Aquaponics_Facility_Equipment_and_Installation:_Phase_2_(Addendum_#2_Revision).pdf

PDF 180 KB Posted

Attached to
Aquaponics Facility Equipment and Installation: Phase 2
Solicitation number
25-06
Issued by
Walton County, Florida

About this file

The document is a Request for Quotation (RFQ) #25-06 issued by Walton County in cooperation with the Muscogee Nation of Florida for an Aquaponics Facility Equipment and Installation: Phase 2 project. The solicitation seeks proposals from qualified vendors to design, deliver, install, and commission a fully functional aquaponics system for a Micro Farm Agritourism Project. The project involves procuring four 800 to 1,000-gallon aquaculture tanks for tilapia farming, seedling tables, growing troughs, water circulation systems, and backup equipment. The quote release date is January 13, 2025, with responses due by February 12, 2025, at 4:00 pm. The contractor must complete delivery and installation by June 15, 2025, and finalize training and commissioning by July 1, 2025, to meet grant requirements.

The estimated budget for the project ranges from $50,000 to $90,000. Vendors must comply with environmental and safety regulations, including EPA and OSHA standards, and adhere to the Build America, Buy America Act (BABA) for materials used. Upon award, the successful contractor must provide liability insurance naming Walton County and proof of Workman's Compensation Coverage. The project requires one training session for project staff, comprehensive user manuals, and final project documentation including as-built drawings, schematics, and maintenance schedules. Vendors must submit a separate cost proposal and provide two references from customers with similar scope of work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/waltoncountyfl

Walton County

REQUEST FOR QUOTATION

25-06

AQUAPONICS FACILITY EQUIPMENT AND INSTALLATION: PHASE 2

RELEASE DATE: January 13, 2025

RESPONSE DEADLINE: February 12, 2025, 4:00 pm

Please refer to the project timeline in this document for all important deadlines.

Request For Quotation #25-06 Title: Aquaponics Facility Equipment and Installation: Phase 2

Table of Contents

1. Introduction

2. Project Details

3. Vendor Questionnaire

4. Attachments

Attachments:

A - Grant_Notice_of_Award_4RDCGR250060-01-00 (1)

B - Grant_Extension_4RDCGR250060-01-01

C - EXAMPLE BID SHEET ITQ 25-06

1. Introduction

1.1 Summary

The County in cooperation with Muscogee Nation of Florida has issued this Invitation to Quote (ITQ) with the sole purpose and intent of obtaining proposals from interested and qualified individuals or firms (Proposers) offering to provide Aquaponics Facility Equipment and Installation: Phase 2, in accordance with the specifications stated herein.

1.2 Timeline

Quote Release Date: January 13, 2025

Quote Requested Due Date: February 12, 2025, 4:00pm

1.3 Project Contact

Melinda Gates

Environmental Manager

117 Montgomery Circle

Defuniak Springs, FL 32435

Email: gatmelinda@co.walton.fl.us

Phone: (850) 892-8108

1.4 Procurement Contact

Jason Cutshaw

Purchasing Director

176 Montgomery Circle

DeFuniak Springs, FL 32435

Email: cutjason@co.walton.fl.us

Phone: (850) 892-8176

2. Project Details

Walton County Purchase Order Terms and Conditions Link:

https://www.co.walton.fl.us/DocumentCenter/View/41270/Purchase-Order-Terms-and- Conditions?bidId=

2.1 Important Instructions for Electronic Submittals

The Walton County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov

Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.

2.2 Quote Request Details (Scope of work):

Scope of Work for Aquaponics System Installation

1. Overview

The purpose of this scope is to procure services for the design, delivery, installation, and commissioning of a fully functional aquaponics system for the Muscogee Nation of Florida Micro Farm Agritourism Project. The system will support sustainable aquaculture and agriculture, serving as both a production facility and an educational showcase.

2. Specifications and Requirements

The aquaponics system shall include the following components and services:

1. System Components:

o Four (4) 800 to 1,000-gallon aquaculture tanks for tilapia farming.

o Seedling tables and growing troughs designed for greenhouse integration.

o Water circulation system, including pumps, filters, and piping for continuous nutrient flow between aquaculture and plant grow areas.

o Backup equipment for operational reliability, such as redundant pumps or power backup systems.

2. Installation Services:

o Delivery and assembly of all system components at 278 Church Road, Bruce, FL 32455.

o Integration of aquaponics system plumbing and water circulation.

o Connection to the electrical system, including pumps, lighting, and monitoring equipment.

o Calibration and testing of the system to ensure operational readiness.

3. Training and Documentation:

https://procurement.opengov.com/signup o Hands-on training for personnel in system operations, maintenance, and troubleshooting.

o Provision of comprehensive user manuals, maintenance schedules, and as-built documentation.

4. Compliance and Standards:

o Adherence to environmental and safety regulations, including EPA and OSHA standards.

o Compliance with the Build America, Buy America Act (BABA) for materials used.

3. Deliverables

• Fully installed and operational aquaponics system.

• One Training session for project staff, with detailed user manuals.

• Do not include any support programs or additional items beyond the scope.

• Final project documentation, including as-built drawings, schematics, and maintenance schedules.

4. Schedule and Completion

• Delivery and installation must be completed by June 15, 2025, with training and commissioning finalized by July 1, 2025, to meet grant requirements.

2.3 Contractor required documentation: (upon award)

• Liability Insurance naming Walton County

• Proof of Workman’s Compensation Coverage

3. Vendor Questionnaire

3.1 Respondent Submittals (without Cost)

Please Upload your response, including any and all required forms listed in the solicitation and the corresponding attachments.

(Do not upload cost information in here)

3.2 Separate Cost Proposal*

Confirm that your fee proposal is not attached in your Proposal and is attached separately here. An example is provided in the attachments section. Estimated budget for this project is $50,000 - $90,000.

*Response required

3.3 I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company.*

☐ Please confirm

*Response required

3.4 Lead Time *

*Response required

3.5 Quote Validity*

*Response required

3.6 Has your company done business with Walton County before?*

If no, upon award we would need a copy of your company’s W-9 and ask you too complete an ACH form.

☐ Yes

☐ No

*Response required

3.7 Please provide two references with contact information from customers you’ve done similar scope of work for:*

*Response required

File details come from the government source that posted it. Updated .