Appendix VII.Exhibit L_Technical Requirements-DCF ITB 2223 060.pdf

PDF 2 MB Posted

Attached to
Florida State Hospital Waste-Water Treatment Plant – Fencing Project
Solicitation number
ITB-03630
Issued by
Glades County, Florida

About this file

The provided document is a technical specification for standard chain link fencing requirements, including details on fence height, mesh gauge, selvage finish, fabric, framework, post sizes, and other components. The related state and local contract opportunity is for the Florida State Hospital Waste-Water Treatment Plant Fencing Project, where the Department of Children and Families is seeking a qualified vendor to install approximately 1,950 linear feet of 6-foot high, 9-gauge knuckle twist chain link fencing around the WWTP buildings and drying beds. The project includes an addendum with a response to a written inquiry and an updated timeline, with a notice of intent to award posted on 2/7/23.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or other salient commercial information. It focuses solely on the technical specifications for the fencing components and installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT L –TECHNICAL REQUIREMENTS

Drawing NO.Revision NO.

Effective DateDrawn By:

Approved By/Date

4’-5’ Standard ChainLink Fence W/Top Tension Wire & Braced & TrussedStandard Chain Link Fencing

Chain Link Fabric

Line Post Cap

Line Post

Post Cap

Corner/End Post

Tension Band 15” On CTR.

Tension Bar

10’ Max

Truss Rod

Rail End

Twist or Barb Selvage Knuckle Selvage

Fabric Selvage

Tension Wire

Joshua Stidham

Last Revised: 10-03-06

Notes

Gate Fabric to match fence For welded frames onit truss rods For more information please see http:\\www.spsfence.com

Height Mesh Gage Selvage Finish Fabric

Framework

End/Corner Post

Line Post

Rails

O.D. Wall Wt. per ft. Length

Gate Frame Gate Post

SPS-CL-O3R2

Drawing NO.General Contractor

Submitted ByOwner

Approved By

SPS Standard End or Gate PostStandard Chain Link Fencing Project

Height Mesh Gage Selvage Finish Fabric

Framework

End/Corner Post

Line Post

Rails

O.D. Wall Wt. per ft. Length

Notes

Gate Fabric to match fence For welded frames onit truss rods For more information please see http:\\www.spsfence.com

Gate Frame Gate Post

Rail End

Post Cap Brace Band

Tension Bands Bolts W/Nuts

Drawing NO.General Contractor

Submitted ByOwner

Approved By

SPS Standard Corner Post DetailStandard Chain Link Fencing Project

Height Mesh Gage Selvage Finish Fabric

Framework

End/Corner Post

Line Post

Rails

O.D. Wall Wt. per ft. Length

Notes

Gate Fabric to match fence For welded frames onit truss rods For more information please see http:\\www.spsfence.com

Gate Frame Gate Post

Rail End

Post Cap Brace Band

Tension Bands Bolts W/Nuts

Drawing NO.Revision NO.

Effective DateDrawn By:

Approved By/Date

Standard ChainLink Fence W/Top Rail & Brace AssemblyStandard Chain Link Fencing

Chain Link Fabric

Line Post Cap

Line Post

Top Rail

Post Cap

Corner/End Post

Tension Band 15” On CTR.

Tension Bar

10’ Max

Truss Rod

Rail End

Twist or Barb Selvage Knuckle Selvage

Fabric Ties

Notes Gate Fabric to match fence For welded frames onit truss rods For more information please see http:\\www.spsfence.com

Height Mesh Gage Selvage Finish Fabric

Framework

End/Corner Post

Line Post

Rails

O.D. Wall Wt. per ft. Length

Gate Frame Gate Post Last Revised: 10-02-06

Joshua Stidham SPS-CL-06R2

Drawing NO:Revision NO:

Effective Date:Drawn By:

Approved By/Date:

Full Cantilever Slide Gate Detail Full Fab Project:

CL-38-STD

Cantilever’s over 30’ No Warranty

- NTS1

Accepted

Date

Customer

OLI Slides Open

Opening

Bays in Opening will Vary on Lenth of Gate

Counterweight On Center@Upright

SPS Quote #

Top & Bottom Rails

Fabric Diagonals

Uprights

+1’

Outside Outside

File details come from the government source that posted it. Updated .