ARFQ 0608 DCR2500000121 - Exhibit B - Contract Drawings for Reference.pdf
PDF 10 MB Posted
- Attached to
- Commercial Laundry Equipment Project
- Solicitation number
- ARFQ-0608-DCR2500000121-1
- Issued by
- Greenbrier County, West Virginia
About this file
The provided document is a comprehensive set of architectural and engineering contract drawings for the Anthony Correctional Center Replacement Facility, prepared for the State of West Virginia Department of Homeland Security and the Division of Corrections and Rehabilitation. The drawings detail a multi-building complex including housing units, food service and laundry facilities, vocational education spaces, and associated mechanical, electrical, plumbing, and structural systems. The project appears to be a complete replacement of an existing correctional facility, with detailed plans showing floor layouts, elevations, electrical and HVAC distributions, and specialized security infrastructure across multiple building zones.
The drawings demonstrate a sophisticated design approach with careful attention to functional requirements typical of correctional facilities, including segmented living spaces, controlled access areas, specialized support zones like food preparation, laundry, and vocational training areas. The design incorporates modern systems for electrical distribution, mechanical ventilation, plumbing infrastructure, and security technologies. While specific budget details are not contained within these drawings, the comprehensive nature of the documentation suggests a significant capital investment in creating a modern, functionally integrated correctional facility that supports rehabilitation, vocational training, and secure housing. The project appears to be funded through state government capital improvement budgets, with a focus on creating a comprehensive, contemporary correctional environment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M M M M M
M
24 48
24 60 24 60
24 48
24 42 24 42
24 60
24 48 24 54
M M M M M
M
M M M M M
M
A10.9
JODY S.
DRIGGS
NO. 3380
R E G I S T E R E D
S
T A
T E
OF WEST
V IR
G
IN
IA
A RC H IT EC T
R E G I S T E R E D
S
T A
T E
OF WEST
V IR
G
IN
IA
A RC H IT EC T
D:\Users\mklapproth\Documents\ACC-Main Campus_mklapproth@silling.com.rvt
1/8" = 1'-0"A12.2
1 FLOOR FINISH PLAN - FOOD SERVICE / LAUNDRY
1/8" = 1'-0"A12.2
2 FLOOR FINISH PLAN - HOUSING UNIT
1/8" = 1'-0"A12.2
3 FLOOR FINISH PLAN - VOC. EDUCATION
1/8" = 1'-0"A12.2
4 FLOOR FINISH PLAN - VOC. EDUCATION MEZZ.
FOOD SERVICE EQUIPMENT NOTES
1. THE PLUMBING CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR WALL
CONSTRUCTION TYPE FOR THE INSTALLATION OF CONCEALED PIPING WITHIN WALLS. PLUMBING
CONTRACTOR IS TO COORDINATE PIPING ROUGH-INS WITH GENERAL CONTRACTOR.
2. THE PLUMBING CONTRACTOR SHALL REFER TO FOOD SERVICE DRAWINGS FOR EXACT
LOCATION, ITEM NUMBER, DESCRIPTION, FINAL PLUMBING CONNECTIONS, AND SERVICE
REQUIREMENTS TO FOOD SERVICE EQUIPMENT.
3. THE PLUMBING CONTRACTOR SHALL PROVIDE ALL ROUGH-IN AND FINAL CONNECTIONS TO ALL
FOOD SERVICE EQUIPMENT INCLUDING THE INTERPIPING OF COMPONENTS NOT SHOWN OR
SHIPPED LOOSE. THE PLUMBING CONTRACTOR SHALL PROVIDE FIXTURE TRAPS, STOPS (SHUT-
OFF VALVES), PIPING, FITTINGS, AND ALL OTHER MATERIALS REQUIRED FOR OPERATING
CONDITIONS.
4. THE FOOD SERVICE EQUIPMENT CONTRACTOR SHALL PROVIDE ALL FIXTURES AND EQUIPMENT
FAUCETS, BASKET WASTES, AND TWIST WASTES AS SPECIFIED. PLUMBING CONTRACTOR SHALL
INSTALL AND CONNECT ALL FAUCETS, BASKET WASTES, AND TWIST WASTES WITH THE
NECESSARY COMPONENTS AND FITTINGS TO MAKE FINAL CONNECTION.
5. THE PLUMBING CONTRACTOR SHALL INSULATE ALL HOT WATER, COLD WATER, AND
RECIRCULATED HOT WATER PIPING. ALL EXPOSED PIPING ALONG WALLS, BELOW COUNTER LINE, BEHIND EQUIPMENT, ETC. SUBJECTED TO DAMAGE SHALL BE PROVIDED WITH INSULATED PVC
JACKETS.
6. THE PLUMBING CONTRACTOR SHALL INSTALL GREASE TRAP/INTERCEPTOR AS REQUIRED.
PLUMBING CONTRACTOR SHALL COORDINATE WITH FOOD SERVICE EQUIPMENT CONTRACTOR,
I.B.C., AND LOCAL CODE REQUIREMENTS FOR EQUIPMENT ITEMS THAT REQUIRE GREASE TRAPS.
7. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL STAINLESS STEEL OR CHROME
PLATED PIPING FOR ALL EXPOSED PIPING ABOVE COUNTER HEIGHT OR IN A DIRECT LINE OF SITE.
PROVIDE STAINLESS STEEL OR CHROME PLATED BRASS ESCUTCHEONS OR FLANGES FOR UTILITY
LINES WHICH EXTEND THROUGH WALLS, FLOORS, AND CEILINGS.
8. THE PLUMBING CONTRACTOR SHALL SUPPLY AND INTERPIPE ALL COMPONENTS THAT ARE IN
COMPLIANCE WITH THE I.B.C. AND MANUFACTURER'S CONNECTIONS FOR THE FOOD SERVICE
EQUIPMENT. THE COMPONENTS INCLUDE FILTERS, STRAINERS, BACK FLOW PREVENTERS, CHECK VALVES, VACUUM BREAKERS, PRESSURE REDUCING VALVES, FLEXIBLE LINES, ETC. FOR PROPER
OPERATING CONDITIONS.
9. THE PLUMBING CONTRACTOR SHALL EXTEND WASTES INDICATED ON THE FOOD SERVICE
EQUIPMENT DRAWINGS AS "INDIRECT" AND NOT CONNECTED TO THE SEWERAGE SYSTEM. THE
INDIRECT DRAIN EXTENSIONS SHALL DRIP OVER AND INTO THE FLOOR DRAIN. WHERE THE DRAIN RUNS UNDER AN ITEM OF EQUIPMENT, IT SHALL BE PROPERLY SUPPORTED FROM THE BOTTOM TO
THE ITEM EQUIPMENT TO ELIMINATE INTERFERENCE WITH CLEANING OF THE FLOOR.
10. ALL PLUMBING COMPONENTS UTILIZED IN THE CONNECTION, DISTRIBUTION, OR DISPENSING OF
WATER SHALL CONTAIN NO LEAD OR LEAD-BASED PRODUCTS.
11. ALL ABOVE GROUND TRAPS ARE TO HAVE WYE CONNECTIONS AT WALL PENETRATIONS FOR
CLEANOUT PURPOSES.
12. THE PLUMBING CONTRACTOR SHALL INSTALL FOOD SERVICE EQUIPMENT CONTRACTOR
FURNISHED GAS REGULATORS FOR ALL FOOD SERVICE EQUIPMENT AS APPLICABLE, FOR GAS
PRESSURES INDICATED BY MANUFACTURER'S SPECIFIED WATER COLUMN (W.C.). THE PLUMBING
CONTRACTOR IS TO FURNISH AND INSTALL INDIVIDUAL GAS SHUT-OFF VALVES AT POINT OF
CONNECTION WITH ALL EQUIPMENT.
13. THE FOOD SERVICE EQUIPMENT CONTRACTOR SHALL PROVIDE MECHANICAL GAS SHUT-OFF
VALVES AS REQUIRED FOR GAS EQUIPMENT LOCATED BENEATH VENTILATION HOODS. THE FOOD
SERVICE EQUIPMENT CONTRACTOR IS TO COORDINATE AND VERIFY THE PIPE SIZE WITH
PLUMBING CONTRACTOR. THE PLUMBING CONTRACTOR SHALL INSTALL SHUT-OFF VALVE AS
REQUIRED FOR INTEGRATION WITH FIRE SUPPRESSION SYSTEM. VALVE AND INSTALLATION SHALL
BE IN ACCORDANCE WITH N.F.P.A. AND I.B.C.
DESCRIPTIONABBREVIATION SYMBOL
US
SAN
UST
GW
DS
ODS
PD
DCW
DHW
RDHW
TDHW
140R
SW
A
G
MG
HG
P
F.P.S.C.
H.B.
F.D.
A.F.D.
R.D.
A.D.
PLUMBING SYMBOL LEGEND
US SANITARY SEWER BELOW FLOOR OR GRADE
SAN SANITARY SEWER ABOVE FLOOR
SANITARY VENT
IW INDIRECT WASTE (ABOVE OR BELOW FLOOR)
UST STORM SEWER BELOW FLOOR OR GRADE
GW SANITARY GREASE WASTE
DS DOWNSPOUT ABOVE FLOOR (WITHIN BUILDING SPACE)
ODS OVERFLOW DOWNSPOUT ABOVE FLOOR (WITHIN BUILDING SPACE)
PD PUMP DISCHARGE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
RDHW RECIRCULATED DOMESTIC HOT WATER
TDHW TEMPERED DOMESTIC HOT WATER
140 140° DOMESTIC HOT WATER
140R 140° RECIRCULATED DOMESTIC HOT WATER
SW SOFT WATER
A COMPRESSED AIR
G GAS-LOW PRESSURE (8 OUNCES OR LESS)
MG GAS-MEDIUM PRESSURE (ABOVE 8 OUNCES, UP TO 5 PSIG)
HG GAS-HIGH PRESSURE (ABOVE 5 PSIG)
P PROPANE GAS
SHOCK STOP IN HORIZONTAL
GATE VALVE
GAS COCK
GLOBE VALVE
BALL VALVE
BALANCE VALVE (SEE SPECIFICATIONS)
CHECK VALVE (SWING)
PUMP DISCHARGE SILENT LIFT CHECK VALVE
BUTTERFLY VALVE
OS&Y GATE VALVE
CONCENTRIC REDUCER/INCREASER
STRAINER WITH BLOWDOWN
UNION
FLANGED UNION
EXPANSION JOINT
PIPE ANCHOR
PIPE GUIDE
PIPE SLEEVE (SEE SPECIFICATIONS FOR ADDIT. REQUIREMENTS)
VIBRATION CONNECTION (SEE SPECIFICATIONS)
PETE'S TEST PLUG
MANUAL AIR VENT
AUTOMATIC AIR VENT WITH BALL VALVE
BFP DOUBLE CHECK BACKFLOW PREVENTER
RPBP REDUCED PRESSURE BACKFLOW PREVENTER WITH AIR GAP DEVICE AND DRAIN
COMPANION FLANGE
YARD HYDRANT
C.O. CLEANOUT
FW/FCO FLUSH WITH FLOOR CLEANOUT
FW/WCO FLUSH WITH WALL CLEANOUT
F.P.S.C. FROSTPROOF SILL COCK / WALL HYDRANT
FAUCET OR HOSE BIBB
F.D. SANITARY FLOOR DRAIN
A.F.D. ACID FLOOR DRAIN
R.D. ROOF DRAIN
A.D. AREA DRAIN (STORM)
D.S. D.S. DOWNSPOUT
R.L. R.L. RAIN LEADER
PRESSURE GAUGE WITH GAUGE COCK (WATER)
PRESSURE GAUGE WITH BALL VALVE (WATER)
P__-__ PLUMBING FIXTURE (SEE SCHEDULE)
PE__-__ PLUMBING EQUIPMENT (SEE SCHEDULE)
E.C. E.C. ELECTRICAL CONTRACTOR
F.S.C. F.S.C. FIRE SUPPRESSION CONTRACTOR
G.C. G.C. GENERAL CONTRACTOR
H.C. H.C. HVAC CONTRACTOR
P.C. P.C. PLUMBING CONTRACTOR
K.E.C. K.E.C. KITCHEN EQUIPMENT CONSULTANT
A.D. A.D. ACCESS DOOR
A.F.F. A.F.F. ABOVE FINISHED FLOOR
F.F.E. F.F.E. FINISHED FLOOR ELEVATION
MFR. MFR. MANUFACTURER
N.O. N.O. NORMALLY OPEN
N.C. N.C. NORMALLY CLOSED
TYP. TYP. TYPICAL
INDICATES TIE INTO EXISTING
INDICATES REMOVE TO POINT FOR RECONNECTION
INDICATES REMOVE TO POINT AND CAP
PLUMBING NEW WORK GENERAL NOTES
1. THE GENERAL NOTES LISTED HERE APPLY TO ALL PLUMBING DRAWINGS IN ADDITION TO ANY
ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS.
2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.
3. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION AND
ELEVATION OF ALL NEW UNDERGROUND UTILITIES PRIOR TO COMMENCING WORK. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES WHICH OCCURS BY HIS FAILURE TO LOCATE OR
PRESERVE THE UNDERGROUND CONDITIONS.
4. COORDINATE WITH GENERAL TRADES WORK, HVAC WORK, FIRE PROTECTION WORK,
ELECTRICAL WORK AND OTHER WORK.
5. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE AND SMOKE WALLS AND RATED
STRUCTURES. SEE DETAILS AND SPECIFICATIONS FOR PIPE PENETRATION SEAL REQUIREMENTS.
6. THE PLUMBING DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW
EXACT LOCATION OF EQUIPMENT AND PIPING UNLESS DIMENSIONS ARE GIVEN OR OTHERWISE
IMPLIED FOR CLEARANCES, ETC. PIPING AND PLUMBING EQUIPMENT ARE TO BE INSTALLED ALONG
THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT KEEPING IN MIND ACTUAL BUILDING
CONDITIONS WHICH MUST BE CONFORMED WITH IN THE ACTUAL WORK. CONTRACTORS IN THEIR
BIDS ARE REQUIRED TO INCLUDE ALL LABOR AND MATERIALS AND OTHER RELATED WORK
NECESSARY TO PROVIDE MINOR OFFSETS IN PLUMBING WORK AS REQUIRED TO AVOID CONFLICT
WITH OTHER WORK ON THIS PROJECT OR AS REQUIRED IN ORDER TO OBTAIN MAXIMUM HEAD
ROOM OR EQUIPMENT ACCESS IN SPACES.
7. THE PLUMBING CONTRACTOR IS TO COORDINATE ALL PIPING WITH OTHER TRADES PRIOR TO ROUTING PIPING AND SHALL MAKE OFFSETS AND ADJUST PIPE ROUTING AS REQUIRED TO HANDLE
CONFLICTS IN FIELD. THE PLUMBING CONTRACTOR SHALL ALSO BE REQUIRED TO OFFSET
VERTICAL SANITARY AND VENT LINES AROUND STRUCTURAL MEMBERS AS REQUIRED AND SHALL
INCLUDE IN THEIR BASE BID THE ASSOCIATED COST FOR ADDITIONAL FITTINGS, PIPING, AND MAN
HOURS TO ACCOMMODATE CONFLICTS.
8. SEE ARCHITECTURAL PLANS FOR EXACT LOCATION AND ELEVATION OF PLUMBING FIXTURES.
9. ALL COLD WATER AND HOT WATER PIPING TO INDIVIDUAL SINKS AND INDIVIDUAL LAVATORIES
TO BE 1/2", UNLESS OTHERWISE INDICATED.
10. ALL COLD WATER AND HOT WATER PIPING SERVING 2 OR 3 OR LESS SINKS OR LAVS ARE TO BE
3/4" UNLESS NOTED OTHERWISE.
11. FINAL COLD WATER PIPING CONNECTIONS TO WATER CLOSETS TO BE 1-1/4".
12. UNLESS OTHERWISE NOTED SEE PLUMBING FIXTURE SCHEDULE FOR FIXTURE DRAIN, VENT, DCW AND DHW PIPE SIZES.
13. P.C. TO FURNISH WALL FLANGES AROUND ALL PIPING EXPOSED BELOW CEILING AND
CASEWORK.
14. P.C. TO COORDINATE ALL COUNTERTOP SINKS WITH CASEWORK TO ENSURE PROPER
INSTALLATION AND CLEARANCE REQUIREMENTS PRIOR TO ORDERING AND INSTALLATION.
COORDINATE ANY CHANGE IN SIZE OR CONFIGURATION WITH PROJECT ENGINEER AND ARCHITECT.
15. SEE PLUMBING ISOMETRICS FOR SANITARY PIPE SIZES NOT INDICATED ON FLOOR PLANS.
16. UNLESS OTHERWISE INDICATED, ALL PIPING TO RUN GENERALLY BELOW DUCTWORK FOR
ACCESS TO VALVES. DO NOT OBSTRUCT EQUIPMENT OR ACCESS DOORS.
17. THE PLUMBING CONTRACTOR IS TO INSTALL HOUSEKEEPING PADS FOR ALL PLUMBING
EQUIPMENT UNITS.
18. FINAL FLOOR DRAIN ELEVATIONS ARE TO BE SET BY THE PLUMBING CONTRACTOR.
COORDINATE EXACT POSITIONING OF FLOOR DRAINS WITH HVAC CONTRACTOR TO SERVE HVAC
EQUIPMENT AS INTENDED, AND TO AVOID TRIPPING HAZARDS WITH ABOVE FLOOR DRAIN PIPING.
19. PLUMBING FIXTURE NUMBERS ARE SHOWN ON WASTE PLANS AND REFERS TO PLUMBING
FIXTURE SCHEDULE.
20. EQUIPMENT CONNECTION ARRANGEMENTS, FLANGES, UNIONS, VALVING, ETC. ARE NOT
TYPICALLY SHOWN ON PLAN VIEWS. REFER TO DETAILS AND FLOW DIAGRAMS FOR
REQUIREMENTS. INSTALL ALL VALVES AND OTHER ITEMS REQUIRING OR FACILITATING
MAINTENANCE IN ACCESSIBLE LOCATIONS, AND SO AS TO NOT OBSTRUCT MAINTENANCE ON
EQUIPMENT SERVED.
21. PLUMBING CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND STRUCTURAL
PLANS ALL PIPE PENETRATIONS AND SLEEVE REQUIREMENTS THROUGH CONCRETE FLOORS,
WALLS, BEAMS, ETC. PRIOR TO CONSTRUCTION.
DATESIGNATURE
ET RE
D
G
RE
I S
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
6/ 9/
1:
:2
AM
C :\U se rs
\C Sc hw ab en \D oc um en ts
\2
_M
EP
_C
EN
TR
AL
FI
LE
_C
SC
H
W
AB
E N
.rv t
SYMBOL LEGEND AND
GENERAL NOTES -
PLUMBING
06.12.23
P0.1
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
REVISIONS
24 42 24 42
V06
V.1 V.2 V.3
V.A
V.B
FD-2
3" V.T.R.
V02
V03
V04
V01
V.1 V.2 V.3
V.A
V.B
FW/WCO
FW/FCO
3" US
4" US
FW/FCO
FW/FCO
3" V.T.R.
2" V
EN
T
P1-1
P3-1
FD-1 FD-1
FW/FCO
3" U
S
3" SAN
P3-3
P1-4
P5-1
H11 H17
H04
H01
H12
H13
H10
H07
H18
H16
H00
H03
H15
H05
H06
H14
H02
H09
H08
FW/FCO
FW/WCO FW/WCO
FW/FCO
4" US
4" US
4" SAN
4" SAN
FW/FCO
6" U
S 6"
U S
2" V
EN
T
2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
1 1/2"
3" V.T.R.
P6-2
P6-2P6-2
P6-2
P5-2 P5-2
FD-1
FW/FCO
FD-1
FD-1
4" US 4" US
2" V
EN
T
P3-1P1-1
1 2
P1-4
P1-4
P3-3
P3-3
P1-4
P1-4
P3-3
P3-3
FD-2
FD-2
6" U
S
F07
F08
F02F00-1
F09
F10
F03
F04
F12
F05
F16
F18
F19
F17
F21
F15
F22
F13
F06
F00-2
FW/FCO
4" U
S
2"
4" US
FW/FCO
4" US
3"
2"
FW/FCO
FW/FCO
FW/FCO
FW/FCO
4" GW
4" G
W
FW/FCO
2" GW4"
G
W
FW/FCO
4" US
6" U
S
2" VENT
6" US6" USFW/FCO
FW/FCO
FW/FCO
4" G
W
2" V
EN
T
3" V.T.R.
3" V.T.R.
2" VENT 2" VENT
2" V
EN
T
2" V
EN
T
3" V.T.R.
2" VENT
4" IW
3" IW
2" VENT
P1-1
P3-1
P5-2 P5-1
P3-1
P1-1
P5-2
P5-1
FD-1
FD-1
FD-2 FD-1
FD-2
FD-2
4" GW
FD-3
FD-3
FD-3
FD-3 FD-3
FD-3 FD-3
FD-1
4" US
4" GW
FD-3
FD-3
FD-3
9 9
P4-2
P4-2 2"
P4-2
P4-2
P4-2
FD-2
PE-11
P3-3 P2 -1
P1 -4
P1-4 P3-3
FW/FCO
CODED NOTES
1. INSTALL 4" SAN BELOW SLAB AND EXTEND UP TO W.C. FLANGE. EXTEND 2" VENT UP IN WALL
TO CEILING SPACE
2. INSTALL 2" SAN BELOW SLAB AND EXTEND UP IN WALL. EXTEND 1-1/2" SAN TO LAV. EXTEND 2"
WET VENT UP IN WALL TO CEILING SPACE.
3. INSTALL 2" SAN BELOW SLAB AND EXTEND UP IN WALL. EXTEND 1-1/2" SAN TO URINAL. EXTEND
2" WET VENT UP IN WALL TO CEILING SPACE.
4. INSTALL 3" SAN BELOW SLAB AND EXTEND UP TO MOP BASIN. EXTEND 1-1/2" VENT UP IN WALL
TO CEILING SPACE.
5. INSTALL 2" SAN BELOW SLAB AND EXTEND UP IN WALL. EXTEND 1-1/2" SAN TO SERVICE SINK.
EXTEND 2" WET VENT UP IN WALL TO CEILING SPACE.
6. INSTALL 2" GW BELOW SLAB AND EXTEND UP IN WALL TO HAND SINK. EXTEND 2" VENT UP IN
WALL TO CEILING SPACE.
7. INSTALL 4" COMBINATION DRAIN AND VENT BELOW SLAB AND EXTEND UP TO FLOOR DRAIN
WITH TRAP PRIMER CONNECTION.
8. INSTALL 4" GW COMBINATION DRAIN AND 2" VENT UP IN WALL TO CEILING SPACE.
9. EXTEND 3" IW LINE BELOW SLAB TO FLOOR SINK.
10. INSTALL 4" COMBINATION DRAIN AND VENT BELOW SLAB AND EXTEND UP TO FLOOR SINK
WITH TRAP PRIMER CONNECTION.
11. INSTALL 2" SAN BELOW SLAB AND EXTEND UP TO SHOWER DRAIN. EXTEND 1-1/2" VENT UP IN
WALL TO CEILING SPACE.
12. INSTALL GREASE TRAP PER DETAIL ON SHEET P4.2.
13. INSTALL FLOOR SINK AT THE END OF COMMERCIAL WASHER TRENCH DRAIN. REFER TO
DETAIL ON SHEET P4.2 FOR FURTHER SPECIFICATIONS.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED AS 30"X42" PLOT. IF THIS PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE MUST BE USED.
B. SEE SHEET PO.1 FOR PLUMBING SYMBOL LEGEND AND GENERAL NOTES.
C. SEE SHEET P3.1 FOR PLUMBING SCHEDULES.
D. SEE SHEETS P4.1 AND P4.2 FOR PLUMBING DETAILS.
E. SEE SHEET P5.1, P5.2, AND P5.3 FOR PLUMBING ISOMETRICS .
F. OFFSET PLUMBING PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND
SPRINKLER PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT
PIPING ROUTING ALL TRADES.
G. INSTALL PLUMBING PIPING SUCH TO CONCEAL IN FURRED OUT WALLS AND CHASES.
COORDINATE EXACT LOCATION WITH ARCHITECTURAL PLANS.
H. PLUMBING PIPING SHOWN ON THIS SHEET IS LOCATED WITHIN CEILING SPACE UNLESS NOTED
OTHERWISE.
I. INSTALL DOMESTIC WATER ISOLATION VALVES AND SHOCK STOPS IN CEILING SPACE AT AN EASILY ACCURATE LOCATION ABOVE LAY-IN CEILING TITLES. COORDINATE WITH ARCHITECTURAL
CEILING PLANS.
DATESIGNATURE
ET RE
D
G
RE
IS
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
0' 1' 2'
1/2" = 1' 0"
0' 1' 3'
3/8" = 1' 0"
0' 2' 4'
1/4" = 1' 0"
0' 3' 6'1'
3/16" = 1' 0"
0' 4' 8'2'
1/8" = 1' 0"
0' 3' 12'
3/32" = 1' 0"
6'0' 8' 16'4'
1/16" = 1' 0"
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
7/
/2
2:
:4
PM
C :\U se rs
\A .H
A rm on \D o c um en ts
\2
_M
E P_
C
EN
TR
A
L
FI
LE
_a ha rm on _ s bm ce
_c om
.rv t
WASTE - VOCATIONAL
EDUCATION/FOOD
SERVICE/LAUNDRY/HOUSING
UNIT - PLUMBING
06.12.23
P1.2
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
1/8" = 1'-0"
WASTE - MEZZANINE - VOCATIONAL EDUCATION - PLUMBING
1/8" = 1'-0"
WASTE - VOCATIONAL EDUCATION - PLUMBING
1/8" = 1'-0"
WASTE - HOUSING UNIT - PLUMBING
1/8" = 1'-0"
WASTE - FOOD SERVICE/LAUNDRY - PLUMBING
ROOM LEGEND
Number Name
H03 STAFF TLT.
H04 SECURITY/ CONTROL
H05 JAN.
H06 UNIT MANAGER
H07 HOUSING STORAGE
H08 VESTIBULE
H09 DAYROOM
H10 DRY ROOM
H11 JAN.
H12 BATHROOM
H13 PLUMB./FIRE SERV.
H14 VESTIBULE
H15 DAYROOM
H16 DRY ROOM
H17 JAN.
H18 BATHROOM
V01 WELDING SHOP
V02 WELDING CLASSROOM
V03 INMATE TLT.
V04 STAFF TLT.
ROOM LEGEND
Number Name
F00-1 KITCHEN-1
F00-2 KITCHEN-2
F02 OFFICE
F03 WALK-IN COOLER
F04 WALK-IN FREEZER
F05 DRY STORAGE
F06 DISHWASHING
F07 DINING HALL
F08 SERVING LINE
F09 JAN.
F10 ELEC.
F12 STAFF TLT./LOCKER
F13 WORK AREA
F15 WASHERS
F16 DRYER CHASE
F17 LINEN STORAGE
F18 SECURE STORAGE
F19 JAN.
F21 TLT.
F22 OFFICE
H00 CORRIDOR
H01 ELEC./ TELE.
H02 UNIT CASE MANAGER
1 Addendum #3 07.11.23
V06
V.1 V.2 V.3
V.A
V.B
1" CA
1" C
A
TP-1
PE-4
PE-7
(30 MBH)
(150 MBH) (150 MBH)
BP-1
V02
V03
V04 V01
V.1 V.2 V.3
V.A
V.B
1" CA
1" P
1" P
2" P
2" P
(1260 MBH)
(150 MBH) (150 MBH)
2" P
2" D
C W
2" DCW
TP-1
TP-1
BP-2
H11 H17
H04
H01
H12
H13
H10
H07
H18
H16
H00
H03
H15
H05
H06
H14
H02
H09
H08
1/2" 1/2"
1/2" 1/2"
1 1/4"
1 1/4"
1/
4"
1/2" 1/2"
1/2" 1/2"
1/2" 1/2"
1 3 4
10TP-2
2" P
2"
PE-3
PE-8
2" P
2"
BP-2
PE-5
PE-5
F07
F08
F02
F00-1
F09
F10
F03
F04
F12
F05
F16
F18
F19 F17
F21
F15
F22
F13
F06
F00-2
1/2"
1/2" DHW
1/2" DCW
3" DCW
1 1/2" DHW
3/4" RDHW
1" 1"
1" 1"
1" 1"
3"
1/ 2"
3/ 4"
1/2" 1/2"
1/2" 1/2"
2" P
1" P
1" P
1" P2" P2" P
1/2" DCW
(120 CFH)
(125 CFH)
(220 CFH)
(200 CFH)
3"
TP-1
TP-1
TP-1
F20
PE-5
PE-2
PE-9
PE-6
3"
TP-1
TP-1
TP-1
3/4"
4 BP-2
2" P
2" D
C W
1/
2" D
H W
3/ 4"
R D
H W
CODED NOTES
1. INSTALL 1-1/4" DCW LINE WITH SHOCK STOP DOWN IN WALL TO W.C.
2. INSTALL 3/4" DCW LINE WITH SHOCK STOP DOWN IN WALL TO URINAL.
3. INSTALL 1/2" DHW & DCW LINES DOWN IN WALL TO LAV.
4. INSTALL 1/2" DCW LINE TO UNDER-LAV TRAP PRIMER VALVE AND EXTEND 1/2" LINE IN WALL
AND EXTEND THROUGH FLOOR TO FLOOR DRAIN WITH TRAP PRIMER CONNECTION. SEE PUBLIC
LAVATORY DETAIL ON SHEET P4.1.
5. INSTALL 3/4" DHW AND DCW LINES WITH CHECK VALVES DOWN IN WALL TO MOP BASIN.
6. INSTALL 1/2" DHW AND DCW LINES WITH CHECK VALVES DOWN IN WALL TO UTILITY SINK.
7. INSTALL 1/2" DHW AND DCW LINES DOWN IN WALL TO EYEWASH.
8. INSTALL 1/2" DHW AND DCW LINES DOWN IN WALL SHOWER.
9. INSTALL 1" DHW AND DCW LINES DOWN ALONG WALL BEHIND WASHING MACHINES. PROVIDE
ROUGH-IN AND FINAL CONNECTIONS.
10. INSTALL 1/2" DCW LINE WITH BALL VALVE AND TRAP PRIMER VALVE IN CEILING SPACE. ROUTE 1/2" PRIMER LINE DOWN ALONG WALL AND EXTEND THROUGH FLOOR TO FLOOR SINK WITH TRAP
PRIMER CONNECTION.
11. INSTALL 1/2" DHW AND DCW LINES DOWN IN WALL TO HAND SINK.
12. EXTEND 3/4" DHW LINE WITH ISOLATION VALVE, CHECK VALVE, AND SHOCK STOP FROM SINK
TO DISHWASHER. PROVIDE ROUGH-IN AND FINAL CONNECTIONS.
13. EXTEND 1/2" DCW LINE WITH BALL VALVE DOWN IN WALL TO ICE MAKER/TEA BREWER.
14. EXTEND 1" CA FROM AIR COMPRESSOR TO FUME EXTRACTION SYSTEM.
15. EXTEND 1" PROPANE LINE WITH VALVE TO SERVE OPEN BURNER. PROVIDE ROUGH-IN AND
FINAL CONNECTIONS.
16. EXTEND 1" PROPANE LINE WITH VALVE TO SERVE CONVECTION STEAMER/ OVEN. PROVIDE
ROUGH-IN AND FINAL CONNECTIONS.
17. EXTEND 1" PROPANE LINE WITH VALVE TO SERVE BRAISING PAN. PROVIDE ROUGH-IN AND
FINAL CONNECTIONS.
18. EXTEND 1" PROPANE LINE WITH VALVE IN CEILING SPACE AND DOWN ALONG WALL TO SERVE
DRYER.
19. EXTEND 2" PROPANE LINE WITH VALVE TO SERVE WATER HEATER. REFER TO SHEET P4.1
FOR SCHEMATIC DETAIL.
20. EXTEND 3/4" DCW AND DHW LINES WITH BALL VALVES TO SERVE PE-4.
21. EXTEND 1-1/2" DCW AND DHW LINES WITH BALL VALVES TO SERVE PE-1 AND PE-3.
22. EXTEND 2" DCW AND DHW LINES WITH BALL VALVES TO SERVE PE-2.
23. EXTEND 1/2" DCW LINE WITH 1/2" REDUCED PRESSURE BACKFLOW PREVENTER TO SERVE
HUMIDIFIER. REDUCE LINE SIZE TO 1/4" AT CONNECTION POINT AND COORDINATE ROUGH-IN AND FINAL CONNECTIONS WITH MECHANICAL. REFER TO SHEET M2.1 FOR LOCATION OF HUMIDIFIER.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED AS 30"X42" PLOT. IF THIS PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE MUST BE USED.
B. SEE SHEET PO.1 FOR PLUMBING SYMBOL LEGEND AND GENERAL NOTES.
C. SEE SHEET P3.1 FOR PLUMBING SCHEDULES.
D. SEE SHEETS P4.1 AND P4.2 FOR PLUMBING DETAILS.
E. SEE SHEET P5.1, P5.2, AND P5.3 FOR PLUMBING ISOMETRICS .
F. OFFSET PLUMBING PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND
SPRINKLER PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT
PIPING ROUTING ALL TRADES.
G. INSTALL PLUMBING PIPING SUCH TO CONCEAL IN FURRED OUT WALLS AND CHASES.
COORDINATE EXACT LOCATION WITH ARCHITECTURAL PLANS.
H. PLUMBING PIPING SHOWN ON THIS SHEET IS LOCATED WITHIN CEILING SPACE UNLESS NOTED
OTHERWISE.
I. INSTALL DOMESTIC WATER ISOLATION VALVES AND SHOCK STOPS IN CEILING SPACE AT AN EASILY ACCURATE LOCATION ABOVE LAY-IN CEILING TITLES. COORDINATE WITH ARCHITECTURAL
CEILING PLANS.
DATESIGNATURE
ET RE
D
G
RE
IS
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
0' 1' 2'
1/2" = 1' 0"
0' 1' 3'
3/8" = 1' 0"
0' 2' 4'
1/4" = 1' 0"
0' 3' 6'1'
3/16" = 1' 0"
0' 4' 8'2'
1/8" = 1' 0"
0' 3' 12'
3/32" = 1' 0"
6'0' 8' 16'4'
1/16" = 1' 0"
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
7/
/2
2:
:2
PM
C :\U se rs
\A .H
A rm on \D o c um en ts
\2
_M
E P_
C
EN
TR
A
L
FI
LE
_a ha rm on _ s bm ce
_c om
.rv t
PIPING - VOCATIONAL
EDUCATION/FOOD
SERVICE/LAUNDRY/HOUSING
UNIT - PLUMBING
06.12.23
P2.2
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
1/8" = 1'-0"
PIPING - MEZZANINE - VOCATIONAL EDUCATION - PLUMBING
1/8" = 1'-0"
PIPING - VOCATIONAL EDUCATION - PLUMBING
1/8" = 1'-0"
PIPING - HOUSING UNIT - PLUMBING
1/8" = 1'-0"
PIPING - FOOD SERVICE/LAUNDRY - PLUMBING
ROOM LEGEND
Number Name
H03 STAFF TLT.
H04 SECURITY/ CONTROL
H05 JAN.
H06 UNIT MANAGER
H07 HOUSING STORAGE
H08 VESTIBULE
H09 DAYROOM
H10 DRY ROOM
H11 JAN.
H12 BATHROOM
H13 PLUMB./FIRE SERV.
H14 VESTIBULE
H15 DAYROOM
H16 DRY ROOM
H17 JAN.
H18 BATHROOM
V01 WELDING SHOP
V02 WELDING CLASSROOM
V03 INMATE TLT.
V04 STAFF TLT.
ROOM LEGEND
Number Name
F00-1 KITCHEN-1
F00-2 KITCHEN-2
F02 OFFICE
F03 WALK-IN COOLER
F04 WALK-IN FREEZER
F05 DRY STORAGE
F06 DISHWASHING
F07 DINING HALL
F08 SERVING LINE
F09 JAN.
F10 ELEC.
F12 STAFF TLT./LOCKER
F13 WORK AREA
F15 WASHERS
F16 DRYER CHASE
F17 LINEN STORAGE
F18 SECURE STORAGE
F19 JAN.
F21 TLT.
F22 OFFICE
H00 CORRIDOR
H01 ELEC./ TELE.
H02 UNIT CASE MANAGER
TOTAL: 11 4078
HR-2 1 500
HR-1 1 500
CG75-85 (DRYER) 2 165 10" 13"
CG115-25 (DRYER) 1 270 10" 13"
CONVECTION OVEN 1 120 10" 13.8"
CONVECTION
STEAMER 1 125 12" 14"
SIX BURNER STOVE 1 220 10" 11"
BRAISING PAN 1 200 5" 11"
PE-5 2 999 8" 13"
APPLIANCE QUANTITY INPUT BTU (CFH) MIN. GAS PRESSURE (W.C.) MAX. GAS PRESSURE (W.C.)
PROPANE GAS LOAD-FOOD SERVICE
TOTAL: 2 199 3.5" 14"
PE-3 2 199 3.5" 14"
APPLIANCE QUANTITY INPUT BTU
(CFH) MIN. GAS PRESSURE (W.C.) MAX. GAS PRESSURE (W.C.)
PROPANE GAS LOAD-HOUSING UNITS
TOTAL: 2 1630 7" 13"
GUH-V06 1 30 7" 14"
GUH-V01-2 1 150 7" 14"
GUH-V01-1 1 150 7" 14"
FURNACE 1 40 11" 13"
MAU UNIT 1 1260 7" 14"
APPLIANCE QUANTITY INPUT BTU
(CFH) MIN. GAS PRESSURE (W.C.) MAX. GAS PRESSURE (W.C.)
PROPANE GAS LOAD-VOCATIONAL
REVISIONS
1 Addendum #3 07.11.23
6" US
FW/FCO
FD-2
FD-1
FW/FCO
6" US
6" US
6" US
2"
3"
P5-2 P5-1
4" S
AN
4"
P1-1
FW/WCO
FD-3
P3-1
FD-1
3" GW
FD-3
2" V
EN
T
2" V
EN
T
V
EN
T
1/
2" V
E N
T
1/
2" V
E N
T
3" V.T.R.
2" VENT
1/
2" V
E N
T
P5-1
P5-2
4" US2"
3"
FD-2
FW/FCO
1/
2" V
E N
T
FD-3
FD-3
4"
4"
2"
FD-3
4"
FW/FCO
6" US
FD-2
4" US
FD-2 4" US
3"
4" GW
4" GW
FW/FCO
4" GW
4" GW
FW/FCO
FD-3
FD-3
FD-1
P1-1
P3-1
FD-1
P4-2
FW/FCO
4" US
4" US
2" 2"
4"
4"
FW/FCO
PE-11
P4-2
P4-2
P4-2
P4-2
P4-2
P3-3
P2-1
P3-3
P1-4
P4-2
1/
2" V
E N
T
1/
2" V
E N
T
2" V
EN
T
2" VENT
2" VENT
VENT
2" VENT
2" V
EN
T
2" V
EN
T 2"
V
EN
T
2" VENT
2" V
EN
T
2" GW
4" GW
4" GW
2" VENT
4" GW
2" GW
6" US
4" US
4" US
4" 4"
FW/FCO
P3-1
P1-1
2"
2"
1/
2"
2" VENT
FW/FCO
4" US
4" SAN
4" SAN
FW/WCO
FD-1
1/
2"
1/
2"
2"
2"
2" VENT
2" VENT
4" US
P5-2
P5-2
FD-1
4"
FW/FCO
SAN
1 1/2" VENT
1 1/2" VENT
2" VENT
2" VENT
FW/WCO
1/
2 " V E
N T
1 /
2 " V E
N T
2" VENT
P6-2
P6-2
P6-2
FW/FCO
FD-2
P6-2
FD-1
3" V.T.R.
P1-4
P1-4
6" US
P3-3
P3-3
P1-4
P3-3
P3-3 P1-4
2" VENT
2" V
EN
T
2" V
EN
T
FW/FCO
P1-1
FD-1
FD-1
FW/FCO
FW/FCO
3"
4" US
4" US
4"
4" US
2"
P5-1
P3-1
4" S
AN
3" V.T.R.
1/
2"
2" VENT
P3-3
P1-4
DATESIGNATURE
ET RE
D
G
RE
I S
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
6/ 9/
1:
:1
AM
C :\U se rs
\C Sc hw ab en \D oc um en ts
\2
_M
EP
_C
EN
TR
AL
FI
LE
_C
SC
H
W
AB
E N
.rv t
SANITARY ISOMETRICS
(SHEET 3 OF 3) -
PLUMBING
06.12.23
P5.3
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
SANITARY ISOMETRICS - FOOD SERVICE/LAUNDRY
SANITARY ISOMETRICS - HOUSING UNITSANITARY ISOMETRICS - VOCATIONAL EDUCATION
HVAC NEW WORK GENERAL NOTES
1. THE GENERAL NOTES LISTED HERE APPLY TO ALL HVAC DRAWINGS IN ADDITION TO ANY
ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS.
2. REFER ALSO TO DUCTWORK MATERIAL SCHEDULE AND NOTES FOR ADDITIONAL GENERAL NOTES
APPLICABLE TO DUCTWORK.
3. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.
4. FIELD VERIFY EXISTING CONDITIONS.
5. COORDINATE WITH GENERAL TRADES WORK, PLUMBING WORK, FIRE PROTECTION WORK,
ELECTRICAL WORK AND OTHER WORK.
6. IT IS RECOGNIZED THAT DRAWINGS MAY BE PLOTTED AT DIFFERENT SCALES, SUCH THAT
PLOTTED DRAWINGS MAY VARY FROM ACTUAL OR INTENDED DIMENSIONS. THEREFORE, DRAWINGS ARE DIAGRAMMATIC AND ARE NOT TO BE SCALED. SBM TAKES NO RESPONSIBILITY FOR ERRORS
REGARDING DISCREPANCIES FROM THE ORIGINAL DRAWINGS DRAWN AT THE PROPER SCALE AND
THOSE DRAWINGS THAT HAVE BEEN PLOTTED.
7. THE MECHANICAL DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW
EXACT LOCATION OF EQUIPMENT, PIPING AND DUCTWORK UNLESS DIMENSIONS ARE GIVEN OR
OTHERWISE IMPLIED FOR CLEARANCES, ETC. PIPING, DUCTWORK AND MECHANICAL EQUIPMENT
ARE TO BE INSTALLED ALONG THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT KEEPING IN
MIND ACTUAL BUILDING CONDITIONS WHICH MUST BE CONFORMED WITH IN THE ACTUAL WORK.
CONTRACTORS IN THEIR BIDS ARE REQUIRED TO INCLUDE ALL LABOR AND MATERIALS AND OTHER RELATED WORK NECESSARY TO PROVIDE MINOR OFFSETS IN MECHANICAL WORK AS REQUIRED TO AVOID CONFLICT WITH OTHER WORK ON THIS PROJECT, OR AS REQUIRED IN ORDER TO OBTAIN
MAXIMUM HEAD ROOM OR EQUIPMENT ACCESS IN SPACES.
8. PHASING - SEE DIVISION 1 PROJECT SPECIFICATION PHASING DOCUMENTS FOR SPECIFIC
PHASING INSTRUCTIONS. COORDINATE SHUT-DOWN OF ANY UTILITY IN ADVANCE WITH THE
OWNER. ACCOMPLISH DRAIN DOWN AND RE-FILL OF PIPING SYSTEMS AS REQUIRED. UNLESS
OTHERWISE SPECIFICALLY INDICATED, EXISTING CHILLED WATER SYSTEMS SHALL NOT BE
DISRUPTED DURING THE COOLING SEASON, AND HEATING SYSTEMS SHALL NOT BE DISRUPTED
WHEN REQUIRED FOR OCCUPANT COMFORT OR BUILDING FREEZE PROTECTION.
9. MAINTAIN REQUIRED RIGGING ACCESS CLEARANCES. COORDINATE CLEARANCE REQUIREMENTS
WITH OTHER TRADES.
10. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE AND SMOKE WALLS AND RATED
STRUCTURES. SEE DETAILS AND SPECIFICATIONS FOR PIPE PENETRATION SEAL REQUIREMENTS.
11. H.C. IS TO COORDINATE ALL MASONRY PENETRATION LOCATIONS AND SIZES WITH G.C.
12. COORDINATE EXACT POSITIONING OF FLOOR DRAINS WITH PLUMBING CONTRACTOR TO SERVE
HVAC EQUIPMENT AS INTENDED, AND TO AVOID TRIPPING HAZARDS WITH ABOVE FLOOR DRAIN
PIPING.
13. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL EQUIPMENT.
14. BALANCE AIR QUANTITY FOR RETURN AIR INLETS TO EQUAL THE SUM OF SUPPLY AIR
INTRODUCED TO THE SPACE, UNLESS NOTED OTHERWISE.
15. UNLESS OTHERWISE INDICATED, ALL PIPING TO RUN GENERALLY BELOW DUCTWORK FOR
ACCESS TO VALVING. DO NOT OBSTRUCT EQUIPMENT OR ACCESS DOORS. AVOID DUCTWORK OVER
LIGHTS WHEREVER POSSIBLE.
16. EQUIPMENT CONNECTION ARRANGEMENTS, FLANGES, UNIONS, VALVING, ETC. ARE NOT
TYPICALLY SHOWN ON PLAN VIEWS. REFER TO DETAILS AND FLOW DIAGRAMS FOR REQUIREMENTS.
INSTALL ALL VALVES AND OTHER ITEMS REQUIRING OR FACILITATING MAINTENANCE IN ACCESSIBLE
LOCATIONS, AND SO AS TO NOT OBSTRUCT MAINTENANCE ON EQUIPMENT SERVED.
17. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE SO THERE
WILL BE COUNTER FLOW BETWEEN WATER AND AIR.
18. NOT ALL AIR VENTS AND DRAINS HAVE BEEN SHOWN ON PIPING AS THEIR REQUIRED LOCATION
DEPENDS ON THE PIPING INSTALLATION. REFER TO SPECIFICATION SECTION 232113 FOR
REQUIREMENTS OF PIPING AIR VENTS AND DRAINS. PROVIDE AIR VENTS IN ALL HIGH POINTS AND
DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM.
19. SEE TEMPERATURE CONTROL DRAWINGS AND COORDINATE WITH TEMPERATURE CONTROL
CONTRACTORS FOR INSTRUMENTATION DEVICES REQUIRED TO BE INSTALLED IN PIPING AND
DUCTWORK, TOGETHER WITH NECESSARY CLEARANCES FOR SAME.
20. ALL HWS AND HWR BRANCH CONNECTIONS TO HEATING EQUIPMENT, TERMINAL UNITS AND
RADIANT PANELS TO BE 3/4" UNLESS OTHERWISE NOTED.
21. NO "BULL-HEAD" TEES ARE PERMITTED IN PIPING. FLOW IS NOT PERMITTED TO BE IN OPPOSING
DIRECTIONS IN THE SAME TEE FITTING.
22. ALL AIR TERMINAL UNITS, HEATING TERMINALS AND REHEAT COILS SHALL BE PROVIDED WITH
WALL-MOUNTED THERMOSTATS UNLESS NOTED ON THE PLANS OR SPECIFICATIONS TO BE
EQUIPPED WITH INTEGRAL THERMOSTATS. REFER TO PLANS FOR APPROXIMATE THERMOSTAT
LOCATIONS - COORDINATE WITH OTHER TRADES. IF A THERMOSTAT IS NOT SHOWN ON THE PLANS, COORDINATE LOCATION WITH ENGINEER. CONTRACTOR SHALL SUBMIT A FLOOR PLAN WITH
APPROXIMATE LOCATIONS OF ALL THERMOSTATS.
23. UNLESS NOTED OTHERWISE, ALL DIFFUSERS, REGISTERS AND GRILLES SHALL BE PROVIDED
WITH A MEANS FOR BALANCING.
DESCRIPTIONABBREVIATION SYMBOL
HWS
HWR
PHWS
PHWR
SHWS
SHWR
MU
RL
RS
CD
H
S
T
H
MIN. GPM
MIN. CFM
MIN. GPM
MIN. CFM
D
MIN. GPM
MIN. CFM
1.5
XXX
CFM
A1 21/
B1 21/
C1 21/
SD
FSD11 2/
A.D.A.D.
HVAC SYMBOL LEGEND
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
PHWS PRIMARY HEATING WATER SUPPLY
PHWR PRIMARY HEATING WATER RETURN
SHWS SECONDARY HEATING WATER SUPPLY
SHWR SECONDARY HEATING WATER RETURN
MU MAKE-UP WATER
RL LIQUID REFRIGERANT LINE
RS SUCTION REFRIGERANT LINE
CD A/C CONDENSATE DRAIN
GATE VALVE
GAS COCK
BALL VALVE
BALANCE VALVE (SEE SPECIFICATIONS)
CHECK VALVE (SWING)
PUMP DISCHARGE SILENT LIFT CHECK VALVE
PRV HYDRONIC PRESSURE REDUCING VALVE
BUTTERFLY VALVE
RV RELIEF OR SAFETY VALVE
SOLENOID VALVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
SUCTION DIFFUSER WITH BLOWDOWN VALVE
CONCENTRIC REDUCER/INCREASER
STRAINER WITH BLOWDOWN
UNION
FLANGED UNION
PIPE SLEEVE (SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS)
VIBRATION CONNECTION (SEE SPECIFICATIONS)
MANUAL AIR VENT
AUTOMATIC AIR VENT WITH BALL VALVE
COMPANION FLANGE
HUMIDITY SENSOR
WALL SWITCH (SEE TEMPERATURE CONTROLS)
TEMPERATURE SENSOR
THERMOSTAT
HUMIDISTAT
THERMOMETER/TEMPERATURE GAUGE
PRESSURE GAUGE WITH BALL VALVE (WATER)
DUCTWORK INSULATION AND MATERIAL (SEE SCHEDULE)
TERMINAL UNIT (SEE SCHEDULE)
TERMINAL UNIT WITH DDC CONTROL (SEE SCHEDULE)
TERMINAL UNIT W/HEATING COIL GPM SETTING (SEE PIPING DWG.)
LOUVERS (SEE SCHEDULE)
CODED NOTE (SEE SCHEDULE)
E.C. E.C. ELECTRICAL CONTRACTOR
F.P.C. F.P.C. FIRE PROTECTION CONTRACTOR
G.C. G.C. GENERAL CONTRACTOR
H.C. H.C. HVAC CONTRACTOR
P.C. P.C. PLUMBING CONTRACTOR
T.C.C. T.C.C. TEMPERATURE CONTROL SUB-CONTRACTOR
A.D. A.D. ACCESS DOOR
A.F.F. A.F.F. ABOVE FINISHED FLOOR
MFR. MFR. MANUFACTURER
N.O. N.O. NORMALLY OPEN
N.C. N.C. NORMALLY CLOSED
TYP. TYP. TYPICAL
E.A. E.A. EXHAUST AIR
R.A. R.A. RETURN AIR
S.A. S.A. SUPPLY AIR
M.O.B.D. M.O.B.D. MANUAL OPPOSED BLADE DAMPER
O.B.D. O.B.D. OPPOSED BLADE DAMPER
FLOW DIRECTION INDICATOR (VAPOR)
FLOW DIRECTION INDICATOR (LIQUID)
FLOW DIRECTION INDICATOR (VAPOR) W/ CFM QUANTITY GIVEN
11/2A 1-1/2 HOUR TYPE A FIRE DAMPER
11/2B 1-1/2 HOUR TYPE B FIRE DAMPER
11/2C 1-1/2 HOUR TYPE C FIRE DAMPER
SD SMOKE DAMPER
11/2FSD 1-1/2 HOUR COMBINATION FIRE/SMOKE DAMPER
ACCESS DOOR IN BOTTOM OF DUCT OR SIDE OF DUCT
BLANK OFF PORTION OF DIFFUSER
90° ELBOW WITH TURNING VANES
SQUARE-TO-ROUND DUCT TRANSITION
TERMINAL UNIT WITH FLEXIBLE CONNECTION AND REHEAT COIL
MANUAL BALANCING DAMPER
AUTOMATIC CONTROL DAMPER
INDICATES TIE INTO EXISTING
INDICATES REMOVE TO POINT FOR RECONNECTION
INDICATES REMOVE TO POINT AND CAP
CO2 SENSORCO2
REMARKSABBREVIATION DESCRIPTION
A-1
AD-1
AF-1
AFM-1
AFM-2
CDS
CSR
D-1
D-2
D-3
D-4
DPS-1
DPT-1
EP-1
ES-1
FMS
FS-1
FSD-1
G
H-1
H-2
M
M 80
M SW
PE-1
PHSS
P
SD-1
SD-2
SD-3
SPS-1
SPS-2
SPS-3
SW-1
T-1
T-2
T-3
T-4
T-5
T-6
T-1
T-2
T-3
T-4
TE-1
TE-2
TE-3
TE-4
TE-5
TLL-1
VE-1
VE-2
VE-3
VE-4
VE-5
VE-6
VE-7
VE-8
VE-9
VE-10
VE-11
VE-12
VE-13
VE-14
VE-15
VE-16
VE-17
VFD
VPS-1
E.C.
MFR.
N.C.
N.O.
T.C.C.
TEMPERATURE CONTROL SYMBOL LEGEND
DUPLEX CONTROL AIR COMPRESSOR
CONTROL AIR DAMPER
OIL/AIR FILTER STATION WITH REDUCING VALVES
AIRFLOW MEASURING STATION - FAN INLET TYPE
AIRFLOW MEASURING STATION - DUCT MOUNTED TYPE
CARBON DIOXIDE SENSOR (DIGITAL) WITH ASPIRATION KIT
CURRENT SENSING RELAY
OPPOSED BLADE LOW LEAKAGE CONTROL DAMPER
PARALLEL BLADE LOW LEAKAGE CONTROL DAMPER
OPPOSED BLADE LOW LEAKAGE INSULATED BLADE CONTROL DAMPER
PARALLEL BLADE LOW LEAKAGE INSULATED BLADE CONTROL DAMPER
DIFFERENTIAL PRESSURE SWITCH FOR LIQUID (BINARY)
DIFFERENTIAL PRESSURE TRANSMITTER FOR LIQUID (BINARY)
ELECTRICAL CONTRACTOR
ELECTRIC TO PNEUMATIC SWITCH
DAMPER PROVING END SWITCH
LIQUID FLOW MEASURING STATION
HYDRONIC FLOW SWITCH
DUCT SMOKE DETECTOR WITH AUXILIARY CONTACT BY E.C.
MAGNEHELIC PRESSURE GAUGE SEE SPECIFICATIONS
DUCT HUMIDITY SENSOR
SPACE HUMIDITY SENSOR (WITHOUT LOCAL ADJUSTABLE SET POINT)
MAIN CONTROL AIR - 20 PSI
MAIN CONTROL AIR - 80 PSI
MAIN CONTROL AIR - 20 PSI - SWITCHED ON/OFF
MANUFACTURER
NORMALLY CLOSED
NORMALLY OPEN
PNEUMATIC TO ELECTRIC SWITCH
PNEUMATIC HIGHER OF TWO PRESSURE SELECTOR SWITCH
PARALLEL BLADE SMOKE DAMPER SEE SPECIFICATIONS
OPPOSED BLADE SMOKE DAMPER SEE SPECIFICATIONS
COMBINATION FIRE/SMOKE DAMPER SEE SPECIFICATIONS
STATIC PRESSURE SENSOR FOR AIRFLOW (ANALOG)
STATIC PRESSURE SENSOR FOR AIRFLOW - HIGH LIMIT - (ANALOG)
STATIC PRESSURE SENSOR FOR AIRFLOW - LOW LIMIT - (ANALOG)
TWO HOUR SPRING TIMER ELECTRIC WALL SWITCH
DUCT TEMPERATURE SENSOR
OUTDOOR AIR TEMPERATURE SENSOR SHIELDED
ROOM TEMPERATURE SENSOR (WITHOUT LOCAL ADJUSTABLE SET POINT)
ROOM TEMPERATURE SENSOR (WITHOUT LOCAL ADJUSTABLE SETPOINT)
MIXED AIR DUCT TEMPERATURE SENSOR WITH EXTENDED ELEMENT
PIPE INSERTION LIQUID TEMPERATURE SENSOR
PNEUMATIC COOLING ONLY ROOM THERMOSTAT
PNEUMATIC COOLING/HEATING ROOM THERMOSTAT
PNEUMATIC HEATING ONLY ROOM THERMOSTAT
STRAP ON AQUASTAT
TEMPERATURE CONTROL CONTRACTOR
ELECTRIC COOLING ONLY ROOM THERMOSTAT
ELECTRIC COOLING/HEATING ROOM THERMOSTAT
ELECTRIC HEATING ONLY ROOM THERMOSTAT
ELECTRIC REMOTE BULB THERMOSTAT
ELECTRIC STRAP ON AQUASTAT
FREEZESTAT WITH AUXILIARY CONTACTS AND LOCAL MANUAL RESET
NORMALLY OPEN (N.O.) ELECTRIC MODULATING STEAM CONTROL VALVE
NORMALLY OPEN (N.O.) ELECTRIC TWO POSITION STEAM CONTROL VALVE
NORMALLY CLOSED (N.C.) ELECTRIC MODULATING STEAM CONTROL VALVE
NORMALLY CLOSED (N.C.) ELECTRIC TWO POSITION STEAM CONTROL VALVE
PISTON ACTUATED ELECTRIC BUTTERFLY CONTROL VALVE - TWO-WAY -
MODULATING
PISTON ACTUATED ELECTRIC BUTTERFLY CONTROL VALVE - THREE-WAY -
MODULATING
PISTON ACTUATED ELECTRIC BUTTERFLY CONTROL VALVE - TWO-WAY -
TWO POSITION
PISTON ACTUATED ELECTRIC BUTTERFLY CONTROL VALVE - THREE-WAY -
TWO POSITION
ELECTRIC HUMIDIFIER CONTROL VALVE (FURNISHED WITH HUMIDIFIER)
VARIABLE FREQUENCY DRIVE (FOR MOTOR SPEED ADJUSTMENT) SEE SCHEDULES
VELOCITY PRESSURE SENSOR
LOCATE WHERE INDICATED ON PLANS PER
MANUFACTURERS RECOMMENDATIONS.
SEE SPECIFICATIONS.
LOCATE WHERE INDICATED ON PLANS PER
MANUFACTURERS RECOMMENDATIONS.
SEE SPECIFICATIONS.
SEE ELECTRICAL DRAWINGS FOR
VOLTAGE
115V-1PH
EQUAL TO TELAIRE SYSTEMS 200/V-3/1502
LOCATE PER MANUFACTURERS
RECOMMENDATIONS
FURNISHED WITH AIRFLOW MEASURING
STATION
NORMALLY CLOSED (N.C.) ELECTRIC TWO POSITION THREE-WAY HYDRONIC
CONTROL VALVE
NORMALLY CLOSED (N.C.) ELECTRIC TWO POSITION TWO-WAY HYDRONIC
CONTROL VALVE
NORMALLY CLOSED (N.C.) ELECTRIC MODULATING THREE-WAY HYDRONIC
CONTROL VALVE
NORMALLY CLOSED (N.C.) ELECTRIC MODULATING TWO-WAY HYDRONIC
CONTROL VALVE
NORMALLY OPEN (N.O.) ELECTRIC TWO POSITION THREE-WAY HYDRONIC
CONTROL VALVE
NORMALLY OPEN (N.O.) ELECTRIC TWO POSITION TWO-WAY HYDRONIC
CONTROL VALVE
NORMALLY OPEN (N.O.) ELECTRIC MODULATING THREE-WAY HYDRONIC
CONTROL VALVE
NORMALLY OPEN (N.O.) ELECTRIC MODULATING TWO-WAY HYDRONIC
CONTROL VALVE
DIFFERENTIAL PRESSURE SENSOR FOR AIRFLOW (BINARY)
STAINLESS STEEL COVERS
HVAC DEMOLITION GENERAL NOTES
1. THE GENERAL NOTES LISTED HERE APPLY TO ALL HVAC DEMOLITION DRAWINGS IN ADDITION TO
ANY ADDITIONAL DEMOLITION DRAWING NOTES ON THE INDIVIDUAL DEMOLITION DRAWINGS.
2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.
3. FIELD VERIFY EXISTING CONDITIONS.
4. COORDINATE WITH GENERAL TRADES WORK, PLUMBING WORK, FIRE PROTECTION WORK,
ELECTRICAL WORK AND OTHER WORK.
5. IT IS RECOGNIZED THAT DRAWINGS MAY BE PLOTTED AT DIFFERENT SCALES, SUCH THAT
PLOTTED DRAWINGS MAY VARY FROM ACTUAL OR INTENDED DIMENSIONS. THEREFORE, DRAWINGS ARE DIAGRAMMATIC AND ARE NOT TO BE SCALED. SBM TAKES NO RESPONSIBILITY FOR ERRORS
REGARDING DISCREPANCIES FROM THE ORIGINAL DRAWINGS DRAWN AT THE PROPER SCALE AND
THOSE DRAWINGS THAT HAVE BEEN PLOTTED.
6. PHASING - SEE DIVISION 1 PROJECT SPECIFICATION PHASING DOCUMENTS FOR SPECIFIC
PHASING INSTRUCTIONS. COORDINATE SHUT-DOWN OF ANY UTILITY IN ADVANCE WITH THE
OWNER. ACCOMPLISH DRAIN DOWN AND RE-FILL OF PIPING SYSTEMS AS REQUIRED. UNLESS
OTHERWISE SPECIFICALLY INDICATED, EXISTING CHILLED WATER SYSTEMS SHALL NOT BE
DISRUPTED DURING THE COOLING SEASON, AND HEATING SYSTEMS SHALL NOT BE DISRUPTED
WHEN REQUIRED FOR OCCUPANT COMFORT OR BUILDING FREEZE PROTECTION.
7. DARK, DASHED LINES INDICATE PIPING, DUCTWORK AND EQUIPMENT TO BE REMOVED.
8. SEE SPECIFICATIONS FOR GENERAL CUTTING AND PATCHING REQUIREMENTS REQUIRED UNDER
DEMOLITION. ALSO SEE DRAWINGS FOR MORE SPECIFIC REQUIREMENTS.
9. SEE SPECIFICATIONS FOR SALVAGE RIGHTS TO ANY EQUIPMENT OR MATERIALS BEING REMOVED.
10. REMOVE ALL HANGERS AND SUPPORTS SERVING PIPING, DUCTWORK AND EQUIPMENT BEING
DEMOLISHED. PROVIDE AND/OR ADJUST EXISTING HANGERS TO SUPPORT ANY REMAINING PIPING, DUCTWORK, OR EQUIPMENT ADJACENT TO DEMOLISHED.
11. CAP ALL REMAINING ACTIVE PIPING WITH SIMILAR MATERIALS TO MATCH EXISTING WATERTIGHT.
PIPE ENDS INDICATED TO BE CAPPED ARE NOT TO BE CRIMPED. INSULATED PIPING SHALL BE
INSULATED AT CAP WITH MATERIALS SPECIFIED FOR NEW WORK.
12. CAP ALL REMAINING ACTIVE DUCTWORK WITH SIMILAR MATERIALS TO MATCH EXISTING AND
SEALED AIRTIGHT. INSULATED DUCTWORK SHALL BE INSULATED AT CAP WITH MATERIALS
SPECIFIED FOR NEW WORK.
13. SEE SPECIFICATIONS FOR SPECIFIC REQUIREMENTS FOR DEMOLITION OF REFRIGERANT
CONTAINING MATERIALS OR EQUIPMENT.
14. REMOVE ALL THERMOSTATS, TEMPERATURE CONTROL WIRING AND PIPING FROM DEMOLISHED EQUIPMENT BACK TO (MAIN SOURCE/WALL) AND CAP CONTROL AIR PIPING AIRTIGHT. CRIMPING
SHALL NOT BE CONSIDERED ADEQUATE.
15. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION OF CEILINGS ASSOCIATED WITH DEMOLITION OF PIPING, DUCTWORK, AND EQUIPMENT. THE HVAC CONTRACTOR
SHALL TEMPORARILY SUPPORT ALL ASSOCIATED CEILING EQUIPMENT SUCH AS LIGHTS, SMOKE
DETECTORS, ETC. AS REQUIRED FOR THIS WORK.
16. WHERE EXISTING PIPING IS MAINTAINED AT WALLS SHOWN TO BE DEMOLISHED, CONTRACTOR
TO REMOVE ABANDONED SLEEVES ASSEMBLIES AND ANY ASSOCIATED FIRESTOPPING MATERIALS
ON PIPING. PIPING INSULATION WITHIN AND AROUND THE SLEEVE ASSEMBLY IS TO BE REMOVED
AND REPLACED WITH SIMILAR INSULATION MATERIALS, MATCHING EXISTING.
DATESIGNATURE
ET RE
D
G
RE
IS
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
7/
/2
2:
:1
PM
C :\U se rs
\A .H
A rm on \D o c um en ts
\2
_M
E P_
C
EN
TR
A
L
FI
LE
_a ha rm on _ s bm ce
_c om
.rv t
GENERAL NOTES &
SYMBOL LEGENDS - HVAC
06.12.23
M0.1
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
T
T
TT
T
T T
T T
T
T
T
H H
24 42 24 42
T
T
TT
T
T T
T T
T
T
T
H H
F07
F08
F02 F00-1
F09
F10
F03
F04
F12
F05
F16
F18
F19F17
F21
F15
F22
F13
F06
F00-2
ECU-F1
CU-F1
6 5
1 1/2"
1 1/2" CD
1" CD
RHC-7
RHC-5
RHC-6
RHC-4
RHC-8 RHC-9
RHC-3
RHC-2
RHC-1
RHC-10
RHC-11
RL/S
RL/S
RL/RS
EWH-F2EWH-F1
RHC-12
AHU-F1
AHU-F2
VFD-EF-F4
VFD-EF-F1 VFD-EF-F2
CODED NOTES
1. MOUNT CONDENSING UNIT ON 4" CONCRETE PAD. EXTEND REFRIGERANT LINES TO INDOOR DX
COIL. SIZE REFRIGERANT LINES PER MANUFACTURER RECOMMENDATIONS. INSULATE AND THEN
PAINT INSULATION. PAINT OUTDOOR REFRIGERANT LINES WITH 2 COATS OF UV PROTECTANT
PAINT OR AS NOTED IN SPECIFICATIONS.
2. DUCT MOUNTED ELECTRIC REHEAT COILS. SEE DETAIL. TYPICAL.
3. ROUTE REFRIGERANT PIPING IN ATTIC AND CONNECT EVAPORATOR COIL (BY OTHERS) TO
CONDENSING UNIT (BY OTHERS) AS REQUIRED. VERIFY LOCATIONS WITH ARCHITECT AND VERIFY
PIPE SIZES WITH MANUFACTURER PRIOR TO INSTALL.
4. ROUTE 1-1/2" A/C CONDENSATE PIPING TO EVAPORATOR COIL (BY OTHERS) AND CONNECT AS
REQUIRED. MAINTAIN REQUIRED SLOPE DURING INSTALLATION.
5. ROUTE REFRIGERANT PIPING FROM EVAPORATOR (BY OTHERS) IN FREEZER UP IN ATTIC TO
ASSOCIATED CONDENSING UNIT (BY OTHERS) AS REQUIRED. VERIFY LOCATIONS WITH
ARCHITECT AND VERIFY PIPE SIZES WITH MANUFACTURER PRIOR TO INSTALL. ROUTE 1-1/2" A/C
CONDENSATE PIPING FROM EVAPORATOR COIL AND STUB OUT OF SIDE OF FREEZER AND
BUILDING. PROVIDE SPLASH BLOCK BELOW CONDENSATE PIPING TERMINATION. MAINTAIN
PROPER SLOPE DURING INSTALLATION. ALL CONDENSATE PIPING INSIDE OF FREEZER TO BE
HEAT TRACED. HEAT TRACE TO BE CHROMALOX "SRF5" OR SIMILAR. HEAT TRACE SHALL BE
SELF-REGULATING WITH A NOMINAL POWER DENSITY OF 5W/FT AND SHALL BE PROVIDED WITH
ALL POWER CONNECTION KITS, SPLICE KITS, END KITS, THERMOSTAT, AND ASSOCIATED
CONTROLS REQUIRED FOR OPERATION. REFER TO ELECTRICAL DRAWINGS. SEE ELECTRICAL
DRAWINGS FOR MORE INFORMATION. ALL CONDENSATE DRAINAGE PIPING TO BE INSULATED.
SEE SPECIFICATIONS.
6. RL/RS PIPING DOWN ALONG EXTERIOR WALL TO OUTDOOR CONDENSING UNIT. COORDINATE
REFRIGERANT SIZES AND MAXIMUM LENGTHS WITH MANUFACTURER.
7. ENVIRONMENTAL CONDITIONING UNIT. EXTEND REFRIGERANT PIPING AND 1" CD PIPING AS
REQUIRED. COORDINATE REFRIGERANT SIZES AND MAXIMUM LENGTHS WITH MANUFACTURER.
8. TERMINATE 1" CD PIPING OVER FLOOR DRAIN/SINK WITH AIR GAP.
9. INLINE EXHAUST FAN EF-F2. EXTEND DUCT THRU ROOF AND TERMINATE WITH GOOSENECK
DOWN. SEE DETAIL FOR INSTALLATION REQUIREMENTS.
10. INLINE SUPPLY FAN TO SERVE KITCHEN HOOD. SEE DETAIL FOR INSTALLATION
REQUIREMENTS.
11. SPLIT SYSTEM OUTDOOR CONDENSING UNIT ON CONCRETE PAD. EXTEND RS AND RL PIPING
DOWN EXTERIOR WALL TO CONDENSING UNIT AND CONNECT AS REQUIRED. VERIFY
REFRIGERANT PIPE SIZES AND MAX LENGTHS WITH MANUFACTURER PRIOR TO INSTALLATION.
MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES.
12. WALL MOUNTED GREASE EXHAUST FAN EF-F1 TO SERVE KITCHEN HOOD. SEE DETAIL FOR
INSTALLATION REQUIREMENTS.
13. WALL MOUNTED HUMIDITY SENSOR MOUNTED 4' A.F.F.
14. WALL MOUNTED TEMPERATURE SENSOR. MOUNT AT 4' A.F.F. TYPICAL.
15. TWO 8"Ø AND ONE 10"Ø DRYER EXHAUST DUCTS UP THROUGH CURB IN METAL ROOF.
CONFIRM DUCT LENGTHS, SIZES, AND ROUTING WITH MANUFACTURER PRIOR TO INSTALLATION.
INSTALL "BUTTERFLY" STYLE BACKDRAFT DAMPER IN DUCTS ABOVE ROOF TO PREVENT
INTRUSION OF PESTS AND COLD AIR. TERMINATE DUCT WITH GOOSENECK FACING DOWN. DUCTS TO BE RIGID AND SHALL HAVE A SMOOTH INNER SURFACE WITH NO RIVETS IN THE AIRSTREAM.
WHEN OFFSETTING, DO NOT USE ELBOWS AT ANGLES GREATER THAN 45 DEGREES. DUCT TO BE
CONSTRUCTED AND SUPPORTED SO THAT ANY SEGMENT MAY BE DISASSEMBLED FOR CLEANING
OR INSPECTION. MAXIMUM STRAIGHT SEGMENT TO BE SIX FEET LONG TO FACILITATE CLEANING.
ALL DUCT COMPONENTS MUST COMPLY WITH PERTINENT BUILDING CODES. SEE SPECIFICATIONS
FOR FURTHER REQUIREMENTS.
16. DO NOT ROUTE DUCTWORK, PIPING, OR MECHANICAL COMPONENTS INSIDE OF THIS ROOM.
17. WALK-IN COOLER/FREEZER EVAPORATOR COILS BY OTHERS.
18. KITCHEN HOOD DUCTWORK. BALANCE TO 4012 CFM EXHAUST AND 3210 CFM SUPPLY.
CONNECT TO HOOD AS REQUIRED.
19. INLINE EXHAUST FAN EF-F3. EXTEND DUCT THRU ROOF AND TERMINATE WITH GOOSENECK
DOWN. SEE DETAIL FOR INSTALLATION REQUIREMENTS.
20. AIR HANDLING UNIT MOUNTED ON GROUND. INSTALL UNIT ON FROSTPROOF CONCRETE PAD.
SEE DETAIL.
21. VARIABLE FREQUENCY DRIVE. TYPICAL.
22. TEMPERATURE CONTROLLER TO BE FURNISHED WITH ENVIRONMENTAL CONDITIONING UNIT,
ECU-F1.
23. INLINE EXHAUST FAN EF-F4. EXTEND DUCT THRU ROOF AND TERMINATE WITH GOOSENECK
DOWN. SEE DETAIL FOR INSTALLATION REQUIREMENTS.
24. 16"x16" TRANSFER DUCT.
25. TEMPERATURE CONTROL PANEL. PROVIDE WITH DATA CONNECTION.
26. ELECTRIC WALL HEATER. SEE DETAIL.
27. APPROXIMATE LOCATION OF RA SMOKE DETECTOR. COORDINATE REQUIREMENTS WITH E.C.
PLAN NOTES
A. SEE SHEET M0.1 FOR GENERAL NOTES AND SYMBOL LEGENDS - HVAC.
B. SEE SHEET SERIES M1.X FOR DEMOLITION AND NEW WORK RELATED TO BUILDING A.
C. SEE SHEET SERIES M2.X FOR NEW HVAC DUCTWORK AND PIPING PLANS.
D. SEE SHEET M3.1 FOR ENLARGED MECHANICAL ROOM (BUILDING 1).
E. SEE SHEET SERIES M4.X FOR DETAILS.
F. SEE SHEET SERIES M5.X FOR TEMPERATURE CONTROL DIAGRAMS.
G. SEE SHEET SERIES M6.X FOR HVAC SCHEDULES.
H. THIS DRAWING WAS DESIGNED AS 30”x42” PLOT. IF THIS PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE MUST BE USED.
I. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING CONSTRUCTION. COORDINATE EXACT
HEIGHT AND MOUNTING OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH OTHER UTILITIES
AND CEILINGS.
J. OFFSET HVAC PIPING AROUND STRUCTURAL MEMBERS, LIGHTING DUCTWORK, PLUMBING AND
SPRINKLER PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT
PIPE ROUTING WITH ALL TRADES.
K. COORDINATE DUCT LAYOUT WITH FINAL TRUSS MANUFACTURER SUBMITTAL.
F07
F08
F02
F00-1
F09
F10
F03
F04
F12
F05
F16
F18
F19
F17
F21
F15
F22
F13
F06
F00-2
ECU-F1
CU-F1
I
I
I
L
L
I
I
I
I
I
I
L
L
C
A
I
L
I
I
I
I
L
L
L
J
L
A
C
F
B
I
I
I
I 350 I
I
I
I
I
I
I
K
K
I
I
"x
20"x16" 22"x16"
"x
26"x20" 38"x22" SA
12"x12"
"x
10"x8"
12"x12"
24"x24" SA24"x24" RA
"x
"x
"x
18"x18" SA
R
R
SF-F1
10"x8"
14"x10"
12"x10"
12"x10"
14"x14" 18"x16"
26"x12" 28"x14" RA
10"x10"
RHC-2
RHC-1
RHC-3
RHC-4
RHC-5
RHC-6
RHC-7
RHC-8 RHC-9
RHC-10
12"x12" 14"x12"
8"x8"
RHC-11
R
12"x10"
16"x10" RA
R
I
I
I 1000 R
L
L
22"x20" SA
"x
10"x10"
18 19
18"x12"
10"x8"
10"x8"
6"x6"
10"x8" 8"x8"
8"x8"
8"x8"
8"x8"
8"x8"
8"x8"
8"x8"
10"x8"
10"x8"
8"x8" 8"x8" 8"x8"
10"x8"
10"x8" 10"x8" 10"x8" 10"x8"
8"ø
10"x8"
10"x8"
10"x8" 10"x8"
10"x8"
10"x8"
8"ø 10"x8"
10"x8"
10"x10"
10"x10"
8"x8"
14"x14"
12"x10"
8"x8"
10"x10" 10"x10" 10"x10"
10"x8"
10"x10"
10"x10" 8"x8"
EWH-F1
EWH-F2
10"x8"
12"x12"
RHC-12
18"x14"
"x
24"x22" EA
"x
M2.2
AHU-F1
AHU-F2
24"x20" SA
10"x8"
8"x8"
R
R
12"x10"
VFD-EF-F4
VFD-EF-F2
VFD-EF-F1
"x
8"
EF-F4
H H
EF-F3 2
I
L
8"x8"
EF-F2
26"x20" EA
"x
" E
A
EF-F1
24"x24" SA
"x
24"x24" RA
"x
12"x24" 10"x14"
SF-F1
KITCHEN HOOD BY
OTHERS
DATESIGNATURE
ET RE
D
G
RE
IS
E I N
E R
N
GRI
I
G
AI
L EN
T
E S
S
W
FE
R
O S
NOI
STATE OF
V
A
P 022922
CH
AD
B . MONTGOMERY
0' 1' 2'
1/2" = 1' 0"
0' 1' 3'
3/8" = 1' 0"
0' 2' 4'
1/4" = 1' 0"
0' 3' 6'1'
3/16" = 1' 0"
0' 4' 8'2'
1/8" = 1' 0"
0' 3' 12'
3/32" = 1' 0"
6'0' 8' 16'4'
1/16" = 1' 0"
DRAWING NUMBER
SEALS
TITLE
DATE
LOCATION
OWNER
PROJECT
CONSULTANTS
405 Capitol Street Upper Atrium Charleston, West Virginia 25301
Office 304.346.0565 silling.com
SMBH Inc.
1166 Dublin Road Columbus, OH 43215 Phone: (614) 481-9800
STRUCTURAL ENGINEER
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
MECHANICAL /ELECTRICAL ENGINEERS
CIVIL ENGINEER
6457 Frances Street, Suite 200 Omaha, NE 68106
Office 402.393.4100 dlrgroup.com
Scheeser Buckley Mayfield, LLC 1540 Corporate Woods Parkway Uniontown, OH 44685 Phone: (330) 526-2700
7/
/2
8:
:4
AM
C :\U se rs
\A .H
A rm on \D o c um en ts
\2
_M
E P_
C
EN
TR
A
L
FI
LE
_a ha rm on _ s bm ce
_c om
.rv t
PIPING/DUCTWORK -
FOOD SERVICE/LAUNDRY -
HVAC
06.12.23
M2.2
State of West Viginia Department of Homeland Security Division of Corrections and Rehabilitation
313 Anthony Center Drive White Sulphur Springs, WV 24986
Anthony Correctional Center and Jail - Replacement Facility
06.12.23
1/8" = 1'-0"
PIPING - FOOD SERVICE/LAUNDRY - HVAC
ROOM LEGEND
Number Name
H03 STAFF TLT.
H04 SECURITY/ CONTROL
H05 JAN.
H06 UNIT MANAGER
H07 HOUSING STORAGE
H08 VESTIBULE
H09 DAYROOM
H10 DRY ROOM
H11 JAN.
H12 BATHROOM
H13 PLUMB./FIRE SERV.
H14 VESTIBULE
H15 DAYROOM
H16 DRY ROOM
H17 JAN.
H18 BATHROOM
V01 WELDING SHOP
V02 WELDING CLASSROOM
V03 INMATE TLT.
V04 STAFF TLT.
ROOM LEGEND
Number Name
F00-1 KITCHEN-1
F00-2 KITCHEN-2
F02 OFFICE
F03 WALK-IN COOLER
F04 WALK-IN FREEZER
F05 DRY STORAGE
F06 DISHWASHING
F07 DINING HALL
F08 SERVING LINE
F09 JAN.
F10 ELEC.
F12 STAFF TLT./LOCKER
F13 WORK AREA
F15 WASHERS
F16 DRYER CHASE
F17 LINEN STORAGE
F18 SECURE STORAGE
F19 JAN.
F21 TLT.
F22 OFFICE
H00 CORRIDOR
H01 ELEC./ TELE.
H02 UNIT CASE MANAGER
1/8" = 1'-0"
DUCTWORK - FOOD SERVICE/LAUNDRY - HVAC
1/4" = 1'-0"
KITCHEN HOOD SECTION
REVISIONS
1 Addendum #3 07.11.23 2 Addendum #4 07.17.23
S LV
S
S3
S 4
S OC
A
DIGITAL SINGLE-CHANNEL WALL SWITCH. nLIGHT #nPODMA
HEAVY DUTY 20 AMP, SINGLE POLE SWITCH. HUBBELL #HBL1221.
HEAVY DUTY 20 AMP, THREE-WAY SWITCH. HUBBELL #HBL1223.
HEAVY DUTY 20 AMP, FOUR-WAY SWITCH. HUBBELL #HBL1224.
BOX AROUND DEVICE INDICATES SURFACE MOUNTED IN 4" SQUARE BOX WITH EXPOSED WORK COVER.
SINGLE-LEVEL SWITCH TYPE OCCUPANCY SENSOR. SENSOR SWITCH #WSXA (PASSIVE INFRARED)
LIGHTING CONTROL REFERENCE TAG. REFER TO DETAILS FOR INFORMATION.
LED LIGHTING FIXTURES . REFER TO LIGHTING FIXTURE SCHEDULE FOR DETAILS.
CEILING OR WALL MOUNTED EXIT SIGN. SHADED AREA INDICATES LOCATION OF FACE(S). ARROWS INDICATE
CHEVRONS. REFER TO LIGHTING FIXTURE SCHEDULE FOR DETAILS.
S
S OCD SINGLE-LEVEL 0-10V DIMMING SWITCH TYPE OCCUPANCY SENSOR. SENSOR SWITCH #WSXA-PDT-D (DUAL-
TECHNOLOGY).
"WP" SUBSCRIPT INDICATES TO PROVIDE WEATHERPROOF COVER WITH HINGE ON TOP.S WP
OC1 LOW-VOLTAGE CEILING MOUNT OCCUPANCY SENSOR WITH ISOLATED RELAY. SENSOR SWITCH #CM-PDT-9-R
(DUAL-TECHNOLOGY).
S D 0-10V LARGE PADDLE SWITCH WITH DIMMING SLIDER. LUTRON DIVA SERIES #DVSTV. SWITCH SHALL HAVE THE
CAPABILITY TO BE WIRED IN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .