APS PWS Tennant scrubbers.pdf
PDF 213 KB Posted
- Attached to
- BPA Floor Scrubber
- Solicitation number
- Not on record
About this file
This is a Statement of Work (SOW) for 436 APS Support Equipment Maintenance at Dover Air Force Base, Delaware, with a base contract period and four option years.
The contractor must provide all management, tools, supplies, equipment, and labor necessary to maintain and repair three Tennant floor scrubbers (one ECH20 T3 walk-behind model and two ECH20 T20 ride-on models) located in Building 550. The contractor shall be trained, certified, and able to provide proof of training and past performance records. Maintenance services consist of two scheduled preventative maintenance (PM) visits per year, performed in accordance with commercial practices or manufacturer specifications, with labor-only costs for routine PM and parts replacement paid on an as-needed basis. The contractor must submit written inspection reports within two business days of each scheduled maintenance visit, identifying equipment, location, work performed, repairs needed, inspection date, inspector name, and overall equipment condition. For unscheduled maintenance and repairs not covered under the basic service contract, the contractor must provide cost estimates including time and materials for Contracting Officer approval before proceeding. All maintenance and repairs identified as warrantable items are covered for one year, with the contractor responsible for performing all necessary warranty work. Hours of operation are 7:00 AM to 7:00 PM, Monday through Friday, with contractor-arranged access required for National Holidays.
The contractor must comply with extensive security and access requirements including Air Force safety regulations, OSHA standards, criminal background investigations, and proper contractor badge and vehicle pass procurement through Dover AFB Security Forces Pass and Registration. Contractor personnel must be certified by appropriate federal and state regulatory agencies and submit proof of certification within five working days of contract signing. Additional requirements include records management compliance per Air Force regulations, Antiterrorism Awareness Level I training, flightline driving adherence to DAFBI 13-202 if applicable, and safeguarding of government property and facilities. The government provides an overhead or indoor facility for inspections and repairs, and a disposal area for hazardous waste generated during contract performance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Current as of: 1 May 2026
STATEMENT OF WORK FOR
436 APS SUPPORT EQUIPMENT MAINTENANCE
Period of Performance:
Requirement will be a base and 4 option years
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment and labor necessary to maintain and repair support equipment at 436 APS Dover AFB, DE in a manner that will ensure continuous and safe operation.
Maintenance services shall consist of preventative maintenance (PM) and unscheduled maintenance.
1.1 Statement of work. The contractor shall be trained, certified, and be able to provide proof of training, past performance records, and to perform maintenance on all equipment.
The following equipment will require both bi-annually and annual PM inspections (labor only, and parts replacement will be paid on an “as needed” basis.)
MAINTENANCE SERVICE. The contractor shall perform four (4) schedule preventive maintenance
MAKE/MODEL SERIAL NUMBER LOCATION
Tennant ECH20 T3 (Walk-Behind scrubber)
901071-10691046 Building 550
Tennant ECH20 T20 (Ride-on Scrubber)
T20-5800 Building 550
Tennant ECH20 T20 (Ride-on Scrubber)
T20-5799 Building 550
2. MAINTENANCE SERVICE. The contractor shall perform two scheduled preventative maintenance visits per year.
2.1 The contractor shall perform preventive maintenance during each visit to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with (IAW) commercial practices or manufacture’s specification, if available, and shall be intended to maintain the equipment in safe and reliable operation condition until the next scheduled maintenance.
2.2 The contractor shall prepare and submit a written report within two-business days of the scheduled maintenance. The report shall identify each equipment, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the equipment. If repairs require work considered over and above routine maintenance work, the contractor shall notify the Contracting Office and designated MXS representative before proceeding with the repairs.
3. SERVICE CALL REPAIRS
3.1 Unscheduled Maintenance. The contracting officer or the APS designated representative will notify the contractor of repairs to be made. The contractor shall provide to the Contracting Office a cost estimate to include time and materials of any repairs not covered in the basic service contract. The contractor shall commence repair work after notification from the contracting office. All repair work shall be in accordance with normal commercial practices using parts specified by the manufacturer or items of equal or better quality. The contractor shall prepare and submit a written report IAW with paragraph 2.1.2.
3.2. Guarantees/Warranties. All maintenance/repairs identified as warrantable items will be covered for one year. The contractor shall perform all necessary work for the warranted items.
4. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
4.1. Customer will provide an overhead or indoor facility for contractor to perform inspections, servicing and/or repairs.
4.2. Customer will provide a disposal area for all hazardous waste generated by the contractor during inspection, servicing and/or repairs.
5. HOURS OF OPERATION. The hours of operation are from 7:00AM to 7:00PM, Monday through Friday. The contractor will have to make arrangement for access on any National Holidays.
6. SECURITY REQUIREMENTS. In performing any work under this contract on premises which are under the direct control of the Government, the Contractor shall conform to all safety rules and requirements prescribed in Air Force Pamphlet 91-210, Contract Safety and Public Law 91-596, The Occupational Safety and Health Act of 1970. Effective on the date of this contract, the contractor shall take such additional precautions as the Contracting Officer may reasonably require for security, safety, traffic fire, personnel clearances and accident prevention purposes. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of the Contractor, Government Property and Government personnel performing or in any way coming in contact with the performance of this contract on such premises. These requirements are additional to and do not replace the standards promulgated by the Department of Labor under the Occupational Safety and Health (OSHA) Act. In the event of a conflict between the OSHA Standards and these requirements, the most stringent shall apply. Any violation of such rules and requirements, unless promptly corrected, as directed by the Contracting Officer, may be considered grounds for termination of this contract in accordance with the default provisions hereof.
7. SECURITY. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.
7.1. At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and windows secured.
7.2. The contractor and as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI).
7.3. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.
7.4. The contractor shall submit any request for compensation on delays to the Contracting Office for approval. The contractor shall notify the Contracting Office or authorized representative as soon as the contractor realizes/determines of any potential delays in accordance with the terms and conditions of this requirement.
7.5. All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.
8. SPECIAL QUALIFICATIONS. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in inspection of equipment. Proof of certification must be submitted to the Contracting Officer within 5 working days of signing the contract.
9. RECORDS MANAGEMENT. The contractor understands that when creating, handling and maintaining records for the Air Force, either electronic or paper, you must meet the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Management Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of Records. In order to meet the requirement established IAW the above mentioned regulations contact the Base Records Management Office (436 CS/SCXK, Bldg 310) at 677-5157 for guidance and to schedule records management training.
10. CONTRACTOR BADGE POLICIES:
All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the requesting agencies base point of contact. The Contracting Squadron Office or base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW DAFBI 31-101. As a minimum the ORM will be submitted 10-days prior to the requested date of employment.
10.1. All contactor employees who’ll be granted unescorted access to the Installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the CBI.
10.2. Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction. Also before a new badge will be issued an ORM must be resubmitted to the Pass and Registration section for approval again. In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge before a new badge can be reissued.
10.3. Base Contracting Office or base point of contact will immediately notify 436 SFS, Pass and Registration when a contractor’s employment has been terminated.
The Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Office.
11. INSTALLATION ACCESS. The contractor shall obtain personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from 436 SFS, Pass and Registration, for the duration of the contract. Employees are only permitted to enter the Installation during the date and time periods indicted on their contractor badge.
11.1. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the Installation. All vehicles entering the DAFB Main Base, Military Family Housing or sensitive areas are subject to search.
Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.
11.2. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.
11.3. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
11.4. During Higher FPCONs (Charlie and Delta) the base will normally curtail non-essential operations/functions; access by non-essential Contract operations will be suspended as the direction of the Installation Commander.
12. Antiterrorism Awareness Level I Training: DoD Contractors supporting a Base Service Contract (e.g., Custodial Services, Ground Maintenance, etc.) are highly encouraged to complete AT Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html for individuals without access to government Non-classified Internet Protocol Router Network (NIPRNET) computer and who do not possess a CAC card.
13. Flightline Driving: Contractors will have to adhere to the provisions in DAFBI 13-202 if operating on the airfield.
http://jko.jten.mil/courses/atl1/launch.html
File details come from the government source that posted it. Updated .