/

STEEL DECK

PER PLAN

(fc=3,000 PSI)

NOTES:

1. LOCATE (E) REINFORCEMENT PRIOR TO CORING USING NON-DESTRUCTIVE

METHOD, (I.E. FERROSCAN, GROUND-PENETRATING RADAR, X-RAY, ETC.). PROVIDE

DOCUMENTATION TO STRUCTURAL ENGINEER OF RECORD (SEOR) OF ANY (E)

REINFORCEMENT AT CORE LOCATIONS.

2. USE CARE & CAUTION TO AVOID CUTTING OR DAMAGING THE (E) REINFORCEMENT

BARS.

3. (E) WIRE MESH REINFORCING (IF PRESENT) MAY CUT AT CORE.

d 2d1

3d2 MIN

TYPICAL CORE HOLE SPACING

6" Ø MAX CORE HOLE

NOTES: SEE 1/S-1.01 FOR ADDL INFO.

HCAI PLAN SUBMITTAL 01-30-2025

ARCHITECTS

•tel: 626.793.9805 fax: 626.793.9807

48 east holly street pasadena, ca 91103

AGENCY STAMP

ISSUE/REVISION

PROJECT DATA

AGENCY NUMBER

SHEET TITLE

PROJECT NO.

DATE

SHEET NO.

DRAWN BY

CHECKED BY

ARCHITECT

20230047

MEDICAL

VACUUM PUMP

REPLACEMENT

400 N. PEPPER AVE.

COLTON, CA 92324

ARROWHEAD REGIONAL

MEDICAL CENTER

SW

RJ

LM/ GE

11-13-2023

(CENTRAL PLANT BLDG)

\\S W

A-

SE

R

VE

R…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .